COMP8130 4130 Adrian Marshall
Verification and ValidationVerification and Validation Processes Processes
Introduction
Adrian Marshall
Intro
COMP8130 4130 Adrian Marshall
Agenda
• Introduction• Definitions• V&V• Test objectives• Testing challenges• Testing and the V model• Testing Approaches• Testing levels• Classes of test• Risk based testing• Requirements based testing• Test Methods• Common testing types• Testing tools
COMP8130 4130 Adrian Marshall
Intro
Verification
IEEE 1012: the process of determining whether or not the products of a given phase of the software development lifecycle fulfil the requirements established during the previous phase.
ISO 12207: confirmation by examination and provision of objective evidence that specified requirements have been fulfilled
COMP8130 4130 Adrian Marshall
Intro
Validation
IEEE 1012: the process of evaluating software at the
end of the software development process to ensure
compliance with software requirements
ISO 12207: confirmation by examination and
provision of objective evidence that particular
requirements for a specific intended use have been
fulfilled
COMP8130 4130 Adrian Marshall
Intro
Put more simply:
We Verify that the output of each software phase meets its requirements, and
We Validate that the software, at the end of the development effort, meets the overall intended use
COMP8130 4130 Adrian Marshall
Types of V & V Activities
Requirements analysis and Traceability analysis
Design analysis
Interface analysis
Implementation evaluation
• static - reviews, inspections, structure analysis
• dynamic - simulation, prototyping, execution time analysis
• formal - mathematical analysis of algorithms
Testing
Project & Management analysis
COMP8130 4130 Adrian Marshall
Sources of guidance on V & V
V & V Standards • IEEE 1012 - Software V & V Plans
• IEEE 1059 - Guide for Software V & V Plans
• IEEE 1028 - Software Reviews & Audits
• IEEE 829 - Software Test Documentation
Related Standards• ISO 12207 - Software Lifecycle Processes
• ISO 9126 - Software Quality Characteristics
TextV & V of Modern Software -Intensive Systems - Schulmeyer &
Mackenzie, Prentice Hall, 2000
COMP8130 4130 Adrian Marshall
Pros and Cons of V & V
Positive• early error detection• better product quality• better project planning• better adherence to standards, methods and practices• better decision support information• Cost of detection & prevention < cost of corrective action
Negative• additional time and effort required for V&V activities• additional cost (visible)• Independence of V&V can be hard for small organisations
COMP8130 4130 Adrian Marshall
Defect Introduction by Phase
What is known about the quality of software systems?
Defect Source Military Industry
Requirements 20.0% 12.5%
Design 20.0% 24.2%
Code 35.0% 38.3%
Documentation 15.0% 13.3%
Bad Fixes 10.0% 11.7%
Applied Software Measurement 2nd Edition, by Capers Jones. McGraw-Hill, 1997. ISBN: 0-07-032826-9
COMP8130 4130 Adrian Marshall
Cost of Removing Defects
What is known about the quality of software systems?
Removal Phase Cost Ratio Example Cost
S/W Analysis 1 : 1 (say) $200
S/W Design 2.5 : 1 $500
Code & Unit Test 5 : 1 $1,000
Integration & Test 36 : 1 $7,200
Deployment 150 : 1 $30,000
Applied Software Measurement 2nd Edition, by Capers Jones. McGraw-Hill, 1997. ISBN: 0-07-032826-9
COMP8130 4130 Adrian Marshall
Testing Definitions (1)
• Testing is the process of executing a program with the
intent of finding errors
• Testing is an activity aimed at evaluating an attribute or
capability of a program or system and determining that it
meets its required results
• Testing is the process by which we understand the status
of the benefits and the risk associated with release of a
software system
• Testing includes all activities associated with the planning,
preparation, execution, and reporting of tests
COMP8130 4130 Adrian Marshall
Testing Definitions (2)
“Testing cannot guarantee that errors are not present, rather
it demonstrates that errors are present”….
COMP8130 4130 Adrian Marshall
Test Objectives
• Verifying the implementation of any or all products
• Requirements and solution validation
• Defect detection
• Provide assessment of deployment risks
• Provide performance & threshold benchmark data
• Establish testing processes, assets, data and
skills for on-going testing activities
COMP8130 4130 Adrian Marshall
Testing Challenges
• Complete testing is not possible
• Testing work is creative and difficult
• Testing is costly
• Testing is often not seen as a core activity
• Testers aim to find and report problems
COMP8130 4130 Adrian Marshall
Testing Challenges
• Technical personnel often do not want to become
testers, leaving testing to non-technical system
users
• Testing requires independence
• Testing is often a critical path activity
• Testing is often trimmed to solve schedule or
budget problems.…
COMP8130 4130 Adrian Marshall
Testing and the V Model
TESTING ACTIVITIES
BUILD ACTIVITIES
Review requirements Analyse test requirements
Install system
Integrate components
Test against system requirements
Accept system
Design component solution
Test components Buy / build components
Design solution
Determine system requirements
Determine business requirements
Test against business requirements
Review solution Develop Master Test Plan
Test integration of components
COMPONENT LEVEL
BUSINESS REQUIREMENTS LEVEL
SYSTEMS REQUIREMENTS LEVEL
INTEGRATION LEVEL DESIGN LEVEL
SYSTEM LEVEL
ACCEPTANCE LEVEL
Develop Detailed Test Plan/s
DESIGN ACTIVITIES
COMPONENT LEVEL
COMP8130 4130 Adrian Marshall
Testing Approaches
Bottom up• tests smallest components / sub functions first• test drivers are required
Top down• tests major functional areas from the top down• stubs are used where lower levels are incomplete
Functional thread• process / path-oriented approach which crosses unit
boundaries
Combined….
COMP8130 4130 Adrian Marshall
Unit / Componenttesting conducted to verify the implementation of the design for one software element (for example, unit, module, function, class instance, method) or a collection of software elements
Integration an orderly progression of testing in which software elements, hardware elements, or both are incrementally combined and tested until the entire system has been integrated
Systemthe process of testing an integrated hardware and software system to verify that the system meets its specified requirements….
Testing Levels
COMP8130 4130 Adrian Marshall
Classes of Test
White (or glass) box testing• designed with knowledge of how the system is constructed
• aims to exercise the internal logical structure• statements, decisions, paths & exception handling evaluated
Black box testing• designed without knowledge of how the system is constructed
• verifies that functional & performance requirements have been satisfied
• focuses on the external behaviour of the system….
Grey Box• designed with some knowledge of how the system is constructed
COMP8130 4130 Adrian Marshall
White Box Testing
White box testing techniques
• Control flow based testing (e.g. decision & statement
coverage testing)
• Statement coverage – each statement is executed at least
once
• Decision coverage – each conditional statement is executed at
least once each way
• Complexity based testing – (eg McCabe cyclomatic complexity
measure) – higher concentration of tests for more complex
software
• Boundary case and exception handling
COMP8130 4130 Adrian Marshall
Black box testing techniques
• Equivalence partitioning
• Boundary value analysis
• Decision table
• Testing from formal specifications
• Error guessing
• Exploratory testing
Black Box Testing
COMP8130 4130 Adrian Marshall
Test areas of risk with more rigor (greater coverage of functionality, and/or code)
Product risks may include:
• Performance (capacity, throughput, accuracy, etc)
• Safety
• Security (authentication…)
• Complexity
Test areas of higher risk first.
Focus on consequences and likelihood.
Risk-Based Testing
COMP8130 4130 Adrian Marshall
Systematic requirements based testing ensures complete testing scope is analysed.
Focus Areas (examples)Functionality -
• Security, Accuracy, Regulatory Compliance, Technical Compliance,
Reliability - • Data Integrity, Error Handling, Fault Tolerance, Recoverability
Useability - • User Friendliness, User Guidance, Adaptability , Clarity of Control, Error Handling,
Conciseness, Ease of Learning, Documentation Quality, Ease of Installation,
Performance - • Throughput, Acceptable Response Time, Data Storage Requirements, Acceptable
Memory Capacity, Acceptable Processing Speed
Portability - • Portability to Different Hardware Platforms, Compatibility With Different
Operating Systems, Conformance, Replaceability, Languages Supported….
Requirements-Based Testing
COMP8130 4130 Adrian Marshall
Test Methods
Method Description
Demonstration The actual operation of an item to provide evidence that it accomplishes the required functions under specific scenarios. This requires human observation against definable objectives.
Inspection Used to verify conformance with specified standards, by examination of, and comparison with, drawings, code, unit test results or other documentation.
Analysis Analysis is the use of established technical or mathematical models or simulations, algorithms, or other scientific principles and procedures to provide evidence that the item meets its stated requirements
Test Test is the application of scientific principles and procedures to determine the properties or functional capabilities of items. The process will generate data that is presented by calculated, precision measurement equipment for subsequent evaluation.
COMP8130 4130 Adrian Marshall
Inspections and reviews require visual examination.
They can be conducted at the early definitions phase and hence provide efficient defect rectification.
Can be influenced by the ability of the inspector/reviewer (use checklists to standardise).
Inspections and Reviews
COMP8130 4130 Adrian Marshall
Acceptance testing / User Acceptance Testing (UAT)Testing a system’s behaviour against the customer’s requirements
Alpha & beta testingTesting by a representative sample of users (internal = alpha, external =
beta)
Installation testingTesting a system after installation in the target environment
Performance testing
Testing against specified performance requirements (eg. response time)
Reliability testingTesting of stability, endurance, robustness, and recoverability….
Common Testing Types (1)
COMP8130 4130 Adrian Marshall
Regression testingRe-testing previously run tests to evaluate the impact that a software change
may have on unaltered software components
Security testingTesting a system’s ability to prevent unauthorised use or misuse, authentication
Compatibility / Interoperability testingTesting the ability of software to operate and coexist with other (application
and system) software and hardware
Stress testingExercising a system at the maximum design load and beyond
Usability testingTesting a system’s user friendliness, ease of learning, and ease of use….
Common Testing Types (2)
COMP8130 4130 Adrian Marshall
Test management tools• information repositories
• document generators
• defect management tools
• requirements traceability and test coverage tools
Test execution tools• compliers, debuggers, link loaders
• source code analysers (coverage & complexity)
• GUI testers
• functional record and replay tools / robots
• performance / load and stress testing tools
• security vulnerability analysis tools….
Testing Tools
COMP8130 4130 Adrian Marshall
Requirements
Requirements definition through design
Software Specifications
Requirement/specification reviews
COMP8130 4130 Adrian Marshall
Software Specification
Twelve Requirements Basics for Project Success”, Dr. Ralph R. Young , Northrop Grumman Information Technology Defense Group
COMP8130 4130 Adrian Marshall
Criteria for good requirements
Twelve Requirements Basics for Project Success”, Dr. Ralph R. Young , Northrop Grumman Information Technology Defense Group
COMP8130 4130 Adrian Marshall
Review for testability
Review criteria:• Concise• Complete• Unambiguous• Consistent• Verifiable• Traceable
COMP8130 4130 Adrian Marshall
Review
• V & V can provide continuous information about the quality of the system and
the development effort
• cost of detection & prevention < cost of corrective action
• Testing is a process by which we understand the status of the benefits and the
risk associated with release of a software system.
• There are many testing techniques available for developers and testers.
• Risk based testing is used to focus scarce testing resources.
• Systematic requirements based testing ensure complete testing scope is
analysed.
• Automated testing tools may by used to assist test management and
execution.