Cloud IaaS Migration Roadmap
A framework for migrating an existing on-
premise infrastructure to a public cloud provider
Richard Weiss
November 3rd 2015
Richard Weiss
• Principal Consultant, Pythian Group
• SQL Server and Wintel Guru
• IT professional for over 20 years
• Senior Data Management roles with First Data, Western Union and AAA
• National Retail Foundation, Data Standards Committee member
• Blogger at Pythian.com
HOW DID WE GET HERE?
INFRASTRUCTURE EVOLUTION
© 2015 Pythian Confidential 3
The 1:1
Data Center Virtualization
emerges
Massive
virtualization
Public Cloud
connections
IaaS mass
adoption &
hybrid cloud
infrastructure
convergence
THE WORLD IS CHANGING FAST…
84 percent of customers depend on social sites for purchasing advice.
Social
62 percent of total workloads will be in the cloud by 2016.
Cloud
2 billion (plus) smart devices shipped in 2014 alone.
Mobile
90 percent of the data created in the last two years alone.
Big Data
Internet of Things
billion devices connected to the internet by 2020.
75
TRADITIONAL ENTERPRISE TECHNOLOGY
PARADIGMS ARE BROKEN
50% of large enterprises will have hybrid cloud deployments by 2017
85% of new software is now being built for the cloud.
46% of IT spend moving to cloud by 2020
CLOUD ADOPTION DRIVERS • Business Agility
• Accelerated time to market
• Leverage elastic resources
• Reduced CAPEX
• Predictable Budgeting
• Leverage OPEX model
• Improved Consumer Experience
• Geographic proximity and diversity
• Increased availability
• Service and Product Expansion
• CDN, Machine Learning,
Big Data Integration
• Risk Mitigation
• Shared responsibility for compliance
• Hybrid cloud offers options for sensitive data
• Address data sovereignty challenges
THE FIVE MAJOR CLOUD
TRANSFORMATION PHASES
Assess:
Analysis &
Planning
Existing and
projected cost
comparison &
analysis
Service and
Application
Classification
Infrastructure
architecture
discovery
Replatforming
IaaS vs. PaaS
& Hybrid
considerations
Initial roadmap
creation
Prepare: POC,
Validation &
Final Roadmap
Telco and
required
connectivity
constructs
Proof of
concept implementation
Security
configuration
and validation
Acquire
licensing
keys/kits
Roadmap
finalization and
hardening
Build:
Construct
Infrastructure
Establish
networking &
authentication
infrastructure
Build server
infrastructure
Provision all
required
storage and
services
Implement
monitoring
constructs
Repeat, each
applicable
region
Migration:
Execute
Transformation
Create
detailed
migration &
rollback plans
Perform mock
migrations and
UAT validation
Begin
migrations with
non-production
environments
Implement
production
migration
process
Optimization:
Cloud
Enhancements
Monitor and
Trend
Identify on-
demand cost
saving
opportunities
Identify IaaS
optimizations
&
consolidation
Investigate
replatforming
opportunities
Leverage
cloud provider
services
MIGRATION TIMELINE
Phase 1:
Analysis &
Planning
Phase 2:
POC &
Roadmap
Phase 3:
Build
Phase 4:
Migration
Phase 5:
Optimization
PHASE 1: CLOUD ASSESSMENT,
ANALYSIS AND PLANNING PHASE Assess Application Classifications Assess Infrastructure Architecture
Consumer facing (B2C) Networking
Client facing (B2B) Authentication
Production internal application (batch
processing, ancillary, etc.)
Compute and OS considerations
Business application (ERP, CRM, Etc.) Storage
Enterprise service bus Scalability
Non-production (Test/DEV) Licensing & Mobility
Existing cloud services Integration / External dependencies
DR and SLA requirements HA/DR/SLA’s
Outliers / Specialty Telco / Circuit requirements
Compliance considerations PII,
HIPPA, PCI, data residency, etc.
Specialty appliances and services
PHASE 1: CLOUD ASSESSMENT, ANALYSIS
& PLANNING PHASE CONTINUED Identify Target Platforms & Costing Migration Planning Considerations
Cloud provider analysis / Selection Migration timeline considerations
Hybrid requirements Migration methodology forklift/hybrid
Replatforming considerations IaaS vs.
PaaS vs. SaaS – each application
Application grouping and dependency
identification
Target connectivity considerations for all
endpoints (public internet, dedicated
circuits, IPSEC, etc.)
Migration tools and/or vendors, evaluation,
and selection
Exclusion considerations (specialized HW,
legacy, telco, etc.)
Outlier considerations (high performance,
non-conforming applications, etc.)
Costing analysis / CAPEX to OPEX Identify stateful and stateless Systems
Existing co-location and facility contracts Define POC scope and deliverables
Vendor inclusion / reduction Establish POC success criteria
Current staffing skillset Initial migration roadmap creation
Regional cloud targets and availability
MIGRATION TIMELINE
Phase 1:
Analysis &
Planning
Phase 2:
POC &
Roadmap
Phase 3:
Build
Phase 4:
Migration
Phase 5:
Optimization
PHASE 2: PROOF OF CONCEPT, VALIDATION,
AND ROADMAP FINALIZATION PHASE
POC, Validation, Course Correction & Roadmap Finalization
Implementation of required connectivity constructs (VPN, Express Route, Direct
Connect, etc.)
Execution of backlog items scoped within the phase 1 “POC Scope and
Deliverables” roadmap
Perform functional, performance and security testing and validation for all proof
of concept implementations
Course correct migration approach as necessary
Utilize POC Process and discovery findings to complete the final migration
roadmap
Acquire proper licensing activation kits and keys. Ensure licensing compliance
and mobility.
Final migration roadmap should include contingency procedures as well as
infrastructure construct precedence/dependency workflow.
MIGRATION TIMELINE
Phase 1:
Analysis &
Planning
Phase 3:
Build
Phase 4:
Migration
Phase 5:
Optimization
Phase 2:
POC &
Roadmap
PHASE 3: CLOUD INFRASTRUCTURE
BUILD PHASE Create Infrastructure Constructs in Public Cloud Platform
Define and implement network infrastructure and IP Ranges
Define and implement network layer security devices (Firewalls, VPN, Etc.)
Provision authentication and backbone mechanisms (LDAP, AD, DNS, Etc.)
Implement integration between cloud resources such as AD and the existing
on-premise infrastructure.
Pre-Build all IaaS components which will be required prior to migration.
Ensure that failover / secondary regions are also configured and integrated as
necessary
Provision all required Blob Storage and services
Create/Deploy monitoring constructs
Enlist a 3rd party provider to conduct penetration testing
Ensure staff/vendors have appropriate cloud platform accounts/Access
MIGRATION TIMELINE
Phase 1:
Analysis &
Planning
Phase 4:
Migration
Phase 5:
Optimization
Phase 2:
POC &
Roadmap
Phase 3:
Build
PHASE 4: MIGRATION PHASE Migrate On-Premise Infrastructure to Public Cloud Platform
Collaborate with all applicable stakeholders to identify and inform regarding all
planned and potential business impacting migration timelines. Get stakeholder
“buy-in” for contingency and communication plans.
Incorporate stakeholder feedback to finalize / expand on the detailed technical
migration plan, Includes maintenance windows and detailed rollback /
contingency plan(s).
Perform mock migration(s)
User acceptance testing of mock migration(s)
Initiate the final migration process starting with non-production systems
Migration of production systems
User acceptance testing and validation of production systems
Monitor for errors and established baseline anomalies
Finalize and disseminate infrastructure documentation to staff and vendors
MIGRATION TIMELINE
Phase 1:
Analysis &
Planning
Phase 5:
Optimization
Phase 2:
POC &
Roadmap
Phase 3:
Build
Phase 4:
Migration
PHASE 5: OPTIMIZATION PHASE
THE FINAL FRONTIER
Optimization Phase
Monitor and trend performance and usage patterns
Optimize infrastructure and application for the cloud
Perform comparative analysis on operational and performance metrics of cloud
infrastructure against known on-premise baselines.
Optimize service and server performance tiers
Identify IaaS and application architecture optimization opportunities
Investigate replatforming opportunities (PaaS / DBaaS / XaaS) for migrated
applications
Identify dynamic costing optimizations
Investigate further consolidation opportunities
Identify automation opportunities leveraging the cloud fabric and platform
services
BUT WAIT THERE’S MORE…
ADDITIONAL TIPS FOR SUCCESS
• Engage potential cloud providers early in the
process. Competition is robust and significant
financial incentives may be available based
on commitment levels.
• It sounds counterintuitive, but your current
data center provider may actually help with
migration tools and managed services.
• Obtain a trusted third party opinion.
• Don’t force a square peg in a round hole. Not
every application is a cloud candidate.
• Get your house in order before attempting a
migration.