City of Dayton Water Supply and Treatment Division.

Post on 18-Dec-2015

223 views 4 download

Tags:

transcript

City of DaytonCity of DaytonWater Supply and Treatment Division Water Supply and Treatment Division

Water Supply and Water Supply and Treatment Division Mission Treatment Division Mission

& Goals& Goals

MissionMission: Provide abundant high quality : Provide abundant high quality water at an affordable price while water at an affordable price while maintaining and protecting the integrity maintaining and protecting the integrity of our natural resources.of our natural resources.

Goals:Goals: Protection of Source WaterProtection of Source Water Water TreatmentWater Treatment Sufficient Quantity & Pressure for Fire Sufficient Quantity & Pressure for Fire

FightingFighting Protection of Public HealthProtection of Public Health

Dayton Water FacilitiesDayton Water Facilities

3 Well Fields3 Well Fields 2 Water Treatment Plants2 Water Treatment Plants 1 Lime Recycling Plant1 Lime Recycling Plant 2 Main Pumping Stations2 Main Pumping Stations 11 Booster Pumping Stations11 Booster Pumping Stations 16 Water Storage Facilities - 88 MG16 Water Storage Facilities - 88 MG We pumped over 20 Billion Gallons We pumped over 20 Billion Gallons

of Water in 2009 of Water in 2009

We supply water to >400,000 We supply water to >400,000 Montgomery County residentsMontgomery County residents

Ottawa Water PlantOttawa Water Plant

Miami Water PlantMiami Water Plant

Lime Recycling Plant Lime Recycling Plant - Recovers lime softening residuals from - Recovers lime softening residuals from

water plants & produces pebble limewater plants & produces pebble lime

Basic Water Treatment Basic Water Treatment ProcessProcess

Aquifer ContaminationAquifer Contamination

Well Field Protection AreasWell Field Protection Areas

Mad River Well Field – Rohrer’s Mad River Well Field – Rohrer’s IslandIsland

Miami WTP Softening Miami WTP Softening BasinsBasins

Rapid Sand FiltersRapid Sand Filters

Miami WTP - South Pump StationMiami WTP - South Pump StationOne of two pumping stationsOne of two pumping stations

Dist. System Maintenance & Dist. System Maintenance & ProtectionProtection

750 Miles of Water Mains750 Miles of Water Mains Storage Facilities and Pumping Storage Facilities and Pumping

StationsStations Hydrant FlushingHydrant Flushing Automatic FlushersAutomatic Flushers Tank/Reservoir InspectionsTank/Reservoir Inspections Valve ExercisingValve Exercising Main ReplacementsMain Replacements Main Break RepairMain Break Repair Backflow PreventionBackflow Prevention Water TestingWater Testing

Water Sampling and Water Sampling and TestingTesting

Water Sampling Water Sampling

Water Quality LaboratoryWater Quality Laboratory

Maintenance Work & WaterTesting Maintenance Work & WaterTesting at Water Plants at Water Plants

The City of Dayton pumped over The City of Dayton pumped over 20 billion gallons of treated 20 billion gallons of treated

drinking water to Montgomery drinking water to Montgomery County residents and businesses in County residents and businesses in

2009.2009.

For more information: (937) 333-6093 or For more information: (937) 333-6093 or

phil.vanatta@cityofdayton.orgphil.vanatta@cityofdayton.org