COMPANY PORTFOLIIO MCLENDON ENTERPRISES FOOTPRINT IN GA.

Post on 31-Mar-2015

214 views 0 download

Tags:

transcript

C O M P A N Y P O R T F O L I I O

MCLENDON ENTERPRISES

FOOTPRINT

IN GA.

OFFICE LOCATIONS

Main Office2365 Aimwell RoadVidalia, GA 30474(912) 537-7887

Savannah Office9 Chatham Pkwy. S. Dr. Suite B-2Savannah, GA 31405(912) 349-0677

MISSION STATEMENT

McLendon Enterprises Inc. and its employees share the same goals of integrity, quality, teamwork, safety and continuous improvement in each and every project.

MEET THE TEAM

President Benny D. Mclendon Email UsSecretary / Treasure Jennifer Hollis jennifer@mclendonenterprises.com

General Manager Tim Adams tim@mclendonenterprises.com

Office Manager Anne Roller anne@mclendonenterprises.com

Chief Engineer Sean Scott P.E. sean@mclendonenterprises.com

Lead Estimator Shane Holland shane@mclendonenterprises.com

Construction Manager Rusty Williams rusty@mclendonenterprises.com

Senior Project Manager Adam Lee adam@mclendonenterprises.com

Business Development Bill Boies bill@mclendonenterprises.com

Contract Revenue Earned2011: $ 33,457,474.00 2012: $ 46,660,631.00

*Number Of Permanent Employees*2010: 93 2011: 112 2012: 130 2013: 140

BACKGROUND

McLendon Enterprises was incorporated in 1979 at which time the leadership role was then taken over by current President / Owner, Benny McLendon

Transportation ProjectsGeorgia Department of Transportation

CDBG ProjectsCity Streets / Roadway

Utility InstallationsWaterStorm

Sewer / Force main / Pump stations

Other ProjectsSubdivisions

Treatment PlantsDesign Builds

ON THE HORIZON

CURRENT PROJECTS OVER $ 2,000,000.00

NAME ACREAGE CITY / STATE GENERAL CONTRACTOR GC REFERENCE COTRACT COST

Dean Forest Road Widening

4480 Savannah, GA. Chatham CountyRuss Abolt

(County Manager) $7,895,231.00

Fort Stewart Elementary

50Fort Stewart,

GA.Sauers Constr.

Darren Harrell (305) 306-0205

$2,546,200.00

GA DOT CSSTP-0007000(190)

1200 Savannah, GA. GA DOTWill Murphey (912) 427-5754

$2,001,921.00

Multi-Purpose Machine Gun Range

420Fort Stewart,

GA.Trend Constr.

Bill Cooke (910) 436-3426

$3,509,212.00

GA DOT EDS00-0545-00(014)

9600 Vidalia, GA. GA DOTWill Murphey (912) 427-5754

$24,040,300.00

GA DOT B145143-13-000-00

1500Bryan /

Effingham GA DOT

Will Murphey (912) 427-5754

$4,023,000.00

GA DOT Screven County

Bridge1200 Sylvania, GA. GA DOT

Edwin Thompson

(478) 552-4603$3,900,000.00

Hwy 80 & Pine Barren / Old

Louisville Road800 Pooler, GA. City of Pooler

Robert Bryd (912) 748-7261

$2,000,120.00

PROJECTS COMPLETED WITHIN PAST TWO YEARS OVER $ 1,000,000.00

NAME CITY / STATE GENERAL CONTRACTOR OR ENGINEER CONTRACT COST

North Aviation Expansion Savannah, GA. North Aviation $24,371,531.00MLP 00-0030-(081) Evans

CountyClaxton, GA. GA DOT $18,934,256.00

ESS00-0545-00(028) Appling County

Baxley, GA. GA DOT $31,000,789.00

WWTP Improvements City of Uvalda Hofstadter & Assoc. $415,019.00

South Hunter Housing Savannah, GA. Balfour Beaty $3,047,079.00

Hazlehurst Airport Hazlehurst, GA. Hofstadter & Assoc. $2,087,801.00

Swift Creek Bridge Toombs County GA DOT $2,952,926.00

Vidalia Cancer Center Vidalia, GA. Little Jon Engineering $1,097,626.00

CCA Correctional Facility Millen, GA. Flint Constr $588,628.00

JD Dickerson School Vidalia, GA. McDonald Construction $385,144.00

Aspen Heights Statesboro, GA. The Aspen Group $2,569,941.00

Bleckley Middle School Cochran, GA. Pope Construction $1,819,523.00

East Dublin WWTP East Dulin, GA. Hofstadter & Assoc. $2,776,066.00

Bundy Officer Housing Ft. Stewart, GA. Balfour Beaty $2,727,139.00

New Meadows Hospital Vidalia, GA. Brasfield & Gorrie $4,183,202.00Hardin Canal Bridge

CulvertSavannah, GA. Chatham County $4,248,657.00

3D-GPS, 3D-MILLIMETER GPS, LPS

BUILDING TODAY'S INFRASTRUCTURE WITH TOMORROWS TECHNOLOGY

-- INCREASE GRADING PRODUCTIVITY SIGNIFICANTLY-- REDUCE STAKING ON JOBSITE ALMOST ENTIRELY

-- CONTROLLING OF MATERIAL

- - UP TO 300% MORE ACCURATE THAN STANDARD GPS-- INCREASED PRODUCTIVITY – FEWER PASSES NEEDED TO REACH FINISH GRADE

- - GRADE TO TIGHTER TOLERANCES

- - HIGH ACCURACY FOR TIGHT TOLERANCES PROJECTS-- USED WHEN THE JOBSITE DOES NOT HAVE VISIBILITY TO OPEN SKY

I.E. WORKING BETWEEN BUILDINGS OR IN HEAVY TREE COVERAGE

CURRENT PROJECTS AS OF AUGUST 1, 2013

MCLENDON ENTERPRISES INC. FOOTPRINT IN GA.

-- LENGTH OF TAXI WAY = 6,800 FEET-- LENGTH OF TUNNEL =1,200 FEET

-- PILES DRIVEN = 688-- CUBIC YARDS OF DIRT MOVED = 850, 000

-- COST OF PROJECT = $ 24,371,531.00

NORTH AVIATION EXPANSION

- 15,000 CYDS. OF DIRT REMOVED-- THREE RUNS OF 72” RCP 180’ LONG EACH REPLACED

-- 50 CYD. CONCRETE WEEP WALL INSTALLED-- 20,000 CYDS. OF DIRT REPLACED

-- 130,000 LBS. OF SAND AND CONCRETE BAGS-- REPLACED 300’ OF RAILROAD

PLANT VOGTLE “21” DAY EMERGENCY RAIL REPAIR

-- LENGTH OF PROJECT = 2.5 MILES-- TOTAL UNDERGROUND UTILITIES INSTALLED = 9,750 FEET

-- CUBIC YARDS OF DIRT MOVED = 60, 000-- COST OF PROJECT = $ 7,895,231.00

DEAN FOREST ROAD WIDENING

-- LENGTH OF PROJECT = 1.58 MILES-- CYDS. OF CONCRETE POURED FOR RETAINING WALL

-= THREE FOOTBALL FIELDS x THREE FT. DEEP-- TOTAL UNDERGROUND UTILITIES INSTALLED = 84,480 FEET

-- COST OF PROJECT = $ 18,934,256.00

GA DOT MLP OO-0030-(081) EVANS COUNTY

NEW MEADOWS HOPISTAL

ASPEN HEIGHTS APARTMENT COMPLEX

VIDALIA, GA

STATESBORO, GA

COST OF PROJECT = $ 4,183,202.00

COST OF PROJECT = $ 2,569,941.00

MCLENDON ENTERPRISES INC. WORKING HAND IN HAND

-- CREATING MAXIMUM VALUE FOR EVERYONE-- WAYS TO MAINTAIN PROJECT SCHEDULES

-- HIGH QUALITY PROJECT RESULTS

BUDGETING

-- PLANNING AND PREPARING-- PROJECTS PROGRESSION-- EXECUTION OF PLANNING-- PROJECT COST ANALYSING

ON SITE MEETINGS

-- -- DID WE MAINTAIN A GOOD QUALITY PRODUCT ?

-- DID WE FINISH UNDER BUDGET ?-- DID WE FINISH PROJECT EARLY ?

-- WHAT DID WE LEARN ?

COMPLETION OF PROJECTS

THE

WAY !

ITEMS TO DISCUSS:

- MCLENDON ENTERPRISES HISTORY: PAST, PRESENT, AND FUTURE

- BUILDING TODAY'S INFRASTRUCTURE WITH TOMORROWS TECHNOLOGY

- MCLENDON ENTERPRISES INC. WORKING HAND IN HAND