Cumberland Investment...Trammell Crowe’s Alexan at Overlook - Multifamily, 300 Units, Under...

Post on 06-Jul-2020

0 views 0 download

transcript

258

259A

259B

259A

260

259

260

Mixed-Use1. Ackerman’s Stadium Walk 2. Atlanta Braves’ The Battery Atlanta 3. Denton’s Broadstone at Windy Ridge4. JLB Realty LLC 2747 Paces Ferry5. Encore Center, Cobb Galleria Pkwy, DRI w/ ARC6. Riverview- Cobb Pkwy & Paces Mill, 8/16/16

Office7. Childress Klein’s Galleria 500 8 Childress Klein’s Galleria 5559. Genuine Parts Company Headquarters10. Greenstone’s Encore Center11. Highwoods and Seven Oaks’ Riverwood 20012. Hines’ Two Overton Park13. Pope & Land’s 200 City View14. TPA Group’s 1100 Overton

Residential15. Acadia Homes’ Sutton Park 16. Arrowhead’s Stillhouse Lane17. Atlantic Realty’s The Reserve at the Ballpark18. John Wieland Homes’ Gates at Ivy Walk19. JW Acquisitions’

Arbington at Wildwood20. Mill Creek Residential21. Oxford Properties’ Encore22.. Pope & Land/River Oaks Drive23. Pope & Land’s Stillhouse Ridge24. Pulte Homes’ Cumberland at Beech Haven Trail25. Pulte Homes’ Terrell Mill Ivy Gate26. Pulte Homes’ Vinings Crest27. Ryland Homes’ Towns at Breton Ridge28. The District at Windy Hill 29. Trammell Crowe’s Alexan at Overlook30. Walton Riverbend31. Brooks Chadwick’s Capital32. Atlantic Realty Development, Phase 3, 8/16/16

Cumberland will realize $4.0 billion in public and private investment between 2013 and 2018.• $2.0 billion in private

• 1.8 million sq ft new Class A office• 6,806 new residential units zoned• 1,397 new hotel rooms• 625,500 sq ft new retail

• $2 billion in area publicinfrastructure improvements

Zoned Under Construction Completed

Hotel33. 1100 Overton Hotel

34. Marriott Courtyard at Vinings35. Candlewood Suites

Retail/ Other36. Olshan Properties’ Akers Mill Square Bonefish Grill37. SpaceMax Storage Facility at Powers Ferry 38. WellStar Vinings Health Park39. Passion City Church

Select CID Capital Improvement ProjectsWindy Hill Improvement Projects Including: Diverging Diamond InterchangeUS 41/Cobb Parkway Widening and Trail US 41/Cobb Parkway Bridge Replacement Street/Ped Lighting & Mast Arms Project (various routes)Cumberland Blvd West Intersection Improvements & Streetscape Cumberland Boulevard Bridgescape Bob Callan Trunk Trail ExtensionRiverwood Parkway Streetscape US 41/Cobb Parkway Central Streetscape & Mast Arms Akers Mill Road Central & West Streetscapes Akers Mill Trail East

Other Select Public Infrastructure ProjectsAtlanta Road InterchangeBraves Related Infrastructure Improvements SPLOST Cumberland Related Projects Including: Terrell Mill ConnectorWater Main Infrastructure

Cumberland Investment

21

2916

18

2

27

17

1

7

8

23

11

13

3728

31

4

33

14

19

25

24

22

26

33

30

39

1520

12

10

34

35

5

9

32

37

38

6

Private Investment Projects PipelineMixed-Use Delivery/Projected Delivery Date - Map Location Number: Planned/Under Construction/Completed

Ackerman’s Stadium Walk - 392 Multifamily units, 290 Hotel rooms, 80,000 Sq Ft Retail, 2018 - 1.Atlanta Braves - 630,000 Sq Ft office, 600 Multifamily units, 260 Hotel units, 500,000 Sq Ft Retail, 2017 - 2.Denton’s Broadstone at Windy Ridge - 280 Multifamily units, 8,000 Sq Ft retail, 2017 - 3.JLB Realty LLC’s 2747 Paces Ferry - 295 Multifamily units, 71 Townhomes, 35,000 Sq Ft Retail, Late 2017-Early 2018 - 4.Encore Center, Cobb Galleria Pkwy, DRI review with ARC, 450K Office, 45K Retail, 600 Residential-5.Riverview, 250K Office, 105K Retail, 300 Residential Units-6.

Office Delivery/Projected Delivery Date - Map Location Number: Planned/Under Construction/Completed

Childress Klein’s Galleria 500 - 475,000 Sq Ft, Zoning Approved, TBD - 7.Childress Klein’s Galleria 555 - 250,000 Sq Ft, Zoning Approved, TBD - 8.Cousins Properties’ Genuine Parts Company Headquarters - 200,000 Sq Ft, Bonds Approved & Validated, Under Construction, 2016 - 9.Greenstone’s Encore Center - 200,000 Sq Ft, Bonds Approved & Validated, 2018 - 10.Highwood & Seven Oaks’ Riverwood 200 - 350,000 Sq Ft, Bonds Approved & Validated, Under Construction, 2017 - 11.Hines’ Two Overton Park - 390,000 Sq Ft, Zoning Approved, TBD - 12.Pope & Land’s 200 City View - 450,000 Sq Ft, Zoning Approved, TBD - 13.TPA Group’s 1100 Overton - 400,000 Sq Ft, Bonds Approved & Validated, 2017 - 14.

Residential Delivery/Projected Delivery Date - Map Location Number: Planned/Under Construction/Completed

Acadia Homes’ Sutton Park - Townhomes, 25 Units, Under Construction, 2016 - 15.Arrowhead’s Stillhouse Lane - Townhomes, 39 Units, Under Construction, 2015 - 16.Atlantic Realty’s The Reserve at the Ballpark - Multifamily, 320 Units, Under Construction, 2016 - 17.John Wieland Homes’ Gates at Ivy Walk - Townhomes, 24 Units, Under Construction, 2016 - 18.JW Acquisitions’ Arbington at Wildwood - Townhomes, 45 Units, Zoning Approved, 2016 - 19. Mill Creek Residential - Multifamily, 300 Units, Zoning Approved, TBD - 20.Oxford Properties’ Encore - Multifamily, 327 Units, Under Construction, 2016 - 21.Pope & Land’s River Oaks Drive - Multifamily, 259 Units, Zoning hearing in March 2016 - 22.Pope & Land’s Stillhouse Ridge - Multifamily, 240 Units, Zoning Approved, TBD - 23.Pulte Homes’ Cumberland at Beech Haven Trail - Townhomes, 28 Units, Zoning Approved, TBD - 24. Pulte Homes’ Terrell Mill Ivy Gate - Townhomes, 52 Units, Zoning Approved, 2017 - 25. Pulte Homes’ Vinings Crest - Townhomes, 63 Units, Under Construction, 2016 - 26.Ryland Homes’ Towns at Breton Ridge - Townhomes, 74 Units, Under Construction, 2016 - 27.The District at Windy Hill - Multifamily, 275 Units, Zoning approved, 2017 - 28.Trammell Crowe’s Alexan at Overlook - Multifamily, 300 Units, Under Construction, 2016 - 29.Walton Riverbend - Multifamily, 26 Units,TBD, 2016 - 30.Brooks Chadwick Capital @ Paces Ferry & Spring Hill Pkwy - 67 Townhomes, TBD - 31.Atlantic Realty Development, Phase 3, 224 Multifamily units-32.

Hotel Delivery/Projected Delivery Date - Map Location Number: Planned/Under Construction/Completed

1100 Overton Hotel - Planned, 350,000 sq ft, 350 rooms, 2015 - 33. Marriott Courtyard at Vinings, 350,000 sq ft, 400 rooms Zoning Approved, TBD - 34.Candlewood Suites - 5-story, 92 rooms, TBD - 35.

Retail/Other Delivery/Projected Delivery Date - Map Location Number: Planned/Under Construction/Completed

Olshan Properties’ Akers Mill Square - Bonefish Grill,TBD- 36.SpaceMax Storage Facility at Powers Ferry - Delivered, 2015 - 37 Well Star Vinings Health Park, 105K sq ft, -38.Passion City Church-Cobb Pkwy & Cumberland Blvd, 186,972 sq. ft. TBD - 39.

This list is gathered through the public records for Cobb County and does not claim to be exhaustive.

Trammell Crowe’s Alexan at Overlook

Atlantic Realty’s The Reserve at the Ballpark

Ackerman’s Stadium Walk

Highwoods & Seven Oaks’ Riverwood 200

Public Investment Projects PipelineSelect CID Capital Improvement ProjectsFUNDING SOURCE ESTIMATED COMPLETION TOTAL COST

Windy Hill Improvement Projects Including: Diverging Diamond Interchange - CID/Cobb SPLOST/SRTA 2017 $48 mUnder Construction - East & West Improvements Broke Ground, DDI will break ground by the end of 2015 US 41/Cobb Parkway Widening and Trail - CID/Cobb SPLOST/GDOT 2017 $35.7 mUS 41/Cobb Parkway Bridge Replacement - CID/Cobb SPLOST/GDOT 2015 $18.8 mStreet/Ped Lighting & Mast Arms Project (various routes) - CID 2017 $3.6 mCumberland Blvd West Intersection Improvements & Streetscape - CID/Cobb SPLOST/TBD 2017 $6.3 mCumberland Boulevard Bridgescape - CID/GDOT 2017 $1 mBob Callan Trunk Extension - CID/FHWA/ARC 2018 $9 mRiverwood Parkway Streetscape - CID 2016 $0.6 mUS 41/Cobb Parkway Central Streetscape & Mast Arms - CID/ARC 2015 $3.8 mAkers Mill Road Central & West Streetscapes - CID/ARC 2017 $4.5 mAkers Mill Trail East - CID 2015 $2.9 m

Other Select Public Infrastructure ProjectsFUNDING SOURCE ESTIMATED COMPLETION TOTAL COST

Cumberland Circulator/Shuttle System - Cobb SPLOST/Federal Aid/Other 2017 $3.35 mI-285 Pedestrian Bridge - CID/Federal Aid TBD $9.8 mInterstate North Parkway / Realignment & Pedestrian Improvements - Cobb SPLOST/State Aid 2017 $4.55 mNorthwest Corridor Express Lanes - GDOT 2018 $830 mWater Main Infrastructure - Cobb $68 mWindy Hill / Terrell Mill Connector - Cobb SPLOST/State Aid/Other TBD $30 mWindy Ridge Parkway / Pedestrian Improvements on Bridge - Cobb SPLOST/State Aid/Other 2017 $10 m

Cumberland Boulevard Bridgescape

Windy Hill and I-75 DDI

US 41/Cobb Parkway Bridge Replacement

Northwest Corridor Express Lanes at I-75 & I-285

Through 7/15/16 the total value of permits in the CCID is $196 million ($185 million is commercial or CID taxable). This makes up 56% of Cobb County’s total commercial permit value to date in 2016.

JLB Realty’s Paces Ferry Development