7.
7.1.1
Construction details
Trapezoidal Roof Panels
All technical information is subject to alterations. Errors and omissions excepted.
Module Module
PVC sealing tape (factory applied) or Butyl
sealing tape (site applied)
Side lap stitching screw (P03)
(at 500 mm)
Wall purlin
Vapour sealing putty – when
required (site applied)
Self-adhesive sealant tape PE 20 × 5 mm to be continuously applied
between liner and steel support only at ridge/eaves/end lap locations where
the internal junction requires sealing (P17)
Module Module
PVC sealing tape (factory applied)
or Butyl sealing tape (site applied)
Roof purlin
Anti-condensation tape (factory applied)
Vapour sealing tape ∅ 6 mm – when required (site applied)
Side lap stitching screw (P03)
(at 500 mm)
Self-adhesive sealant tape PE 20 × 5 mm to be
continuously applied between liner and steel
support only at ridge / eaves / end lap locations
where the internal junction requires sealing (P17)
Panel Side Lap (FF)
Panel Side Lap (RW)
7.
7.1.2
Construction details
Trapezoidal Roof Panels
All technical information is subject to alterations. Errors and omissions excepted.
102
K
12
P
07
P
12
P
04
P
103a
K
04
P
12
P
07
P
14
P
101
K
14
P
03
P
12
P
102
K
03
P
αα
a
at 333 mm at 333 mmSite applied
insulation
Back putty Back putty
Outer sheet
turned up
P
50
a a
50
21
P
17
P
18
P
04
P
03
P 6 fasteners per end lap
Panel End Lap
Ridge
Note:
P Cut back dimensions:
– for roof slope > 10% – 200 mm (supplied / delivered to site with cut backs)
– for roof slope ≤ 10% – 250 mm (supplied / delivered to site with cut backs)
Maximum cut backs available on panels from Kingspan is 250 mm.
a according to structural / static requirements
Note:
a according to structural / static requirements
P12 for roof slope ≤ 10% – 4 pcs / m
> 10% – 2 pcs / m
7.
7.1.3
Construction details
Trapezoidal Roof Panels
All technical information is subject to alterations. Errors and omissions excepted.
08
P
08
P
17
P
04
P
132
K
14
P
131
K
02
P
08
P
17
P
Site applied insulation
at 300 mm
at 300 mm at 300 mm
Gable
a
α
129
K
08
P
02
P
03
P
04
P
07
P
102
K
12
P
07
P
14
P
Outer sheet turned up
Site applied
insulation Back putty
at 300 mm
at 333 mm
Mono Ridge
Note:
a according to structural / static requirements
P12 for roof slope ≤ 10% – 4 pcs / m
> 10% – 2 pcs / m
7.
7.1.4
Construction details
Trapezoidal Roof Panels
All technical information is subject to alterations. Errors and omissions excepted.
130
K
08
P
04
P
17
P
02
P D
L
03
P
14
P
08
P
137
K
132
K
105
K
at 300 mm
Site applied
insulation
at 500 mm at 300 mm
α104
K
08
P
14
P
02
P
130
K
08
P
115
K
12
P
07
P
03
P
12
P
102
K
04
P
07
P a
D
L (2
50 m
m)
at 300 mm
at 300 mm
at 333 mm
Site applied insulation
Back putty
Outer sheet
turned up
Side Wall Parapet
Parapet in Slope – Single
Note:
a according to structural / static requirements
P12 for roof slope ≤ 10% – 4 pcs / m
> 10% – 2 pcs / m
7.
7.1.5
Construction details
Trapezoidal Roof Panels
All technical information is subject to alterations. Errors and omissions excepted.
04
P
130
K
08
P
04
P
07
P
14
P
167
K
04
P
04
P
08
P
04
P
04
P
14
P
133
K
08
P
132
K
a
b b
D
D X d
at 300 mm
at 300 mm
Trapezoidal sheet
Profiled sealing filler type “A”
Site applied insulation
04
P
20
P
03
L
08
P
21
P
135
K
130
K
21
P
08
P
02
P
50
a
L
D
max
. 200
Overflow
at 150 mm
at 300 mm
Parapet in Slope – Double
Eaves Parapet Gutter – Prefabricated
Note:
a according to structural / static
requirements
L, X specify dimension to defi ne
fl ashing K105 and K130
Note:
The prefabricated gutter is recommend to be supported every 2,000 mm.
7.
7.1.6
Construction details
Trapezoidal Roof Panels
All technical information is subject to alterations. Errors and omissions excepted.
α
04
P
08
P
20
P
123
K
08
P
07
Z
33
P
130
K
08
P
02
P
50
a
D
at 333 mm
at 150 mm
at 300 mm
min
. 120 m
m Overflow
Trough grate
Adhered membrane
liner
Site applied rigid
urethane board
Galvanised gutter
support
Eaves Parapet Gutter – Membrane Lined
Note:
a according to structural / static requirements
L specify dimension to defi ne fl ashing K135
P33, Z07, K123 when required
7.
7.1.7
Construction details
Trapezoidal Roof Panels
All technical information is subject to alterations. Errors and omissions excepted.
04
P
130
K
17
P
08
P
04
P
21
P
02
L
17
P
08
P
12
P
08
P
13
P
20
P
04
P
D X D
50
50
a
αat 333 mm
at 333 mm
at 150 mm
Back putty
Site applied rigid urethane board
Overflow
Eaves Gutter Parapet – Prefabricated
Note:
a according to structural / static requirements
X specify dimension to defi ne fl ashing K130
The prefabricated gutter is recommended to be supported every 2,000 mm.
7.
7.1.8
Construction details
Trapezoidal Roof Panels
All technical information is subject to alterations. Errors and omissions excepted.
08
P
110
K
16
P
107
K
136
K
10
P
14
P
04
P
01b
Z
07
P
193
K
02
P
07
P
109
K
30
α
d
a
at 333 mm
at 666
or 1,000 mmSite applied insulation
min. 190 mm
at 666
or 1,000 mm
08
P
08
P
127
K
03
P
13
P
08
P
03
P
04
P
07
P
14
P
07
P
109
K
126
K
108
K
08
P
02
P
α
a
d
20 35 25
at 333 or 666 or
1,000 mm
Back putty
80 (cut back)
at 333 or 666 or
1,000 mm
Site applied insulation
at 333 mm
at 300 mm
at 333 mm
600 mm
External Gutter
External Gutter
Note:
a according to structural / static requirements
To order eaves gutters systems and accessory
components please contact Kingspan technical
Services Department.
7.
7.1.9
Construction details
Trapezoidal Roof Panels
All technical information is subject to alterations. Errors and omissions excepted.
04
P
20
P
01
L
20
P
04
P
αα
a
50 50
a
530
Overflow
Valley Gutter
Note:
a, b according to structural / static requirements
The prefabricated gutter is recommended to support by 2,000 mm.
To order eaves gutters systems and accessory components please contact Kingspan technical Services
Department.
7.
7.1.10
Construction details
Trapezoidal Roof Panels
All technical information is subject to alterations. Errors and omissions excepted.
12
R
06
P
04
P
17
P
06
P
08
P
20
P
04
P
14
2
K
04
L
20
P
04
P
20
P
08
P
D
D
A
A
D
a
50
α
β
06
P
15
4
K
08
P
21
P
08
P
14
P
a a
at 1
50
mm
at 1
50
mm
Ove
rflow
at 1
50
mm
at 1
50
mm
Sec
tion
A –
A
Site
app
lied
insu
latio
n
Site
app
lied
insu
latio
n
Curved Eaves with Gutter – Roof to Wall
No
te:
a accord
ing t
o s
tructu
ral /
sta
tic r
eq
uirem
ents
The p
refa
bricate
d g
utt
er
is r
ecom
mend
ed
to
sup
port
by
2,0
00 m
m.
7.
7.1.11
Construction details
Trapezoidal Roof Panels
All technical information is subject to alterations. Errors and omissions excepted.
10
07
P
16
P
08
P
132
K
133
K
D
D
14
P
07
P
169
K
04
P
at 300 mm
Site applied insulation
16
P
08
P
172
K
14
P
07
P
04
P
04
P
13
P
12
P
07
P
03
P
139
K
102
K
d
50
D
a
α
at 333 mm
at 150 mm
Site applied insulation
Back putty
Back putty
Outer sheet turned up
Roof to Wall Junction
Roof to Wall Junction in Slope
Note:
a according to structural / static requirements
P12 for roof slope ≤ 10% – 4 pcs / m
> 10% – 2 pcs / m
7.
7.1.12
Construction details
Trapezoidal Roof Panels
All technical information is subject to alterations. Errors and omissions excepted.
31
P
120
K
31
P
141
K
03
P
106
K
14
P
08
P
132
K
31
P
14
P
07
P
04
P
at 200 mm
at 200 mm
at 200 mm
at 500 mm
at 300 mm
Site applied insulation
Butyrub building cement
04
P
102
K
114
K
03
P
07
P
12
P
31
P
120
K
31
P
07
P
14
P
31
P
104
K
α
a
at 200 mm
at 200 mmat 333 mm
at 200 mm
Butyrub building cement
Site applied insulation
Outer sheet turned up
Back putty
Roof to Brickwork Junction
Roof to Brickwork Junction in Slope
Note:
a according to structural / static requirementss
P12 for roof slope ≤ 10% – 4 pcs / m
> 10% – 2 pcs / m
7.
7.1.13
Construction details
Trapezoidal Roof Panels
All technical information is subject to alterations. Errors and omissions excepted.
14
P
07
P
122
K
07
P
14
P
14
P
08
P
08
P
132
K
04
P
121
K
04
P
132
K
14
P
50
35
P
at 300 mm at 300 mm
Site applied insulation PE pipe
50
EPDM sealant supplied and installed
Cover collar
For extractor flue exhaust high temperature
gases/pollutants a suitable fire rated/non-combustible
barrier gasket should be installed by specialist contractor
Sealing designed/supplied and
installed by specialist contractor
diameter varies
Expansion Joint
Roof Penetration Extractor Flue
7.
7.1.14
Construction details
Trapezoidal Roof Panels
All technical information is subject to alterations. Errors and omissions excepted.
27–
30 m
m
50–
60 m
m
∅ d
23
P
PE pipe
Roof Pipe Extractor Flue
Note:
Complete installation contents:
– passage piping packing
– sealing material
– necessary quantity of fasteners
Piping sleeves for better additional sealing of passages can be ordered according to diameter of piping.
See to the section of the Accessories or contact Kingspan Technical Service Department for range of piping
sleeves.
7.
7.1.15
Construction details
Trapezoidal Roof Panels
All technical information is subject to alterations. Errors and omissions excepted.
α
102
K
03
P
07
P
12
P
04
P
17
P
08
P
111
K
a
at 300 mm
at 333 mm
Back putty
Roof/skylight Support curb
Site applied rigid urethane board
Site applied insulation
Outer sheet turned up
132
K
111
K
08
P
14
P
04
P
17
P
03
P
08
P
at 300 mm
at 300 mm
at 500 mm
Roof/skylight Support curb
Site applied rigid urethane board
Site applied insulation
Ridge – Roof / Skylight
Ridge Roof / Skylight Downslope (RW)
Note:
a according to structural / static requirements
P12 for roof slope ≤ 10% – 4 pcs / m
> 10% – 2 pcs / m
7.
7.1.16
Construction details
Trapezoidal Roof Panels
All technical information is subject to alterations. Errors and omissions excepted.
50
300
50
50
250
500
50
d
60
820
aa
21 P
03 P
04 P
18 P
07 P
24
7
K
18 P
17 P
18 P
07 P
04 P
03 P
21 P
21 P
slop
e α
1,0
00
min
. 100
6 p
cs p
er p
anel
6 p
cs
per
pane
l
01 A
Al u
psta
nd
No
te:
a accord
ing t
o s
tructu
ral /
sta
tic r
eq
uirem
ents
Dome Type Roof / Skylight
7.
7.1.17
Construction details
Trapezoidal Roof Panels
All technical information is subject to alterations. Errors and omissions excepted.
50
d1
7 P
a
a
04 P
12 P
08 P
20
3
K
21
7
K
03 P
13 P
17 P04 P
21 P 20 P
Site
app
lied
flash
ingS
ite a
pplie
d
insu
latio
n
Out
er s
heet
turn
ed u
p
Bac
k pu
tty
slop
e α
slop
e β
at 3
33
mm
at 3
33
mm
No
te:
d, D
sp
ecify
dim
ensio
ns t
o d
efi n
e fl a
shin
gs K
20
3 a
nd
K2
17
P12
fo
r ro
of slo
pe ≤
10
% –
2 p
cs /
m
> 1
0%
– 1
pcs /
m
a acco
rdin
g t
o s
tructu
ral /
sta
tic r
eq
uirem
ents
Change of Roofslope
7.
7.2.18
Construction details
All technical information is subject to alterations. Errors and omissions excepted.
Flat Roof Panels
Fixing solution (X-DEK)
Preliminary hole, filled with PUR canister foam
after installation of fastener
Waterproof membrane adhered
or mechanically fixed by others
Site applied butyl sealant
Direct fastener at each rib –
diameter min 5.5 + washer 19 mm
Steel support
Top finish PVC membrane
– FACTORY APPLIED
fully bonded
to the IPN insulation core
Site welded membrane (hot air weld) with adjacent panel after fastener installation
Preliminary hole, filled
with PUR canister foam
after installation of fastener
PVC membrane
side-lap
Site applied butyl sealant
Direct fastener at each rib – diameter min 5.5
+ washer 19 mm or Self Coring Helical fastener (SFS)
Steel support
90–100 mm
Preliminary hole, filled with PUR canister foam
after installation of fastener
Waterproof membrane adhered
or mechanically fixed by others
Site applied butyl sealant
Direct fastener at each rib –
diameter min 5.5 + washer 19 mm
Steel support
Waterproof membrane adhered
or mechanically fixed by others Spreader plate
Site applied butyl sealant
Through fasteners at each rib –
diameter min 5.5
Steel support
KS1000 XD – option 1 KS1000 XD – option 2
KS1000 XD TR20 / TR27 KS1000 XD PVC
7.
7.2.19
Construction details
All technical information is subject to alterations. Errors and omissions excepted.
Flat Roof Panels
04
P
Site applied insulation
gap > 10 mm
Preliminary hole, filled with PUR canister foam
after installation of fastener
Waterproof membrane adhered
or mechanically fixed by others
Back putty
Trapezoidal XD profile filler
03
P
21
P
site applied – max at 500 mm centres if the fire performance is required
– max at 1,000 mm centres if the fire performance not required
Waterproof membrane adhered or mechanically fixed by others
04
P
Site applied insulation
gap > 10 mm
Cut-back
size 50–650 mm
Preliminary hole, filled with PUR canister foam
after installation of fastener
Waterproof membrane adhered
or mechanically fixed by others
Butt joint (X-DEK)
Side lap Stitching detail (X-DEK)
Panel End Lap (X-DEK)
7.
7.2.20
Construction details
All technical information is subject to alterations. Errors and omissions excepted.
Flat Roof Panels
04
P
04
P
04
P
16
P
16
P
08
P
08
P
401a
K
404
K
Preliminary hole, filled with PUR canister foam
after installation of fastener
Waterproof membrane adhered
or mechanically fixed by othersSite applied insulation
04
P
404
K
Preliminary hole, filled with PUR canister foam
after installation of fastenerSite applied insulation
Waterproof membrane adhered
or mechanically fixed by others
Ridge (X-DEK)
Valley (X-DEK)
7.
7.2.21
Construction details
All technical information is subject to alterations. Errors and omissions excepted.
Flat Roof Panels
at 500 mm
at 300 mm
2× at 500 mm
08
P
183
K
07
P
08w
P
28
P
04
P
Preliminary hole, filled with PUR canister foam
after installation of fastener
Hot air weld
150 <
L <
400 m
m
Waterproof membrane adhered
or mechanically fixed by others
Trapezoidal XD profile filler
Back putty
Membrane coated metal flashing
for hot air welding
Site applied insulation
gap min. 10 mm
Gable Wall Parapet (X-DEK)
7.
7.2.22
Construction details
All technical information is subject to alterations. Errors and omissions excepted.
Flat Roof Panels
at 500 mm
at 300 mm
chessboard pattern
2× at 500 mm
08
P
183
K
07
P
08w
P
106
K
at 300 mm07
P
04
P
14
P
Preliminary hole, filled with PUR canister foam
after installation of fastener
Hot air weld
150 <
L <
400 m
m
Waterproof membrane adhered
or mechanically fixed by others
Membrane coated metal flashing
for hot air welding
Site applied insulation
Gable Wall Parapet (X-DEK)
7.
7.2.23
Construction details
All technical information is subject to alterations. Errors and omissions excepted.
Flat Roof Panels
Gal
vani
sed
gutt
er s
uppo
rt
Site
app
lied
rigid
pol
yure
than
e bo
ard
alte
rnat
ivel
y K
ings
pan
insu
late
d gu
tter
Site
app
lied
insu
latio
n
Mem
bran
e co
ated
met
al fl
ashi
ng
for
hot
air
wel
ding
Hot
air
wel
d
13
0
K
Ove
rflow
at 3
00
mm
08 P
at 3
00
mm
28 P 04 P
at 3
00
mm
07 P
at 3
00
mm
07 P
at 1
50
mm
08 P
02 P
Pre
limin
ary
hole
, fille
d w
ith P
UR
can
iste
r fo
am
afte
r in
stal
latio
n of
fas
tene
r
Wat
erpr
oof
mem
bran
e ad
here
d
or m
echa
nica
lly fi
xed
by o
ther
s
Eaves Gutter Parapet (X-DEK)
7.
7.2.24
Construction details
All technical information is subject to alterations. Errors and omissions excepted.
Flat Roof Panels
at 300 mm07
P
Preliminary hole, filled with PUR canister foam
after installation of fastener
Site applied rigid insulation fully adhered 150–
450 m
m
Waterproof membrane adhered
or mechanically fixed by others
Hot air weld
2× at 500 mm
08
P
02
P
at 500 mm 183
K
Membrane coated metal flashing
for hot air welding
Site applied insulation
04
P
Eaves Gutter Parapet (X-DEK)
130
K
at 300 mm
08
P
at 300 mm08
P
02
P
at 300 mm
07
P
Membrane
coated
metal
150–
450 m
m
Membrane coated metal flashing for hot air welding
Hot air weld
Site applied rigid insulation fully adhered
Membrane outlet fixed to roof panel
Preliminary hole, filled with PUR canister foam
after installation of fastener
Waterproof membrane adhered
or mechanically fixed by others
at 300 mm28
P
04
P
Site applied insulation
Eaves Gutter Parapet (with outlet) (X-DEK)
7.
7.2.25
Construction details
All technical information is subject to alterations. Errors and omissions excepted.
Flat Roof Panels
407
K
Preliminary hole, filled with PUR canister foam
after installation of fastener
Waterproof membrane adhered
or mechanically fixed by others
Steel cover flashing
cut to the XD bottom deck shape
Individually designed flashing steel thickness min. 1.1 mm
Trapezoidal XD profile filler
Back putty
03
P
04
P
04
P
at 500 mm08
P
at 300 mm
chessboard pattern
08
P
402
K
> 8
0 m
m
External Gutter (X-DEK)
Valley Gutter (X-DEK)
28
P
Preliminary hole,
filled with PUR canister foam
after installation of fastenerSite applied insulationRoof outlet Hot air weld
Waterproof membrane adhered
or mechanically fixed by others
04
P
28
P
04
P
7.
7.2.26
Construction details
All technical information is subject to alterations. Errors and omissions excepted.
Flat Roof Panels
31
P
at 200 mm
31
P
at 200 mm
31
P
at 200 mm
155
K
groove filled with sealant406
K
04
P at 200 mm
112
K
Preliminary hole, filled with PUR canister foam
after installation of fastener
Membrane coated metal flashing
for hot air welding
Hot air weld Waterproof membrane adhered
or mechanically fixed by others
min
. 300 m
m
Roof to Brickwork Junction (X-DEK)
31
P
at 200 mm
155
K
04
P
406
K
Preliminary hole, filled with PUR canister foam
after installation of fastener
Hot air weld Waterproof membrane adhered
or mechanically fixed by others
min
. 300 m
m
Membrane coated metal
Site applied insulation
gap min. 10 mm
31
P
at 200 mm
groove filled with sealant
Roof to Brickwork Junction in Slope (X-DEK)
7.
7.2.27
Construction details
All technical information is subject to alterations. Errors and omissions excepted.
Flat Roof Panels
Hot air weld PE elastic pipe
Waterproof membrane adhered
or mechanically fixed by others
Preliminary hole, filled with PUR canister foam
after installation of fastener
Expansive filler04
P
04
P
Expansion Joint (X-DEK)
Note:
This joint allows up to 30 mm expansion.
at 300 mm 28
P
at 300 mm 28
P
106
K
04
P
Preliminary hole, filled with PUR canister foam
after installation of fastener
Membrane coated metal flashing
for hot air welding
Site applied rigid polyurethane board
Site applied insulation
Rooflight upstand by others
Waterproof membrane adhered
or mechanically fixed by others
Hot air weld
Gun grade sealant-high temperature rated
min
. 150 m
m
Roof / Skylight – Pyramid / Dome Type – Ridge (X-DEK)
7.
7.2.28
Construction details
All technical information is subject to alterations. Errors and omissions excepted.
Flat Roof Panels
Gun grade sealant
04
P
at 300 mm
28
P
at 300 mm
28
P
Membrane coated metal
Site applied insulation
Preliminary hole, filled with PUR canister foam after installation of fastener
Waterproof membrane adhered
or mechanically fixed by others
Hot air weld
Smoke Vent (X-DEK)
7.
7.2.29
Construction details
All technical information is subject to alterations. Errors and omissions excepted.
Flat Roof Panels
Module Module
Membrane side lap cover strip hot air welded
The drilling hole to fill by the drill core or site applied
insulant after fastening of panel
Roof framework / purlin
Butyl sealing tape or PVC sealing tape
when required (site applied)Fastener – (P04)Variant A – over the support
Variant B – between the supports
Fastener – (P03) (at 300 mm)
Anti-condensation
tape (site applied)
Panel Side Lap (TOP-DEK)
Fastener – (P04) Membrane side lap cover strip hot air welded The drilling hole to fill by the drill core or
site applied insulant after fastening of panel
Intermediate Fixing (TOP-DEK)
7.
7.2.30
Construction details
All technical information is subject to alterations. Errors and omissions excepted.
Flat Roof Panels
a a
04
P
18
P Site applied insulant or P18
The drilling hole to fill by the drill core or site
applied insulant after fastening of panel Membrane cover strip hot air welded
a
50
04
P
18
P Site applied insulant or P18
The drilling hole to fill by the drill core or
site applied insulant after fastening of panel Membrane cover strip hot air welded
Panel End Lap (TOP-DEK)
Panel End Lap (TOP-DEK)
Note:
a according to structural / static requirements
7.
7.2.31
Construction details
All technical information is subject to alterations. Errors and omissions excepted.
Flat Roof Panels
a
04
P
07
P
12
P
12
P
07
P
04
P
101
K
Membrane cover strip hot air
welded min. 200 mm wideSite applied insulation Back putty
07
P
06
Z
04
P
112
K
14
P
07
P
02
P
30 at 300 mm
min. 200 mmFlexible sealing bead Membrane overlap hot air welded
Membrane coated metal
Site applied insulation
Purlin system
Ridge (TOP-DEK)
Gable (TOP-DEK)
Note:
a according to structural / static requirements
7.
7.2.32
Construction details
All technical information is subject to alterations. Errors and omissions excepted.
Flat Roof Panels
08
P
183
K
07
P
28
P
04
P
14
P
07
P
02
P
at 500 mm
at 300 mm
at 300 mm
min. 100 mm
L (m
in. 1
50 m
m)
Membrane coated metalMembrane cover strip
hot air welded
Adhered type membrane
Membrane coated metal flashing
hot air welded
Site applied insulation
Roof purlin
Gable Wall Parapet (TOP-DEK)
7.
7.2.33
Construction details
All technical information is subject to alterations. Errors and omissions excepted.
Flat Roof Panels
a
07
P
08
P
183
K
07
P
04
P
02
P
28
P
Membrane
coated metal
Membrane
coated metal
Continous hot air
weld to membrane
coated metal
at 500 mm
at 300 mm
Membrane outlet fixed
to roof panel
Site applied insulation
Steel support
Membrane overlap
hot air welded
Membrane fully
adhered
Site applied rigid
insulation fully adhered
Membrane overlap
hot air welded
Membrane overlap
hot air welded
Membrane fully
adhered
a
04
P
28
P
07
P
07
P
08
P
130
K
08
P
02
P
at 300 mm at 300 mm
at 300 mm
at 150 mm
at 300 mm
Overflow
Membrane overlap
hot air welded
Site applied insulation Membrane flashing fully adhered Site applied rigid urethane board Galvanised gutter support
Membrane coated metal
Eaves Gutter Parapet (TOP-DEK)
Eaves Gutter Parapet (with outlet) (TOP-DEK)
Note:
a according to
structural / static
requirements
Note:
a according to structural / static requirements
7.
7.2.34
Construction details
All technical information is subject to alterations. Errors and omissions excepted.
Flat Roof Panels
a
40
90
12
P
04
P
28
P
249
K
08
P
08
P
17
P
02
Z
02
P
136
K
02
P
min. 100 mm
min. 200 mm
Membrane hot
air welded
Membrane metal
flashing
Site applied insulation
at 300 mm
at 300 mm
Back putty
External Gutter (TOP-DEK)
Note:
a according to structural / static
requirements
a 04
P
12
P
28
P
04
P
12
P
28
P
Membrane overlap hot
air welded
Membrane overlap hot
air welded
at 300 mm at 300 mm
Back putty
min. 100 mm
Back putty
Internal flashing
Valley Gutter (TOP-DEK)
Note:
a according to structural / static requirements
7.
7.2.35
Construction details
All technical information is subject to alterations. Errors and omissions excepted.
Flat Roof Panels
a
31
P
105
K
31
P
28
P
31
P
07
P
112
K
04
P
Butyrub building
cement
Membrane coated
metal
Membrane fully adhered
Membrane overlap hot
air welded
Continous hot air
weld to membrane
coated metal
Site applied
insulation
at 200 mm
at 200 mm
min
. 300 m
m
min. 100 mm
at 300 mm
Roof to Brickwork Junction (TOP-DEK)
Note:
a according to structural / static requirements
31
P
105
K
31
P
28
P
04
P
112
K
14
P
31
P
Butyrub building
cement
Membrane fully adhered
Membrane overlap
hot air welded
Membrane coated
metal
Continous hot air
weld to membrane
coated metal
Site applied
insulation
at 200 mm
at 300 mm
at 200 mm
min. 100 mm
min
. 300 m
m
Roof to Brickwork Junction in Slope (TOP-DEK)
7.
7.2.36
Construction details
All technical information is subject to alterations. Errors and omissions excepted.
Flat Roof Panels
28
P
07
P
121
K
07
P
35
P
Membrane coated metal to be
fastened to trapezoidal sheet
Membrane overlap
hot air welded
Membrane overlap
hot air welded Site applied insulationat 300 mm PE pipe
Expansion Joint (TOP-DEK)
7.
7.2.37
Construction details
All technical information is subject to alterations. Errors and omissions excepted.
Flat Roof Panels
Cowl
Silicone sealant Silicone sealant
Sleeve
Membrane overlap
hot air welded
Cover collar
Double insulated
jacket exhaust pipe
Membrane overlap hot
air welded
Site applied insulation Diameter
min
. 150 m
m
Roof Penetration Extractor Flue (TOP-DEK)
7.
7.2.38
Construction details
All technical information is subject to alterations. Errors and omissions excepted.
Flat Roof Panels
28
P
28
P
28
P
04
P
Neutral silicone sealant
Membrane coated metal
Site applied rigid urethane
board
Roof / skylight support
Site applied insulation
Continuous hot air weld to
membrane coated metal
Membrane overlap hot air
welded
Membrane overlap
hot air welded
Membrane fully adhered
min. 100 mm
at 300 mm
at 300 mm
at 300 mm
min
. 150 m
m
a
28
P
28
P
28
P
04
P m
in. 150 m
m
min. 100 mm
Neutral silicone sealant
Membrane coated metal
Site applied rigid urethane
board
Roof / skylight support
Continous hot air weld to
membrane coated metal
Site applied insulation
Membrane overlap
hot air welded
Membrane overlap
hot air welded
Membrane fully adhered
at 300 mm
at 300 mm
at 300 mm
Roof / Skylight – Pyramid / Dome Type – Ridge (TOP-DEK)
Roof / Skylight – Pyramid / Dome Type – Downslope (TOP-DEK)
Note:
a according to structural / static requirements
7.
7.2.39
Construction details
All technical information is subject to alterations. Errors and omissions excepted.
Flat Roof Panels
a
04
P
28
P
04
P
28
P
Neutral silicone sealant
Membrane fully adhered
Membrane coated metal
Continous hot air weld to
membrane coated metal
Membrane overlap
hot air welded
Neutral silicone sealant
Membrane fully adhered
Continous hot air weld to
membrane coated metal
Membrane overlap
hot air welded
at 300 mm at 300 mm
Smoke Vent (TOP-DEK)
Note:
a according to structural / static requirements
7.
7.3.40
Construction details
All technical information is subject to alterations. Errors and omissions excepted.
Rooftile
325
0–65
α
03
P
12b
P
12b
P
103c
K
03
P
04
P
14
P
101
K
14
P
04
P
Site applied insulation
at 400 mm at 400 mmBack puttyBack putty
03
P
Sealing tape (factory applied) Vapour proof sealant (bitumen c. d. 6 mm)
Weather sealing tape
at 325 mm
Panel Side Lap
Ridge
7.
7.3.41
Construction details
All technical information is subject to alterations. Errors and omissions excepted.
Rooftile
196–325
α
03
P
12b
P
103c
K
03
P
12b
P
04
P
04
P
14
P
14
P
101
K
Site applied insulation
at 400 mm at 400 mmBack puttyBack putty
325
66–195 (*)
α
25
P
25
P
12b
P
103d
K
04
P
04
P
14
P
14
P
101
K
Site applied insulation
at 400 mm Only to 100 mm (*) Back putty
Only over 100 mm (*)
at 400 mmOnly to 100 mm (*)
Only over 100 mm (*)
Ridge
Ridge
7.
7.3.42
Construction details
All technical information is subject to alterations. Errors and omissions excepted.
Rooftile
14
P
07
P
131
K
106
K
236
K
08
P
25
P
14
P
08
P
12z
P
04
P
07
P
at 325 mm Back puttyat 325 mm
at 333 mm
Site applied insulation
04
P
12z
P
08
P
14
P
25
P
236
K
131
K
at 325 mm Back puttyat 325 mm
Facing timber
Site applied insulation
Gable
Gable
7.
7.3.43
Construction details
All technical information is subject to alterations. Errors and omissions excepted.
Rooftile
40
03 P
03 P
04 P
13 P
08 P
08 P
10
9
K14 P 07 P07 P
02 P
10
8
K
23
2
K
24
0
K
α
420
160
at 3
00
mm
at 3
00
mm
at 3
00
mm
at 3
00
mm
at 4
00
(60
0 o
r 8
00
) mm
Site
app
lied
insu
latio
n
Bac
k pu
tty
External Gutter
7.
7.3.44
Construction details
All technical information is subject to alterations. Errors and omissions excepted.
Rooftile
23
2
K
04 P
α
160
420
24
0
K
13 P
03 P
03 P
08 P
Site
app
lied
insu
latio
n
Faci
ng t
imbe
r
at 4
00
(60
0 o
r 8
00
) mm
Bac
k pu
tty
at 3
00
mm
External Gutter
7.
7.4.45
Construction details
All technical information is subject to alterations. Errors and omissions excepted.
Roofl ights
Kingspan Polycarb RooflightPVC painted steel strip (factory fitted)
KS1000 RW insulated roof panel
Kingspan Polycarb Rooflight
Site applied spacer
30 min
4 No. main fixings
with storm washers
4 No. main fixings
with storm washers
4 No. main fixings with storm washer
in each crown location, per rooflight, per purlin
Direction of lay
Site applied spacer
Side laps stitched at max. 300 mm c/cs with “Mega-stitcher” screws (typ 6.3 mm dia × 25 mm long) with 19 mm dia washers
PVC painted steel strip (factory fitted)
End lap stitchers only inserted
where rooflight end laps
over KS1000 RW panel
6 × 5 mm butyl rubber sealant applied in continuous unbroken length at side lap to weather side of stitching screw
Side lap stitched at 300 mm centres
with 6.3 mm × 25 mm stitching
screws with 19 mm washers
6 × 5 mm butyl rubber sealant
on weather side
Side lap stitched at 300 mm centres
with 6.3 mm × 25 mm stitching
screws with 19 mm washers
6 × 5 mm butyl rubber sealant
on weather side
PVC painted steel strip
(factory fitted)
Side Lap (KS1000 PC)Primary and Side Lap Fasteners
Kingspan Polycarb Roofl ight to Panel Panel to Kingspan Polycarb Roofl ight
End Lap (KS1000 PC)Tail Stitcher Locations
7.
7.4.46
Construction details
All technical information is subject to alterations. Errors and omissions excepted.
Roofl ights
3 runs of 6 × 5 mm butyl rubber sealant
applied in continuous unbroken lengths at end lap
KS1000 RW insulated roof panel
End laps crown stitched 2 times
with “Mega-stitcher” screws
(typ 6.3 mm dia × 25 mm long)
with 19 mm dia washers
4 No. main fixings with storm washer
in each crown location, per rooflight, per purlin
Kingspan Polycarb Rooflight
Additional run of 6 × 5 mm butyl rubber sealant
Site applied spacer
150 mm end lap
50 mm
30 min 30 min
50 mm
3 runs of 6 × 5 mm butyl rubber sealant
applied in continuous unbroken lengths at end lap KS1000 RW insulated roof panel
End laps crown stitched 2 times
with “Mega-stitcher” screws
(typ 6.3 mm dia × 25 mm long)
with 19 mm dia washers
4 No. main fixings with storm washer
in each crown location, per rooflight, per purlin
Kingspan Polycarb Rooflight
Nominal 15 mm
Minimum 10 mm
Site applied spacer
150 mm end lap
50 mm
30 min 30 min
50 mm
End Lap (KS1000 PC)Kingspan Polycarb Roofl ight to KS1000 RW
KS1000 RW to Kingspan Polycarb Roofl ight
7.
7.4.47
Construction details
All technical information is subject to alterations. Errors and omissions excepted.
Roofl ights
Nominal 15 mm
Minimum 10 mm
150 mm end lap
50 mm
50 mm
3 runs of 6 × 5 mm butyl rubber sealant
applied in continuous unbroken lengths at end lap
4 No. main fixings with storm washer
in each crown location, per rooflight, per purlin
Kingspan Polycarb Rooflight
Kingspan Polycarb Rooflight
Additional run of 6 × 5 mm butyl rubber sealant
30 min 30 min
Site applied spacer
End laps crown stitched 2 times
with “Mega-stitcher” screws
(typ 6.3 mm dia × 25 mm long)
with 19 mm dia washers
Position of 4 No. main fixings with 19 mm dia.
and storm washers to crowns
Kingspan Polycarb Rooflight
30 min
Site applied spacer
End Lap (KS1000 PC)Kingspan Polycarb Roofl ight to Kingspan Polycarb Roofl ight
Intermediate Purlin Fasteners (KS1000 PC)
7.
7.4.48
Construction details
All technical information is subject to alterations. Errors and omissions excepted.
Roofl ights
27
P
34
P
242
K
21
P
01
P
d p= 1
6 (2
5; 32)
d
Sealing tape 12×6 mm (part of panel RW/HTL)
Roof purlin
Spacing profile
(part of delivery RW/HTL)
PE shaped filler into panel
(part of panel RW/HTL)
Sealing tape 40×5 mm
(part of panel RW/HTL)
at 500 mm
2 pcs
for spacing profile
For every
corrugation
03p
P
34
P
243
K
21
P
01
Pd p=
16 (2
5; 32)
d
Sealing tape 12×6 mm
(part of panel RW/HTL)
Roof purlin
Spacing profile
(part of delivery RW/HTL)
PE shaped filler into panel
(part of panel RW/HTL)
Sealing tape 40×5 mm
(part of panel RW/HTL)
at 500 mm
2 pcs
for spacing profile
For every
corrugation
Side Lap (KS1000 RW/HTL)RW/HTL–RW
Side Lap (KS1000 RW/HTL)RW–RW/HTL
7.
7.4.49
Construction details
All technical information is subject to alterations. Errors and omissions excepted.
Roofl ights
34
P
233
K
21
P
01
P
27
P
d p= 2
5 (1
6; 32)
d
2 pcs
for spacing profile
For every corrugation at 500 mm
Roof purlin
Spacing profile
(part of delivery FF/HTL)
PE shaped filler into panel
(part of panel FF/HTL)
Sealing tape 40×5 mm
(part of panel FF/HTL)
Sealing tape 12×6 mm
(part of panel FF/HTL)
34
P
233
K
21
P
01
P
03p
P
d p= 1
6 (2
5; 32)
d
2 pcs
for spacing profile
For every corrugationat 500 mm
Roof purlin
Spacing profile
(part of delivery FF/HTL)
PE shaped filler into panel
(part of panel FF/HTL)
Sealing tape 40×5 mm
(part of panel FF/HTL)
Sealing tape 12×6 mm
(part of panel FF/HTL)
Side Lap (KS1000 FF/HTL)FF/HTL–FF
Side Lap (KS1000 FF/HTL)FF–FF/HTL
7.
7.4.50
Construction details
All technical information is subject to alterations. Errors and omissions excepted.
Roofl ights
50
P=250
50
aa
d
03p
P
21
P
17
P
01
P
18
P
6 fasteners per end lap
For every corrugationPE shaped filler into panel
(part of panel RW/HTL)
Spacing profile
(part of delivery RW/HTL)
slope α
50
P=250
50
aa
d
27
P
21
P
17
P
01
P
18
P
slope α
6 fasteners per end lap
spacing profile
(part of delivery RW/HTL)
PE shaped filler into panel
(part of panel RW/HTL)
Panel End Lap – Upslope (KS1000 RW/HTL)
Note:
a according to structural / static requirements
Note:
a according to structural / static requirements
Panel End Lap – Down slope (KS1000 RW/HTL)
7.
7.4.51
Construction details
All technical information is subject to alterations. Errors and omissions excepted.
Roofl ights
P=250
5050
27
P
21
P
18
P
01
P
aa
8 fasteners per end lap
For every corrugation
PE shaped filler into panel
(part of panel RW/HTL)
Spacing profile
(part of delivery RW/HTL)
slope α
Note:
a according to structural / static requirements
Panel End Lap – Intermediate (KS1000 RW/HTL)
01
P
b
For every corrugation
PE shaped filler into panel
(part of panel RW/HTL)
Spacing profile
(part of delivery RW/HTL)
slope α
Note:
b according to structural / static requirements
Intermediate Fixing (KS1000 RW/HTL)