Classification: Internal Status: Draft Eksperter i Team – Gullfakslandsbyen 2008 Gullfaks historie...

Post on 31-Mar-2015

214 views 1 download

Tags:

transcript

Classification: Internal Status: Draft

Eksperter i Team – Gullfakslandsbyen 2008

Gullfaks historie – et norsk svennestykke Leif-Kristian Teviterå, Corporate trainee, StatoilHydro Gullfaks satelitter Petec

2

Structural Depthmap – Base Structural Depthmap – Base CretaceousCretaceous

Area : 50 km2

Top Structure : 1700 m TVD

Dipping : 0-20 West

Oil-water contact : 1947 m TVD

Initial pressue : 310 bar

Bubblepoint pressure : 220 bar

Initial temprature : 72 deg C

Formation volume factor : 1,2

Oil viscosity : 1.2 cp

Oil gravity : 36.9 API

Gullfaks reservoir data

3

Gullfaks main field, WE cross-section

4

The Gullfaks-field

Classification: Internal Status: Draft

For at en skal få danne et olje/gas felt er det flere forhold som må oppfylles :

Reservoir

Trap

Reservoar

Felle

Seal Segl

Modning og migrasjon av hydrokarboner

6

Infill of oil (migration)

7

Gullfaks Production Profile (incl. IOR) and the Timing of the 3D Seismic Surveys

1986 1990 1994 1998 2002 2006 2010 20140

50

100

150

200

Ra

te S

m3

/sd

x 1

00

0

1985

SU

RV

EY

1995

SU

RV

EY

1996

SU

RV

EY

OIL

WATER

IOR OIL

WATER INJECTED

1999

SU

RV

EY

2003

SU

RV

EY

2001

OB

C

8

Implemented Oil Recovery Measures at Gullfaks

• Water injection from start

• Upgrading of water injection capacities

• 4D seismic and inversion

• Tracers

• Hydraulic fracturing in low perm reservoirs

• WAG (Water alternating gas) injection

• ”Huff and puff” gas injection

• Extensive exploration activity within drilling reach from platforms => new volumes

• Sand control in most wells

• ”Designer wells” (horizontal, 3D)

• Extended reach drilling (10 km)

• Monobore completions

• DIACS -”Smart wells”

• Multilateral wells (ML)

• Coiled Tubing drilling (CT)

• Through tubing drilling (TTRD)

• Rig assisted snubbing (RAS)

• Underbalanced drilling (UBD)

• Expandable liners

9

Oil Recovery Measures studied

Studied, but discarded:

• Surfactant injection (1992 pilot)

• Gel blocking (1992 pilot)

• CO2 miscible injection (2000)

• Aerobic Microbiological EOR

(2006)

Currently being studied:

• Reservoir characterisation, remaining saturation and relative permeability

• Temprature effects

• Building new reservoir simulation models

• WAG evaluations

• EOR with water based methods

• CO2 studies

10

Well targets

Gullfaks in the past and present;

Steak vs. ragu

Gullfaks

11

Korleis drive eit felt som er på haleproduksjon?

12

Finne nye boremål og planlegge nye brønnar utgjør størsteparten av

arbeidsoppgavene til petroleumsteknisk (Petek) personell på Gullfaks

13

Saturation log34/10 C-3

Etive-formation

1990 04.1993 02.1994 12.1996

By repeated well-tests we can monitor how the flooding affect our reservoirs