Civic Design Review Phase 2 - SFGOVsfgov.org/arts/sites/default/files/Headworks_Presentation Phase...

Post on 15-May-2018

216 views 2 download

transcript

SEWER SYSTEM IMPROVEMENT PROGRAM | Grey. Green. Clean. 1

SEP 020 Headworks Project July 17th 2017

Civic Design Review Phase 2

SEWER SYSTEM IMPROVEMENT PROGRAM | Grey. Green. Clean.

Campus Plan Consolidate and Connect

SEWER SYSTEM IMPROVEMENT PROGRAM | Grey. Green. Clean.

Campus Plan Phase 1 New Buildings

SEWER SYSTEM IMPROVEMENT PROGRAM | Grey. Green. Clean. 4

Headworks Existing Conditions

Looking east from Rankin & Evans

Looking west along Evans

Looking west along Evans at Rankin

Project Site

Context. The headworks project is located at the SFPUC Southeast Plant which treats 80% of San Francisco’s wastewater. This project replaces the existing headworks which is at the end of its useful life. The project site is at the corner of Evans Avenue and Rankin Street in the Bayview neighborhood. On the plant side, the site is hemmed in by an above ground treatment basin.

3rd Street Commercial Corridor

Industrial Uses

Looking west at load out bay inside plant

Looking east at load out bay inside plant

Hwy 101

Residential Areas

Caltrain

SEWER SYSTEM IMPROVEMENT PROGRAM | Grey. Green. Clean. 5

Replacement Headworks & Functions

Extent of Art Wall

Electrical Building

Screenings Facility

Grit Tank Facility

Grit Handling Facility

Transformer Building

Odor Control Structure

Program: Influent from the City enters the Headworks via the Bruce Flynn Pump Station. The Screening Facility removes large objects and transfers them to Screenings Handling for trucks to haul away. The influent then enters the Grit Tanks to remove smaller particles, which are transferred to Grit Handling for trucks to haul away. All air is captured and routed back to Odor Control for filtering. Liquids and solids are piped to respective treatment areas at the plant.

1

2

3

4

5

6

7

1 4 5

6

7

6

Existing Headworks

A

B

Circosta Scrap Metal

C

A

B

C

Bruce Flynn Pump Station

Union Pacific Railway

Liquid Treatment Basin 8 8

8

3

2

SEWER SYSTEM IMPROVEMENT PROGRAM | Grey. Green. Clean. SYSTEM IMPROVEMENT PROGRAM | Grey. Green. Clean.

Headworks Functions Building as Machine

6

Facility Tours. Visitors to the Headworks enter at the main entry stair and take the elevator to the 3rd floor, where they tour the control room before entering the Screenings area. Then they step out onto the Grit Tank roof before returning to the entry and head to the Biosolids tour route.

Odor Control

Screenings & Loadout

Grit Tank Grit Handling

Electrical & Control Rooms

Influent

To liquids treatment

1

2

3

Main Entry

SEWER SYSTEM IMPROVEMENT PROGRAM | Grey. Green. Clean.

Headworks Functions Evans Avenue

7

Grit Handling elevator &

stairs

Grit Tank

Hydraulics & Pipes Influent Pipes & Support Structure

Odor Control Structure

Electrical Conduits

Electrical Substation

Facility Functions. Headworks and Odor Control are sited along the plant property line at Evans Avenue. Multiple functions and structural components are adjacent to the public realm. Architectural cladding and screening, along with the Public Art Wall, work in conjunction to screen most of the functions.

SEWER SYSTEM IMPROVEMENT PROGRAM | Grey. Green. Clean. 8

Evans Ave. Landscape Streetscape Plan

Art Wall Extended Sidewalk Proposed Sycamore Tree

Pairs

Existing Magnolia Trees

SEWER SYSTEM IMPROVEMENT PROGRAM | Grey. Green. Clean. 9

Landscape Material Palette

London Planetree Platanus x acerfolia (Proposed)

Star Magnolia Magnolia stellata (Existing + Proposed)

Atlas Fescue Festuca mairei Cobblestone Decomposed Granite

TREE

S G

RO

UN

D P

LAN

E

SEWER SYSTEM IMPROVEMENT PROGRAM | Grey. Green. Clean. 10

Architectural Material Palette

Structural Concrete

Stainless Steel Mesh Zinc Panels Perforated Aluminum - Art wall

Channel Glass Concrete Reveals Stainless Steel Cable Rail

Aluminum Windows

replace

replace

replace

SEWER SYSTEM IMPROVEMENT PROGRAM | Grey. Green. Clean. 11

Evans Ave. Art WallConcept

SEWER SYSTEM IMPROVEMENT PROGRAM | Grey. Green. Clean. 12

Evans Ave. Art WallTransition to Architecture

Setback Art Wall Option Flush Art Wall Options

SEWER SYSTEM IMPROVEMENT PROGRAM | Grey. Green. Clean. 13

Design Progression Birdseye from Northwest

Phase 2 Informal

Phase 2

SEWER SYSTEM IMPROVEMENT PROGRAM | Grey. Green. Clean. 14

Interior plant road

Design Progression Birdseye from Southeast

Phase 2 Informal

Phase 2

SEWER SYSTEM IMPROVEMENT PROGRAM | Grey. Green. Clean. 15

Design Progression North Elevation

Phase 1

Phase 2

Evans Ave.

Phase 2 Informal

SEWER SYSTEM IMPROVEMENT PROGRAM | Grey. Green. Clean. 16

Phase 1

Design Progression South Elevation

Interior plant road

Phase 2

Phase 2 Informal

SEWER SYSTEM IMPROVEMENT PROGRAM | Grey. Green. Clean. 17

Design Progression East Elevation

Phase 2 Informal

Phase 1

Evans Ave.

Phase 2

SEWER SYSTEM IMPROVEMENT PROGRAM | Grey. Green. Clean. 18

Design Progression Electrical Building / Main Entry

Phase 2 Preferred

Phase 1

Phase 2 Informal

Phase 2 Options

SEWER SYSTEM IMPROVEMENT PROGRAM | Grey. Green. Clean. 19

Design Progression Screenings Handling

Phase 2

Phase 1

Phase 2 Informal

SEWER SYSTEM IMPROVEMENT PROGRAM | Grey. Green. Clean. 20

Screenings Washing Room

Screenings Loading Bay

Screenings Balcony

View from Screenings Balcony

Design Progression Screenings Handling

SEWER SYSTEM IMPROVEMENT PROGRAM | Grey. Green. Clean. 21

Design Progression Grit Handling

Phase 2 Informal Phase 2

Phase 1

SEWER SYSTEM IMPROVEMENT PROGRAM | Grey. Green. Clean. 22

Grit Loading Bay

Grit Hopper Room

Grit Washing Room

Grit Washing Mezzanine

View from Grit Washing Balcony

Design Progression Grit Handling

Grit Washing Balcony

SEWER SYSTEM IMPROVEMENT PROGRAM | Grey. Green. Clean. 23

Design Progression Grit Handling from Evans Avenue

Phase 2 Informal

Phase 2

SEWER SYSTEM IMPROVEMENT PROGRAM | Grey. Green. Clean. Key Plan 24

Rendering

Concrete Reveals

Zinc Panel

Grit Handling looking Northwest

SEWER SYSTEM IMPROVEMENT PROGRAM | Grey. Green. Clean. 25

Thank You