Post on 18-Apr-2015
transcript
CITY OF EVERETT PUBLIC WORKS
SURVEY & CAD STANDARDS
City of Everett Engineering & Public Services Department
Revised: September 30, 2004
Table of Contents
Survey Standards.......................................................................................1 General Information ................................................................................................................2 Survey Control ........................................................................................................................3 Field Books .............................................................................................................................5 Digital Survey Data .................................................................................................................6 Requirements For Submission Of GPS Data..........................................................................8 Project Coordinates Conversion To State Plane (City GIS) Coordinates .............................10 Survey Recovery Form .........................................................................................................11 City of Everett Vertical Datum...............................................................................................12
CAD Standards.........................................................................................13 General Information ..............................................................................................................14 Working With Vertical Applications .......................................................................................14
Autodesk Land Desktop ..................................................................................................15 Description Keys .......................................................................................................15 Symbols.....................................................................................................................15 Points ........................................................................................................................16 Contours....................................................................................................................16
Overview of Standard Digital Files ........................................................................................17 Digital File Preparation..........................................................................................................19 Layer Names.........................................................................................................................20
Layer Name Syntax.........................................................................................................20 Layer Name Field Definitions ..........................................................................................21
Feature Field .............................................................................................................21 Feature Field Table ...................................................................................................21 Phase Field ...............................................................................................................27 Phase Field Table .....................................................................................................27 Entity Field.................................................................................................................29 Entity Field Table.......................................................................................................29 Optional User Field....................................................................................................30 Optional User Field Table..........................................................................................30
Color Standard......................................................................................................................32 Plot Style Standard ...............................................................................................................32
EVERETT.STB................................................................................................................33 AutoCAD Linetypes...............................................................................................................35
Second Field Abbreviations Table ..................................................................................36 Standard Symbols.................................................................................................................37
Block/Symbol Name Table..............................................................................................37 Abbreviation List....................................................................................................................38
Appendix...................................................................................................43
Introduction The purpose of this document is to provide the surveying and engineering consultants with the appropriate guidelines for completing surveys and CAD drawings created for the City of Everett. Compliance with agreed upon project control and data management conventions is important to the City and public in terms of quality control and return on investment. The success of this compliance/cooperation will influence the continuation of the present program of contracting with private surveying firms for City projects.
City of Everett EPS Dept CAD Standards.doc September 30, 2004 1
Survey Standards
City of Everett EPS Dept CAD Standards.doc September 30, 2004 2
General Information Prior to the start of any survey work, the following steps will be required:
• A job-specific scope of work must be coordinated with and approved by the City’s project manager and the City survey representative prior to beginning surveying work for the City. This scope of work shall include, at a minimum, compliance with this document and specify the vertical datum to be used for the survey.
• A meeting will be scheduled to review the project scope of work and compliance with these standards. At minimum, representatives from the survey firm shall include the project manager (PE or PLS) and the CAD manager or operator who will be preparing the digital base maps and associated files. The City will be represented by the Project Engineer, a representative for Surveying and a representative from the City CAD department.
• The Survey firm will be provided a current copy of this document along with a disk including this document, current blocks and templates, and other CAD support files necessary to meet the City’s CAD standards.
• The Survey firm will be provided with City of Everett field books, appropriate monument locations, elevations and coordinates for both horizontal and vertical control points, and additional monument archival information previously coordinated with the City Surveyor, and IDS prints for project area showing existing city utilities.
All consultant survey work done for the City shall be coordinated and completed under the direct supervision of a State of Washington professional land surveyor in accordance with their professional services contract with the City of Everett. Surveys done under contract to the City by private surveyors can provide important information to update the City of Everett’s Geographic Information System (GIS) database as well as meet the surveying and CAD needs for specific projects. The City of Everett is interested in maintaining and expanding its GIS and Survey base drawing files with information provided through this consulting surveying process. Since most of the surveying work done by private surveyors will have to be archived and used by City staff and the public for many years, it is essential for surveying work to comply with City of Everett Survey and CAD Standards. All survey data will be submitted to the City in a digital format that is compatible with the version of AutoCAD currently being used by the City of Everett. Any departure from the requirements set forth in this document must be approved by the City before any work is started by the consulting survey firm. Surveys not complying with this convention will not be accepted. Basic horizontal and vertical survey control information on all City projects must be recorded in City supplied field books. This requirement is particularly important as it pertains to control monuments, right-of-way and property corner locations. For surveys done with data collectors, the work recorded in the field books, although limited, should include sketches and diagrams of the survey control base lines, horizontal and vertical control monument descriptions, the basis for horizontal and vertical control on a project such as the state plane coordinates for control monuments and the benchmark elevations. This information will be included in the digital drawing files on the appropriate control, monument and GIS layers.
City of Everett EPS Dept CAD Standards.doc September 30, 2004 3
. The following stationing conventions will be followed and provided in the base drawing on a stationing layer with ties to existing City monumentation. Deviations from these conventions may be necessary on certain utility projects as determined by the City’s project manager.
• Stationing shall read left (10+00) to right (?+??). The minimum stationing start point will be 10+00. Negative stationing will not be allowed.
• Stationing shall run from south to north or west to east.
• North shall be to the top or right of the printed page. On the data file, north shall be up
(World Coordinate System).
• Centerline stationing shall have tick marks (SV-STA-T) every 50 or 20 feet with annotation at 100 foot intervals
Departures from data collection and presentation conventions will be approved by the City survey manager and the project manager prior to beginning surveying work. In all cases, the Revised Code of Washington (RCW) and the Washington Administrative Code (WAC) shall take precedence over policy and convention. Survey Control The appropriate vertical and horizontal control for a project will be discussed and agreed upon at a coordination meeting with the City’s project manager, City surveyor and the private surveyor before work begins on a project. Local monumentation should be researched, reviewed and shared by the City and the private surveyor for the specific project. The selection of control should be based upon the appropriate instrumentation, methodology and required control closures for the project. The project budget, scope and quality control should be considered as well as GIS database enhancement. Field surveying instruments and measuring techniques to be used on the project should also be discussed and agreed upon. In general, a 1:20,000 minimum closure will be regarded as an appropriate closure for project control surveys although a 1:10,000 minimum closure may be accepted under some circumstances. In order for projects to be incorporated into the City’s GIS mapping, projects must be referenced or tied to the Washington State Plane Coordinate System which is used for the City’s GIS mapping system. This will be incorporated in the digital base drawing file using the GIS layer and TB-SURVY block. In most cases, due to the proximity of the City’s GIS control monuments, this work will have to be done by Global Positioning System (GPS) techniques. GPS work for a City project must be coordinated with the City surveyor prior to beginning work. All GPS data developed as part of a Survey project must be submitted for review and approval to the City along with the other survey data. Data submitted for each monument shall include but shall not be limited to the information requested on the attached “Survey Recovery Form.” (see attached) GPS data shall conform to the section titled “Requirements for Submission of GPS Data”. Horizontal coordinate datum for the GIS control network is presently based on the North American Datum of 1983, with the 1991 re-adjustment, (NAD 83/91). Locations, elevations
City of Everett EPS Dept CAD Standards.doc September 30, 2004 4
and coordinates of both horizontal and vertical control points for use on a project shall be provided by or approved for use by the City surveyor prior to beginning the survey. All elevations and state plane coordinates submitted to the City as shown on the Survey Recovery Form shall be in both meters and U.S. Survey Feet. New or existing monuments, if un-named/numbered, shall be named/numbered by City surveyor prior to recording or monument data for the project. If the City has already established names/numbers for project monuments, the surveyor shall use the City’s designations. Monument references submitted to the City as part of a City project shall not be assigned names/numbers without prior approval of the monument names/numbers by City surveyor. Names/numbers for monuments shall be assigned to monuments according to function, i.e. Right-of-Way Monuments, Public Land Survey System (PLSS) Monuments or GIS Monuments as follows: Right-of-way monument: (4 spaces) (2 spaces) (2 spaces) Field Book # Page # Point #
Example: Point No. 3 on Page 13 of field book No. 614 should be written as 614 13 03
Sections/Quarter Corners: (2 spaces) (2 spaces) (3 spaces) Township # Range # Section # *
*Section number used DNR alpha/numeric convention Example: The northwest corner of Sec. 17, T. 28 N., R 5 E. should be written as 28 05 J05
GIS Control Monument: (4 spaces) Number/Name
Example: A typical City GIS monument will be a 3-digit number preceded by an “E” such as: EO88
In addition to survey control, other survey data, which shall be coordinated with the City project manager, shall include the data sheet orientation, cross section intervals, stationing requirements and other project specific data collection requirements.
City of Everett EPS Dept CAD Standards.doc September 30, 2004 5
Field Books All work must be recorded in City field books and shall provide the following information:
• The name or title of the project as assigned by the City project manager.
• The date the work was done on each page of the field book.
• The pages of the field book shall be numbered.
• The names of members of the field party doing the work. All work shall be indexed in the front of the field book. References and/or descriptions of all PLSS land record monuments, City of Everett GIS monuments, NGS monuments, an other governmental land record or mapping monuments utilized during the course of the work shall be indexed independently in a monument index at the front of the field book. Field notes shall be clear, concise, and legible and shall contain sufficient information for ease of use by unfamiliar parties. All City supplied field books shall be returned to the City’s project manager at the completion of the survey tasks.
City of Everett EPS Dept CAD Standards.doc September 30, 2004 6
Digital Survey Data The following instructions must be followed on all survey projects, unless prior approval is obtained from the City: 1. Survey data provided to the City in a digital format shall be compatible with the version
of AutoCAD presently being used by the City. Third party fonts, hatch patterns, and linetypes shall not be used in drawing files submitted to the City. Custom objects generated by other software, such as Land Desktop, shall be converted to a format readable by standard AutoCAD without the use of plug-ins such as Autodesk’s Object Enablers. Files must be complete and usable without having to download any files not included in the standard AutoCAD release. Digital survey data shall be provided to the City on CD-ROM.
2. Survey point data files submitted to the City in a digital format shall include the following:
• Point numbers will numerically designate survey points. Points will be sequentially numbered.
• Nodes will denote the exact location of a point. • Elevations shall be shown to the nearest hundredth of a foot. • Descriptions will be abbreviated descriptions from the City’s Abbreviation List
found in this manual.
All survey point data shall be represented with an AutoCAD block with attributes for the point number, elevation, and description. Each attribute within the block definition will be on its own layer. Blocks such as the City of Everett’s SV-POINT or Land Desktop’s POINT are acceptable. Point blocks shall be grouped on layers by topographic feature per the following layer name syntax:
AAAAA-SURVY-POINT-FIRM
AAAAA = Item Description (5 char.) see “Layer Names” in the section “CAD Standards” of this document.
SURVY = Always use this five character code for survey work. POINT = Always use this five character code for surveyed points. FIRM = Survey Control Identifier – Survey firm name or abbreviation.
3. All linework, symbols and text will follow current City of Everett layering standards. 4. Use the following guidelines for text:
• Only standard text fonts supplied with AutoCAD will be used. Text Style names will be the same and the Text Font used to create the Style. Text height will not be defined in the Text style definitions. Roman, Standard and Complex are the City default text styles/fonts.
• All text will be placed on separate layers per the drafting standards.
City of Everett EPS Dept CAD Standards.doc September 30, 2004 7
• All text describing existing entities will be placed in Model Space. Text height will be
such that when viewed through a 1=20 scaled viewport, it will no smaller than 0.08 inches and no greater than 0.10 inches high.
• Street names placed in Model Space will be on layer “STNAM-EXIST-TEXT”. Text
height will be such that when viewed through a 1=20 scaled viewport it will be 0.17 inches high. Street names in Model Space are normally frozen during printing. Street names placed in Paper Space will be on “SHEET-MISC” layer. Text height shall be 0.17 inches high.
• An attempt shall be made to orient existing feature text annotation (asphalt, grass, fence
etc.) so it is in the general direction of the project centerline stationing.
• Utility line text annotation is included in the line via use of Everett linetypes.
5. All survey base drawing files shall be tied to the City’s GIS mapping control monument system. This will be accomplished by inserting the Everett standard block “TB-SURVY” on layer GIS---SURVY-SYMBL. The block will be scaled such that it is readily visible when the base drawing is opened. A leader/line will be provided from the inserted block to the control monument(s).
6. The surveyor shall provide a complete print-out of the coordinate file that lists or
describes all points surveyed in project datum as specified by the City’s project manager, and in station and offset left or right format whenever possible.
7. Separate AutoCAD files will be provided for:
• Surveyed base map consisting of linework, blocks and text representing existing topography and utilities.
• Point data per item 2 above.
• Contours on appropriate layers
City of Everett EPS Dept CAD Standards.doc September 30, 2004 8
Requirements For Submission Of GPS Data All hard copy and digital data files, as indicated in Typical Files Table, shall be bound/included in a binder for easy review and analysis by City Personnel. Information provided shall include:
1. The make and model of all equipment used in data collection. 2. The serial number of each instrument 3. The type of method or procedure used for the project, i.e., Static, Fast Static or other
used 4. Single or dual frequency
For all GPS stations used as a starting point for a project. The City requires at least two vectors from stations approved by the City surveyor, Additional GPS positions required for any other reasons, including temporary points, must be approved by the City surveyor. Data sheets will be filled out as outlined:
a. State Plane Coordinates in US survey feet “WA NORTH ZONE,” three decimal places b. State Plane Coordinates in meters ‘WA NORTH ZONE,” four decimal places c. Final Coordinates in latitude and longitude, five decimal places d. Final orthometic heights, if leveling was used to derive:
In US survey feet to three decimal palaces In meters to four decimal places
e. Final orthometric heights, if GPS was used to derive: In US survey feet to two decimal places In meters to two decimal places
f. Convergence angle in degrees, minutes and tenths of seconds g. Scale factor to at least eight decimal places h. Fill out text with pertinent information, description of monument and how to get to the
point Static or rapid static will be used for all GPS control surveys. Kinematic GPS will not be acceptable for control surveys. Minimal satellite conditions:
a. Check satellite almanac prior to GPS session to determine optimum time/day for GPS sessions.
b. PDOP for all observations shall be five or less. City supplied field book shall be used to record pertinent information describing the GPS session such as:
a. Project description including names of constrained (stationary) position b. Monument description c. Receiver (start time) d. Receiver (stop time) e. Height of instrument f. Offset distance g. At least three reference azimuths at each monument h. Diagram of monument location
Any other information of interest about the monuments or the GPS session
City of Everett EPS Dept CAD Standards.doc September 30, 2004 9
Different types of equipment will produce their own formats, please send similar files. Typical Files Digital Hard Copy Diagram of points and vectors X Raw data files X Corrected vector files X Session log files X X Minimally Constrained Adjustment X X a. Analysis data X X b. Adjustment parameters X X c. Statistical summaries X X Fully Constrained Adjustment X X a. Analysis data X X b. Final adjustment iterations X X c. Final adjustment parameters X X d. Final weighting parameters X X e. Final adjustment closures and statistical data
X X
f. Final state plane coordinates in US survey feet
g. Final orthometric heights: In US survey feet (two decimal places) In meters (three decimal places)
X X
X X
h. Convergence angle in degrees, minutes & tenths of seconds
X X
i. Final ellipsoid heights X X j. Final X X Vertical adjustment files, if vertical adjustment is
done separately, submit the same files as in Number 6
X X
Conversion files from State plane coordinates, Washington North Zone, to latitude & longitude & metric coordinates.
X
X
City of Everett EPS Dept CAD Standards.doc September 30, 2004 10
Project Coordinates Conversion To State Plane (City GIS) Coordinates Prior to final submittal to the City, the surveyor shall provide the following information on each base drawing in a size that is clearly legible when viewing the entire base drawing: Set the current layer to: “GIS - - - SURVY-SYMBL” For horizontal control point(s), insert the block: “TB-SURVY” or “TB-SURVY-2”. (Insertion point and scale as required to be visible and not interfere with existing TOPO) For separate project vertical control point (benchmark), insert the block “TB-VERT CNTR”. (Insertion point and scale as required to be visible and not interfere with existing TOPO) Answer the attribute questions and the information will be inserted on the drawings in the format shown in the Survey Control Data Tables included in the Appendix. Note: the block should not be exploded when inserted into base map. Leader lines will point to the control points referenced in the table. This layer would normally not be printed.
City of Everett EPS Dept CAD Standards.doc September 30, 2004 11
Survey Recovery Form City of Everett State: Washington Department of Public Works County: Snohomish
Station Name:________ Horizontal Datum: NAD 83/91 Vertical Datum: NAVD 88 Established by: Control Point ID: Book: Page: Pt#: Date: Section: Township: Range: LATITUDE: (5 decimal places)____________________ LONGITUDE: (5 decimal places) __________________ ORTHOMETRIC HEIGHT: _______________________ Feet _______________________ Meters Washington State Plane Coordinates – North Zone
Northing (4 decimal places)
Easting (4 decimal places)
Point Scale Factor (to 9 decimal places)
Convergence Deg Min Sec
Feet Meters HORIZONTAL DATA: Horizontal position established by: _____ resection survey, comments: _________________________ _____ GPS survey, GPS adjustment software used: _____________ _____ other, explain: _____________________________________ surveyor’s estimated relative positional accuracy: _____ft @ _____% confidence surveyor’s estimated absolute positional accuracy: _____ft @ _____% confidence VERTICAL DATA: vertical position established by: _____ differential leveling to: _____ order accuracy _____ GPS survey, accuracy within _____ft. _____meters surveyor’s estimated relative positional accuracy: _____ft. @ _____% confidence surveyor’s estimated absolute positional accuracy: _____ft. @ _____ % confidence
MONUMENT DESCRIPTION
TO REACH REFERENCES: Az from North Distance Reference Description ________________________________________________________________________ Month & Year Recovered: Condition Mark: Recovered By:
City of Everett EPS Dept CAD Standards.doc September 30, 2004 12
City of Everett Vertical Datum
City of Everett EPS Dept CAD Standards.doc September 30, 2004 13
CAD Standards
City of Everett EPS Dept CAD Standards.doc September 30, 2004 14
General Information The City of Everett, Department of Engineering and Public Services has prepared a detailed set of standards for preparing CAD drawings. Drawing files provided to the City in a digital format shall be compatible with the version of AutoCAD presently being used by the City. Third party fonts, hatch patterns, or linetypes shall not be used in CAD files submitted to the City. All final data files shall be provided to the City on CD-ROM. Preliminary files can be electronically transmitted to the City project manager via email. These standards are flexible enough to handle all types of AutoCAD drawing needs, but specific enough to provide uniformity between drawings. They provide the ability to create entity or layer selection sets during drawing production.. These standards were designed to allow data to be exchanged with the Utility Mapping’s ArcInfo based GIS. The City GIS system is based on the Washington State Plane Coordinate System. Therefore, it is imperative that all survey and design data files be convertible to this coordinate system. This requirement allows information from either system to be combined for comparison or planning. These standards include layer definition and assignment, symbol or block naming and placement, along with customized linetypes and abbreviation conventions. Information on the use of layouts and model space in plan preparation is also presented. The layering convention includes default settings for: layer names, color assignments, linetypes, and plot styles. Plot styles are directly related to the default line weight and screening in the plotted drawings for surveyed TOPO and proposed designed TOPO. Layer settings shall be retained for each unique layout printing. To save these Layer State settings, use either AutoCAD’s Layer Properties Manager (LA) or Express Tools Layer Manager (LMAN). A Layer State shall be named according to the layout(s) it applies to. The default model space settings are contained in “Evt-acad.dwt” as “Evt-Default”. The symbol naming convention allows symbols to be separated by discipline. The Symbol Table shows what each block looks like and provides examples of layers the symbols might be typically placed on. This standard allows new symbols to be defined provided they are created on layer 0 and their color, line type and plot style are defined as BYBLOCK and line weight is “default”. Everett customized Line types are defined in the standard AutoCAD format using plotted dimensions to be constant with default AutoCAD settings. The abbreviations have been provided to improve consistency. It is anticipated that all of these standards will be reviewed and revised over time as the variety and complexity of drawings produced increases. Therefore, periodic updates to these standards are anticipated and the latest version should be requested before starting a new project. Working With Vertical Applications Many programs that run “on top” of AutoCAD are available to help consultants prepare CAD projects. Some of these programs create new entity types in order to make their program more powerful. However, the City requires that all drawing objects be standard AutoCAD entities that can be viewed with “plain vanilla” AutoCAD. In order for this to occur, you should set the AutoCAD system variable PROXYGRAPHICS to 1.
City of Everett EPS Dept CAD Standards.doc September 30, 2004 15
Autodesk Land Desktop
There are a few issues to deal with when using the Land Desktop version of AutoCAD on City of Everett projects. Even though Autodesk has free object enablers that allow standard AutoCAD to see custom objects such as points and contours, the City is still somewhat limited when controlling the display of some of these objects. Also, when handing off the CAD file to the city’s GIS system, only standard AutoCAD entities are processed.
Following are some suggestions when using Land Desktop:
Description Keys
Description keys are used when you insert points into the drawing from the point database file or when you import points into the drawing from an external file or user database. When the point is inserted into the drawing, the point layer and symbol associations of the description key file are applied to the points.
A sample description key file (EVERETT SAMPLE.mdb) is being supplied as a starting point to create your own file. This sample file is not intended to be complete, nor is it intended to define your company’s description codes. It is merely a portion of a file that was used on an actual project. Note that the last field of the Point Layer field in this sample file contains “CO_ABBREV“ as a reference to the consultant’s company name. This should be changed to fit your abbreviated company name. Tip – you can use Microsoft Access to do a search and replace operation on this description key field. Just make sure the description key file isn’t being used in AutoCAD while you are making your edits in Access.
Symbols
The City of Everett symbols have been created with the intention of inserting them at a one-to-one scale factor. You should temporarily set your drawing scale in Land Desktop to 1 before performing an operation that automatically inserts symbols.
Land Desktop limits you to one path for specifying where the blocks are found when inserting points with symbols. This path is found under the Land Desktop Points menu, Point Settings…, the Insert tab, in the Search Path for Symbol Block Drawing Files field. All Everett blocks should be copied from the individual folders found on the city-supplied CD into a single folder of your choice.
City of Everett EPS Dept CAD Standards.doc September 30, 2004 16
Points
Do not submit drawings that contain Land Desktop’s custom point object (AECC_POINT). Before submitting work to the City, re-insert the points using Land’s point label style “softdesk point block only”. Following are the recommended settings for this point label style:
Contours
Drawings that contain Land Desktop’s custom contour object (AECC_CONTOUR) will NOT be allowed. Tip - Before submitting work to the City, explode AECC_CONTOURS so they become POLYLINEs with MTEXT elevation labels.
City of Everett EPS Dept CAD Standards.doc September 30, 2004 17
Overview of Standard Digital Files The following is intended to highlight the major items covered by these standards.
1. All files will be delivered in a DWG format compatible with the version of AutoCAD currently being used by the City.
2. All base maps will be developed in a local coordinate system such that all points have positive values and are tied to the Washington State Plane Coordinate System using an existing monument designated by and/or approved by the city survey representative. Refer to section “Project Coordinates Conversion To State Plane (City GIS) Coordinates” in Survey Standards.
3. All drawing files will: a. Use “EVERETT.stb” named plot styles. b. Have an “LTSCALE=1” and all Layouts will have a “PSLTSCALE=1” c. Have a world coordinate system with an origin such that all points will have a min
“X,Y” value of “10,000,10,000”. All files will be 2D with “Z” coordinate values equal to 0.
d. Use only Layer, Block, Linetype naming conventions defined in this standard or approved in advance by City CAD department. Tip – Use AutoCAD’s DesignCenter and open the file EVT-ACAD.dwg. Drag and drop desired objects (layers, blocks, etc) into your current drawing. Dragging the desired items into your drawing assigns the default properties per the City of Everett CAD Standard.
e. Use only standard AutoCAD fonts “.shx”, and Hatch Patterns files. f. Entity properties will be assigned “BYLAYER” accept as specifically noted in this
standard. g. The “Standard” Text Style, will be defined using AutoCAD Font “ROMANS.shx”
with height=0 and width factor=1. h. Normally all text, notes and dimensions pertaining to existing features will appear
in model space. All text, notes and dimensions pertaining to new features should only appear in Layout/Paper Space.
i. Only linetypes defined in AutoCAD “ACAD.LIN” and “EVERETT.LIN” will be used.
j. City Standard templates will be used whenever possible.
4. Subject to project manager requirements, the typical Civil project should consist of the following base files:
a. COVER.dwg developed from Everett template “EVT-GEN-SHTS.dwt” containing Legend, Vicinity Map and Engineers stamp sheet for project specification.
b. DESIGN.dwg consisting of construction drawing file with a layout for each sheet. c. BASE.dwg consisting of all existing TOPO d. POINT.dwg with all surveyed point data e. CONTR.dwg containing contours. f. PRF##.dwg based on a specific line (CL, RT, LT etc) and a 1 to 1 scale ratio. A
second profile with traditional scale factors for horizontal and vertical may be used. However, the 1 to 1 will be provided for future use.
g. CRSEX.dwg (when required ) consists of cross sections along the various profiles. As with profiles one set of all cross sections will be provided with a scale ratio of 1 to 1 for current or future use. A second file may be used in the project.
City of Everett EPS Dept CAD Standards.doc September 30, 2004 18
5. The typical project construction drawing file is constructed by: a. Creating a new drawing file using the appropriate Everett template file:
1) EVT-Gen-Shts.dwt=Used for Cover, Index, Legend, Vicinity Map and Signature sheet for Specifications.
2) EVT-TB D PlnPrf.dwt = Used when Plan and Profile view required. Viewports preset at 1=20
3) EVT-TB D Plan.dwt = Used when only Plan view required. 4) EVT-TB D Xsects.dwt = Used to show Cross sections on title block. 5) EVT-TB D DETAIL.dwt = Used when Standard and/or Project details
are shown in Plan set and not at back of project specification.
b. In the model space tab Xreference the needed drawing files using overlay on the appropriate layer set to “XR-##-(BASE, PROFL, XSECT, POINT, CONTR ETC)”. The use of overlay allows others to xref the original files and/or your drawing file without creating overlapping nested files.
c. Place new design entities on appropriate layers in model space. d. Use paper space containing the standard title block, viewports for plan and
profiles, to place non-topo entities such as notes, scale bars, north arrows etc. Layout name will be the same as the drawing number.
e. Once first sheet is set up with appropriate viewports, etc., lock viewports. Edit title block attributes which apply to overall project. Then copy the layout to second layout and rename appropriately.
Tip – Layouts can be imported from drawing files or template files. Right-click on any layout tab and select “From template…”, select the desired City standard drawing or template file, then select the desired layout.
City of Everett EPS Dept CAD Standards.doc September 30, 2004 19
Digital File Preparation The following standards are designed to utilize a single continuous base map for each project drawn in real world coordinates where one drawing unit equals one foot and the local coordinate system origin is tied to the state plane coordinate system by the information provided in the “TB-SURVY” attributes for the project control monument. This allows different survey base maps to be combined by inserting each into a drawing using the information provided by the “TB-SURVY” block of the respective project control points
City of Everett EPS Dept CAD Standards.doc September 30, 2004 20
Layer Names The City of Everett’s layering standard is necessary to provide a baseline for coordination between the City’s GIS and other agencies and departments. It is important to adhere to this standard to facilitate use of this information. The basis of this standard is the layer naming convention, which readily identifies groups of similar entities within the drawing. Layer Name Syntax
Layer Name Example: AAAAA-BBBBB-CCCCC-DDD AAAAA = Feature (5 character) See “Default Layering Table.” BBBBB = Phase (5 character) describes Features location in time. See
Phase Below. CCCCC = Entity Type (5 character) describes AutoCAD entities on Feature
layer DDD = Optional User Defined (Variable character length) to provide more
specific detailed information about the entities on the layer when user feels such delineation is justified in manipulation of layers within the file.
The layering standard is based on a minimum of three fields and an optional user field separated by hyphens: AAAAA – BBBBB – CCCCC – DDD. The first three fields have a fixed length of five characters. Codes less than five characters in length shall be completed with hyphens on the right-hand side. For default layer settings, refer to the field definition tables on the following pages. For a consolidated list of field definitions, refer to Layer Name Field Definitions in the Appendix. Tip – Use AutoCAD’s DesignCenter and open the file EVT-ACAD.dwg. Drag and drop desired objects (layers, blocks, etc) into your current drawing. Dragging layers into your drawing sets the layer properties per the City of Everett CAD Standard.
City of Everett EPS Dept CAD Standards.doc September 30, 2004 21
Layer Name Field Definitions Feature Field AAAAA – BBBBB – CCCCC - DDD The first 5-character field indicates the item description, major characteristic or discipline of the items contained on that layer. For example, drawing entities related to a 12” water line would be on the WTR12-BBBBB-CCCCC-DDD layer, and those related to Storm Drain would be on layer SD----BBBBB-CCCCC-DDD. Feature Field Table
Feature Field Designations
Feature (AAAAA) Relating to Standard Modifiers
(## Definitions)
EVT-DEFAULT.LASDefault Color
# ACCID accident diagrams 10 ASPHL generic asphalt pavement 21/25 BASIN
drainage basin boundary/limits and data
BENCH benchmark data 61/65
BNDRY municipal boundaries (city, county etc)
192/197
BRIDG bridge structures 21/25
BUILD building structures (footprints, addresses, etc)
141/145
CENSU 10 year census data and boundaries
61
CHANL channelization features other than striping
102/105
CITY- boundaries of properties owned by a city agency
cyan
CITYL incorporated city limit boundary 3
CL### centerline data (ROW, const, survey, etc)
-C-=construction, -R-=right-of-way, AAA=street name
abbreviation -PR=profile
61
CMUWL concrete modular wall
CNT## contour lines with major and minor divisions (5’ with 1’, 10’ with 2’ or 1’, etc
05=5’ contours, 10=10’ contours, 02=2’ contours
01=1’ contours
major=41/45, minor=11/15
CNTRL control survey data 61
CONC- generic concrete pavement or slab
21/25
CONST linework used by drafter to construct entities
magenta
COORD coordinate system data & information (state plane, local)
1
CRB## curb structures formed or CO=concrete, 21/25102/105
City of Everett EPS Dept CAD Standards.doc September 30, 2004 22
Feature Field Designations
Feature (AAAAA) Relating to Standard Modifiers
(## Definitions)
EVT-DEFAULT.LASDefault Color
# extruded AS= asphalt
CREEK data pertaining to a creek 102/105
CS### combined sanitary and storm sewer systems
---=when non-specific -EQ=equipment,
###=pipe dia. in inches, -FM=force main
-PR=profile
32/35
CUTS- cut limits 21/25
DATUM survey datum symbol in model space
DETUR detour plans, routes & temporary signs
DETAL line and text for all detail drawings
per plot style
DIKE- dike limits and associated data DITCH drainage ditch and/or swale line 161/165
DW-## driveway limits CO=concrete, AS= asphalt, GR=gravel 102/105
EASMT easement boundary (utility, access road, etc)
111/115
ELE## generic conduit & junction boxes
--=when non-specific JB=junction box
EQ=equip. & structures PL=poles
EROSN erosion control data 162/165
FNC-# fence line G=generic M=metal W=wood
141/145
FILL- fill limits 152 FLOW- flow direction arrows FUEL- fuel features 211
GAS## natural gas features
-- when non-specific EQ=structures other than
pipe ##=line size/diameter in
inches PR=profile
211/215
GIS-- data or information pertaining to city GIS system
2
GRAIL guardrail line 171/175
GRAVL gravel limits other than drive ways (road shoulders, open areas, parking lots, etc)
21/25
GRID- grid lines in model space
GS### ground shot (survey points) ---=general BRK=break 61
City of Everett EPS Dept CAD Standards.doc September 30, 2004 23
Feature Field Designations
Feature (AAAAA) Relating to Standard Modifiers
(## Definitions)
EVT-DEFAULT.LASDefault Color
# SLP=on slope
TOE=toe of slope TOP=top of slope
IMAGE referenced raster images
INFO- drawing information for other drafting techs
2
IRRIG irrigation systems and facilities 71/75
LDSCP landscape data (trees, shrubs, etc)
91/95
LFG-- landfill gas collection 211/215
LIGHT private lighting system other than street lighting
51/55
MALBX mailbox data and symbols 212/215
MHWA mean high water data & symbols
MON## monumentation data and symbols
--=when non-specific RW=right-of-way
PR=property CL=centerline
61/65
OVLIM asphalt overlay limits 21
PLAT- plat data - use optional field for plat name/number if needed for clarity
245
PROFL profile (model space) lines & text
0, 4 & white
PROPL private property limits and data 241/245
PWR## power
--=when non-specific EQ=equipment OH=overhead
UG=underground PR=profile
211/215
RCKRY rockeries and rock retaining walls
141/145
ROCKS rock outcropping limits 141/145 ROW-- right-of-way limits 132/136
ROWRR railroad right-of-way boundary RR--- railroad facilities and track 31/35
SAWCT sawcut line (any material)
SD-## storm drainage features
--=when non-specific EQ=equipment/structure -##=pipe dia. in inches COL=collector system
-PR=profile
161/165
SEC-- survey section data and limits 222
SEC16 survey sixteenth (1/16) section data.
221
City of Everett EPS Dept CAD Standards.doc September 30, 2004 24
Feature Field Designations
Feature (AAAAA) Relating to Standard Modifiers
(## Definitions)
EVT-DEFAULT.LASDefault Color
#
SECQT survey quarter (1/4) section data.
221
SECT- section lines and text per plot style SECTR township and range data 223
SETBK setback limits for buildings, wetlands, slopes, etc.
per plot style
SHEET items which only appear in paper space or layout
per plot style
SHORE shorelines (lakes, rivers, bays etc.)
121/125
SIG## traffic control features
--=when non-specific HD=heads
CD=conduits LP=loops
EQ=cabinets poles, JB’s PR=profile
32/35
SIGNS traffic signs 122/125
SOILS soils data (borings, test pits, etc)
181/185
SS-## sanitary sewer systems
--=when non-specific EQ=equipment
##=pipe dia. in inches SID=side sewer FM=force main
-PR=profile
32/35
STA-- centerline stationing text and tick marks
61
STL## street lighting (public)
--=when non-specific DB=direct burial cable EQ =vaults, poles, JB’s
OH=overhead cable CD=generic size conduit ##=conduit dia in inches
52/55
STNAM street names 223
STRIP pavement striping painted, raised pavement markers and plastic
232/235
SW-## sidewalks and pathways including driveway and pedestrian ramps
AS=asphalt, CO=concrete,
GR=gravel, BR=brick
102/105
SWALE swale limits SWAMP swamp land limits TABLE lines and text for all tables per plot style
TEL## telephone facilities --=when non-specific EQ=equipment, JB’s, 211/215
City of Everett EPS Dept CAD Standards.doc September 30, 2004 25
Feature Field Designations
Feature (AAAAA) Relating to Standard Modifiers
(## Definitions)
EVT-DEFAULT.LASDefault Color
# vaults poles,etc,
UG=underground cable/conduit, OH=overhead cable/conduit
PR=profile FO=fiber optic
TIN-# triangulated irregular network surface
#=iteration (1-9)
TLM## telemetry data facilities (city owned and maintained)
--=when non-specific EQ=equipment, JB’s,
vaults poles, etc UG=underground
cable/conduit OH=overhead cable/conduit
PR=profile FO=fiber optic
51/55
TNK## storage tank footprint UG=underground
SF=on surface AR=aerial
TRANS transit facilities 201/205
TURN- vehicle turning data (not including striping)
231/235
TV-## cable television
--=when non-specific EQ=equipment, JB’s,
vaults poles, etc UG=underground
cable/conduit, OH=overhead cable/conduit
211/215
UTIL- non city-owned facilities 211/215 VEG-- vegetation VOLS- traffic volume data 10/15 VP-## viewports ##=the vp number same as ##
WALL# retaining walls B=block
C=concrete W=wood
122/125
WELL# wells M=monitoring T=test (temp)
W=water 131/135
WETLD wetland limits and symbols 121/125
WTR## water system facilities
--=when non-specific EQ=equipment
##=pipe diameter in inches
122/125
City of Everett EPS Dept CAD Standards.doc September 30, 2004 26
Feature Field Designations
Feature (AAAAA) Relating to Standard Modifiers
(## Definitions)
EVT-DEFAULT.LASDefault Color
# SR=service lines
PR=profile
WTRN# City of Everett water transmission lines
#=City of Everett designated line no. 122/125
XR-## X-referenced files ##=XREF No (Phase field used to describe
what is Xref’d optional
XRCLP x-referenced files clip boundary optional
XSECT lines and text for all cross sections
optional
ZIPCD ZIP Code boundary data 61
City of Everett EPS Dept CAD Standards.doc September 30, 2004 27
Phase Field AAAAA – BBBBB – CCCCC – DDD The second 5-character field indicates the project phase of the item associated with that layer. For example, entities which were existing at the time of construction could be on the AAAAA-(EXIST, SURVY, GIS—, or RECRD ETC)-CCCCC-DDD layers. Entities that are to be constructed by this project could be on layers AAAAA-(NEW--, REMOV, ALT-1 or ABAND, ETC)-CCCCC-DDD. Therefore, layer WTR12-NEW---CCCCC-DDD would contain drawing entities relating to the 12” water line to be constructed by this project. Phase Field Table
Phase Field Designations
Phase (BBBBB) Relating to
Properties Different Than the Associated
Feature Layer in Default Layer Table
model space entities
ABAND items abandoned in place as a result of current project construction
AERIL item locations digitized from City of Everett aerial photos data
color or line type can be changed for clarity
ALT## alternative design phasing (##=01-99) color or line type can be changed for clarity
ASBLT changes made during construction color red and plot style normal
CONST construction lines (for drafting) user’s option since layer not plotted
DEMOL items to be demolished during current design
color or line type can be changed for clarity
DETUR or
DTR##
Temporary construction detour route. For phased detour routing, use (##=01-99)
color or line type can be changed for clarity
EXIST item locations prior to project construction see default layer table
FUTUR items to be constructed in the future which relate to or dictate current design
color or line type can be changed for clarity
GIS-- items derived directly from City of Everett GIS data
color or line type can be changed for clarity
GRID- model space profile grid lines only color or line type can be changed for clarity
MOVE- items to be relocated and/or removed and reinstalled during current project
color or line type can be changed for clarity
NEW— new construction under current project see default layer table
PHAS# phased construction #=1-9 color or line type can be changed for clarity
RECOR item location determined from utility record dwgs not survey, GIS or aerial photo
place id (abbreviation) of record source (pse, pud, verizon etc) in
user field “ddd”
REMOV or
REM##
permanently removed under current project (##=01-99 for phased removal )
color or line type can be changed for clarity
City of Everett EPS Dept CAD Standards.doc September 30, 2004 28
Phase Field Designations
Phase (BBBBB) Relating to
Properties Different Than the Associated
Feature Layer in Default Layer Table
SURVY
used for all point data and can be used in place of EXIST when portions of base map are derived from sources other than project survey data
place surveyor id (company name abbreviation) in user field
TEMP or
TMP##
items required temporally during construction (##=1-99 for phased temp items)
color or line type can be changed for clarity
VACAT vacated right-of-way line type = dashed or dashed2
layout or paper space (feature=sheet) TLBLK all title blocks (City of Everett standard
title blocks must be used)
GRID- profile grid lines, related elevation and stationing text
MISC-
miscellaneous items and symbols/blocks not included in other phases (datum, scale bars, fed aid, % review, north arrow, plan/profile/section/detail titles, match lines, etc)
NOTES notes, symbols, dimensions and text used to describe construction work in plan or profile views
HALF- half size stamp REVIS revision clouds, flag symbols, notes, etc.
STAMP stamps for professional engineer, land server, etc
City of Everett EPS Dept CAD Standards.doc September 30, 2004 29
Entity Field AAAAA – BBBBB – CCCCC – DDD The third 5-character field is used to identify the AutoCAD entity type and is used to separate entities for the purpose of drawing presentation. For all Feature, Phase field combinations there will normally be an Entity Field of LINES, SYMBL or TEXT-. The two main reasons for this are that each layer can be turned off or on and/or assigned different pen weights via the named plot styles. For example, by placing water mains on layer WTR12-BBBBB-LINES-DDD and water valves on layer WTR12-BBBBB-SYMBL-DDD, you are able to turn the lines off or on in different viewports with in the same layout using the freeze command. The plotted line weight can be controlled from layout to layout by changing the plot style associated with the layer in the appropriate layout. The different settings will be retained by using Layer Manager “.las” files named according to the layout it controls. Note that it is also possible to maintain different “lay” files for same Layout under different names. Entity Field Table
Entity Field Designations
Entity Type
(CCCCC) Relating to
Properties Different Than the Associated Feature Layer in Default Layer
Table LINES all linework SYMBL all symbols/blocks. TEXT- all text
depending on phase, plot style will be pen101 for visibility
DIMEN feature specific dimensions color and plot style user optional
HATCH all hatching depending on phase, plot style will be pen100 for visibility
HATBD hatching border/boundary when required user’s option since layer normally not plotted
Survey Data Points Only POINT the point representing the surveyed
coordinates point only with the survy feature color 1
pen100
DESC- point description only with the survy feature color 3, plot style pen100
NUMBR point number only with the survy feature color 2, plot style pen100
ELEVA point elevation per the appropriate datum only with the survy feature color 4, plot style pen100
City of Everett EPS Dept CAD Standards.doc September 30, 2004 30
Optional User Field AAAAA – BBBBB – CCCCC – DDD The fourth field, when required, can have any number of characters. This field is intended for a user-defined description when it is necessary to further separate entities. This optional field can show things like ownership (PUD, PARKS, SNOCTY), material (APS, PVC, WOOD), entity name (MH, INLET, GATE V, JBOX, EMPTY) or plotted pen weight (PEN101, PEN105) For example, entities on WTR12-EXIST-LINES-DI would be existing 12” ductile iron water line, where as WTR12-EXIST-LINES-ASC would contain existing 12” asbestos concrete water. Optional User Field Table
Suggested Optional (User) Field Designations
Optional (User) (DDD)
Relating to
Properties Different Than The
Associated Feature Layer As Shown In Default Layer
Table Sanitary Sewer And Storm Drainage Features
CB## catch basin type CLOUT clean out
IL or INLET inlet MH## manhole type and/or diameter
V#X#X# vault with or without size (lxwxd) Water And Force Main Systems Features
FH fire hydrants GV gate valves
MH or MH## manhole with or without size and type TB thrust blocks
TEE piping tee Striping Features
BUSLN lane line for bus stops DROP drop lane stripe
DY double yellow FOG fog line
GORE 12” white gore stripe SKIP lane line stripe
TURNS guide strip for intersection turn lanes
## line width and color ##=4Y(4”yellow), 8W(8”white) etc
Signal Telemetry, Street Lighting, etc. Features C## traffic controller cabinet ##=30, 336,
m, p)
CD## conductor ##=ug, oh sig, sl, tlm, 2pvc, etc
JB## electrical junction box ##=1, 2, 3, etc MH## manhole type and/or diameter
P##-@@ traffic signal pole ##=type @@=mast arm length
City of Everett EPS Dept CAD Standards.doc September 30, 2004 31
Suggested Optional (User) Field Designations
Optional (User) (DDD)
Relating to
Properties Different Than The
Associated Feature Layer As Shown In Default Layer
Table SERV electrical service cab
V#X#X# vault with or without size (#=LxWxD) Survey Point Data Points
FIRM FIRM=engineer, consultant or surveyor name or abbreviation
PLS##### WA PLS license number Miscellaneous
RAMPS wheel chair or driveway ramps in sidewalks
(OWNER) name of item owner (city, co, individual etc)
(MATERIAL) material item made of (DI, AC, PL, etc) Profl/Sheet-Grid- Phase
FINE fine grid lines (0.1” spacing) HEAVY heavy grid lines (1” spacing)
Tables, Sections & Detail Features P100 0.005" solid plotted pen width P101 0.012" solid plotted pen width P102 0.020" solid plotted pen width P103 0.031" solid plotted pen width P104 0.047" solid plotted pen width P105 0.012" screened plotted pen width P106 0.020" screened plotted pen width P107 0.031" screened plotted pen width P108 optional solid plotted pen width P109 optional screened plotted pen width
Corresponding Plot Style With User Defined Line Type & Color
City of Everett EPS Dept CAD Standards.doc September 30, 2004 32
Color Standard
The suggested/default colors provide two functions. The first and probably the most important is to separate different types of entities by color so they can be differentiated on the monitor during drawing production. The second is merely the need for a starting point from which to start and to return to. This concept applies to base maps in model space more than anywhere. The model space base drawing is what other users and systems will use. Therefore, the standard provides a base to start from for these users and systems. This layer property is retained, as are the other default properties, in the Evt-Default.las file. The user can save this file under another name and then modify it to their specific usage. The Evt-Default.las file is not to be modified.
Plot Style Standard With the advent of Named Plot Styles (stb’s) the plotted line weight no longer needs to be controlled by the layer or entity color. As always, the intent of a drawing is normally clarified with the use of different line weights. Different drawings and layouts may have different objectives (intents) and therefore the same entity may need to appear different in each of the drawings. For example, new curb and gutter and electrical conduit may appear differently in the electrical drawing than they would in the drawing used to construct the curb and gutter. However, it is required that they both be shown in each drawing. Thus the Everett CAD Standard is based on this same idea. As has always been the industry standard to show this distinction by the use of 3 or 4 line weights and the use of screened (normally representing existing entities) and solid line intensity. This relationship of line weight and intensity is shown in the EVERETT.STB plot style table shown in this section. Tip – Print the attached sheet “Everett Plot Styles (EVERETT.STB) & 255 Color Palette” on your in-house printer/plotter used for draft and/or final production. This will give you an accurate preview of the colors and shades of gray that you have to print with.
City of Everett EPS Dept CAD Standards.doc September 30, 2004 33
EVERETT.STB
City of Everett EPS Dept CAD Standards.doc September 30, 2004 34
City of Everett EPS Dept CAD Standards.doc September 30, 2004 35
AutoCAD Linetypes All custom line types created for the City of Everett CAD Standards are contained in the EVT-Support\EVERETT.LIN file. These line type definitions are now consistent with those in AutoCAD’s ACAD.LIN file and thus no longer require LTSCALE and PSLTSCALE settings different than the default AutoCAD settings (LTSCALE=1, PSLTSCALE=1). With this system, the line types will appear the same in all scaled viewports. The line types were developed using the following standards:
• The overall appearance of the plotted line was determined by its appearance and clarity within a 20 scale viewport using the default plot style of the layer which would normally contain the line type. This scale being the standard for all non-architectural dwgs with in the Everett System. Note - all other scales must be approved by the City project manager.
• The standard line type name consists of three fields separated by a hyphen. The first field consists of “-EV-“,.The second field is a short abbreviation/description of the line’s intended use or discipline (see table below). The third field indicates the annotation used in annotated line types. In non-annotated line types this field is used as a short, more definitive description. The optional forth field can be used for further clarification. For example, REV would indicate the line appears the opposite of a line type with the same name (only on directional lines). The use of HF is intended to indicate a line type which repeats in approximately half the distance as the line with the same name.
• Romans text style and Romans text font were use in all annotated line types. Therefore, a text style called ROMANS using a text font of ROMANS must be defined in the drawing before loading the Everett line types.
• Text in annotated line types is intended to have a height of 0.1” in all viewports. The same line type is used for existing and new lines.
By setting the LTSCALE=20 in the model space base map the lines will appear as they will within the standard 20 scale viewport and make the line type text easy to read. However, since the LTSCALE variable is a drawing standard variable and not controlled by the layout the LTSCALE=20 requires one to change the LTSCALE factor after entering the layout or model space. Therefore, it is suggested that the base map be xrefed into the construction drawing file where the layout LTSCALE=1. This will eliminate the need to change the LTSCALE before plotting.
City of Everett EPS Dept CAD Standards.doc September 30, 2004 36
Second Field Abbreviations Table Second Field Abbreviation
Description
CD Conduit (unknown Owner or Contents) CNT Contour Lines CS Combined Sanitary Storm Line CUT Cut Limit DITCH Ditch Line EL Electrical (Generic Electrical) EP Edge of Pavement FILL Fill Limit FN Fence Line FO Fiber Optic Lines G Gas Line GRID Profile Grid Lines GUARD Guard Rail IR Irrigation Line LFG Landfill Gas Collection Line PWR Power Lines (Commercial Power Service ie PUD etc) RR Railroad Track RW Right-of-Way SD Storm Drainage Main SIG Signal Cable SL Street Light SS Sanitary Sewer Main STRIP Striping Lines TEL Telephone TLM Telemetry Cable TV Cable Television UT Generic Utility Line WTR Water Main WTRSV Water Service Refer to the Appendix for a complete listing of Everett linetypes.
City of Everett EPS Dept CAD Standards.doc September 30, 2004 37
Standard Symbols Block names are the same as the file name that they are stored in. They start with a two-character prefix followed by a hyphen. This allows all of the blocks to be sorted by discipline and improves readability. The System allows for new symbols to be defined provided that they are created on layer zero and their color, plot style and linetype are defined BYBLOCK. The attached City of Everett Standard Symbols Blocks lists all of the currently defined blocks. The table shows a not-to-scale icon of the symbol, its file name, a description of what the symbol is intended to represent, whether the symbol is typically found in model or paper space and examples of the layers the symbol might be found on. The symbols library has been sorted by function and then stored in the EVT-Symbols Directory. Block/Symbol Name Table 2-Character Block Prefix
Block Prefix Description
AC- Accidents Diagrams CH- Non-Striped Channelization EE- Electrical Diagram Symbols LD- Landscaping and Vegetation LT- Light, Street Light or Other Light ME- Mechanical Diagram Symbols NT- Note Or Call Out Symbol PV- Pavement Or Curb And Gutter RR- Railroads SF- Surface Features Not Otherwise Specified SG- Signals SH- Sheet, Legends, North Arrow, Title Blocks, Etc SN- Signs SP- Striping SV- Survey, Section Lines TB- Data Table TR- Transit UT- Utilities WD- Wiring Diagram Component WL- Wall, Rockeries, Guardrails
Refer to the Appendix for a complete listing of Everett symbols.
City of Everett EPS Dept CAD Standards.doc September 30, 2004 38
Abbreviation List The following City of Everett Abbreviations List includes the common abbreviations used in our AutoCAD drawings. These abbreviations should be used only if necessary to conserve space on the drawing. Abbreviation Description
A AB Anchor Bolt ABAND Abandoned ABBR Abbreviation ABUT Abutment ACT Actual ADD Addendum, Addition ADJ Adjust AFF Above Finished Floor AH Ahead ALT Alternate ALY ALLEY AMEND Amendment AP Angle Point APPROX Approximately APWA American Public Works Association ARCH Architecture ARV Air Relief Valve ASPH Asphalt AUX Auxiliary AVE Avenue AVG Average AWG American Wire Gauge
B B Black, Beam BC Block Corner BITUM Bituminous BK Back BL Baseline, Blue BLDG Building BLK Block BLVD Boulevard BM Bench Mark BOC Back of Curb BOL Bollard BOT Bottom BOW Back of Walk BRDG Bridge BRG Bearing BRK Break BTWN Between
C C Conductor, Channel, Column C/L Centerline CAP Capacity CB Catch Basin, Cable
Abbreviation Description CB1 Catch Basin Type 1 CB2 Catch Basin Type 2 CC Center to Center, Closing Corner,
Concrete Curb CCb Coaxial Cable CCd Control Conduit CCG Concrete Curb & Gutter CCGS Concrete Curb, Gutter & S/W CCL Creek Center Line CD Conduit CG Curb and Gutter CHG Change CHK Check CI Cast Iron CICL Cast Iron Concrete Lined CIP Cast in Place CIR Circuit, Circle CJ Construction Joint CL Centerline CLASS Classification CLF Chain Link Fence CLR Clearance, Clear CLY Clay CMP Corrugated Metal Pipe CMU Concrete Masonry Unit CND Conduit CNTY County CO Clean Out COE City of Everett COL Column COM Common COMM Communicate CONC Concrete CONN Connection CONST Construct, Construction CONT Continued, Continuous, Control COOR Coordinate COP Copper COR Corner CORR Corrugated CRK Creek CRN Crown of Road CS Combined SS & SD System CT Court, Community Transit CTR Center CTRE Tree (conifer) CU Cubic
City of Everett EPS Dept CAD Standards.doc September 30, 2004 39
Abbreviation Description CULV Culvert CYL Cylinder
D D Depth, Dipole DB Direct Burial Cable D/L Daylight D/W Driveway DBL Double DCL Ditch CL DE DE-Energize DEG Degree DET Detail or Detector DI Ductile Iron DIA Diameter DIAPH Diaphragm DIR Direction DN Down DR Drain DWG Drawing DWY Driveway
E E East, Electrical EA Each ECb Buried Electrical Cable ECC Eccentric EF Each Face EJB Electric Junction Box EL Easement Line, Elevation ELB Elbow ELEC Electrical ELEV Elevation EMB Embankment EMH Electrical Manhole ENCL Enclose ENG Engine ENGR Engineer EO Edge of EOA Edge of Asphalt EOC Edge of Concrete EOD Edge of Dirt EOG Edge of Gravel EP Edge of Pavement EQ Equal EQUIP Equipment ET Everett Transit EV Electrical Vault EVC End Vertical Curve EVP Emergency Vehicle Pre-Emption EVT Everett, City of Everett EW Each Way EX Existing, Example EXC Excavation EXIST Existing EXP Expansion EXP JT Expansion Joint EXT Exterior, Extension, Extruded
F F Flanged
Abbreviation Description FAB Fabricate FDN Foundation FF Far Face, Finished Floor FG Finish Grade FH Fire Hydrant FIG Figure FIN Finish, Finished FL Fog Line, Flow Line, Flash, Flashing,
Floor FLD Field FLEX Flexible FLG Flange FLT Filter FLX Flexible FM From, Force Main FNC Fence FOC Face of Curb FOG Fog Line FOW Face of Wall FP Full Penetration, Flag Pole FT Feet/Foot FTG Footing FWD Forward FWPS Finished Water Pump Station FWY Freeway
G G Gas Line, Green, Girder GA Gauge GALV Galvanized GAR Garage GB Green W/Black Tracer, Grade Break GDWY Gravel Driveway GE Grate Elevation GEN Generator GI Galvanized Iron GL Glass, Gutter Line GLU Globe Value GM Gas Meter GND Ground GOVT Government GR Guard Rail GRD Ground, Grade GV Gate Valve GVL Gravel GVT Gas Vault
H H Height, High H-T Hub & Tack HD Head HDCP Handicap Parking Symbol HDG Hot Dipped Galvanized HI Height of Instrument HORIZ Horizontal HPS High Pressure Sodium, High
Pressure Steam HSB High Strength Bolt HSE House HT Height of Target
City of Everett EPS Dept CAD Standards.doc September 30, 2004 40
Abbreviation Description HTS Heights HW Hot Water HWY Highway HYDR Hydraulic
I I Iron ID Inside Diameter IDENT Identification IE Invert Elevation IF Inside Face IL Inlet ILLUM Illuminate IMSA International Municipal Signal Assoc. IN Inch/Inches INCL Include INCR Increase IND Indicator INDUCT Inductance INST Install, Instrument INSUL Insulation INT Intersection, Internal INV Invert, Inverse IP Iron Pipe IS Island ITE Institute of Transportation
Engineering J
JB Junction Box, Jersey Barrier JCT Junction JNX Junction JT Joint
K KG Kilogram KHZ Kilohertz KM Kilometer KV Kilovolt KW Kilowatt KWH Kilowatt Hour
L L Length of Arc, Traffic Detection Loop LAB Laboratory LAT Lateral, Latitude LBS Pounds LEN Length LF Linear Foot/Feet LIM Limit LK Lake LOC Locate LONG Longitudinal, Longitude LP Lamp, Light Pole LT Left, Light LUMIN Luminaire LWR Lower
M M Meter, Mile M/L Monument Line MA Traffic Detection Magnetometer MACH Machine
Abbreviation Description MAINT Maintenance MATL Material MAX Maximum MB Mailbox MC Meander Corner MECH Mechanical MED Medium MER Meridian MFR Manufacture MH Manhole MHHW Mean Higher High Water MHT Mean High Tide MHW Mean High Water MIC Monument In Case MID Middle MIL Military MIN Minimum, Minute, Minor MISC Miscellaneous MJ Mechanical Joint MK Mark ML Match Line MLLW Mean Lower Low Water MLCSP Mortar lined & Coated Steel Pipe MLTCS Mortar Lined Tape Coated Steel Pipe MLECSP Mortar Lined Epoxy Coated Steel
Pipe MLT Mean Low Tide MLW Mean Low Water MOD Modification MON Monument MPOC Midpoint On Curve MSNRY Masonry MT Mean Tide MUTCD Manual On Uniform Traffic Control
Devices N
N North NA Not Applicable NAUT Nautical NEG Negative NEMA National Electrical Manufacturers
Association NEUT Neutral NF Near Face NIC Not in Contract NO Number NOM Nominal NTS Not To Scale
O O Orange O-XING Overhead Crossing OB Orange with Black Tracer OC On Center OD Outside Diameter OF Outside Face OH Overhead OL Overlap Phase OHP Overhead Power
City of Everett EPS Dept CAD Standards.doc September 30, 2004 41
Abbreviation Description OHW Ordinary High Water OPNG Opening OPP Opposite OPR Operate OPT Optic ORIG Original OT Overhead Telephone OZ Ounce
P P Pole, Power P/C Pre-cast P/L Property Line P/S Pre-stressed P/T Post Tensioned PAR Parallel, Parcel PC Point of Curve PCC Point of Compound Curve PD Perforated Drain Line PE Plain End PED Pedestrian, Pedestal PERM Permanent PERP Perpendicular PH Phase PI Point of Intersection PKWY Parkway PL Place, Plastic, Plain Bar, Plate, Plug PLSS Public Land Survey System POA Pole Orientation Angle POC Point On Curve, Point of Vertical
Curve POS Positive, Position PPB Pedestrian Push Button PPBP Pedestrian Push Button Post PR Pair PRC Point of Reverse Curve PROJ Project PROP Property PRV Pressure Reducing Valve PSI Pounds per Square Inch PT Point of Tangency, Point PUD Public Utility District #1 of Sno Cnty PV Power Vault PVC Polyvinyl Chloride PVMT Pavement PVRC Point of Vertical Reverse Curve PVT Point of Vertical Tangency PWR Power
Q Q Quadruple QC Quarter Corner QT Quart QTR Quarter QTY Quantity QUAD Quadrant, Quadrangle QUAL Quality
R R Radius R-C Rebar & Cap
Abbreviation Description R/W Right-of-Way RA Raised RB Red with Black Tracer RC Reinforced Concrete RCKY Rockery RCP Reinforced Concrete Pipe RD Road, Round RECD Received RECT Rectangle REF Reference REG Regular REINF Reinforced REM Remove, Removed REPL Replace, Replaced REQ Required RET Retaining RETW Retaining Wall RIV River RLD Rolled RMC Rigid Metal Conduit RPT Report RR Railroad RRC Railroad Crossing RRCS Railroad Crossing Signal RRG Railroad Crossing Gate RT Right
S S South, Slab, Slope S/L Survey Line S/W Sidewalk SAN Sanitary SB Soil Boring SC Section Corner SCb Shielded Cable SCC Closing Corner SCEN Section Center SCHED Schedule SD Storm Drain SDMH Storm Drain Manhole SE Spot Elevation, Southeast SEC Second SECT Section SEG Segment SEP Separate SERV Service SEW Sewage SHLD Shielded SHLDR Shoulder SHT Sheet SIG Signal SIM Similar SL Sea Level, Span Length, Section
Line SLJB Street Lighting Junction Box SLP Slope SLS Stainless Steel SLV Sleeve SM Small
City of Everett EPS Dept CAD Standards.doc September 30, 2004 42
Abbreviation Description SN Sign SOV Shut-off Valve SP 1 Shielded Pair, Single Cable, Span
Wire, Spiral Space, Specific SPA Space/Spaces SPC Shielded Individual Single Cable SPCb Shielded, Twisted pairs in a Single
Cable SPEC Specifications SQ Square SS Sanitary Sewer SSCO Sanitary Sewer Cleanout SSMH Sanitary Sewer Manhole SSXC Sixteenth Corner ST Straight, Street, Straight Bar STA Station STAG Staggered STD Standards STIR Stirrup STL Steel STLT Street Light STP Lane Stripes STPS Steps STR Stream SUB Substitute SUR Surface SURV Survey SVL Survey Line SW Switch SYM Symmetrical, Symbol SYS System
T T Top, Tangent T&B Top & Bottom TAB Tabulate TAN Tangent TB Thrust Block TBM Temporary Benchmark TCB Buried Telephone Cable TEBO Telephone Booth TESC Temp Erosion & Sedimentation
Control TK Thick TEL Telephone TEMP Temporary TJB Telephone Junction Box TMH Telephone Manhole TOC Top of Curve, Top of Curb TOE Concave Slope Break TOP Convex Slope Break TOPO Topography TOS Top Of Slab TOW Top of Wall TP Twisted Pairs, Test Pit TPOL Traffic signal Pole TR Traffic, Telephone Riser TRAN Transition TRJB Traffic Control Junction Box TS Test Station
Abbreviation Description TSD Traffic Sign Double Post TSS Traffic Sign Single Post TUN Tunnel TV Television, TV Vault TWST Twisted TYP Typical
U UDS Utility Duct System UG Underground UGPC Underground Power Cable UGTS Underground Telephone Cable UNGD Underground UNO Unless Noted Otherwise UP Utility Pole UPA Utility Pole Anchor UTIL Utility
V V Valve, Voltage VAR Varies, Variable VB Valve Box, Vapor Barrier VEH Vehicle VERT Vertical VLT Vault VP Vent Pipe VPC Vertical Curve PC VPCC Vertical Curve PCC VPI Vertical Curve PI VPRC Vertical Curve PRC VPT Vertical Curve PT
W W West, Width, Water Line, White W/ With WB White with Black Tracer WC Witness Corner WCR Wheel Chair Ramp WGV Water Gate Valve WHSE Warehouse WK Walk WL Water Line WM Water Meter, Water Main W/O Without WO Work Order WP Work Point WSDOT Wash St Dept of Transportation WT Watts, Weight WV Water Valve WW Wing Wall
X X-BM Cross Beam X-RD Cross Road XFOC Extruded Face of Curb
Y Y Yellow YD Yard
City of Everett EPS Dept CAD Standards.doc September 30, 2004 43
Appendix
Table of Contents
Survey Control Data Tables .............................................................. A
Typical Construction Project Sheet Creation ................................... B
Everett Templates (contained in folder EVT-TEMPLATES) ............. C
Layer Name Field Definitions ............................................................ D
Everett Plot Styles (contained in file EVERETT.STB)....................... E
Custom Linetypes (contained in file EVERETT.LIN)......................... F
Symbols (contained in folder EVT-SYMBOLS)................................. G