Construction Outlook 2011 - Roy Fisher (Caltrans)

Post on 20-Jan-2015

1,133 views 4 download

Tags:

description

 

transcript

Construction Outlook 2011

Caltrans District 7Los Angeles & Ventura Counties

March 10, 2011

Construction Outlook 2011District

# Contracts

Total Current Allotment

1 38 159,869,899.00$ 2 33 395,462,160.00$ 3 67 1,057,501,991.00$

4 - Non-Toll 111 2,070,889,204.00$ 4-Toll 4 2,276,669,266.00$

5 51 405,250,716.43$ 6 54 454,671,579.50$ 7 111 1,424,180,901.63$ 8 35 496,789,720.00$ 9 11 22,229,000.00$ 10 36 156,356,149.50$ 11 58 1,063,601,008.00$ 12 39 362,835,473.00$

Statewide 648 10,346,307,068.06$

7 111 $ 1,454,671,579.50

Construction Outlook 20119/10 fiscal year awarded 602 contracts

$2.3 billion 10/11 fiscal year to date 258 contracts

$2 billion$444 million in the pipeline now in D-711/12 proposed state budget maintains

roughly the same funding levels

Construction Outlook 2011Alternative Delivery MethodsTraditionally Design Bid Build

Awarded to lowest responsible bidder

Legislation Allows Caltrans Ten Design Build Projects

Five Local Projects

Private Public Partnership in San Francisco (D-4)Partnering

Caltrans/Construction Partnering Steering Committee Construction Deputies Top Management of Construction Firms Conducted Joint Training

Construction Outlook 2011

I-5 South

Construction Outlook 2011

Schuyler Heim Bridge

Construction Outlook 2011

Gerald Desmond Bridge

Additional Informationwww.dot.ca.gov/hq/esc/oe/contractor_info/

Or www.dot.ca.gov

Click on ‘Engineering’Click on ‘Contractor Info Table’

Or Google a contract number:07-241304

Additional InformationProjects less than $250,000Division of Procurement and Contracts

http://caltrans-opac.ca.gov/

Construction Outlook 2011

Questions?