CROSSRAIL MOVING LONDON FORWARD Terry Morgan CBE Chairman - Crossrail.

Post on 05-Jan-2016

221 views 2 download

Tags:

transcript

CROSSRAILMOVING LONDON FORWARD

Terry Morgan CBEChairman - Crossrail

Header here max 30 charactersCrossrail route

Cost £14.8bn

Net benefit £42bn

Length 118km

Stations 40 (10 new)

Trains per hour 24

Journeys pa 200m

Header here max 30 charactersTunnelling progress

Header here max 30 charactersCrossrail: delivering a railway

13 14 15 16 17 182012

Railway Systems

Stations

Rolling Stock & Depot

NR Surface Works

Test and Com

mission

Trial O

peration

Crossrail TOC

Civils and Tunnelling

Property Acquisition

OSD & Urban Realm

5

Under Platform Services Area

Station Structure

Track Systems

Traction Power & Overhead Line

Equipment

Emergency Walkway

Gravity Drainage

HV Power

LV Power

Tunnel Lighting

Communications& Control

Radio Systems

Signalling

Platf

orm

Doo

rs

Tunnel Ventilation

Pumped Drainage

Pump

Smoke Extract

Fire Detection Station Ventilation

Station Lighting Signage

Passenger Information

CCTVPA / VA

Hel

p Po

int

Fire Main Station Cable Management

System

Station Systems

Automatic Fare Collection

Lifts & Escalators

Station Management

System

Station Heating, Cooling and Air

Conditioning

Route Wide Railway Infrastructure

Route Control Centre

Back Up Control Facility

Bulk Supply Points

Auto Trans-former Sites

Depots & Stabling

Rolling Stock

Paddington

Railway and Tunnel Systems

Header here max 30 charactersThe second half - Delivering a world class railway

Header here max 30 charactersLightweight, energy efficient rolling stock

200m long trains; 1,500 capacityRegenerates energy during braking Aluminium constructionLightweight inside-framed bogiesReduced weight cuts energy consumptionReduced weight and ‘unsprung mass’ helps reduce noise and track-wear Driver advisory systemsSmart control systems for heating and lightingDigital asset management enables preventative maintenance

Header here max 30 charactersSustainability

May 2015446 Apprentices

10,086 enrolled at TUCA

c. 12,000 employed on the project

3,886 jobs for local/previously unemployed people

Header here max 30 charactersWider skills agenda

Header here max 30 charactersThank you