Post on 21-Feb-2017
transcript
West Team - Carl Crist (Engineering Manager) - William Johnson (Manufacturing Engineer) - Chris Glenn (Machinist) - Bryan Bower (Machinist) - Michael Dincher (Process Engineer)
Michael OverdorfCo-Op at
West Pharmaceutical
Credit Mr. Wheeland and West Pharmaceutical Services
What Brought Me To West
Gather “on the Job” Experience
Introduce MasterCam
Goals
Orientation/Safety – Unit 100 Performing Layout Work – Unit 200 Part Inspection – Unit 300 Operation Lathes – Unit 700 Milling Machines – Unit 800 Maintaining Machines and Tools – Unit 1000 Metallurgy – Unit 1100 Use of Charts and References – Unit 1200 Blueprint Reading – Unit 1300 CNC Programming – Unit 1400
Goals
Covered In Orientation
Daily Performance
Safety
Mold Storage Rack – Units (200, 300, 700, 800, Welding)
Projects
Bruderer Ram Lock Slides – Unit (200, 300, 800)
Projects
Thor wrenches – Units (200, 300, 700, 800, 1300, 1400)
Projects
Conveyer Idler Roller – Units (300, 700)
Projects
Jing Day Mold Press Cart – TIG Welding
Projects
BD1ML Die Plate Holder – Units (300, 800, 1200, 1400)
Projects
Probe
On the job experience
A higher level of skill and education
Preparation for future jobs
What have I gained?
l