Construction Progress for TechTown 1st Floor Renovation | Nov 1 - Nov 30

Post on 25-May-2015

130 views 0 download

Tags:

description

As this year comes to a close, I reflect back on all of our projects this year. All of our projects presented great opportunities for creative design solutions but the one that stands out the most is TechTown’s 1st Floor Renovation project. This involved renovating nearly 26,000sf of existing office space and transforming the floor into Detroit’s premier Co-Working Space named Junction440 (opening in January 2014). I started posting these slideshares to capture the construction progress of this project every month starting back in May 2013. As the construction for this project finishes up I encourage everyone to view all of progress posted on my slideshare profile. We are blessed & proud of this accomplishment at Centric Design Studio. Enjoy!

transcript

Slide Show of Construction Progress at TechTown - DetroitTechTown 1st Floor Renovation

Nov. 1 - Nov. 30 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Reception Desk Construction ProgressTechTown 1st Floor Renovation

Nov. 1 - Nov. 30 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Sliding Door Installation at 2 Person Meeting RoomTechTown 1st Floor Renovation

Nov. 1 - Nov. 30 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

View Looking at Reception Desk and Co-Working AreaTechTown 1st Floor Renovation

Nov. 1 - Nov. 30 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

View Outside of Future TechTown Suite + Video Conf. Rm.TechTown 1st Floor Renovation

Nov. 1 - Nov. 30 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Future Lobby Waiting AreaTechTown 1st Floor Renovation

Nov. 1 - Nov. 30 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Interior View of Future TechTown Management SuiteTechTown 1st Floor Renovation

Nov. 1 - Nov. 30 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Interior View of Future TechTown Management SuiteTechTown 1st Floor Renovation

Nov. 1 - Nov. 30 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Interior View of Reception + Conference RoomsTechTown 1st Floor Renovation

Nov. 1 - Nov. 30 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Co-Working Kitchen AreaTechTown 1st Floor Renovation

Nov. 1 - Nov. 30 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Glass Tile + Shelves Installed at Co-Working KitchenTechTown 1st Floor Renovation

Nov. 1 - Nov. 30 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Video Monitor Installation at Video Conference RoomTechTown 1st Floor Renovation

Nov. 1 - Nov. 30 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Co-Working Cubical AreaTechTown 1st Floor Renovation

Nov. 1 - Nov. 30 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Soft Seating Furniture at Co-Working AreaTechTown 1st Floor Renovation

Nov. 1 - Nov. 30 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Soft Seating (Foreground) Conference Room (Background)TechTown 1st Floor Renovation

Nov. 1 - Nov. 30 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Co-Working Cubical ChairsTechTown 1st Floor Renovation

Nov. 1 - Nov. 30 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

View Looking West at Reception + Lobby AreaTechTown 1st Floor Renovation

Nov. 1 - Nov. 30 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

View Inside Conference Room 2 with Conf. Table + ChairsTechTown 1st Floor Renovation

Nov. 1 - Nov. 30 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

View Inside Conference Room 5 with Lounge FurnitureTechTown 1st Floor Renovation

Nov. 1 - Nov. 30 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

View of Corridor 2 with Bench SeatingTechTown 1st Floor Renovation

Nov. 1 - Nov. 30 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Copy CenterTechTown 1st Floor Renovation

Nov. 1 - Nov. 30 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Co-Working Seating AreaTechTown 1st Floor Renovation

Nov. 1 - Nov. 30 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Co-Working Seating AreaTechTown 1st Floor Renovation

Nov. 1 - Nov. 30 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Waiting Lobby FurnitureTechTown 1st Floor Renovation

Nov. 1 - Nov. 30 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

TechTown’s Grand Opening of Junction440, Coming Jan. 2014TechTown 1st Floor Renovation

Nov. 1 - Nov. 30 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com