Purpose
• To gather thoughts, ideas and information from the public and from various organizations around town.
Why is the Brownsville Rural Fire District moving?
• Coverage on both sides of the Calapooia.• Space considerations for equipment.• Better preparedness in the event of a
natural disaster.
When?
Construction on the new Fire Hall is scheduled for completion in the middle of December.
The move from Main Street to Blakely will physically happen after the Holidays; the
building will be available for City uses around March of 2009.
♦
♦
The Basics
• 5,320 s.f. Total Building Space
• 1957-58 “Four Bays” (4,256 s.f.)
• 1980 “Annex or Two Bays” (1,064 s.f.)
• 3,800 s.f. of Net Space