Parts:

A 2 35453-102 MountingBlock2x4x10-1/2"

B 1 35320-102 BaseRail2x3x19-1/4"

C 1 40629-102 TopLadderAssembly

D 1 40628-102 EndLadderAssembly

Classic Pine Monkey Bars Model:63082-102

SPECIAL NOTES AND INSTRUCTIONSThe addition ofMonkey Bars to a Creative Playthingsgymwillincreasethesafeplayzonerequiredofthegym.

Noobstructionsofanykindshouldbewithin6'ofanypartof theMonkeyBars. Pleasereviewthe in-structionsandmanualprovidedwiththegymforsafetyinformationandinstructionsonpropergroundcover.

All hardware on this set is specially coated for corro-sion resistance. If non-Creative Playthings hardware

is used, it must be galvanized or stainless steel.

E 2 36515-102 GroundStake

F 2 14099-4006"TriangleBrace

G 2 14100-4006"L-Brace

Classic Pine Monkey Bar Instructions - 19932-200A (09/17)Copyright 2016, Creative Playthings - Printed in U.S.A. Page 2

Fasteners:

50555-701 Washer&Weldnuts1912002-206 FlatWasher5/16"1912017-206 LockWasher5/16"1917001-105 WeldNut5/16"

Screw #8 x 2-1/2"

Hex Bolt 5/16 x 1-1/2"

Hex Bolt 5/16 x 3"

Hex Bolt 5/16 x 4-1/2"

Lag Screw 5/16 x 2"

Lag Screw 5/16 x 3-1/2"

Flat Washer 5/16"Lock Washer 5/16"Weld Nut 5/16"

50555-700 Classic Pine Monkey Bar Fasteners

STEP ONE - Remove Wall SlatsDeterminethesideofthegymtoinstalltheMonkeyBars.TheMonkeyBarsmustbeplacedsothattheydonotinter-ferewiththeplayareasofotheraccessoriessuchasswingsorslides.NootheritemshouldbecloseenoughforchildrentoencounterifcrossingorfallingfromtheMonkeyBars.InpreparationforinstallingtheMonkeyBars,removeallWallSlatsfromthechosensideofthegym.Do not position the Monkey Bars near enough to a slide that a child encounters the Monkey Bars with any part of the body while sliding.

50555-702 BoltPack8 17003-611 HexBolt5/16x1-1/2"4 17003-1211 HexBolt5/16x3"6 17003-1811 HexBolt5/16x4-1/2"

50555-703 ScrewPack5 17020-109 Screw#8x2-1/2"1 17036-802 LagScrew5/16x2"1 17036-1402 LagScrew5/16x3-1/2"

Classic Pine Monkey Bar Instructions - 19932-200A (09/17)Copyright 2016, Creative Playthings - Printed in U.S.A.Page 3

STEP TWO - Base Rail to End LadderPlacetheEndLadder(D)onthegroundwiththescrewsthatsecuretherungsfaceup.PlacetheBaseRail(B)acrossthebottomoftheEndLad-derwiththecounter-boredholesfaceup.FastentheBaseRailtotheEndLadderusingtwo5/16x4-1/2"HexBoltAssemblies,asshown.

STEP THREE - End Ladder to Top Ladder

* Note: a Hex Bolt Assembly consists of one Hex Bolt passing through one Lock Washer and one Flat Washer, threaded into one Weld Nut.

D

B

50555-703 ScrewPack5 17020-109 Screw#8x2-1/2"1 17036-802 LagScrew5/16x2"1 17036-1402 LagScrew5/16x3-1/2"

F

D

C

FliptheEndLaddersothescrewssecuringtherungsarefacedown.Position theTopLadder (C)with thescrewssecuring therungsfacedown.PutoneendoftheTopLadderbetweentherailsatthetopoftheEndLadder.SliptheTriangleBrac-es(F)betweentherailsoftheEndLadderandTopLadder.BoltthetopholesoftheEndLadder assembly to the TriangleBraces and the end holes on theTopLadderusingtwo5/16x3"HexBoltAssemblies.

Withthehelpofanotherperson,lifttheTopLadderandEndLadderintopositionshownbelow.

Fasten each Triangle Brace to the TopLadder usingone5/16 x 1-1/2"HexBoltAssembly.FasteneachTriangleBrace tothe End Ladder using one 5/16 x 1-1/2"HexBoltAssembly.

Screwsface-up

Dependingonmodel,thetopladdermaylookdifferent.

3"1-1/2"

1-1/2"

Classic Pine Monkey Bar Instructions - 19932-200A (09/17)Copyright 2016, Creative Playthings - Printed in U.S.A. Page 4

STEP FIVE - Mount to Clayton

Partsomittedforclarity.

WallSupport

Thisposthasaseamthatinterfereswithmountingdirectlytothepost

STEP FOUR - Mounting BlocksForClaytongymfastenoneMountingBlock(A)andoneL-Brace(G)toeachrailoftheTopLadderasshownatright.NotethepositionoftheholesontheedgeoftheMountingBlocks.Use5/16x3"HexBoltAssembliesthroughtheRail,theL-Brace,andtheMountingBlock.Use5/16x1-1/2"HexBoltAssemblies to secure each L-Brace to theMountingBlockandtheTopLadderRail.ForNorthbridgegym,fastenaMountingBlockandL-BracetoonlyonerailoftheTopLadder.Leaveopenthesidead-jacenttothegymcornerpost.Fornon-standardinstallations,iftheMonkeyBaristobemountedadjacenttoacornerpostomittheMountingBlockonthatside,unlesstheposthasaseamthatwillinterferewithmountinghardware.

A

A

G

C

ForNorthbridgegymdonotattachtheMountingBlock&L-Braceadjacenttothepost.

If the Monkey Bars will not to be mounted to the Corner Post, use this step. To mount to a Corner Post see the next page.LifttheMonkeyBarinpositionasshownbelow,withtheMount-ingBlocktightagainsttheWallSupport.Adjustthepositionofthewallslat,ifneeded.Mark the position of the holes in theMountingBlock onto theWallSupport.Drill3/8"diameterholesthroughtheWallSupportatthemarks.Secureusingfour5/16x4-1/2"HexBoltAssembliesasshown.

Classic Pine Monkey Bar Instructions - 19932-200A (09/17)Copyright 2016, Creative Playthings - Printed in U.S.A.Page 5

STEP FIVE - Mount to Northbridge Perform this step if mounting one side of the Monkey Bars to the gym corner post.

Partsomittedforclarity.

WallSupport

CornerPost

G

Lift theMonkeyBar intopositionasshownbelow,with theMountingBlock tightagainsttheWallSupport,thetopLaddersnugagainstthebottomoftheWallSup-portandtheTopLadderRailagainsttheCornerPost.Adjustthepositionofthewallslat,ifneeded.MarkthepositionoftheholeattheendoftheTopLadderandtheholeintheL-Braceontotheadjacentfaceofthepost.Drilla7/32"diameterhole2"deepintothepostateachmark.MarkthepositionoftheholesintheMountingBlockontotheWallSupport.Drill3/8"diameterholesthroughtheWallSupportatthemarks.SecuretheMountingBlockusingfour5/16x4-1/2"HexBoltAssembliesasshown.SecuretheotherrailoftheTopLaddertothecornerpostusingone5/16x3-1/2"LagScrewandFlatWasher.SecuretheL-Bracetothepostusingone5/16x2"LagScrewandoneFlatWasher.Use a 1/4" diameter drill to create pilot holes for the Lag Screws.

FastentheL-BracetotheopenrailoftheTopLadderusingone5/16x1-1/2"HexBoltAssemblyinthepositionshown.AlignthecornerholeintheL-BracewiththeholenearesttheendoftheTopLadderrail.

Classic Pine Monkey Bar Instructions - 19932-200A (09/17)Copyright 2016, Creative Playthings - Printed in U.S.A. Page 6

STEP SIX - Ground Stakes

STEP SEVEN - Wall Slats

MakesurethattheBaseRailisfirmlyonthegroundandtheMonkeyBarsarestable.HammeraGroundStakeintotheground1"to2"fromeachend of the Base Rail. Drive the Ground Stakes approxi-mately1/8"belowthetopedgeoftheBaseRailasshown.Fasten theGround stakes using two #8 x 2-1/2" Screwseach.Alternatively,theStakescanbedrivennexttotheoutsiderailsoftheEndLadderandfastenedtotherailsusing#8x2-1/2"ScrewsNote:DoNOTuseconcretetosetGroundStakes.Simplydrive them in to theground. Inhardor rockysoil,driveametalspikeorrodasapilotholeforthewoodenstakes.

IftheMonkeyBarismountedinastockposition,theWallSlatsshouldbeplacedproperly.Ifthisisanalternativeinstallation,fillanyopenspacesusingWallSlatsremovedinStepOne.LeavetheareabetweentheTop LadderRails open for access. Evenly space theWallSlatsandfastenthemusingthescrewsfromStepOne.WARNING: To avoid serious injury or death, the space between Wall Slats or any other members MUST be less than 3-1/2" or greater than 9".Avoidcreatinggaps lessthan1/2";thegapsmaycausefingerentrapment.

1"to2"