CUSTOMER: Ciment Calcia – Heidelberg Cement (former Italcementi)
LOCATION: Couvrot (France)
YEAR: 2012
PROJECT: Job No. 2870 - Coal & Petcoke Handling System to Grinding Mill
COAL RECEIVING,
SIZING &
CLASSIFICATION
…Building for the Future
COAL TRANSPORT
CO
AL
ST
OR
AG
E
PROJECT: Job No. 2870 - Coal & Petcoke Handling System to Grinding Mill
DESCRIPTION: TPD-01 / COAL RECEIVING, SIZING & CLASSIFICATION
BAG
FILTER
VIBRATING SCREEN
…Building for the Future
BW 1000 – CAPACITY 250 tph
CONVEYOR TO
STORAGE
TRUCK SURFACE
FEEDER
MAGNETIC
SEPARATOR
METAL
DETECTORDISCARDED
SIZE
PROJECT: Job No. 2870 - Coal & Petcoke Handling System to Grinding Mill
DESCRIPTION: TPD-01 / COAL RECEIVING, SIZING & CLASSIFICATION
BAG FILTERTRAMP METAL
SEPARATION / DETECTIONVIBRATING SCREENDISCARDED SIZE
…Building for the Future
BW 1000 – CAPACITY 250 tph
Screen House and Discarded Size Handling
(pre-cladding)
Truck Surface Feeder and Tramp Metal Facility
PROJECT: Job No. 2870 - Coal & Petcoke Handling System to Grinding Mill
DESCRIPTION: TPD-04 / COAL TRANSPORT
PREVAILING WIND
…Building for the Future
BW 800 – CAPACITY 150 tph
WEIGHING SYSTEM
COUNTERWEIGHT TOWER
BAG FILTER
PREVAILING WIND
PROJECT: Job No. 2870 - Coal & Petcoke Handling System to Grinding Mill
DESCRIPTION: HP-01 / COAL STORAGE AND FEEDING TO GRINDING MILL
HOPPER
VOLUME 120m3
NET CAPACITY 75m3
EX
TR
AC
TIN
G R
ED
LER
W1
20
0 L
=6
08
5m
m 3
0tp
h
REDLER TO MILL
W1000 L=7625mm 30tph
WITH 2 SLIDE GATES
…Building for the Future
TPD-04
EX
TR
AC
TIN
G R
ED
LER
W1
20
0 L
=6
08
5m
m 3
0tp
h
EM
ER
GE
NC
Y R
ED
LER
W6
30
L=
10
22
5m
m 3
0tp
h
WITH 2 SLIDE GATES
CUSTOMER: Sommet SA – Arcelor Mittal
LOCATION: Cokerie de Seremange, Florange (France)
YEAR: 2014
PROJECT: Job No. 2962 - Coke Handling and Emergency Stock
COKE CAR
RECEIVING
EMERGENCY
STOCKPILE
SORTING
…Building for the Future
TRANSFER TO
RAILCAR LOADING
SORTING
TOWER
PROJECT: Job No. 2962 - Coke Handling and Emergency Stock
DESCRIPTION: COKE CAR RECEIVING AND CONVEYOR TS1
SORTING TOWERVIBRATING FEEDER
…Building for the Future
BW 1200 – CAPACITY 170 tph
PROJECT: Job No. 2962 - Coke Handling and Emergency Stock
DESCRIPTION: STOCKPILE BELT CONVEYOR TS2
SORTING TOWER
…Building for the Future
BW 1200 – CAPACITY 170 tph
PROJECT: Job No. 2962 - Coke Handling and Emergency Stock
DESCRIPTION: SORTING TOWER
…Building for the Future
BW 1200 – CAPACITY 170 tph
HIGH ABRASIVE MATERIAL
REQUIRES CUSTOMIZED
SOLUTION ON IMPACT AND
TRANSFER ARE SUCH AS SPECIAL
LINERS, ROCK BOX, ETC..
HIGH ABRASIVE MATERIAL
REQUIRES CUSTOMIZED
SOLUTION ON IMPACT AND
TRANSFER ARE SUCH AS SPECIAL
LINERS, ROCK BOX, ETC..
PROJECT: Job No. 2962 - Coke Handling and Emergency Stock
DESCRIPTION: TRANSFER TO RAILCAR LOADING CONVEYOR
…Building for the Future
BW 1200 – CAPACITY 170 tph
HIGH ABRASIVE MATERIAL
REQUIRES CUSTOMIZED
SOLUTION ON IMPACT AND
TRANSFER ARE SUCH AS SPECIAL
LINERS, ROCK BOX, ETC..
HIGH ABRASIVE MATERIAL
REQUIRES CUSTOMIZED
SOLUTION ON IMPACT AND
TRANSFER ARE SUCH AS SPECIAL
LINERS, ROCK BOX, ETC..
CUSTOMER: Coeclerici Logistics SpA
LOCATION: East Kalimantan, Borneo Region (Indonesia)
YEAR: From 2008 to today
PROJECT: Various - Offshore Floating (Storage) Transfer Station
…Building for the Future
CUSTOMER: Coeclerici Logistics SpA
LOCATION: East Kalimantan, Borneo Region (Indonesia)
YEAR: From 2008 to today
PROJECT: Various - Offshore Floating (Storage) Transfer Station
…Building for the Future
PROJECT: Various - Offshore Floating (Storage) Transfer Station
DESCRIPTION: FTS “Bulk Java” in Operation
…Building for the Future
BW 1200/1600 - CAPACITY UP TO 2.400 tph
PROJECT: Various - Offshore Floating (Storage) Transfer Station
DESCRIPTION: COAL RECEIVING HOPPERS
…Building for the Future
CAPACITY abt. 50m3 (each)
PROJECT: Various - Offshore Floating (Storage) Transfer Station
DESCRIPTION: TRANSFER CONVEYORS, TRAMP METAL DETECTORS, SAMPLING SYSTEM
TRAMP METAL DETECTOR
…Building for the Future
BW 1200/1600 - BELT SPEED 4m/s - CAPACITY 1.200 tph (each)
SAMPLING
SYSTEM
PROJECT: Various - Offshore Floating (Storage) Transfer Station
DESCRIPTION: TRANSFER CONVEYORS, E-HOUSE
E-HOUSE
WEIGHING
SYSTEM
…Building for the Future
BW 1200/1600 - BELT SPEED 4m/s - CAPACITY 1.200 tph (each)
PROJECT: Various - Offshore Floating (Storage) Transfer Station
DESCRIPTION: SHIPLOADER
LOADING SPOUT:
� AXIAL TILTING +50/-25° FROM VERTICAL (HYDRAULIC)
� TRAVERSE TILTING ±25° FROM VERTICAL (HYDRAULIC)
…Building for the Future
BW 1200 - BELT SPEED 4m/s - CAPACITY 1.200 tph (each)
BOOM LENGTH 30m / LUFFING RANGE -10/+12° (hydraulic) / SLEWING RANGE 270° (hydraulic)