Surf Coast Shire Council Annual Budget – 2015-2016 Page 2 of 106
Contents Page
Mayor’s introduction .................................................................................................................................. 3
Chief Executive Officer’s Summary ............................................................................................................... 4
Budget processes ...................................................................................................................................... 12
1. Linkage to the Council Plan .................................................................................................................... 13
2. Services, initiatives and Service Performance Indicators ........................................................................... 15
3. Budget influences.................................................................................................................................. 28
4. Analysis of operating budget .................................................................................................................. 32
5. Analysis of budgeted cash position ......................................................................................................... 40
6. Analysis of capital budget ...................................................................................................................... 45
7. Analysis of budgeted financial position ................................................................................................... 50
8. Strategic resource plan and key financial indicators ................................................................................. 53
9. Rating strategy ...................................................................................................................................... 56
10. Other strategies .................................................................................................................................. 59
Appendix A ‐ Financial statements ............................................................................................................. 63
Appendix B ‐ Statutory disclosures ............................................................................................................. 68
Appendix C ‐ Capital works program and new initiatives .............................................................................. 75
Appendix D ‐ Fees and charges schedule ..................................................................................................... 81
Appendix E ‐ Cash Reserves ....................................................................................................................... 95
Appendix F – Local Government Rates Capping Framework Terms of Reference .......................................... 100
Appendix G – Council Contributions to External Parties ............................................................................. 103
Appendix H – Asset Renewal Backlog ....................................................................................................... 104
Surf Coast Shire Council Annual Budget – 2015-2016 Page 3 of 106
Mayor’s introduction
It is my pleasure to present the third budget of this Council term.
The budget reflects the progression of Council’s key strategies whilst being mindful of rate
affordability for our community. Council has conducted a mid‐term review of the Council Plan that
largely affirmed its planned objectives. The proposed updated Council Plan has been released for
community comment in line with the release of this budget.
The budget sees a rate increase of 5.5% for existing ratepayers, including the municipal charge. This
increase in part addresses the funds foregone from the three year freezing of Commonwealth
financial assistance grants, estimated in total to be in the order of $255,000 every year. The rate
income contribution from new ratepayers is in addition to this rate increase.
The Victorian Government’s rate capping policy is also scheduled to commence from 1 July 2016.
While details are not yet known, a 2% lower rate increase would reduce Council funds for initiatives
by approximately $720,000 every year. At this stage Council has made no allowance for this impact
and we will issue an updated financial plan once rate capping details are finalised.
Surf Coast Shire includes communities with significant growth and those with less growth. Growing
communities need supporting infrastructure, while all areas of our Shire reasonably expect
opportunities for some new investment and sound maintenance of their existing facilities and roads.
This budget document includes enhancements that support these objectives. For example, the
delineation of rates from existing and new ratepayers indicates the contribution being made by
growth. Additionally, changes in how asset renewal is funded will support facility and road
maintenance.
For the first time Council is also publishing the Asset Renewal Backlog, being assets that require
renewal however at this stage exceed Council’s capacity to provide funding.
Council believes these changes improve transparency and will support great discussions with the
community on how Council raises and allocates its available funds. Council looks forward to further
improvements in its financial management and the budget document over time.
The budget document outlines funding for a wide range of initiatives, however I would like to
highlight one in particular. Council plans to upgrade the remainder of its streetlights to energy
efficient LED globes. This budget includes the first year of funding towards this important goal.
The budget will be on public consultation for 30 days with a number of consultative forums across
the Shire. I encourage you to come to these forums and we would welcome comments and
submissions prior to the budget’s formal consideration and adoption.
Cr Margot Smith Mayor
Surf Coast Shire Council Annual Budget – 2015-2016 Page 4 of 106
Chief Executive Officer’s Summary Council’s annual budget seeks to meet the needs of the upcoming year as well as pursuing long term
priorities. In doing so Council seeks to address the needs and aspirations of existing ratepayers and
new ratepayers in the future.
Council has set this year’s rate increase to be 5.5%. Council is mindful of affordability concerns for
our ratepayers and balances this with the need to deliver services, maintain existing facilities and
roads, and provide for the needs of our growing community.
The budget provides significant funding of $18.2 million for capital works, including over $8.2m to 45
new/upgrade projects and an allocation of $6.0m to 25 renewal programs. Candidate projects did
however exceed available funding and required Council to prioritise and shift out the timing of some
projects. The ongoing prioritisation of new initiatives is a vital facet of Council’s long term planning
and it is intended to engage the community in this process. Council has also identified $1.1 million of
new initiatives to be supported across the shire.
Officers seek to continually improve Council’s financial management and the information provided
for our community. This year’s budget document demonstrates this approach and includes a
number of enhancements that aim to add value:
Separately identifying rates raised from existing and new ratepayers
Adopting an asset renewal funding allocation rather than fluctuating annual amounts
Stating the asset renewal backlog, reflecting candidate projects that could not be funded
Updated list of Council reserve accounts, including a specific account for Unallocated Cash
Principle of maintaining $0.25m accumulated unallocated cash as a contingency
Including a contributions summary, outlining Council funds provided to organisations
Additional break down of service area net costs
Funding carried forward capital works and new initiatives projects from specific reserve
accounts
Managing new initiatives projects separate to cost centre budgets
In addition to these budget enhancements, Council has also implemented changes to its monthly
financial report:
Approval of project budget changes at the individual project level
Providing a year to date listing of all changes to the accumulated unallocated cash reserve
Council is reviewing its financial management approach and further enhancements to future budget
documents are anticipated.
I thank Councillors and staff for their ongoing commitment and hard work in preparing this budget.
Surf Coast Shire Council Annual Budget – 2015-2016 Page 5 of 106
Rates
It is proposed for rates to increase for existing ratepayers by 5.5% for the 2015/16 year, which
includes both general rates and the municipal charge. In addition, it is estimated that $0.5m in
supplementary rates will be raised from new ratepayers.
Council’s long term financial planning now identifies the rate funds that are estimated to be raised
from new ratepayers. These funds are substantial over time and important in supporting the needs
of a growing population.
Surf Coast Shire Council Annual Budget – 2015-2016 Page 6 of 106
Annual Result
Local government financial reporting often includes a number of pre‐allocated items that can make it
difficult for readers to easily understand performance. This may include items such as specific
charges, contributions, grants and project funding that are not available to fund Council regular
operations, as they are required to be allocated to particular purposes. Council also then makes
additional allocations through the budget process.
Accordingly an additional measure is provided in addition to the overall Net Surplus, the Operating
Surplus. This measure highlights underlying operational performance by excluding all pre‐allocations.
Net Surplus
The expected net surplus for the 2015/16 year is $7.7m. It is important to note this result includes
many one‐off factors such as external capital funding that are pre‐allocated to prescribed uses. This
can make comparison over time difficult.
Operating Surplus
Surf Coast Shire Council Annual Budget – 2015-2016 Page 7 of 106
Council’s long term financial plan is updated during the year to assist Council in forming the annual
budget. A key objective of the plan is financial sustainability in the medium to long term, while still
achieving Council’s strategic objectives as specified in the Council Plan.
The Operating Surplus is a measure of financial sustainability as it seeks to remove non‐recurring or
one‐off items that can mask the underlying result. The expected operating surplus for the 2015/16
year is $1.4 million.
The 2016/17 deficit of $4.7 million can partially be attributed to a budgeted $8.6 million of expensed
capital works.
Unallocated Cash
Unallocated cash refers to the cash available after allocations are made to meet Council’s funding
commitments and priorities.
Accumulated unallocated cash refers to the accumulation of prior year unallocated cash. It
comprises the prior year closing balance plus the unallocated cash for the current financial year, plus
or minus any unanticipated cash items or cash allocations.
Council has established a financial planning principle of maintaining a $0.250m accumulated
unallocated cash minimum balance. This will support Council’s ability to respond to opportunities or
issues that may arise throughout the year.
A dedicated reserve account is being established for accumulated unallocated cash. A formal
resolution at a Council meeting is required to utilise these funds.
Council is undertaking a review of unallocated cash and will affirm balances during the upcoming
year.
Cash and Investments
Surf Coast Shire Council Annual Budget – 2015-2016 Page 8 of 106
Cash and investments are expected to increase by $1.1m during the year to $22.3m. This balance is
expected to reduce in future years in line with capital works expenditure.
Capital Works
The capital works estimated spend for the 2015/16 is expected to be $18.2m, of which $1.1m relates
to projects that will be carried forward from the 2014/15 year. The carried forward component is
funded from previous budgets with those funds held at year end in a reserve account.
The capital works program has been based on analysis and consultation that has enabled Council to
assess needs and develop sound justification for each project.
Asset Renewal Allocation
$0.0
$2.0
$4.0
$6.0
$8.0
$10.0
$12.0
$14.0
Millions
Asset Renewal Allocation
Surf Coast Shire Council Annual Budget – 2015-2016 Page 9 of 106
Council’s capital works program is comprised of works for new or upgraded infrastructure and works
to renew existing infrastructure.
Council has established an asset renewal funding strategy that provides an overall allocation to asset
renewal, rather than determining each year’s funding from the projects that are to be undertaken
that year. This approach is based on predicting the level of asset renewal funding required in the
longer term (at this stage 15 years) and smoothly increasing the annual allocation to achieve that
target. The annual allocation is placed into the Asset Renewal Reserve, with approved renewal
projects drawing on that balance as required.
This approach aims to smooth the impact of increasing renewal allocations on Council’s budgets.
Council is also focused on improving its long term modelling for the renewal requirement, enabling
the target to be affirmed each year and the continual refinement of Council’s funding level.
Utilising a known allocation rather than having renewal requirements compete for funding against
new priorities reflects Council’s commitment to maintain existing facilities. This supports those
communities that are not growing at the same rate as others in the Shire and may not receive
funding for many new or upgraded facilities.
Asset Renewal Backlog
Council has assets such as facilities and roads to support its services. When the condition of an asset
degrades to the point that it impedes the service then Council needs to consider whether the asset
will be renewed. Council then prioritises renewal candidates within available renewal funding, with
those unable to be funded identified as being on the Asset Renewal Backlog.
Council’s currently identified backlog is $1.3m with those assets currently on the backlog listed in
appendix H of this document. Related projects will be considered for funding in next year’s budget,
along with other assets whose condition reaches that point within the next 12 months.
Officers run models that estimate the asset renewal requirement into the future. Given Council’s
Asset Renewal Funding Strategy provides a known level of renewal allocation, the likely future
Surf Coast Shire Council Annual Budget – 2015-2016 Page 10 of 106
backlog can be predicted. Officers aim to include the longer term renewal backlog in future budget
documents.
Financial Position
Net assets is an indicator used to measure Council’s financial position; however it largely reflects the
size of Council’s asset base. It is however unlikely that Council would be able to or choose to realise
substantive funds from disposing of these assets. The scale of these assets does however highlight
the asset renewal challenge faced by Councils.
Debt Management
No further borrowings are planned for the 2015/16 year. Council continues to maintain a moderate
level of debt, however is planning to take out a further loan of $1.6m in 2016/17 and $3.0m in
2017/18 as part of funding for the North Torquay Children’s Hub.
Surf Coast Shire Council Annual Budget – 2015-2016 Page 11 of 106
Council’s debt level at 30 June 2016 will be $15.5m, being 39% of Rate Revenue (a commonly
referred to industry indication, with the recommended prudential guidelines to be within 60%).
Strategic Objectives
Rate Capping
Council acknowledges the election commitment of the Victorian Government to introduce rate
capping. The government has sought the advice of the Essential Services Commission (ESC) regarding
the implementation of this policy, with a response required by 31 October 2015. The Local
Government Rates Capping Framework Terms of Reference has been provided for information as
Appendix F.
Council is seeking to work with the local government sector and government to ensure the
implications of this policy are understood and for it to be implemented in a pragmatic manner.
Updated Long Term Financial Plan
Council anticipates preparing an updated long term financial plan in November 2015.
This updated plan will allow for consideration of the impacts of rate capping, the actual financial
result for 30 June 2015 and Council’s consideration of potential major new initiatives.
Keith Baillie Chief Executive Officer
Surf Coast Shire Council Annual Budget – 2015-2016 Page 12 of 106
Budget processes This section lists the budget processes to be undertaken in order to adopt the Budget in accordance with the Local Government Act 1989 (the Act) and Local Government (Planning and Reporting) Regulations 2014 (the Regulations).
Under the Act, Council is required to prepare and adopt an annual budget for each financial year. The budget is required to include certain information about the rates and charges that Council intends to levy as well as a range of other information required by the Regulations which support the Act.
The 2015/16 budget, which is included in this report, is for the year 1 July 2015 to 30 June 2016 and is prepared in accordance with the Act and Regulations. The budget includes financial statements being a Comprehensive Income Statement, Balance Sheet, Statement of Changes in Equity, Statement of Cash Flows and Statement of Capital Works. These statements have been prepared for the year ending 30 June 2016 in accordance with the Act and Regulations, and consistent with the annual financial statements which are prepared in accordance with Australian Accounting Standards. The budget also includes information about the rates and charges to be levied, the capital works program to be undertaken, the human resources required, and other financial information Council requires in order to make an informed decision about the adoption of the budget. In advance of preparing the budget, Officers firstly review and update Council's long term financial projections. Financial projections for at least four years are ultimately included in Council's Strategic Resource Plan, which is the key medium‐term financial plan produced by Council on a rolling basis. The preparation of the budget, within this broader context, begins with Officers preparing the operating and capital components of the annual budget during January and February. A draft consolidated budget is then prepared and various iterations are considered by Council at informal briefings during March and April. A ‘proposed’ budget is prepared in accordance with the Act and submitted to Council in April for approval ’in principle’. Council is then required to give ’public notice’ that it intends to ’adopt’ the budget. It must give 28 days notice of its intention to adopt the proposed budget and make the budget available for inspection at its offices and on its web site. A person has a right to make a submission on any proposal contained in the budget and any submission must be considered before adoption of the budget by Council. To assist interested persons to understand the budget and make a submission if they wish, Council officers undertake a community engagement process including public information sessions, focus groups and other techniques. The final step is for Council to adopt the budget after receiving and considering any submissions from interested parties. The budget is required to be adopted by 30 June and a copy submitted to the Minister within 28 days after adoption. The key dates for the budget process are summarised below:
Budget process Timing
1. Officers update Council's long term financial projections Dec‐Mar
2. Officers prepare operating and capital budgets Jan‐Feb
3. Councillors consider draft budgets at informal briefings Jan‐Mar
4. Proposed budget submitted to Council for approval 7 April
5. Public notice advising intention to adopt budget 9 April
6. Budget available for public inspection and comment 9 April
7. Public submission process undertaken Apr/May
8. Submissions period closes (30 days) 8 May
9. Submissions considered by Council/Committee 19 May
10. Budget and submissions presented to Council for adoption 9 Jun
11. Copy of adopted budget submitted to the Minister Jun
12. Revised budget where a material change has arisen Sep‐Jun
Surf Coast Shire Council Annual Budget – 2015-2016 Page 13 of 106
1. Linkage to the Council Plan This section describes how the Annual Budget links to the achievement of the Council Plan within an overall planning and reporting framework. This framework guides the Council in identifying community needs and aspirations over the long term (Strategic Resource Plan), medium term (Council Plan) and short term (Annual Budget) and then holding itself accountable (Annual Report). 1.1 Strategic planning framework The Strategic Resource Plan, part of and prepared in conjunction with the Council Plan, is a rolling four year plan that outlines the financial and non‐financial resources that Council requires to achieve the strategic objectives described in the Council Plan. The Annual Budget is framed within the Strategic Resource Plan, taking into account the services and initiatives which contribute to achieving the strategic objectives specified in the Council Plan. The diagram below depicts the planning and accountability framework that applies to local government in Victoria.
Source: Department of Environment, Land, Water and Planning (formerly Department of Transport, Planning and Local Infrastructure)
The timing of each component of the planning framework is critical to the successful achievement of the planned outcomes. The Council Plan, including the Strategic Resource Plan, is required to be completed by 30 June following a general election and is reviewed each year in advance of the commencement of the Annual Budget process.
Surf Coast Shire Council Annual Budget – 2015-2016 Page 14 of 106
1.2 Our purpose
Vision
Our Vision: “Working towards an engaged, innovative and sustainable community”
Achieving the Vision
Council has identified five strategic objectives, each of which is underpinned by outcomes, strategies and a number of measurable performance indicators that are designed to help Council to achieve its Vision. It is through the achievement of these strategic objectives that Council will deliver on its mandate to govern in the interests of the entire Surf Coast Shire community.
1.3 Strategic objectives The Surf Coast Shire Council delivers activities and initiatives under major service categories. Each contributes to the achievement of one of the five Strategic Objectives as set out in the Council Plan for the years 2013‐2017. The following table lists the five Strategic Objectives as described in the Council Plan.
Themes Strategic Objectives
1.Environment Preserve and enhance the natural environment
Pursue alternative energies
Leadership in innovative environmental practices
Protect public open space and green belts
2.Governance Robust risk management framework and processes
High performing accountable organisation
Long term financial viability
Transparency in decision making and access to information
Enhanced community engagement
Advocate on behalf of our community
3.Communities Communities that can plan for and recover from disasters
Quality services allocated according to need
Preservation of peaceful, safe and healthy environments
Building leadership and skills within the community
4.Infrastructure Allocation of infrastructure according to need
Accessible and well maintained Council facilities
Enhance key rural and coastal roads and transport options
5.Development and growth
Protect productive farmland and support rural business
Encourage sustainable economic development and growth
Develop and grow sustainable year round tourism
Transparent and responsive land use and strategic planning
Surf Coast Shire Council Annual Budget – 2015-2016 Page 15 of 106
2. Services, initiatives and Service Performance Indicators This section provides a description of the activities and initiatives to be funded in the budget for the 2015/16 year and how these will contribute to achieving the strategic objectives specified in the Council Plan as set out in section 1. It also includes a number of key strategic activities and performance targets and measures in relation to these. The relationship between these components of the Budget and the Council Plan is shown below.
2.1 Theme 1: Environment Surf Coast Shire Council will pursue innovative and sustainable practices across the Shire that will preserve and enhance our natural environment for all, by being socially responsible and environmentally aware. To achieve this, we are committed to the following strategic objectives:
Preserve and enhance the natural environment
Pursue alternative energies
Leadership in innovative environmental practices
Protect public open space and green belts The activities and initiatives for each Council service area are described below.
Budget
Activities Initiatives
KeyStrategicActivities
Council Plan
Strategic Objective
Strategic Objective
Strategic Objective
Strategic Objective
PerformanceMeasures/
Targets
PerformanceStatement
Medium term planning(4 Years)
Short term planning(12 Months)
Activities
Activities
Activities
Initiatives
Initiatives
Initiatives
Budget
Activities Initiatives
KeyStrategicActivities
Council Plan
Strategic Objective
Strategic Objective
Strategic Objective
Strategic Objective
PerformanceMeasures/
Targets
PerformanceStatement
Medium term planning(4 Years)
Medium term planning(4 Years)
Short term planning(12 Months)
Short term planning(12 Months)
Activities
Activities
Activities
Initiatives
Initiatives
Initiatives
Services
Services
Major Initiatives
Surf Coast Shire Council Annual Budget – 2015-2016 Page 16 of 106
Services
Service Area Description of Services Provided
Expenditure (Revenue)Net Cost
$’000
Environment This service ensure that Council complies with State and Federal legislative requirements regarding the environment, including native vegetation, listed species and ecological communities, estuary works and artificial estuary openings and statutory planning referrals. The Unit also delivers a wide range of Council Plan strategies related to pest plant and animal management, sustainability and climate change. The Unit is the designated land manager for Council’s many nature reserves (including the world famous Bells Beach Surfing Recreation Reserve), 1500km of rural roadsides and also some waterways. The Unit provides specialist environmental and sustainability advice internally to Council and externally to community groups, local businesses, agencies and members of the public.
856__‐856
Open Space Planning The open space activities of Council include ensuring that the management of public open space is conducted with a focus on environmental planning. The Open Space Planning unit are responsible for maintaining and planning the development of public open space.
193__‐193
Waste Management The Waste Management function involves management of Council’s landfill and transfer stations, waste collection including kerbside rubbish collection and street cleaning and maintenance of street litter bins. The Waste Management unit has a strong focus on community education and waste services planning. The surplus generated by Council’s waste charge is reserved for future landfill rehabilitation costs.
6,482(2,642)3,840
Major Initiatives Community consultation on unconventional gas exploration ($15,000) Initiatives 1. Torquay Plastic Bag Free Project ($10,000) 2. Revegetation of embankment below the Historical Society $1,500) Service Performance Outcome Indicators
Service Indicator Performance Measure Computation
Waste collection
Waste diversion
Kerbside collection waste diverted from landfill(Percentage of garbage, recyclables and green organics collected from kerbside bins that is diverted from landfill)
[Weight of recyclables and green organics collected from kerbside bins / Weight of garbage, recyclables and green organics collected from kerbside bins] x100
Surf Coast Shire Council Annual Budget – 2015-2016 Page 17 of 106
2.2 Theme 2: Governance Surf Coast Shire Council is committed to delivering a transparent, high performing and sustainable business that engages with the community and adopts robust risk management practices. To achieve this, we are committed to the following strategic objectives:
Robust risk management framework and processes
High performing accountable organisation
Long term financial viability
Transparency in decision making and access to information
Enhanced community engagement. The activities and initiatives for each Council service area are described below. Services
Service Area Description of Services Provided
Expenditure (Revenue)Net Cost
$’000
Executive Services & Council Support
This area of governance includes the Mayor, Councillors, Chief Executive Officer and Executive Management Team and associated support which cannot be easily attributed to the direct service provision areas.
3,066(495)2,571
Information Services This service includes two main sections, Information Technology (incl. Geospatial Information systems) and Records Management. The Information Technology area supports the organisations requirements for computer services (incl. provision, support, maintenance, licencing and infrastructure), communications (fixed, mobile and data) and geospatial mapping facilities for council and external uses. The Records Management area manages document compliance (incl. Creating, capturing, classifying and archival maintenance), and processing of incoming and outgoing correspondence. The Information Management department has the responsibility to support the organisation with a cost effective and efficient technology service which seeks to improve the performance of the organisation.
2,132____‐2,132
Corporate Planning This service provides organisational policy, systems and support in the areas of continuous improvement, corporate planning, performance measurement and reporting.
195__‐195
Financial Management This service provides financial services to both internal and external customers of the organisation. The unit is responsible for ensuring that Council complies with its statutory obligations in regard to financial planning and reporting as well as provision of accounting services and management of Council funds. Duties include managing creditors, payroll and financial reporting. The Financial Management unit plays an integral part in Council’s long term financial planning processes, the formulation of Council’s annual budget, and the regular reporting of Council’s financial performance. This function also includes management of the raising and collection of Council’s primary revenue source, rates and charges.
2,399(765)1,634
Surf Coast Shire Council Annual Budget – 2015-2016 Page 18 of 106
Service Area Description of Services Provided
Expenditure (Revenue)Net Cost
$’000
Risk Management This service involves overseeing Council’s risk management system, including provision of support to the organisation in regard to managing risks, insurance policies and business continuity.
139__‐139
People and Culture
This service is responsible for supporting the organisation with strategic and operational human resources management and includes learning and development and occupational health and Safety. The activities of the unit include developing and implementing strategies, policies and procedures that promote high level human resources and industrial relations services. The unit also supports the organisation in attracting new staff, retaining existing staff and the ongoing development of the skills within Council’s work force.
1,012____‐1,012
Communications and Community Engagement
This service is responsible for coordinating Council communications, including liaising with media, formulating press releases, preparing publications and delivering digital communication. The unit also provides support to the Mayor and Councillors in regard to media matters. Council’s community engagement activity is lead and supported by the unit.
1,437___(4)1,433
Customer Service This service is responsible for coordinating Council’s front of house customer services activities, including attending to customer phone and face to face enquiries.
567__‐567
Governance This service provides provision of statutory and corporate support to the organisation, development and review of organisational policies and procedures, Council meeting administration, ensuring compliance with legislative requirements, managing Freedom of Information and privacy requests, maintaining the public registers and managing Council delegations and authorisations.
657__‐657
Development Compliance & Local Laws
This service includes animal management, traffic management, permits for footpath trading, local law enforcement and State Government agencies enforcement activities, Building development controls function and planning enforcement. This service provides staff at school crossings to ensure that all pedestrians are able to cross the road safely. It maintains and improves the health and safety of people, animals and the environment in Council by providing animal management services including a cat trapping program, a dog and cat collection service, a lost and found notification service, a pound service, a registration and administration service, an afterhours service and an emergency service.
1,733(1,220)
513
Surf Coast Shire Council Annual Budget – 2015-2016 Page 19 of 106
Major Initiatives Leadership Development Program ($12,000) Initiatives 3. Local Law Signage upgrades to parks and reserves regarding dog regulations ($5,000) 4. Workplace Health & Safety Program support ($20,000) 5. Commission new software to improve council reporting ($15,000) Service Performance Outcome Indicators
Service Indicator Performance Measure Computation
Governance
Satisfaction Satisfaction with Council decisions(Community satisfaction rating out of 100 with how Council has performed in making decisions in the interests of the community)
Community satisfaction rating out of 100 with how Council has performed in making decisions in the interests of the community
Animal Management
Health and safety
Animal management prosecutions(Number of successful animal management prosecutions)
Number of successful animal management prosecutions
2.3 Theme 3: Communities Surf Coast Shire Council will pursue active engagement with the diverse and growing communities in which we operate and live, to establish quality services, healthy and safe environments for all and long term community partnerships supported by strong leadership. To achieve this, we are committed to the following strategic objectives:
Communities that can plan for and recover from disasters
Quality services allocated according to need
Preservation of peaceful, safe and healthy environments
Building leadership and skills within the community The activities and initiatives for each Council service area are described below.
Surf Coast Shire Council Annual Budget – 2015-2016 Page 20 of 106
Services
Service Area Description of Services Provided
Expenditure (Revenue)Net Cost
$’000
Sport & Recreation This service is primarily responsible for Council’s promotion and support of community access and provision of recreation facilities and programs. It is responsible for the management of Council’s sporting reserves and pavilions, community houses and leisure and community services. The unit provides advice on local leisure needs and assists community groups with funding applications, licence agreements and liaises with community houses, men’s sheds and S86 committees.
1,657(435)1,222
Social Planning This service assists Council to meet its responsibilities for the social wellbeing of the community by providing advice and coordinating projects in the areas of social research, social planning, social policy and health promotion.
221__‐221
Arts Development This service provides a varied program of arts and cultural activities. Council plans and develops arts and cultural infrastructure and develops policies and strategies to facilitate art practice. The function is also responsible for the provision of library services at Torquay and across the municipality with a mobile service.
232__‐232
Early Years This service provides family oriented support services including kindergartens, toy libraries, maternal and child health, youth services, family day care, vacation and occasional care programs. The unit also supports playgroups, visiting specialists and through community engagement provision of access to facilities and services.
3,022(2,211)
811
Positive Ageing This service provides a range of home and community care and social support services for older people and people with a disability including home delivered and community meals, in home domestic respite and personal care, home maintenance, senior citizens and service coordination.
3,246(2,265)
981
Community Emergency Management
This service assists community and Council plan for, respond to and recover from all potential emergencies and their consequences. This includes coordinating arrangements for the utilisation and implementation of Council resources in response to emergencies and arrangements for the provision of assistance to the community during recovery from emergencies. The Unit prepares and maintains fire and other emergency management plans integrated with other local, regional and state plans. The Unit also delivers fire prevention programs under the CFA Act and community resilience outreach programs with high risk communities.
718(36)682
Environmental Health This service provides public and environmental health protection services to the community and ensures Council complies with its legislative duties. Services include: food safety ‐ registration and monitoring compliance of food,
576(263)313
Surf Coast Shire Council Annual Budget – 2015-2016 Page 21 of 106
Service Area Description of Services Provided
Expenditure (Revenue)Net Cost
$’000
accommodation, caravan parks and health (hairdressers, tattooist, beauty etc.) businesses; Inspection and issuing permits for wastewater treatment systems and septic tanks; Investigations of public health complaints such as nuisances, food safety, pest control, noise, emissions, odour, pollution, asbestos, water quality; Customer Services/Expert Advice on public and environmental health matters; Public health emergency response; and Childhood and School Immunisation Services.
Major Initiatives Lorne Stribling Reserve Masterplan ($50,000) Initiatives 6. Aireys Inlet Masterplan ($10,000) 7. Assessment & Review Officer 0.4 EFT Home Support Program ($30,000) 8. Children's Hub Trainee to support early years programs (27,526) 9. G21 Regional Study into the Economic and other benefits of Arts and Culture ($10,000) 10. Expand Library Services – Children’s and Youth Programs ($81,720) 11. New position of Environment Health Officer 1.0 EFT ($89,575)
Surf Coast Shire Council Annual Budget – 2015-2016 Page 22 of 106
Service Performance Outcome Indicators
Service Indicator Performance Measure Computation
Libraries Participation Active library members(Percentage of the municipal population that are active library members)
[Number of active library members / municipal population] x100
Maternal and Child Health
Participation Participation in the MCH service(Percentage of children enrolled who participate in the MCH service)
[Number of children who attend the MCH service at least once (in the year) / Number of children enrolled in the MCH service] x100
Participation in MCH service by Aboriginal children (Percentage of Aboriginal children enrolled who participate in the MCH service)
[Number of Aboriginal children who attend the MCH service at least once (in the year) / Number of Aboriginal children enrolled in the MCH service] x100
Home and Community Care
Participation
Participation in HACC service(Percentage of the municipal target population who receive a HACC service)
[Number of people that received a HACC service / Municipal target population for HACC services] x100
Participation in HACC service by CALD people(Percentage of the municipal target population in relation to CALD people who receive a HACC service)
[Number of CALD people who receive a HACC service / Municipal target population in relation to CALD people for HACC services] x100
Food Safety
Health and safety
Critical and major non‐compliance notifications(Percentage of critical and major non‐compliance notifications that are followed up by Council)
[Number of critical non‐compliance notifications and major non‐compliance notifications about a food premises followed up / Number of critical non‐compliance notifications and major non‐compliance notifications about food premises] x100
Surf Coast Shire Council Annual Budget – 2015-2016 Page 23 of 106
2.4 Theme 4: Infrastructure Council is committed to meeting our community’s needs for accessible, well maintained and safe infrastructure. Council will work with the community to understand its needs, delivering infrastructure where it is needed, and partnering with or influencing others on behalf of our community. To achieve this, we are committed to the following strategic objectives:
Allocation of infrastructure according to need
Accessible and well maintained Council facilities
Enhanced key rural and coastal roads and transport options The activities and initiatives for each Council service area are described below. Services
Service Area Description of Services Provided
Expenditure (Revenue)Net Cost
$’000
Parks & Open Space This service is responsible for the coordination of all Council parks, reserves, gardens and related infrastructure. This involves ensuring appropriate maintenance levels, including planting of vegetation, tree pruning, planning and developing areas of open space, and implementation of street tree strategies.
3,567_(15)3,552
Civil Works This service is responsible for the maintenance of Council’s 563 km sealed road network, 540 km unsealed road network, 180km of drains and 63km of footpaths. In undertaking these responsibilities, the unit is also required to source and manage contracting services to assist with the completion of works, regularly review the standard and cost of materials, and to keep up to date with improved work practices.
4,851_(54)4,797
Contracts & Capital Works
This service is responsible for integrated and prioritised capital works planning. This includes development and implementation of asset management plans for planning for the expansion of Council’s asset portfolio for the needs of a growing population, as well as planning the renewal management of Council’s existing Infrastructure. In addition the function manages and maintains Council’s building and fleet portfolio. This service area also is responsible for design, tendering, contract management and supervision of works required to deliver Council’s capital works program.
6,658(3,532)3,126
Engineering Services This service is responsible for the design of traffic and drainage infrastructure projects as well as subdivision design approval and works inspections. They also manage traffic management, street lighting and bus shelters throughout the Shire.
1,583(249)1,334
Surf Coast Shire Council Annual Budget – 2015-2016 Page 24 of 106
Major Initiatives Street Light Upgrade Program, upgrade of lamps to LED, 1st year of 5 year program for which Council will be seeking 1 to 1 grant funding ($100,000) Initiatives 12. Installation of drinking water fountain at Eastern Reserve ($3,000) 13. Construction of Storage Pods at Stribling Reserve Stadium ($35,000) 14. Lorne Hazard Street Tree remedial works ($138,900) 15. Building Disability Discrimination Act Audit ($40,000) 16. Infrastructure Development Services Support ($33,280) 17. Civil works maintenance budget increase for growth ($32,688) 18. Parks & Open Space maintenance budget for growth ($24,344) 19. Building maintenance budget increase for growth ($167,000) Service Performance Indicators
Service Indicator Performance Measure Computation
Roads
Satisfaction
Satisfaction with sealed local roads(Community satisfaction rating out of 100 with how Council has performed on the condition of sealed local roads)
Community satisfaction rating out of 100 with how Council has performed on the condition of sealed local roads.
Surf Coast Shire Council Annual Budget – 2015-2016 Page 25 of 106
2.5 Theme 5: Development & Growth Surf Coast Shire Council will actively pursue healthy and sustainable communities through growth and development initiatives that protect and support tourism and rural businesses, and encourage clean industries and development that respects the attributes of the Surf Coast Shire environment and lifestyle. To achieve this, we are committed to the following strategic objectives:
Protect productive farmland and support rural business
Encourage sustainable economic development and growth
Develop and grow sustainable year round tourism
Transparent and responsive land use and strategic planning The activities and initiatives for each Council service and key strategic activities are described below. Services
Service Area Description of Services Provided
Expenditure (Revenue)Net Cost
$’000
Planning & Development This service is responsible for building and strategic and statutory planning. It includes processing all planning applications, providing advice and assessing development proposals which require a planning permit, and representing Council at the Victorian Civil and Administrative Tribunal where necessary. It is also responsible for monitoring Council’s planning scheme, developing land use policy and preparing and processing amendments to the Planning Scheme. Review of policies and strategies relating to urban design issues are also processed under this function.
2,000(283)1,717
Economic Development & Tourism
The Economic Development and Tourism service is responsible for business engagement and support, grants administration, tourism marketing, visitor centres, event facilitation and the Australia National Surfing Museum. It includes supporting existing business, attracting new business, providing economic data, grants administration, developing business profiles and contributing to local trader groups. Tourism development functions include promoting the conference market, product development and marketing and funding Great Ocean Road Regional Tourism. The service also facilitates a range of small to internationally recognised events via our event liaison team and provides an event grants funding program. Four visitor centres and the Australian National Surfing Museum service and distribute information to visitors.
2,330(630)1,700
Major Initiatives National Surfing Museum and Anglesea Visitor Experience ($40,000) Initiatives 20. Planning Scheme Amendments to implement approved strategic work ($100,000) 21. Strategic planning projects ($35,000) including Torquay town centre parking survey and updating parking
in planning scheme.
Surf Coast Shire Council Annual Budget – 2015-2016 Page 26 of 106
Service Performance Outcome Indicators
Key Strategic Activity Performance Measure Performance Target
Statutory planning
Decision making
Council planning decisions upheld at VCAT(Percentage of planning application decisions subject to review by VCAT and that were not set aside)
[Number of VCAT decisions that did not set aside Council’s decision in relation to a planning application / Number of VCAT decisions in relation to planning applications] x100
Economic Development
Economic activity
Change in number of businesses(Percentage change in the number of businesses with an ABN in the municipality)
[Number of businesses with an ABN in the municipality at the end of the financial year less the number of businesses at the start of the financial year / Number of businesses with an ABN in the municipality at the start of the financial year] x100
2.6 Performance statement The service performance indicators detailed in the preceding pages will be reported on in the Performance Statement which is prepared at the end of the year as required by Section 132 of the Act and included in the 2015/16 Annual Report. The Performance Statement will also include reporting on prescribed indicators of financial performance (outlined in Section 8) and sustainable capacity, which are not included in this budget report. The prescribed performance indicators contained in the Performance Statement are audited each year by the Victorian Auditor General who issues an audit opinion on the Performance Statement. The major initiatives detailed in the preceding pages will be reported in the Annual Report in the form of a statement of progress in the Report of Operations
Surf Coast Shire Council Annual Budget – 2015-2016 Page 27 of 106
2.7 Reconciliation with budgeted operating result
(#1) Includes grants commission, debt servicing, interest on investments, insurances, net gain on disposal of property, plant and equipment, depreciation, asset write‐off and granted assets.
Net Cost
(Revenue)
$'000
Expenditure
$'000
Revenue
$'000
Strategic Theme
Environment 4,890 7,532 (2,642)
Governance 10,853 13,336 (2,483)
Communities 4,462 9,671 (5,209)
Infrastructure 12,809 16,659 (3,850)
Development and growth 3,418 4,330 (913)
Total activities and initiatives 36,430 51,528 (15,098)
Non‐attributable items (#1)
5,274
Deficit before funding sources 41,704
Funding Sources
Rates and charges 45,732
Capital grants 3,201
Special Rates & Charges 301
Capital Contributions 156
Total funding sources 49,391
Surplus for the year 7,686
Surf Coast Shire Council Annual Budget – 2015-2016 Page 28 of 106
3. Budget influences This section sets out the key budget influences arising from the internal and external environment within
which the Council operates.
3.1 Snapshot of Surf Coast Shire Council The Surf Coast Shire, with its beach, bushland and rural environment, is located in south‐western Victoria, 95km from Melbourne, 21km south of Geelong and close to the extended Geelong Ring Road. The Surf Coast Shire is an appealing destination for holiday makers and international visitors, or those looking to make a permanent sea change. The Shire is home to some of the world’s best surfing locations, with the iconic Great Ocean Road beginning in the Surf Coast Shire. The natural environment is a defining feature of the Surf Coast Shire. From spectacular rugged coastlines to dense native forests and rolling rural plains, the Shire is strongly influenced by physical and natural features that impact on urban development and land management. The Shire is home to nine distinct townships; Aireys Inlet, Anglesea, Deans Marsh, Fairhaven, Jan Juc, Lorne, Moriac, Torquay and Winchelsea. Each of these townships has a keen sense of community, a unique identity and a strong desire to protect and nurture the environment. There is also a significant rural population including farming and rural/residential communities. Torquay is at the start of the Great Ocean Road and is the fastest growing location within the municipality, with census data showing that Torquay has grown on average by 8% per annum between 2006 and 2011. Torquay and neighbouring Jan Juc continue to attract a large number of young families to the Shire given the coastal lifestyle and ease of commuting to Geelong and Melbourne. Winchelsea has been identified as a town that is also capable of supporting substantial residential growth and is the principal agricultural centre of the Shire. Duplication of the Princes Highway together with access to good physical and community infrastructure support Winchelsea’s position as our secondary growth centre within the shire. Lorne, in the south‐west of the Shire, is another iconic destination. Bordered by Loutitt Bay, the Great Ocean Road and the Otways National Park, this town is a scenic and recreational wonderland. Smaller coastal towns of Anglesea and Aireys Inlet offer magnificent seaside and bushland experiences while the hinterland villages of Deans Marsh and Moriac maintain strong links to the land, much of which is highly productive agricultural countryside adjacent to the Otways National Park.
The Surf Coast Shire, with its natural beauty, proximity to the beach and bushland, and its ability to sustain thriving vibrant communities, continues to deliver jobs and create economic development opportunities. Population Proximity and lifestyle continue to contribute to the Surf Coast Shire being one the fastest growing municipalities in Victoria. Since 2001 the permanent population of the Surf Coast Shire has grown from 20,872 to 28,282 in 2013 (latest official Estimated Resident Population) and an estimated 30,299 in 2015 (forecast .id). The population is forecast to grow to nearly 45,000 by 2031 (forecast .id). Between 2012 and 2013 Surf Coast Shire was the fourth fastest growing municipality in regional Victoria increasing by 2.9% and Torquay/Jan Juc and surrounds grew by 4.9% to around 17,000 people. Between 2015 and 2016 Torquay North is forecast to grow by 465 people (Forecast .id).
Since 2006, the Surf Coast Shire has experienced a higher than average population growth rate of 3.0% per annum and the forecast average annual growth rate through to 2031 is the fifth highest in regional Victoria (Department of Planning and Community Development, Victoria in Future 2014). Census and forecasts population data is available on the Surf Coast Shire website and includes community profile data for all Surf Coast Shire townships (Go to My Council/Population Information).
Surf Coast Shire Council Annual Budget – 2015-2016 Page 29 of 106
Visitation and part time populations While the region’s permanent population continues to grow, part time populations are also significant in Surf Coast Shire including holiday home residents, seasonal visitors, event populations and day trippers. The peak overnight population of Surf Coast Shire between December 2013 to January 2014 was estimated at 85,409 (Economic Indicators Bulletin Geelong 2013). In the year end June 2014 over 1.8 million visitors came to Surf Coast Shire directly expending over $400 million. Summer periods dominate visitation patterns with the March Quarter accounting for just over 42%. Age structure Surf Coast Shire has a younger age profile in 2011 compared to the Geelong Region. In 2011 25% of our population was in the younger age groups (0 to 17) and 21% was aged 60 years or older, compared with 23.1% and 22.7% respectively for the Geelong Region. (Australian Bureau of Statistics, Census of Population and Housing). By 2031, it is forecast that the proportion of people in both these groups will be similar, around 23%, reflecting continued family growth and the ageing of the population. Births New births are also contributing to Council’s increasing population. In 2013 there were 321 births in Surf Coast Shire (Australian Bureau of Statistics, Registered Births). Between 2015 and 2024 it is projected that there will be a further 4,400 births (forecast .id). Dwellings and households Strong dwelling growth has also occurred with approximately 4,000 additional dwellings between 2001 and 2011 (Australian Bureau of Statistics, Census of Population and Housing). Since the 2011 Census count of about 16,630 dwellings, forecasts indicate growth to 18,640 dwellings in 2015. It is anticipated that residential development will grow at a rate of about 2.5% per annum during 2015/16 with about 475 additional dwellings (forecast .id). Only 53% of properties within the Surf Coast Shire are owned by people residing in the shire. On Census night, in August 2011, 42% of private dwellings were unoccupied, reflecting the large number of holiday homes in the shire. In 2011 31.9% of all households in Surf Coast Shire were couples with children, 35.3% were couples without children, 7.8% were one‐parent families and 20.9% were lone person households. (Australian Bureau of Statistics, Census of Population). Education Surf Coast Shire has experienced a steadily improving retention of students who are completing Year 12, from 44.7% in 2006 to 50.4% in 2011, compared to the Geelong Region with 41.5%. The proportion of residents who have post‐school qualifications has also increased from 47% in 2006 to 54.3% in 2011 (Australian Bureau of Statistics, Census of Population and Housing). Employment Surf Coast Shire is strongly influenced by the impact of tourism and surfing. Total employment in the municipality is estimated at 7,500 jobs with major employers including Rip Curl, Quiksilver, Barwon Health and Surf Coast Shire. Industry breakdowns for the top 4 employment sectors are as follows: Accommodation and Food Services 15.5%, Retail Trade 13.5%, Construction 13.4% and Health Care and Social Assistance 7.9%. When identified as a distinct industry sector the surf sector represents approximately 27% of total employment in Surf Coast Shire (REMplan 2015).
Budget implications
As a result of the Shire’s demographic profile there are a number of budget implications in the short and long term as follows:
The development of Torquay North continues with the construction of open space pathways, recreation areas and facilities, a regional bicycle route, road widening and an intersection upgrade to support the growing population and demand placed on Council provided community infrastructure.
Surf Coast Shire Council Annual Budget – 2015-2016 Page 30 of 106
Various strategic projects are planned to prepare Council for the anticipated growth and development in the Shire, including:
Planning Scheme amendments to implement approved strategic work, including Growing Winchelsea, Aireys Inlet to Eastern View Plan, and the Spring Creek Precinct Structure Plan.
Developing masterplans for Stribling Reserve in Lorne, and the Aireys Inlet Community Centre.
Supporting a regional study (conducted by the G21 group of Councils) into Economic and other benefits of Arts and Culture.
Providing further support to introduce new children’s and youth programs in Council’s libraries.
The budget also recognises that an increasing population continues to bring pressure on Councils asset maintenance services, including buildings, recreation reserves, pathways, and drainage.
3.2 External influences In preparing the 2015/16 budget a number of external influences have been taken into consideration, as they are likely to impact significantly on the services delivered by Council in the budget period. These include:
An annual inflation rate (CPI) of 3.0% has been applied to all expense categories in 2015/16 with the exception of wages, construction, contract and materials maintenance costs (Reserve Bank forecast is 2.25%‐3.25 % for the 2015/16 year per Statement on Monetary Policy:Feb 2015 – Economic Outlook).
An annual construction price index forecast for the 2014/15 year of 4.0% has been applied to construction, contract and materials maintenance costs as these costs traditionally increase higher than the CPI rate.
Total labour costs represent 42% of Council’s Operating expenses. An annual average allowance of 4.2% has been allowed for wage growth, including wage and banding increments.
Grants Commission funding is expected to remain steady as $3.6 million due to the Commonwealth governments’ freeze on indexation of Financial Assistance Grants to local government.
3.3 Internal influences As well as external influences, there are also a number of internal influences that are expected to have a significant impact on the preparation of the 2015/16 Budget. These matters have arisen from events occurring in the 2014/15 year resulting in variances between the budgeted results and the revised forecast for that year and from matters expected to arise in the 2015/16 year. These include:
$1.1 million of Capital Works budgeted in 2014/15 that will not be completed until 2015/16, including the Jan Juc Creek Daylighting project and the Banyul Warri Fields Playzone project.
Inclusion of the Winchelsea and Jan Juc Kindergartens into Council’s kindergarten cluster management, which include a subsequent increase of 7.32 EFT employees that are employed by those kindergartens. This has produced an increase in Council’s employee costs of $0.3 million which is offset by an increase in kindergarten revenue.
The 2015/16 Capital Works Program includes works that are related to Council assets that do not meet asset recognition criteria and cannot be capitalised to the Balance Sheet – Operating impact $1.9 million increase in expenses, plus a further $1.4 million for landfill rehabilitation that is charged directly against the provision.
3.4 Budget principles The key budget principles on which the 2015/16 budget is based (and which are drawn from the Strategic Resource Plan 2015/25) are:
Rate increases that are adequate to maintain current service delivery levels, as well as meeting increased expectations for services and capital works. Council will aim to achieve its long term objectives with the goals of maintaining the affordability of rate increases to ratepayers, and the efficient use of ratepayer money.
Responsible use of debt, which includes maintaining debt levels below local government prudential guidelines.
A fully funded 10 year capital works program, which includes increased funding for new infrastructure and increased funding for renewing existing assets to high standards.
Surf Coast Shire Council Annual Budget – 2015-2016 Page 31 of 106
Maintenance of a strong liquidity position, ensuring Council has the flexibility to respond to short term challenges.
Achievement of an operating surplus every year, with the goal of achieving a sustainable surplus in the near future.
Equitable and transparent distribution of rate revenue.
Responsible and sustainable asset management.
Being financially sustainable in the long‐term. This budget has also been constructed based on the principle of continuous improvement of Council’s financial reporting to the community, and includes a number of new inclusions and appendices designed to provide better understanding of Council’s financial decisions and obligations to the community.
3.5 Long term strategies The budget includes consideration of a number of long term strategies to assist Council in considering the Budget in a proper financial management context. These include a Strategic Resource Plan for the years 2015/16 to 2024/25 (section 8.), Rating Strategy (section 9.) and Other Long Term Strategies (section 10.) including borrowings, infrastructure and service delivery.
Surf Coast Shire Council Annual Budget – 2015-2016 Page 32 of 106
4. Analysis of operating budget This section analyses the expected revenues and expenses of the Council for the 2015/16 year. 4.1 Operating revenue
4.1.1 Rates and charges ($3.0 million increase)
It is proposed that income raised by all rates and charges be increased by 6.9% or $3.0 million over 2015/16 to $45.7 million. This includes an increase from existing rate payers (including municipal charge) of 5.5%; Garbage Charge increase of 4%; the annualised effect of new ratepayers from 2014/15 paying a full year’s worth of rates in 2015/16, and income from new rate payers in 2015/16 of $0.5 million and new garbage charges of in 2015/16 of $0.1 million.
2014/15
Revised
Forecast
2015/16
Budget Variance
Ref $'000 $'000 $'000
Income
Rates and charges 4.1.1 42,761 45,732 2,971
Operating grants 4.1.2 6,972 7,151 179
Capital grants 4.1.3 3,958 3,201 (757)
Contributions 4.1.4 2,904 2,521 (383)
Interest 4.1.5 741 773 32
User charges 4.1.6 5,845 6,433 589
Statutory fees 4.1.7 625 673 49
Total operating revenue 63,804 66,485 2,680
Net gain (loss) on disposal 4.1.8 775 (119) (894)
Granted assets 4.1.9 2,902 3,220 318
Total income 67,482 69,586 2,104
Surf Coast Shire Council Annual Budget – 2015-2016 Page 33 of 106
4.1.2 Operating grants ($0.2 million increase)
Operating government grants include all monies received from State and Federal sources for the purposes of funding the delivery of Council’s services. Overall, the level of grants is forecast to increase by 2.6% or $0.2 million compared to 2014/15. The Commonwealth Government has paused the indexation of the total national pool of financial assistance grants to local government for three years until 2017/18. Council’s 2015/16 Grants Commission Allocation is expected to remain constant with the 2014/15 allocation. The reduction of $0.02 million in the 2015/16 budget represents an underpayment from 2013/14 paid to Council in 2014/15.
Operating Grant Funding and Source
2014/15
Revised
Forecast
$'000
2015/16
Budget
$'000
Variance
$'000
Recurrent ‐ Commonwealth
Government
Victorian Grants Commission 3,667 3,644 (23)
HACC Assessment and Care 166 168 2
HACC General 363 395 33
HACC Personal Care 272 270 (2)
Flexible Service Response 20 20
HACC Property Maintenance 66 68 2
HACC Respite Care 74 45 (29)
HACC Cafe Style Support 26 26
Commonwealth Respite Care Program 109 113 3
Home care packages 234 356 122
Recurrent ‐ State Government
Maternal & Child Health 217 225 8
Family Day Care 51 44 (7)
Kindergarten Cluster Management 825 1,028 203
Youth Services 1 1 ‐
Statutory Planning 3 ‐ (3)
State Emergency Services 32 32 ‐
Positive Ageing Administration 50 33 (17)
Rural Access 48 48 ‐
Delivered Meals 66 60 (7)
Local Laws 36 36 ‐
Health Services 24 24 ‐
SSRC Holiday Program 50 45 (5)
Fleet Management 12 12 ‐
Total recurrent grants 6,410 6,692 282
Non recurrent ‐ State Government
Youth New Initiatives 102 100 (2)
Environment New Initiatives 71 61 (10)
Communications New Initiatives 19 ‐ (19)
Community Emergency Management 275 265 (10)
Leisure & Wellbeing 34 ‐ (34)
Senior Citizens 38 29 (9)
Economic Development & Tourism 19 4 (15)
Other non‐recurrent grants 4 ‐ (4)
Total non‐recurrent grants 562 459 (103)
Total Operating Grants 6,972 7,151 179
Surf Coast Shire Council Annual Budget – 2015-2016 Page 34 of 106
4.1.3 Capital grants ($0.8 million decrease)
Capital grants include all monies received from State and Federal sources for the purposes of funding the Capital Works Program. Overall, the level of capital grants has decreased by 19.1% or $0.8 million compared to 2014/15. Grants that are budgeted to be received in 2015/16 include Federal Roads to Recovery projects $1.3 million; Great Ocean Road Service Road Upgrade $0.5 million; Community Civic Precinct Playzone $0.5 million; Recreation Community Civic Precinct Recreation Facilities $0.4 million; and Anglesea Kindergarten $0.4 million.
4.1.4 Contributions ($0.4 million decrease)
Contributions relate to recoupment of expenditures, community contributions to capital works ,and monies paid by developers in regard to new subdivision works. Contributions are forecast to decrease by 13.2% or $0.4 million compared to 2014/15. A number of once‐off contributions were received in 2014/15 that will not reoccur in 2015/16, these include the Surf Lifesaving Club Policy ($0.8), Asian Cup Pre‐Season Tournament Training ($0.03) and Aireys Inlet Skate Park Upgrade ($0.02). Family Day Care contributions have also reduced by $0.1 million in line with the expected expenditure.
4.1.5 Interest ($0.03 million increase)
Interest on investments is forecast to increase by 4.3% in 2015/16, or $0.03 million compared to 2014/15. This is mainly due to anticipated higher cash reserves available for investing with the expenditure required for the capital works program reducing in 2015/16. 4.1.6 User charges ($0.6 million increase)
User charges relate mainly to the recovery of service delivery costs through the charging of fees to users of Council services and special rates raised for capital works projects. User charges are forecast to increase by 10.1% or $0.6 million compared to 2014/15. This is mainly due to the special charge scheme increase $0.14 million for the Torquay footpaths precinct and kindergarten program fees increasing $0.07 million due to the effects of a full year operating of the Jan Juc and Winchelsea kindergartens.
Capital Grant Funding Types and Source
2014/15
Revised
Forecast
2015/16
Budget Variance
$'000 $'000 $'000
Recurrent ‐ Commonwealth Government
Roads to Recovery 648 1,389 742
Roads & Bridges Initiative 1,000 ‐ (1,000)
Total Recurrent Commonwealth Grants 1,648 1,389 (259)
Non‐recurrent ‐ Commonwealth Government
Recreation facil ities 50 470 420
Total Non‐recurrent Commonwealth Grants 50 470 420
Non‐recurrent ‐ State Government
Community buildings 672 350 (322)
Drainage 65 318 253
Recreation facil ities 778 634 (144)
Transport 295 40 (255)
Waste management 450 ‐ (450)
Total Non‐recurrent State Grants 2,260 1,342 (918)
Total Capital Grants 3,958 3,201 (757)
Surf Coast Shire Council Annual Budget – 2015-2016 Page 35 of 106
4.1.7 Statutory fees ($0.05 million increase)
Statutory fees and fines relate mainly to fees and fines levied in accordance with legislation and include fees for planning certificates, subdivision certificates, building certificates and local law infringements. Statutory fees are forecast to increase by 7.8% or $0.05 million compared to 2014/154. This increase is mainly due to food registrations increasing $0.04 million as a result of the fee restructure undertaken as part of the Food Safety Service Review. 4.1.8 Net gain/(loss) on disposal of property, infrastructure, plant and equipment ($0.9 million decrease)
Proceeds from the sale of Council assets are forecast to be $0.9 million for 2015/16 and relate mainly to the planned cyclical replacement of the plant and vehicle fleet ($0.4 million) and the sale of surplus land that has been rehabilitated at Mt Moriac ($0.4 million). The loss on disposal is calculated as the difference between the proceeds from sale of $0.9 million and the written down value of the disposed of assets of $1.0 million.
4.1.9 Granted assets ($0.3 million increase)
Granted assets relate to assets provided by developers to Council on completion of subdivision works. Granted assets are forecast to increase by 11% or $0.3 million compared to 2014/15 mainly reflecting an increase in anticipated property development in Torquay.
Surf Coast Shire Council Annual Budget – 2015-2016 Page 36 of 106
4.2 Operating expenditure
4.2.1 Employee benefits ($1.8 million increase)
Employee benefits include all labour related expenditure such as wages and salaries and on‐costs such as allowances, leave entitlements, employer superannuation and Workcover. Employee costs are forecast to increase by 7.7% or $1.8 million compared to 2014/15. This increase relates to the following key factors:
The Surf Coast Shire Enterprise Agreement increase of 3.4%
Position level increments
Increase in staff numbers including an environmental health officer and a home support program
assessment officer as well as the full year impact of employees commencing in 2014/15 including
kindergarten staff at Jan Juc & Winchelsea kindergartens
The 2014/15 revised forecast reflects adjustments for vacancies
2014/15
Revised
Forecast
2015/16
Budget Variance
Ref $'000 $'000 $'000
Expenses
Employee benefits 4.2.1 24,109 25,987 1,878
Materials and services 4.2.2 23,990 22,232 (1,758)
Bad and doubtful debts 4.2.3 69 69
Finance costs 4.2.4 1,150 1,124 (26)
Depreciation 4.2.5 10,480 10,708 227
Asset write offs 4.2.6 1,409 1,779 371
Total operating expenses 61,208 61,899 692
Surf Coast Shire Council Annual Budget – 2015-2016 Page 37 of 106
A summary of planned human resources expenditure categorised according to the organisational structure of Council is included below:
A summary of the number of full time equivalent (FTE) Council staff in relation to the above expenditure is included below:
The most significant increases in staff positions by service unit are summarised below:
Some of the key aspects in the major variances within the table above are:
The Early Years department increases by $0.3 million due to the full year effect of expenditure of Jan Juc
and Winchelsea Kindergartens.
Human Resources increases by $0.1 million due to the full year effect of the newly created position of
Volunteer Support Officer and the effect of a prolonged vacancy in the 2014/15 forecast.
The Compliance & Local Laws department increases by $0.2 million due to two new positions that were
contract staff in the 2014/15 forecast.
Visitor Information Centre's and Surfing Museum increases by $0.1 million due to the full year effect of
the newly created Coordinator position and the effect of a prolonged vacancy in the 2014/15 forecast.
Directorate
Permanent Full
Time
Permanent Part
Time
$'000 $'000 $'000
CEO 510 510 ‐
Community 7,542 3,205 4,337
Corporate 3,772 2,963 809
Infrastructure 6,687 6,022 665
Planning & Environment 6,836 5,087 1,748
Total Permanent Staff Expenditure 25,346 17,788 7,559
Casuals & Other Expenditure 641
Capitalised Labour Costs 725
Total Expenditure 26,712
Directorate Budget EFT
Permanent Full
Time
Permanent Part
Time
CEO 3.0 3.0 0.0
Community 84.8 31.6 53.2
Corporate 37.1 27.7 9.4
Infrastructure 71.2 62.0 9.2
Planning & Environment 64.9 45.3 19.6
Total Permanent Staff 261.0 169.7 91.3
Casuals & Other 8.6
Capitalised Labour Costs 10.0
Total Staff 279.6
Directorate Service Unit
$'000 $'000 $'000
Community Early Years 2,101 2,424 323
Corporate Human Resources 241 363 122
Records Management 394 450 56
Governance 297 338 41
Planning & Environment Compliance & Local Laws 1,131 1,351 220
Business & Tourism 248 295 47
Communication Services 530 616 86
VIC's & Surfing Museum 718 822 105
Variance
Revised Forecast
2014/15
Budget
2015/16
Surf Coast Shire Council Annual Budget – 2015-2016 Page 38 of 106
4.2.2 Materials and services ($1.8 million decrease)
Materials and services include the purchase of consumables, payments to contractors for the provision of services, utility costs and expensed capital works. Materials and services are forecast to decrease by 7.3% or $1.8 million compared to 2014/15 revised forecast. The decrease in materials and services is due to several factors including expensed capital works. Expensed capital works are works associated with Council assets and major projects that do not meet the definition of asset expenditure under Australian Accounting Standards. Expensed capital works are forecast to decrease by $1.2 million to $1.9 million compared to 2014/15 (note $1.5 million of expensed capital expenditure recorded in the capital works program in Appendix C relates to the rehabilitation of the landfill site and is funded out of the landfill provision). Expensed works in 2015/16 are mainly attributable to the Torquay South Beach Road/Surf Coast Highway Intersection upgrade and the Jan Juc Creek Daylighting projects. Other cost movements compared to 2014/15 are due mainly to lower sub‐contractor services ($0.8 million) and lower consultants ($0.8 million). These decreases are mainly due to services being undertaken in‐house by permanent staff. Landfill royalties and software maintenance have both experienced an increase of ($0.1 million). 4.2.3 Bad and doubtful debts (in line with forecast)
Bad and doubtful debts is projected to remain at similar levels to the 2014/15 revised forecast of $0.07 million. 4.2.4 Finance Costs ($0.03 million decrease)
Finance costs relate to interest charged by financial institutions on funds borrowed. The reduction of $0.03 million or 2.3% compared to the 2014/15 revised forecast is in accordance with Council's loan borrowing schedule. No new borrowings are proposed for the 2015/16 financial year. 4.2.5 Depreciation ($0.23 million increase)
Depreciation measures the allocation of the value of an asset over its useful life for Council’s property, plant and equipment, including infrastructure assets such as roads and drains as a result of delivering services to the community. The increase of $0.23 million or 2.2% is due mainly to the completion of the 2015/16 capital works program and the full year effect of depreciation on the 2014/15 capital program. Refer to section 6. ‘Analysis of Capital Budget’ for a more detailed analysis of Council’s capital works program for the 2015/16 year. 4.2.6 Asset write‐off ($0.4 million increase)
Asset write‐off relates to the estimated value of infrastructure assets removed from Council’s property, plant and equipment assets when replaced by new assets in the capital works program during 2015/16. Asset write‐off is forecast to increase by 26.3% or $0.4 million compared to 2014/15.
Surf Coast Shire Council Annual Budget – 2015-2016 Page 39 of 106
4.3 Operating Surplus (Underlying Result)
The operating surplus is the net surplus or deficit for the year adjusted for capital contributions, gains or losses on disposal of non‐operating assets sold and other asset adjustments. This is a measure of financial sustainability as it is not impacted by non‐recurring or once‐off items of revenues and expenses which can often mask the operating result. This measure is reported by the Victorian Auditor‐General’s Office in its annual audit of Local Government results. The budgeted underlying result for 2015/16 is a surplus of $1.4 million, which is an increase of $3.0 million over the 2014/15 year. This is mainly due to the increase in rates and charges $3.0 million and decrease in expensed capex $1.2 million.
4.4 Adjusted Underlying Result
The adjusted underlying result is the net surplus or deficit for the year adjusted for non‐recurrent capital grants, non‐monetary asset contributions, and capital contributions from other sources. It is an alternative measure of financial sustainability and Council’s ability to achieve its service delivery objectives as it is not impacted by capital income items which can often mask the operating result. The adjusted underlying result for the 2015/16 year is a surplus of $1.7 million which is an increase of $2.0 million over the 2014/15 year. In calculating the adjusted underlying result, Council has excluded grants received for capital purposes which are non‐recurrent and the capital contributions from other sources. Contributions of non‐monetary assets are excluded as the value of assets assumed by Council is dependent on the level of development activity each year. The adjusted underlying result terminology and definition contained in the new regulations differs from the underlying result as determined the Victorian Auditor General’s report “Local Government Results of the 2013‐14 Audits” issued in February 2015.
2014/15
Revised
Forecast
2015/16
Budget Variance
$'000 $'000 $'000
Surplus for year 6,274 7,686 1,412
Less Net gain(loss) on disposal of assets 775 (119) (894)
Add Asset write offs (1,409) (1,779) (371)
Less Capital grants 3,958 3,201 (757)
Less Special Charges 161 301 140
Less Contributions 1,450 1,422 (29)
Less Granted assets 2,902 3,220 318
Underlying surplus/(deficit) (1,564) 1,441 3,005
2014/15 2015/16
Forecast
/
Budget Variance
$'000 $'000 $'000
Surplus for year 6,274 7,686 1,412
Less Grants ‐ capital non‐recurrent (2,260) (1,342) 918
Less Contributions ‐ non‐monetary assets (2,902) (3,220) (318)
Less Capital Contributions ‐ other sources (1,450) (1,422) 29
Adjusted Underlying surplus/(deficit) (338) 1,702 2,040
Surf Coast Shire Council Annual Budget – 2015-2016 Page 40 of 106
5. Analysis of budgeted cash position
This section analyses the expected cash flows from the operating, investing and financing activities of Council for the 2014/15 year. Budgeting cash flows for Council is a key factor in setting the level of rates and providing a guide to the level of capital expenditure that can be sustained with or without using existing cash reserves. The analysis is based on three main categories of cash flows:
Operating activities ‐ Refers to the cash generated or used in the normal service delivery functions of Council. Cash remaining after paying for the provision of services to the community may be available for investment in capital works, or repayment of debt
Investing activities ‐ Refers to cash generated or used in the enhancement or creation of infrastructure and other assets. These activities also include the acquisition and sale of other assets such as vehicles, property and equipment
Financing activities ‐ Refers to cash generated or used in the financing of Council functions and include borrowings from financial institutions and advancing of repayable loans to other organisations. These activities also include repayment of the principal component of loan repayments for the year.
Surf Coast Shire Council Annual Budget – 2015-2016 Page 41 of 106
5.1 Budgeted cash flow statement
2014/15
Revised
Forecast
2015/16
Budget Variance
Ref $'000 $'000 $'000
Cash flow from operating activities 5.1.1
Receipts
Rates and charges 42,664 45,627 2,963
Operating grants 6,972 7,151 179
Capital grants 3,628 3,201 (426)
Contributions 2,904 2,521 (383)
Interest 741 773 32
User charges 5,998 6,443 445
Statutory fees 625 673 49
63,531 66,390 2,859
Payments
Employee costs (24,009) (25,932) (1,923)
Other (23,621) (23,708) (86)
Net cash provided from operating activities 15,900 16,750 850
Cash Flows from investing activities 5.1.2
Proceeds from sale of property, plant & equipment 1,532 877 (655)
Payments for property, plant, equipment & infrastructure
assets (12,769) (14,855) (2,085)
Net cash used in investing activities (11,237) (13,978) (2,741)
Cash flows from financing activities 5.1.3
Finance costs (1,150) (1,124) 26
Proceeds from interest bearing loans and borrowings ‐ ‐ ‐
Repayment of interest bearing loans and borrowings (549) (584) (36)
Net cash provided from financing activities (1,699) (1,708) (9)
Net decrease in cash & cash equivalents held 2,964 1,065 (1,899)
Cash & cash equivalents at the beginning of the period 16,743 19,707 2,964
Cash & cash equivalents at the end of the period 5.1.4 19,707 20,772 1,065
Investments (financial assets) 1,500 1,500 ‐
Total cash & investments at the end of the period 21,207 22,272 1,065
Surf Coast Shire Council Annual Budget – 2015-2016 Page 42 of 106
5.1.1 Operating activities ($0.9 million increase) The increase in net cash provided from operating activities is due mainly to an increase in rates and charges ($3.0 million) partially offset by the increase in employee costs ($1.9 million). The net cash provided from operating activities does not equal the operating result for the year as the expected revenues and expenses of the Council include non‐cash items that have been excluded from the Cash Flow Statement. The budgeted operating result is reconciled to budgeted cash flows available from operating activities as set out in the following table. The net movement in current assets and liabilities in 2015/16 of $1.4 million predominately relates to the payment of $1.5 million for the landfill rehabilitation.
5.1.2 Investing activities ($2.7 million increase) The increase in payments for investing activities represents the planned increase in capital works expenditure ($2.1 million) and the decrease in proceeds from sale of assets ($.7 million). Refer to section 6. ‘Analysis of Capital Budget’ for a more detailed analysis of the capital works program. 5.1.3 Financing activities ($9 thousand decrease) For 2015/16 the total of principal repayments is projected to be $0.6 million and finance charges is projected to be $1.1 million. 5.1.4 Cash & cash equivalents at end of the period ($1.1 million increase) Cash and cash equivalents is forecast to increase to $20.8 million in 2015/16.
2014/15
Revised
Forecast
2015/16
Budget Variance
$'000 $'000 $'000
Surplus for year 6,274 7,686 1,412
Add Depreciation 10,480 10,708 227
Less Granted assets 2,902 3,220 318
Add Asset write offs 1,409 1,779 371
Add Debt servicing 1,150 1,124 (26)
Less Net gain (loss) on disposal of property infrastructure,
plant and equipment
775 (119) (894)
Add Net Movement in current assets and l iabilities 264 (1,446) (1,710)
Net cash provided from operating activities 15,900 16,750 850
Surf Coast Shire Council Annual Budget – 2015-2016 Page 43 of 106
5.2 Restricted and unrestricted cash and investments Cash and cash equivalents held by Council are restricted in part, and are not fully available for Council’s operations. The budgeted Balance Sheet statement indicates that Council is estimating total cash and investments of $22.3 million as at 30 June 2016. The following table shows the cash and cash equivalents as at 30 June 2016 which have been set aside for specific purposes in the future:
Note 1: Council is reviewing its unallocated cash to determine the accumulated unallocated cash reserve balance. Cash and cash equivalents that have been restricted by statute (legislative reserves) and by Council (policy reserves) as shown in the following table:
Description
2014/15
Revised
Forecast
Budget
2015/16
Variance
(Unfavour)
$'000 $'000 $'000
Restricted
Open Space 871 1,148 277
Main Drainage 205 205 ‐
Aireys Inlet Units 331 324 (7)
Asset Development 60 60 ‐
Developer Contributions 3,580 4,046 466
Waste 5,766 5,763 (2)
Trust and Deposits 1,199 1,199 ‐
Total Restricted Reserves 12,011 12,745 734
Unrestricted
Mayoral Charity ‐ ‐ ‐
Plant Replacement 828 789 (39)
Gherang Gravel Pits 1,414 1,497 83
Defined Benefits 274 474 200
Carried Forward Capital Works 2,185 1,600 (585)
Carried Forward New Initiatives 95 ‐ (95)
Adopted Strategy Implementation ‐ ‐ ‐
Asset Renewal ‐ ‐ ‐
Accumulated Unallocated Cash (Note 1) ‐ ‐ ‐
Total Unrestricted Reserves 4,796 4,359 (437)
Total Reserves 16,807 17,104 297
2014/15
Ref
Revised
Forecast
Budget
2015/16 Variance
$'000 $'000 $'000
Total Cash & Investments 21,207 22,272 1,065
Restricted Cash & Investments
‐ Legislative Reserves 5.2.1 1,407 1,677 270
‐ Other Restricted Reserves 5.2.2 10,605 11,068 463
Total Restricted cash and investments 12,011 12,745 734
Unrestricted cash and investments 5.2.3 9,196 9,527 331
Surf Coast Shire Council Annual Budget – 2015-2016 Page 44 of 106
5.2.1 Legislative reserves ($0.3 million increase) These funds must be applied for specified statutory purposes in accordance with various legislative and contractual requirements. While these funds earn interest revenues for Council, the funds are not available for other purposes. Legislative reserves are made up of:
Open Space
Main Drainage
Aireys Inlet Units
Open Space contributions for new subdivision works in are expected to increase by $0.3 million to $1.1 million which will be allocated to fund future strategic open space development. Council must retain cash at all times to match these reserves. 5.2.2 Other Restricted Reserves ($0.5 million increase) These funds must be applied for specified purposes in accordance with Council’s contractual commitments. While these funds earn interest revenues for Council, the funds are not available for other purposes. Other Restricted reserves are made up of:
Asset Development
Developer Contributions
Waste
Trust and Deposits
Developer contributions will increase by $0.5m in the 2015/16 year in line with Council’s Torquay and Jan Juc Developer Contributions Plan. Funds from this reserve will be allocated to major capital works in 2016/17, including the construction of the Torquay North Children’s Services Hub. Council must retain cash at all times to match these reserves. 5.2.3 Unrestricted Reserves ($0.4 million decrease) Unrestricted Reserves are applied for specific purposes in accordance with Council’s adopted policies. These funds are available to meet Council’s cash flow requirements, including the running of operations, provision for long service leave entitlements, unexpected short term needs, and ensuring that Council can meet its future capital works commitments. While Council can utilise these funds throughout the year to support its operations, Council must ensure that there is equivalent cash available to match these reserves at year end. Unrestricted reserves are made up of:
Plant Replacement
Gherang Gravel Pits
Defined Benefits Superannuation
Carried Forward Capital Works
Carried Forward New Initiatives
Adopted Strategy Implementation
Asset Renewal
Accumulated Unallocated Cash
Carried Forward Capital Works will decrease by $0.6m in the 2015/16 year in line with completion of programmed capital works budgeted for in 2014/15. Partially offsetting this is an increase in the Defined Benefits Superannuation Reserve $0.2m. Information regarding cash reserves and their purpose are included in Appendix E of this document.
Surf Coast Shire Council Annual Budget – 2015-2016 Page 45 of 106
6. Analysis of capital budget
This section analyses the planned capital expenditure budget for the 2015/16 year and the sources of funding for the capital budget. 6.1 Capital works
Ref
2014/15
Revised
Forecast
2015/16
Budget Variance
$'000 $'000 $'000
Capital works carried forward 6.1.1 2,523 1,113 (1,410)
New Capital Works
Asset Preservation 6.1.2 5,743 7,691 1,948
Corporate Projects 6.1.3 1,045 563 (482)
Community Buildings 6.1.4 477 221 (256)
Drainage 6.1.5 206 100 (106)
Open Space/Recreation Facil ities 6.1.6 541 1,510 969
Pathways 6.1.7 123 901 778
Transport 6.1.8 2,563 1,954 (609)
Waste Management 6.1.9 1,106 1,727 621
Torquay/Jan Juc DCP 6.1.10 1,515 2,402 888
Total New Capital Works 13,318 17,069 3,751
Total Capital Works 15,841 18,182 2,341
Represented by:
Renewal 6,550 6,632 82
Upgrade 2,162 754 (1,408)
Expansion 352 403 52
New 3,706 7,066 3,360
12,769 14,855 2,086
Expensed Capital Works 3,072 1,871 (1,201)
Landfil l Provision Works ‐ 1,456 1,456
Total Capital Works 15,841 18,182 2,341
Surf Coast Shire Council Annual Budget – 2015-2016 Page 46 of 106
6.1.1 Carried forward works ($1.4 million decrease) At the end of each financial year there are projects that are either incomplete or that haven’t begun due to external factors such as planning issues, special charge scheme appeal processes, delayed grant funding approvals and weather delays. For the 2014/15 year it is forecast that $1.1 million of capital works will be incomplete and will be carried forward into the 2015/16 year. The more significant projects include the South Beach Road / Surf Coast Highway Intersection Upgrade in Torquay ($0.4 million), the Torquay North Civic Precinct Play‐zone at Banyul Warri Fields ($0.4 million), and the Jan Juc Creek Daylighting project ($0.3 million). 6.1.2 Asset preservation ($1.9 million increase) Asset preservation includes renewal of existing roads, drains, pathways, park assets, active recreation facilities, buildings, stairways and retaining structures. The increase in the asset preservation relates mainly to some larger renewal projects such as the Anglesea Landfill Road Construction ($0.6 million), and Anglesea Kindergarten Refurbishment ($0.7 million). 6.1.3 Corporate projects ($0.5 million decrease) Corporate projects in 2015/16 include funds for the purchase of Jan Juc land ($0.5 million), and the Public Lighting Upgrade Program ($0.02 million) 6.1.4 Community Buildings ($0.3 million decrease) Community buildings include community and sports facilities. New community building works in 2015/16 include the design of future building and open space project ($0.1 million), the Anglesea Riding Club Ecopod Pavilion ($0.06 million), and the Accessible Toilet in Hesse Street, Winchelsea ($0.03 million). 6.1.5 Drainage ($0.1 million decrease) New drainage works in the 2014/15 year included a number of catchment upgrades. The 2015/16 budget forecasts the Freshwater Creek Flood Mitigation works to be the major drainage project of the new capital works projects ($0.1 million).
Surf Coast Shire Council Annual Budget – 2015-2016 Page 47 of 106
6.1.6 Open space/Recreation facilities ($1.0 million increase) Open space development in 2015/16 includes the continuation of the development at the Community and Civic Precinct in Torquay with Stage 2B of the project ($1.0 million), the Playground Strategy Implementation ($0.2 million), Anglesea Tennis Club’s Synthetic Court installation ($0.2 million), and the Polwarth Oval Sports Lighting Upgrade in Torquay ($0.1 million). 6.1.7 Pathways ($0.8 million increase) New pathways in 2015/16 include the Torquay Precinct Pathways ($0.6 million), Winchelsea’s Hesse Street ridge design ($0.05 million), Mt Moriac’s Senior Citizen Trail Connection ($0.05 million) and Winchelsea’s Walk of Honour ($0.04 million). 6.1.8 Transport ($0.6 million decrease) Transport includes rehabilitation, upgrade, expansion and construction of roads, and includes the allocation of Federal Roads to Recovery and State Roads and Bridges funding. Transport works in 2014/15 mainly related to the Gnarwarre Pollocksford Rd widening stages 1&2 ($1.2 million). In 2015/16, the major projects include Construction of The Great Ocean Road Service Road at Forest Road ($0.5 million), Torquay’s Esplanade Kerb and Sealing ($0.4 million), Anglesea Long Vehicle Parking ($0.2 million), and Aireys Inlet Pedestrian Refuge ($0.2 million). 6.1.9 Waste management ($0.6 million increase) Waste management projects typically include landfill site rehabilitation works and upgrade of building facilities such as transfer stations and recycling facilities. The increase in waste management projects relates mainly to installation of the Anglesea landfill cell liner ($1.7 million). There are also design works for the Stormwater at Anglesea Landfill for $0.05 million.
6.1.10 Torquay/Jan Juc Developer Contributions Plan (DCP) ($0.9 million increase) Projects relating to the adopted Torquay/Jan Juc DCP and included in the 2015/16 program include the Torquay North Early Learning Centre planning and design ($0.5 million), Torquay’s Civic Precinct Active Recreation Facilities ($1.4 million), Widening of Spring Creek Bridge for the Regional Bike Route ($0.3 million), and Construction of Pathways through the Torquay North Open Space Network ($0.2 million).
Surf Coast Shire Council Annual Budget – 2015-2016 Page 48 of 106
6.2 Funding sources
Ref2014/15
Revised
Forecast
2015/16
Budget Variance
$'000 $'000 $'000
Internal
Capital works carried forward 6.2.1 2,523 1,113 (1,410)
Totat capital works carried forward 2,523 1,113 (1,410)
New capital works
External
Capital grants 6.2.2 2,805 2,674 (131)
Contributions 6.2.3 64 156 92
Special charges 6.2.4 161 301 140
Proceeds from sale of assets 6.2.5 1,532 442 (1,090)
4,562 3,573 (989)
Internal
Cash reserves and investments 6.2.6 5,913 4,352 (1,561)
Operations 6.2.7 2,842 9,144 6,301
Total new capital works 13,318 17,069 3,751
Total funding sources 15,841 18,182 2,341
Surf Coast Shire Council Annual Budget – 2015-2016 Page 49 of 106
6.2.1 Capital works carried forward ($1.4 million decrease) At the end of each financial year there are projects that are either incomplete or that haven’t begun due to external factors such as planning issues, special charge scheme appeal processes, delayed grant funding approvals and weather delays. For the 2014/15 year it is forecast that $1.1 million of capital works will be incomplete and be carried forward into the 2015/16 year. The decrease on 2014/15 reflects Council’s increased focus around capital and resource planning. 6.2.2 Capital grants ($0.1 million decrease) Capital grants include all monies received from State and Federal sources for the purposes of funding the capital works program. Grants that are budgeted to be received in 2015/16 include Federal Roads to Recovery projects – Great Ocean Road Service Road Construction at Forest Road, Anglesea Long Vehicle Parking, Aireys Inlet Pedestrian Island, and Gosney St/Murrell St modifications in Winchelsea ($1.4 million), and $0.5 million from the Federal Government for the Civic Centre Precinct’s Banyul Playzone. 6.2.3 Capital contributions ($0.09 million increase) Contributions relate to community contributions to capital works. The main source of capital contributions for the 2015/16 year relate to the Anglesea Kindergarten Refurbishment ($0.1 million)
6.2.4 Special charges ($0.1 million increase) Special charges are declared under Section 163 of the Local Government Act 1989 for the purpose of raising revenue from ratepayers who will receive a specific benefit from new capital works projects. Council proposes a special charge scheme for Torquay Precinct Pathways construction in 2015/16 ($0.3 million). 6.2.5 Proceeds from sale of assets ($1.1 million decrease) Council has a planned program for replacing fleet vehicles, heavy plant and equipment, which is partially funded by proceeds from sale of these assets each year. The 2015/16 year proceeds relates to the sale of Council’s light fleet and heavy plant ($0.4 million). The 2014/15 forecast includes sale of land. 6.2.6 Cash reserves and investments ($1.6 million decrease) Council’s cash reserves are held to meet cash flow requirements and future capital works commitments. Council has allocated cash reserve funds to new capital works commitments in 2015/16, including the purchase of land in Jan Juc ($0.5 million), fleet and plant replacement ($0.8 million), waste management projects ($2.3 million), and open space development ($0.4 million). 6.2.7 Operations ($6.3 million increase) Council generates cash from its operating activities, which is used as a funding source for the capital works program. Refer to section 5 ‘Budgeted Cash Position’ for more information on funds from operations.
Surf Coast Shire Council Annual Budget – 2015-2016 Page 50 of 106
7. Analysis of budgeted financial position This section analyses the movements in assets, liabilities and equity between 2014/15 and 2015/16. It also considers a number of key performance indicators. 7.1 Budgeted balance sheet
2014/15
Ref
Revised
Forecast
2015/16
Budget Variance
$'000 $'000 $'000
Current assets 7.1.1
Cash & cash equivalents 7,457 8,522 1,065
Trade and other receivables 3,621 3,722 101
Other financial assets 12,250 12,250 ‐
Inventories 303 303 ‐
Total current assets 23,631 24,797 1,166
Non current assets 7.1.2
Trade and other receivables 510 504 (6)
Financial assets 1,500 1,500
Property plant & equipment, infrastructure 396,824 410,807 13,983
Investments in l ibrary 589 589 ‐
Total non current assets 399,423 413,400 13,977
Total assets 423,054 438,197 15,143
Current liabilities 7.1.3
Trade and other payables 4,746 4,796 50
Provisions 6,232 6,237 5
Interest bearing l iabil ities 584 628 44
Trust funds and deposits 1,199 1,199 ‐
Total current liabilities 12,761 12,860 99
Non current liabilities 7.1.4
Provisions 13,284 11,878 (1,406)
Interest bearing l iabil ities 15,517 14,888 (628)
Total non current liabilities 28,800 26,766 (2,034)
Total liabilities 41,561 39,626 (1,935)
Net assets 7.1.5 381,493 398,571 17,078
Equity 7.1.6
Accumulated surplus 177,242 184,631 7,389
Assets revaluation reserve 187,445 196,836 9,391
Other reserves 16,807 17,104 297
Total equity 381,493 398,571 17,078
Surf Coast Shire Council Annual Budget – 2015-2016 Page 51 of 106
7.1.1 Current assets ($1.2 million increase) Cash and cash equivalents include cash and investments such as cash held in the bank and in petty cash and the value of investments in deposits or other highly liquid investments with short term maturities of three months or less. These balances are projected to increase ($1.1 million) in 2015/16. Trade and other receivables are monies owed to Council by ratepayers and others and include rates, grants, user charges, special charges and asset sales. Trade and other receivables are projected to increase ($0.1 million) in 2015/16. Other financial assets include investments with maturity dates of over three months and less than twelve months. These are expected to remain at 2014/15 levels. 7.1.2 Non‐current assets ($14.0 million increase) Property, infrastructure, plant and equipment is the largest component of Council’s balance sheet and represents the value of all the land, buildings, roads, drainage, recreation facilities and plant and equipment. The increase of $14.0 million in this balance is mainly attributable to the total capital works program excluding expensed capital works ($14.9 million), granted assets ($3.2 million), cyclical revaluation of assets ($9.4 million), less depreciation of assets ($10.7 million), asset write‐off ($1.8 million) and disposal of assets ($1.0 million). 7.1.3 Current liabilities ($0.1 million increase) Trade and other payables are those to whom Council owes money as at 30 June. These liabilities are budgeted to increase in 2015/16 due to increased levels of capital expenditure. Provisions include accrued long service leave, annual leave and future landfill rehabilitation. They are expected to increase by ($0.005 million) 7.1.4 Non‐current liabilities ($2.0 million decrease) The decrease of $2.0 million in 2015/16 is mainly due to the reclassification of $1.5 million of rehabilitation works to current liabilities for expected works in 2016/17 and a $0.6 million decrease in Interest bearing liabilities which move to current liabilities as they fall due for payment. 7.1.5 Net assets ($17.1 million increase) This term is used to describe the difference between the value of total assets and the value of total liabilities. It represents the net worth of Council as at 30 June each year. The increase in net assets of $17.1 million is a result of the operating surplus plus the revaluation of property, infrastructure, plant and equipment. 7.1.6 Equity ($17.1 million increase) Total equity always equals net assets and is made up of the following components:
Asset revaluation reserve which represents the difference between the previously recorded value of assets and their current valuations
Other reserves that are funds that Council wishes to separately identify as being set aside to meet a specific purpose in the future and to which Council has committed. These amounts are separated from the Accumulated Unallocated Surplus Reserve of the Council to be disclosed
Accumulated surplus which is the value of all net assets less Reserves that have accumulated over time. It has been budgeted that during the year a net amount of $0.3 million is to be transferred to other reserves. This is a transfer between equity balances only and does not impact on the total balance of equity. The increase in the asset revaluation reserve of $9.4 million reflects the anticipated revaluation of Council assets in the 2015/16 year.
Surf Coast Shire Council Annual Budget – 2015-2016 Page 52 of 106
7.2 Key assumptions In preparing the Budgeted Balance Sheet for the year ending 30 June 2016 it was necessary to make a number of assumptions about assets, liabilities and equity balances. The key assumptions are as follows:
Trade creditors to be based on a proportion of total capital expenditure, operating expenditure and employee costs at 2015/16 levels. Payment cycle is 30 days
Other debtors are anticipated to be 3% of total revenue
Current provisions for future landfill rehabilitation are $1.5 million at June 30, 2016 relating to rehabilitation works to be carried out at the Anglesea Landfill in 2016/17.
Provisions for employees to the value of $5.4 million in 2015/16 will remain steady as management encourage use of leave entitlements by employees
Non‐current provisions for future landfill rehabilitation are $12.50 million as at June 30, 2016 relating to future rehabilitation works at the Anglesea Landfill, which is forecast to close in 2023/24
Repayment of loan principal to be $0.6 million and no new borrowings in 2015/16
Total capital works to be $18.2 million (including works to be expensed $3.3 million).
A total of $4.3 million to be transferred from cash reserves to fund the capital works program for the 2015/16 year
Asset revaluations of land and buildings will be undertaken in the 2015/16 year and are expected to total $9.4 million relate to scheduled revaluations of Council’s road, drainage, and recreation assets.
Surf Coast Shire Council Annual Budget – 2015-2016 Page 53 of 106
8. Strategic resource plan and key financial indicators This section considers the long term financial projections of the Council. The Act requires a Strategic Resource Plan to be prepared covering both financial and non‐financial resources, and including key financial indicators for at least the next four financial years to support the Council Plan. 8.1 Plan development Council has prepared a Strategic Resource Plan (SRP) for the 10 years 2015/16 to 2024/25 as part of its ongoing financial planning to assist in adopting a budget within a longer term framework. The SRP takes the strategic objectives and strategies as specified in the Council Plan and expresses them in financial terms for the next 10 years. The key objective, which underlines the development of the SRP, is financial sustainability in the medium to long term, while still achieving Council’s strategic objectives as specified in the Council Plan. The key financial objectives that underpin the SRP, are:
Rate increases that are adequate to maintain current service delivery levels and capital works keeping in mind population growth
Equitable and affordable distribution of rate revenue keeping in mind economic conditions
Responsible use of debt subject to debt levels remaining below local government prudential guidelines
Increase funding levels for capital works focusing on asset renewal and infrastructure asset growth to accommodate population growth
Work towards reduced reliance on rates
Maintenance of a strong liquidity position
Achieve an operating surplus every year and work towards achieving a positive underlying operating result.
In preparing the SRP, the Council has also been mindful of the need to comply with the following principles of sound financial management as contained in the Act:
Prudently manage financial risks relating to debt, assets and liabilities
Provide reasonable stability in the level of rate burden
Consider the financial effects of Council decisions on future generations
Provide full, accurate and timely disclosure of financial information. The SRP is updated annually through a rigorous process of consultation with Council service providers followed by a detailed sensitivity analysis to achieve the key financial objectives.
8.2 Financial resources The following table summarises the key financial results for the next four years as set out in the SRP. Appendix A includes a more detailed analysis of the financial resources to be used over the four‐year period.
Key to Forecast Trend: + Forecasts improvement in Council's financial performance/financial position indicator o Forecasts that Council's financial performance/financial position indicator will be steady ‐ Forecasts deterioration in Council's financial performance/financial position indicator
2014/15
Revised
Forecast
2015/16
Budget
2016/17
Forecast
2017/18
Forecast
2018/19
Forecast
Trend
+/o/‐
$'000 $'000 $'000 $'000 $'000
Operating result 6,274 7,686 1,973 5,707 11,007 +
Underlying operating result (1,564) 1,441 (4,702) 581 2,465 +
Cash and investments 21,207 22,272 17,462 19,094 21,829 ‐
Cash flow from operations 15,900 16,750 11,163 13,861 22,785 o
Capital works 12,769 14,855 16,217 13,711 18,194 o
Surf Coast Shire Council Annual Budget – 2015-2016 Page 54 of 106
The following graph shows the general financial indicators over the four year period.
The key outcomes of the SRP are as follows:
Financial sustainability (section 5) ‐ Cash and investments are forecast to decrease during 2016/17 due to the completion of significant capital works including the Early Learning Centre $7.4 million. Cash and investments are expected to remain above $15.5 million, which indicates a balanced budget on a cash basis in each year. Council will also have accumulated in excess of $14.0 million by 30 June 2015 for planned waste management infrastructure and significant rehabilitation of the Anglesea landfill which will commence in 2015/16 and be completed by 2023/24.
Rating strategy (section 9) – Rate increases are budgeted at 5.5% in 2015/16 which is up 0.75% from 2014/15 that in part covers the Grants Commission funding freeze. The annual increase from 2016/17 is set at 5%. This reflects Council’s current cost index base and is within that expected of comparable councils. Actual rate increases will be subject to future Council decisions.
Service delivery strategy (section 10) – There was a 4.0% increase in the garbage charge for kerbside waste collections for the 2014/15 financial year. A 5.0% increase is indicated in Council’s Strategic Resource Plan which includes 1% for growth. Other service levels will remain steady in the 2015/16 year with additional staff resources 2015/16 of 3% with the inclusion of 2 new Kindergartens from January 2015 and are then indexed throughout the next three year period by a 1% growth factor. Operating surpluses are forecast in each of the 10 years with a significant decrease in anticipated capital grant revenue and increased surpluses are directed to fund the annual capital works program. Excluding the effects of non‐operating items such as capital contributions, the underlying result improves steadily over the 15 year period with the exception of 2016/17 we have an underlining deficit of $4.8 million which mainly reflects expensed capital works of $7.1 million including South Beach Road $3.3 million partly grant funded and $1.7 million Waste funded from reserve. The underlying result is an important measure of financial sustainability as once‐off items can often mask the operating result.
Borrowing strategy (section 10) – $1.6 million of new borrowings are planned in 2016/17 and a further $3.0 million in 2017/18 to fund the construction of the Torquay North Early Learning Centre. No other new borrowings are planned over the next 10 years and borrowing levels are within the local government prudential guidelines that set limits for working capital, levels of debt and debt commitment costs compared to levels of rate revenue and assets.
Infrastructure strategy (section 10) ‐ Capital expenditure over the four year period will total $63.0 million at an average of $15.7 million each year. Expenditure on renewal and upgrade of existing assets will total $32.1 million while expenditure on new and expanded assets will total $32.9 million.
Surf Coast Shire Council Annual Budget – 2015-2016 Page 55 of 106
8.3 Non‐financial resources In addition to the financial resources to be consumed over the planning period, Council will also consume non‐financial resources, in particular human resources. The following table summarises the non‐financial resources for the next four years.
The increase in EFT in 2015/16 is due an increase in staff numbers including an environmental health officer and a home support program assessment officer as well as the full year impact of employees commencing in 2014/15 including kindergarten staff at Jan Juc and Winchelsea kindergartens.
2014/15
Revised
Forecast
2015/16
Budget
2016/17
Forecast
2017/18
Forecast
2018/19
Forecast
$'000 $'000 $'000 $'000 $'000
Total employees costs ‐ operating ($'000) 24,109 25,987 27,993 28,529 29,870
Total employees numbers (EFT) 256 261 266 267 270
Surf Coast Shire Council Annual Budget – 2015-2016 Page 56 of 106
9. Rating strategy This section considers the Council’s rating strategy including strategy development and assumptions underlying the current year rate increase and rating structure. 9.1 Rating context In developing the Strategic Resource Plan (referred to in Section 8.), rates and charges were identified as an important source of revenue, accounting for 68.8% of the total revenue received by Council annually. Planning for future rate increases has therefore been an important component of the Strategic Resource Planning process. However, it has also been necessary to balance the importance of rate revenue as a funding source with community sensitivity to increases. To ensure that deliberations about future rate increases have been made on an informed basis, comparisons of historical rate increases were made between Council and other similar sized Councils. The following table shows Council’s last six years rate increases.
9.2 Current year rate increase In order to maintain service levels, a strong capital expenditure program, and fund new initiatives that meet the needs of a rapidly growing population and a range of other much needed infrastructure, general rates will increase by 5.5% for existing ratepayers in 2015/16 raising a total rate of $39.8 million ($45.7 million total rates and charges). This total includes the Municipal Charge which will increase by 5.4% or $10 per assessment. The following table sets out future proposed rate increases and total rates to be raised, based on the forecast financial position of Council as at 30 June 2015. The total rates raised include supplementary rates.
Future rate increases have been set based on the minimum required to meet projected cost base increases including employee costs, materials, contracts and construction costs. The final decision on the size of future rate increases rests with Council. Total rate revenue includes rates from existing ratepayers plus an allowance for the contribution by new ratepayers.
Year Surf Coast
Shire
2010/11 6.90%
2011/12 6.30%
2012/13 4.90%
2013/14 5.90%
2014/15 4.75%
2015/16 5.50%
Average increase 5.71%
Rate Total RateYear Increase Revenue
% $’000
2014/15 4.75 37,133
2015/16 5.5 39,792
2016/17 5 42,831
2017/18 5 46,075
2018/19 5 49,537
Surf Coast Shire Council Annual Budget – 2015-2016 Page 57 of 106
9.3 Rating structure Council has established a rating structure which is comprised of three key elements. These are:
Property values, which reflect capacity to pay and form the central basis of rating under the Local Government Act 1989
A ‘user pays’ component to reflect usage of services provided by Council.
A ‘fixed’ municipal charge per property to cover some of the administrative costs of Council Striking a proper balance between these elements provides equity in the distribution of the rate burden across residents. Council makes a further distinction within the property value component of rates based on the purpose for which the property is used; that is, whether the property is used for residential, commercial/industrial or farming purposes. This distinction is based on the concept that different property categories should pay a fair and equitable contribution to rates, taking into account the benefits those properties derive from the local community and Council. Council’s rating structure comprises five differential rates (residential or general, commercial/industrial, farm, vacant residential and vacant provisional). These rates are structured in accordance with the requirements of Section 161 ‘Differential Rates’ of the Act, and in line with the ministerial guidelines for differential rating 2013. The commercial/industrial rate is set at 190% of the residential rate, the farm rate at 75% of the residential rate, vacant residential at 200% of the residential rate and vacant provisional equals the residential rate. Council also has a municipal charge, a kerbside collection charge and a recycling charge as permitted under the Act. In deliberating over the setting of the differential rate structure for the 2015/16 year, Council has been mindful of the increase in residential property rates. The effect of the 2015/16 rate increase will be that properties will experience an increase in the general rate of 5.5% as the rate in the dollar amounts have been increased by 5.5% and an increase of $10 in the municipal charge (a 4.5% increase on 2014/15). Council has also added a new differential which is described in section 9.5 below. There will be an increase of 4.2% in the garbage charge for kerbside waste collections in 2015/16 bringing the fee to $350 per collection. The rural garbage collection fee will increase by 3.9% bringing the fee to $291. The following table summarises the rates to be made for the 2015/16 year. A more detailed analysis of the rates to be raised is contained in Appendix B ‘Statutory Disclosures’.
9.4 General revaluation of properties A general revaluation of all properties within the Council’s municipal district occurs every two years, with the last general revaluation carried out as at 1 January 2014 and taking effect on 1 July 2014. The next general revaluation of all properties will be carried out 1 January 2016 to take effect on 1 July 2016.
2014/15 2015/16
cents/$CIV cents/$CIV Change
General Rates Cents in $ of CIV 0.24130 0.25457 5.50%
Farm Rates Cents in $ of CIV 0.18098 0.19093 5.50%
Commercial/Industrial Rates Cents in $ of CIV 0.45848 0.48369 5.50%
Vacant Residential Rates Cents in $ of CIV 0.48261 0.50915 5.50%
Vacant Provisional Rates Cents in $ of CIV ‐ 0.25457
Municipal Charge $ per property 185$ 195$ 5.41%
Urban Garbage (al l residential tenements) $ per property 336$ 350$ 4.17%
Rural Garbage (optional) $ per property 280$ 291$ 3.93%
Rate Type
Surf Coast Shire Council Annual Budget – 2015-2016 Page 58 of 106
9.5 Changes to vacant residential rate land Council’s newly adopted rating strategy rectifies an unintended consequence of the vacant residential rate land differential in the prior year differential rating structure. The purpose of the vacant land differential is to facilitate building development and to act as a disincentive for vacant residential land to be held as a long term investment. However, under the previous differential rating structure, as soon as land is reclassified to vacant residential (via new subdivisions or demolition of existing structures) the vacant land differential is applied, leading to increased costs for those with genuine intentions to build or rebuild. From 1 July 2015 a new differential ‘Vacant Provisional’ has been introduced which will be at the same rate as the general rate for all rateable residential properties . This differential category allows a one year grace period for vacant land that is reclassified as a result of new subdivisions or becomes vacant as a result of demolition of the established dwelling. This will allow sufficient time for those with genuine intentions to build on the newly vacant land to carry through with their plans without an additional financial burden. The grace period will apply for any property that is reclassified to vacant residential land from 1 July 2015. Those that qualify for the grace period will pay the vacant provisional rate on their land for up to the remainder of that rating year plus one full rating year from the date the land was reclassified. If a certificate of occupancy is not issued for the property when that period has expired, the differential will revert back to the vacant residential rate. The vacant residential rate will continue to apply until proof of a certificate of occupancy being issued is provided to Council.
Surf Coast Shire Council Annual Budget – 2015-2016 Page 59 of 106
10. Other strategies
This section sets out the strategies that have been developed and incorporated into the Strategic Resource Plan including borrowings, infrastructure and service delivery. 10.1 Borrowings In developing the Strategic Resource Plan (SRP) (see section 8), borrowings are identified as an important funding source for capital works programs. In the recent past, Council has borrowed strongly to finance large infrastructure projects. The SRP includes the results of an analysis of Council’s debt position against both State averages and large Council averages over a number of different indicators. It also shows the results of prudential ratios used by the Victorian State Government to assess the loan capacity of local governments. The outcome of the analysis highlights that current debt levels are adequately accommodated. For the 2015/16 year, Council has not proposed to take out any new borrowings to expand the capital works program and therefore, after making loan repayments of $0.6 million, will reduce its total borrowings to $15.5 million as at 30 June 2016. However, it is anticipated that new borrowings will be required to fund construction of the Torquay North Early Learning Centre. Late in 2016/17 new borrowings of $1.6 million will be required in place of grant funding that is not available and $3.0 million will be required in 2017/18. The following table sets out future proposed borrowings, based on the forecast financial position of Council as at 30 June 2015.
The table below shows information on borrowings specifically required by the Regulations.
10.2 Infrastructure The Council has developed an Asset Management Strategy based on the knowledge provided by various Asset Management Plans, which set out Council’s capital expenditure requirements for the next 10 years and is a key input to the SRP. It predicts infrastructure consumption, renewal and infrastructure needs to meet future community service expectations. Asset Management Plans summarise the anticipated needs of the community, which have been identified through a rigorous process of consultation and evaluation, and sourced from master plans, developer contribution plans (DCP’s), structure plans and service strategies (eg Early Learning Strategy). The Asset Management Strategy has been developed based on industry standards developed through the Municipal Association of Victoria and adapted to meet the needs of the Surf Coast Shire. The key aspects of the process are as follows:
Year
New
Borrowings
$'000
Principal
Paid
$'000
Interest
Paid
$'000
Balance
30 June
$'000
2014/15 ‐ 542 1,150 16,101
2015/16 ‐ 584 1,124 15,517
2016/17 1,600 628 1,079 16,488
2017/18 3,000 775 1,150 18,713
2018/19 ‐ 1,006 1,328 17,707
2014/15
$'000
2015/16
$'000
Total amount borrowed as at 30 June of the prior year 16,643 16,101
Total amount to be borrowed ‐ ‐
Total amount projected to be redeemed 542 584
Total amount proposed to be borrowed as at 30 June 16,101 15,517
Surf Coast Shire Council Annual Budget – 2015-2016 Page 60 of 106
A long term capital planning process which integrates with the Council Plan, Strategic Resource Plan and the annual budget.
Identification of capital works by preparation of asset management plans and various master plans, DCP’s and service strategies.
Prioritisation of capital works within asset classes on the basis of evaluation criteria that incorporate strategic, economic, social and environmental factors.
Application of a methodology to allocate annual funding to classes of capital works.
Preparation of business cases to document capital works submissions. A key objective of the Asset Management Strategy is to maintain or renew Council’s existing assets at desired condition levels. If sufficient funds are not allocated to asset renewal then Council’s investment in those assets will reduce, along with the capacity to deliver services to the community. Council has established an asset renewal funding strategy that provides an overall allocation to asset renewal, rather than determining each year’s funding from the projects that are to be undertaken that year. This approach is based on predicting the level of asset renewal funding required in the longer term (at this stage 10 years) and smoothly increasing the annual allocation to achieve that target. The annual allocation is placed into the Asset Renewal Reserve, with approved renewal projects drawing on that balance as required. The following influences have had a significant impact on Council’s Asset Management Strategy:
Use of cash and investment reserves and special charge schemes to fund future capital expenditure programs.
Continuing availability of significant Federal funding for the renewal and upgrade of roads (Roads to Recovery), noting the Country Roads and Bridges Initiative has been discontinued.
Availability of significant funding for other capital project.
Allocation of funds to meet Council’s commitment to implement the new infrastructure identified in the Torquay Jan Juc Developer Contribution Plan.
The following table summarises Council's forward outlook on capital expenditure including funding sources for the next four years.
In addition to using cash generated from its annual operations, borrowings and external contributions such as government grants and special rates, Council has significant cash or investment reserves that are also used to fund a variety of capital projects. These cash reserves are either ‘legislative’ or ’policy’ cash reserves. Legislative reserves relate to cash and investments held by Council that must be expended on a specific purpose as directed by statute and include contributions to car parking, drainage and public resort and recreation. Policy cash reserves relate to those cash and investment balances that have been set aside by Council and can be used at Council’s discretion, even though they may be earmarked for a specific purpose. Section 5.2 includes a Statement of Reserves which summarises reserves for the year ending 30 June 2015.
Year
Total Capital
Works
Program
External
funding Cash Reserves
Council
Operations
$'000 $'000 $'000 $'000
2014/15 15,841 3,356 6,140 6,345
2015/16 18,182 3,573 5,465 9,144
2016/17 24,821 5,201 11,728 7,892
2017/18 20,515 1,533 5,296 13,686
2018/19 21,383 4,885 4,484 12,014
Surf Coast Shire Council Annual Budget – 2015-2016 Page 61 of 106
10.3 Service delivery The key objectives in Council’s Strategic Resource Plan (referred to in Section 8.) that directly impact the future service delivery strategy are to maintain existing service levels while meeting the increased demands of a growing community and to achieve a breakeven operating result within the medium term. The Rating Strategy (referred to in Section 9) also refers to future rate increases approximating CPI plus 2%. Rate increases reflect the rising costs of Local Government Cost Index (published by the Municipal Association of Victoria), which is forecast to be 3.9% or 0.9% higher than CPI, and the future expansion of the capital works program and service delivery to respond to anticipated future population growth needs. The general influences affecting all operating revenue and expenditure are set out in the following table.
2015/16 2016/17 2017/18 2018/19
% % % %
3.0 3.0 3.0 3.0
5.0 5.0 5.0 5.0
4.2 4.2 4.2 4.2
5.5 5.0 5.0 5.0
4.0 4.0 4.0 4.0
Grants Commission 0.0 0.0 0.0 3.0
Government funding 2.8 3.0 3.0 3.0
3.0 3.0 3.0 3.0
3.0 3.0 3.0 3.0
Interest on Borrowings 7.0 7.0 7.0 7.0
Consumer Price Index
Statutory fees
Council fees
Road Maintenance & Construction Index
Rate increases
Garbage Charge increases
Wages growth
Surf Coast Shire Council Annual Budget – 2015-2016 Page 62 of 106
Appendices The following appendices include voluntary and statutory disclosures of information which provide support for the analysis contained in sections 1 to 10 of this report. This information has not been included in the main body of the budget report in the interests of clarity and conciseness. Council has decided that while the budget report needs to focus on the important elements of the budget and provide appropriate analysis, the detail upon which the annual budget is based should be provided in the interests of open and transparent local government. The contents of the appendices are summarised below:
Appendix Nature of information Page #
A Financial statements 63
B Statutory disclosures 68
C Capital works program and new initiatives 75
D Fees and Charges Schedule 81
E Cash Reserves 95
F G H
Local Government Rates Capping Framework Terms of Reference Council Contributions to External Parties Asset Renewal Backlog
100103104
Surf Coast Shire Council Annual Budget – 2015-2016 Page 63 of 106
Appendix A ‐ Financial statements This appendix presents information in regard to the Financial Statements. The budget information for the years 2014/15 to 2017/18 has been extracted from the Strategic Resource Plan. The appendix includes the following budgeted information:
Comprehensive Income Statement
Statement of Human Resources
Balance Sheet
Statement of Cash Flows
Statement of changes in Equity
Statement of Capital Works
Appendix A
Surf Coast Shire Council Annual Budget – 2015-2016 Page 64 of 106
Comprehensive Income Statement For the four years ending 30 June 2019
Statement of Human Resources For the four years ending 30 June 2019
2014/15Revised
Forecast
2015/16
Budget
Forecast
2016/17
Forecast
2017/18
Forecast
2018/19
$'000 $'000 $'000 $'000 $'000
Revenues from ordinary activities
Rates and charges 42,761 45,732 49,036 52,591 56,378
Operating grants ‐ recurrent 6,410 6,692 6,574 6,662 6,855
Operating grants ‐ non‐recurrent 562 459 451 457 471
Capital grants ‐ recurrent 648 1,389 648 648 648
Capital grants ‐ non‐recurrent 3,310 1,812 2,587 633 3,757
Contributions 2,904 2,521 3,225 3,428 3,851
Interest 741 773 593 659 708
User charges 5,845 6,433 6,170 6,348 6,544
Statutory fees 625 673 733 658 678
Total revenues 63,804 66,484 70,018 72,084 79,889
Expenses from ordinary activities
Employee benefits 24,109 25,987 27,993 28,529 29,870
Materials and services 23,990 22,232 29,210 26,609 27,177
Bad and doubtful debts 69 69 73 76 78
Finance costs 1,150 1,124 1,079 1,150 1,328
Depreciation 10,480 10,708 11,284 11,743 12,211
Asset write offs 1,409 1,779 1,767 1,817 1,917
Total expenses 61,208 61,899 71,406 69,923 72,581
Net gain (loss) on disposal of property infrastructure, plant
and equipment 775 (119) (19) (4) (28)
Granted assets 2,902 3,220 3,381 3,550 3,728
Net surplus 6,274 7,686 1,973 5,707 11,007
Other Comprehensive Income
Items that will not be reclassified to surplus or deficit in future periods
Net asset revaluation increment 8,956 9,391 6,813 13,557 2,242
Total Comprehensive Result 15,230 17,078 8,786 19,264 13,249
2014/15
Revised
Forecast
Budget
2015/16
Forecast
2016/17
Forecast
2017/18
Forecast
2018/19
$'000 $'000 $'000 $'000 $'000
Total employee costs 24,109 25,987 27,993 28,529 29,870
Employee Numbers
Permanent full‐time 169 170 173 174 176
Permanent part‐time 87 91 93 93 94
Total employee numbers (EFT) 256 261 266 267 270
Appendix A
Surf Coast Shire Council Annual Budget – 2015-2016 Page 65 of 106
Balance Sheet For the four years ending 30 June 2019
2014/15Revised
Forecast
2015/16
Budget
Forecast
2016/17
Forecast
2017/18
Forecast
2018/19
$'000 $'000 $'000 $'000 $'000
Current assets
Cash & cash equivalents 7,457 8,522 7,962 7,594 8,329
Trade and other receivables 3,621 3,722 3,809 3,900 3,996
Other financial assets 12,250 12,250 8,000 10,000 12,000
Inventories 303 303 303 303 303
Total current assets 23,631 24,797 20,074 21,796 24,628
Non current assets .
Trade and other receivables 510 504 635 616 599
Financial assets 1,500 1,500 1,500 1,500 1,500
Property plant & equipment, infrastructure 396,824 410,807 423,796 440,643 450,172
Investments in l ibrary 589 589 589 589 589
Total non current assets 399,423 413,400 426,520 443,348 452,860
Total assets 423,054 438,197 446,594 465,145 477,488
Current liabilities
Trade and other payables 4,746 4,796 4,846 4,896 4,946
Provisions 6,232 6,237 7,814 4,776 4,776
Interest bearing l iabil ities 584 628 775 1,006 1,028
Trust funds and deposits 1,199 1,199 1,199 1,199 1,199
Total current liabilities 12,761 12,860 14,634 11,877 11,949
Non current liabilities
Provisions 13,284 11,878 8,890 8,940 8,990
Interest bearing l iabil ities 15,517 14,888 15,713 17,707 16,679
Total non current liabilities 28,800 26,766 24,602 26,646 25,668
Total liabilities 41,561 39,626 39,237 38,523 37,617
Net assets 381,493 398,571 407,357 426,621 439,871
Equity
Accumulated surplus 177,242 184,631 188,460 191,816 199,122
Assets revaluation reserve 187,445 196,836 203,649 217,206 219,448
Other reserves 16,807 17,104 15,248 17,599 21,301
Total equity 381,493 398,571 407,357 426,621 439,871
Surf Coast Shire Council Annual Budget – 2015-2016 Page 66 of 106
Statement of Cash Flows For the four years ending 30 June 2019
Statement of Changes in Equity For the four years ending 30 June 2019
2014/15
Revised
Forecast
2015/16
Budget
Forecast
2016/17
Forecast
2017/18
Forecast
2018/19
$'000 $'000 $'000 $'000 $'000
Cash flows from operating activities
Receipts from customers 52,190 55,265 58,946 62,953 67,372
Payments to suppliers (23,621) (23,708) (30,694) (29,672) (27,205)
Payments to employees (24,009) (25,932) (27,943) (28,479) (29,820)
4,560 5,625 309 4,801 10,347
Interest received 741 773 593 659 708
Government receipts 10,599 10,352 10,260 8,400 11,730 Net cash provided from operating activities 15,900 16,750 11,163 13,861 22,785
Cash flows from investing activities
Payments for property, plant, equipment & infrastructure
assets
(12,769) (14,855) (16,217) (13,711) (18,194)
Proceeds from sale of property, plant & equipment 1,532 877 352 408 478
Net cash used in investing activities (11,237) (13,978) (15,865) (13,303) (17,716)
Cash flows from financing activities
Finance costs (1,150) (1,124) (1,079) (1,150) (1,328)
Proceeds from interest bearing loans and borrowings ‐ ‐ 1,600 3,000 ‐
Repayment of interest bearing loans and borrowings (549) (584) (628) (775) (1,006)
Net cash provided from financing activities (1,699) (1,708) (108) 1,074 (2,334)
Net decrease in cash & cash equivalents held 2,964 1,065 (4,810) 1,632 2,735
Cash at the beginning of the period 16,743 19,707 20,772 15,962 17,594
Cash & cash equivalents at the end of the period 19,707 20,772 15,962 17,594 20,329
2014/15
Revised
Forecast
2015/16
Budget
Forecast
2016/17
Forecast
2017/18
Forecast
2018/19
$'000 $'000 $'000 $'000 $'000
Equity Opening Balance 366,263 381,493 398,571 407,356 426,621
Comprehensive result 6,274 7,686 1,973 5,707 11,007
Net asset revaluation 8,956 9,391 6,813 13,557 2,242
Total Equity 381,493 398,571 407,356 426,621 439,871
Surf Coast Shire Council Annual Budget – 2015-2016 Page 67 of 106
Statement of Capital Works For the four years ending 30 June 2018
Reconciliation of net movement in property, plant and equipment
2014/15
Revised
Forecast
2015/16
Budget
2016/17
Forecast
2017/18
Forecast
2018/19
Forecast
$'000 $'000 $'000 $'000 $'000
Capital Works
Land 1,015 500 ‐ ‐ ‐
Buildings 1,124 1,836 8,223 1,186 8,017 Plant, machinery & equipment 1,591 1,250 1,107 1,229 1,455
Furniture & computers 382 415 340 340 340
Road pavements & other structures 5,186 5,769 3,122 9,052 5,367
Drainage 569 390 301 580 497
Street furniture 35 55 40 50 55
Passive recreation facil ities 2,868 4,640 3,085 1,274 2,463
Expensed Capital Works 3,072 1,871 7,143 3,766 3,189
Landfill Provision ‐ 1,456 1,461 3,038 ‐
Total Capital Works 15,841 18,182 24,822 20,515 21,383
Represented by:
Renewal 6,550 6,632 6,147 7,039 7,355
Upgrade 2,162 754 1,126 2,670 1,751
Expansion 352 403 598 382 148
New 3,706 7,066 8,347 3,620 8,940
Expensed Capital Works 3,072 1,871 7,143 3,766 3,189
Landfill Provision ‐ 1,456 1,461 3,038 ‐
Total Capital Works 15,841 18,182 24,822 20,515 21,383
2014/15
Revised
Forecast
2015/16
Budget
2016/17
Forecast
2017/18
Forecast
2018/19
Forecast
$'000 $'000 $'000 $'000 $'000
Total capital works 15,841 18,182 24,821 20,515 21,383
Asset revaluation increment (430) ‐ ‐ ‐ ‐
Depreciation and amortisation (10,480) (10,708) (11,284) (11,743) (12,211)
Written down value of assets sold (757) (996) (371) (411) (506)
Assets written off (1,409) (1,779) (1,767) (1,817) (1,917)
Expensed capital works 3,072 (3,327) (8,604) (6,804) (3,189)
Granted assets 2,902 3,220 3,381 3,550 3,728
Net movement in property, plant and
equipment 8,739 4,591 6,176 3,290 7,287
Surf Coast Shire Council Annual Budget – 2015-2016 Page 68 of 106
Appendix B ‐ Statutory disclosures This appendix presents information which the Act and the Regulations require to be disclosed in the Council’s annual budget. The appendix includes the following budgeted information:
Borrowings
Rates and charges
Differential rates.
Appendix B
Surf Coast Shire Council Annual Budget – 2015-2016 Page 69 of 106
Statutory disclosures 1. Borrowings
2. Rates and charges 2.1 The rate in the dollar to be levied as general rates under Section 158 of the Act for each type or class of land compared with the previous financial year
2.2 The estimated total amount to be raised by general rates in relation to each type or class of land, and the estimated total amount to be raised by general rates, compared with the previous financial year
Note: Increases in total revenue raised by different rates is influenced by rate increases, general revaluation of Capital Improved values, the full year effect of supplementary rates, and the reclassification of land to different classes, for example vacant land to residential land.
2.3 The number of assessments in relation to each type or class of land, and the total number of assessments, compared with the previous financial year
2.4 The basis of valuation to be used is the Capital Improved Value (CIV)
2014/15 2015/16
$ $
New borrowings (other than refinancing) - -
Debt redemption 549,000 584,000
2014/15 2015/16
cents/$CIV cents/$CIV Change
General rate land 0.24130 0.25457 5.50%
Farm rate land 0.18098 0.19093 5.50%
Commercial/Industrial rate land 0.45848 0.48369 5.50%
Vacant Residential rate land 0.48261 0.50915 5.50%
Vacant Provisional rate land ‐ 0.25457 ‐
Type of Property
2014/15 2015/16
$ $ Change
General rate land 25,524,304 27,571,481 8.02%
Farm rate land 1,734,340 1,868,638 7.74%
Commercial/Industrial rate land 2,768,771 3,104,346 12.12%
Vacant Residential rate land 2,664,395 2,811,878 5.54%
Vacant Provisional rate land ‐ ‐
Total amount to be raised by general rates 32,691,810 35,356,343 8.15%
Type of Property
2014/15 2015/16 Change
General rate land 17,042 17,293 1.47%
Farm rate land 944 959 1.59%
Commercial/Industrial rate land 934 938 0.43%
Vacant Residential rate land 1,221 1,263 3.44%
Vacant Provisional rate land ‐ ‐
Total number of assessments 20,141 20,453 1.55%
Type of Property
Appendix B
Surf Coast Shire Council Annual Budget – 2015-2016 Page 70 of 106
2.5 The estimated total value of each type or class of land, and the estimated total value of land, compared with the previous financial year
2.6 The proposed unit amount to be levied for each type of charge under sections 159 and 162 of the Act
2.7 The estimated amounts to be raised for each type of charge to be levied, compared to the previous
year
2.8 The estimated total amount to be raised by rates and charges
2.9 Any significant changes that may affect the estimated amounts to be raised by rates and charges There are no known significant changes that may affect the estimated amounts to be raised by rates and charges. However, the total amount to be raised by rates and charges may be affected by:
The making of supplementary valuations
The variation of returned levels of value (e.g. valuation appeals)
Changes in use of land such that rateable land becomes non‐rateable land and vice versa
Changes in use of land classification, such as vacant land becoming residential or commercial/industrial rate land and vice versa.
2014/15 2015/16
$ $ Change
General rate land 10,577,738,000 10,830,609,000 2.39%
Farm rate land 958,323,000 978,703,000 2.13%
Commercial/Industrial rate land 603,901,900 641,804,900 6.28%
Vacant Residential rate land 552,075,000 552,269,000 0.04%
Vacant Provisional rate land ‐ ‐
Total Value 12,692,037,900 13,003,385,900 2.45%
Type of Property
Per Rateable Per Rateable
Type of Charge Property Property
2014/15 2015/16
$ $ Change
Municipal 185 195 5.41%
Urban Garbage (all residential tenements) 336 350 4.17%
Rural Garbage (optional) 280 291 3.93%
2014/15 2015/16
$ $ Change
Municipal Charge 3,677,985 3,935,490 7.00%
Urban Garbage (all residential tenements) 5,193,088 5,462,147 5.18%
Rural Garbage (optional) 452,006 478,349 5.83%
Total 9,323,079 9,875,986 5.93%
2014/15 2015/16
$ $ Change
General Rates Revenue 32,691,810 35,356,343 8.15%
Municipal Charge 3,677,985 3,935,490 7.00%
Kerbside Collection and Recycling 5,645,094 5,940,496 5.23%
Total 42,014,889 45,232,329 7.66%
Appendix B
Surf Coast Shire Council Annual Budget – 2015-2016 Page 71 of 106
3. Differential rates 3.1 Rates to be levied The rate and amount of rates payable in relation to land in each category of differential are:
A general rate of 100% (0.25457 cents in the dollar of CIV) for all rateable residential properties.
A farm rate of 75% (0.19093 cents in the dollar of CIV) for all rateable farm properties.
A commercial/industrial rate of 190% (0.48369 cents in the dollar of CIV) for all rateable business properties.
A vacant residential land rate of 200% (0.50915 cents the dollar of CIV) for all rateable vacant residential land.
A vacant provisional residential land rate of 100% (0.25457 cents in the dollar of CIV) for all rateable vacant provisional residential land.
Each differential rate will be determined by multiplying the Capital Improved Value of rateable land (categorised by the characteristics described below) by the relevant cents in the dollar indicated above. Council believes each differential rate will contribute to the equitable and efficient carrying out of council functions. Details of the objectives of each differential rate, the types of classes of land that are subject to each differential rate and the uses of each differential rate are set out below. 3.2 General Rate land General Rate is any land, which is:
Any land which does not have the characteristics of the following rating differentials: - Farm Rate land; - Commercial/Industrial Rate land or - Vacant Rate land.
The objectives of this differential rate are:
To ensure that Council has adequate funding to undertake its strategic, statutory, service provision and community services obligations; and
To ensure that the differential rate in the dollar declared for defined general rate land properties is fair and equitable, having regard to the cost and the level of benefits derived from provision of Council services.
3.3 Farm Rate Land Farm Rate is any land, which is:
2 or more hectares in area;
Used primarily for primary producing purposes from its activities on the land;
Used primarily for grazing (including agistment), dairying, pig‐farming, poultry farming, fish farming, tree farming, bee keeping, viticulture, horticulture, fruit growing or the growing of crops of any kind or for any combination of those activities; and
Used by a business – - That has a significant and substantial commercial purpose of character; - That seeks to make a profit on a continuous or repetitive basis from its activities on the
land; and - That is making a profit from its activities on the land, or that has a reasonable prospect of
making a profit from its activities on the land if it continues to operate in the way that it is operating.
The objectives of this differential rate are:
To maintain agriculture as a major industry in the municipal district;
To facilitate the longevity of the farm sector;
To achieve a balance between providing for growth and retaining the important agricultural economic base; and
Appendix B
Surf Coast Shire Council Annual Budget – 2015-2016 Page 72 of 106
To ensure that the rate in the dollar declared for defined Farm Land properties is fair and equitable having regard to the cost and the level of benefits derived from provision of Council services to the farm sector.
3.4 Commercial/Industrial Rate Land Commercial/Industrial Rate is any land, which is:
Used primarily for the carrying out the manufacture or production of, or trade in goods or services (including tourist facilities and in the case of a business providing accommodation for tourists, is prescribed accommodation under the Public Health and Wellbeing Act (Vic) 2008; or
Unoccupied building erected which is zoned Commercial or Industrial under the Surf Coast Shire Planning Scheme; or
Unoccupied land which is zoned Commercial or Industrial under the Surf Coast Shire Planning Scheme The objectives of this differential rate are:
To enhance the economic viability of the Commercial / Industrial sector through targeted programs and projects;
To extend regional initiatives toward the establishment of ventures and themes that complement Council’s strategic objectives;
To identify, develop and market the strengths and attractions of each town and village;
To determine the feasibility of establishing tourism education facilities;
To identify and develop opportunities for rural tourism;
To participate as an active partner in regional tourism initiatives;
To encourage employment opportunities;
To promote economic development;
To facilitate the establishment or improvement of tourism infrastructure;
To ensure that signage, street scaping and promotional activity is complementary to the achievement of commercial and tourism objectives; and
To ensure that the differential rate in the dollar declared for defined Commercial / Industrial land properties is fair and equitable having regard to the cost and the level of benefits derived from provision of council services to the commercial / industrial sector.
The level of funding applied to the above objectives is a 90% loading levied on Commercial/Industrial properties, which is additional to the amount that would have been raised if there were no differential applied. The remaining balance of the funds (i.e. the amount equivalent to the General Rate) is to be applied to the provision of general council services. 3.5 Vacant Residential Rate Land Vacant Residential Rate is any land, which is:
On which no building is erected on land which is zoned residential under the Surf Coast Shire Planning Scheme, except for
- any uninhabitable shed or shelter, the size of which does not exceed 5% of the total area of land; or
- any vacant land that is newly reclassified as a result of a new subdivision or becoming vacant as a result of demolition of an existing dwelling for a period of one year from the reclassification date will only pay the general residential rate.
The objectives of this differential rate are summarised below:
To facilitate building development on vacant allotments.
To provide a financial incentive for land to be developed and not held as an investment.
To promote affordable housing within Council boundaries.
Appendix B
Surf Coast Shire Council Annual Budget – 2015-2016 Page 73 of 106
3.6 Vacant Provisional Rate Land Vacant Provisional Rate Land is any land on which no building is erected which is zoned residential under the Surf Coast Shire Planning Scheme and is newly reclassified as a result of a new subdivision or becoming vacant as a result of demolition of an existing dwelling. After the period of the remainder of the rating year plus one year the land will no longer be classified as vacant provisional rate land and will be classified into the appropriate differential category. The objectives of this differential rate are summarised below:
To facilitate building development on vacant allotments.
To provide a financial incentive for land to be developed and not held as an investment.
To promote affordable housing within Council boundaries.
Appendix B
Surf Coast Shire Council Annual Budget – 2015-2016 Page 74 of 106
4. Charges 4.1 Municipal Charge The municipal charge is declared for the purpose of covering some of the administrative costs of Council. The municipal charge is declared in respect of all rateable land within the municipality district in respect of which a municipal charge may be levied. 4.2 Service Charges An annual service charge is declared for the collection and disposal of waste (garbage). The objectives of the annual service charge (refuse collection and disposal) are:
To recover the contract cost of provision of the refuse collection service;
To recover the cost of disposal of collected refuse in Council’s waste disposal sites; and
To recover the cost of collection of refuse from: ‐ Residential premises within the township areas, in accordance with Attachment D of the Waste Collection Contract and Waste Collection Maps;
‐ Residential premises in the rural collection area (optional), and ‐ Commercial premises within the township areas (optional) subject to approval by Council’s Environmental Health Services department.
The criteria for the annual service charge are:
An urban garbage charge per service for all residential tenements and each commercial tenement (optional) where approval has been given by the environmental health services department, in respect of which a garbage collection is made in the urban townships; and
A rural garbage charge per service for each residential tenement in respect of which garbage collection is made in the rural collection area (optional) within the municipality.
Surf Coast Shire Council Annual Budget – 2015-2016 Page 75 of 106
Appendix C ‐ Capital works program and new initiatives This appendix presents a listing of the capital works projects and new initiatives that will be undertaken for the 2015/16 year. The capital works projects are grouped by class and include the following:
New works for 2015/16
Works carried forward from the 2014/15 year. The new initiatives are grouped by ward and include the following:
New initiatives for 2015/16
Surf Coast Shire Council Annual Budget – 2015-2016 Page 76 of 106
Capital works program For the year ending 30 June 2015
Total
Renewal Upgrade Expansion New Expensed
Grants Contrib's Cash Reserve Funds
Special Rates
Asset Sales Shire Funds
$' 000 $' 000 $' 000 $' 000 $' 000 $'000 $' 000 $' 000 $' 000 $' 000 $' 000 $' 000 $' 000Renewal Program 2015/16RenewalBike Park Renewal Program 25 25 25Bridge Renewal 56 24 80 80Bus Shelters Program 20 20 20Council Buildings Renewal Program 525 525 525Drainage Renewal & Upgrade Program 200 200 200Facility Fencing Renewal Program 50 50 50Footpath Renewal 100 100 100Gravel Re-sheeting program for Local Roads 900 900 900Information Systems 415 415 415Irragation System Renewal Program 60 60 60Kerb Renewal 80 80 80Netball/Tennis Court Resurfacing Program 60 65 125 65 60Replacement of Heavy Plant 765 765 585 180Replacement of Light Fleet 485 485 223 262Replacement of Park Furniture 200 200 200Reseal Renewal Program for Local Roads 1,400 1,400 200 1,200Crack Sealing Program 20 20 20Road Safety Program 56 84 84 56 280 280Sports Lighting Renewal 25 25 25Stairways / Retaining Structures Renewal 30 30 30Playground Renewal 259 259 259Nature Reserve Renewal Program 50 50 50Soft Playing Surface Renewal Program 60 60 60
Anglesea Kindergarten Refurbishment 221 517 738 350 100 288Lorne - Stribling Reserve Terraces - Construction 52 52 103 103Winchelsea Swimming Pool Surrounds Improvement Project 30 30 60 60Torquay - Grant Pavilion Service Lane Upgrade 4 13 4 22 22Anglesea Landfill - Road Construction 614 614 614
Total Renewal 6,632 173 149 603 134 7,691 415 100 1,725 442 5,009
Expenditure Funding
Works Description
External Funds Council Cash
Borrowings
Surf Coast Shire Council Annual Budget – 2015-2016 Page 77 of 106
Total
Renewal Upgrade Expansion New Expensed
Grants Contrib's Cash Reserve Funds
Special Rates
Asset Sales Shire Funds
$' 000 $' 000 $' 000 $' 000 $' 000 $'000 $' 000 $' 000 $' 000 $' 000 $' 000 $' 000 $' 000New Capital Works Program 2015/16DCP ProjectsConstruct an Early Learning Centre in Torquay North 450 450 450Civic precinct active recreation facilities 1,400 1,400 400 1,000Upgrade Grass Tree Park 23 23 45 45Upgrade Deep Creek linear reserve 7 3 10 10Develop Whites Beach 61 61 61Construct pathways through the Torquay North open space network 181 181 181Construct regional bike route (2) - Widen Spring Creek bridge 254 254 40 214
Corporate ProjectsFacility Signage Program 20 20 20Purchase of Land - Jan Juc 500 500 500Sale of Land (costs) - Mt Moriac 28 28 28Public Lighting Upgrade Program 15 15 15
Community BuildingsDesign of Future Building & Open Space Projects 100 100 100Anglesea Riding Club - Ecopod Pavilion 63 63 6 57Accessible Toilet at Hesse St Reserve, Winchelsea 33 33 33Shopping Centre Refurbishment Program 15 10 25 25
DrainageFreshwater Creek Flood Mitigation Works 50 50 100 100
Open SpacePlayground Strategy Implementation - Ongoing Program 111 111 222 222Community & Civic Precinct Stage 2b - Playspaces, toilets, cricket nets 800 200 1,000 300 400 300Torquay - Polwarth Oval Sports Lighting Upgrade 95 95 95Anglesea - Coogoorah Park Access Road Improvements - Stage 1 33 33 33Anglesea Tennis Club - Court Synthetic Surface 160 160 80 50 30
Expenditure Funding
Works Description
External Funds Council Cash
Borrowings
Surf Coast Shire Council Annual Budget – 2015-2016 Page 78 of 106
Total
Renewal Upgrade Expansion New Expensed
Grants Contrib's Cash Reserve Funds
Special Rates
Asset Sales Shire Funds
$' 000 $' 000 $' 000 $' 000 $' 000 $'000 $' 000 $' 000 $' 000 $' 000 $' 000 $' 000 $' 000TransportDesign of Future Transport & Drainage Projects 150 150 150Tree Trimming pre reseal 80 80 80Intersection Sealing 50 50 50Jan Juc - Sunset Strip - Indented and Accessible Parking 90 90 90Torquay, The Esplanade Kerb and Sealing - Stage 1 430 430 90 340Gosney St / Murrell St, Winchelsea Modification - Stage 2 140 140 140Danawa Community Garden Access Road and Drainage 20 20 20Anglesea long vehicle parking, Cameron Road 174 174 174Torquay long vehicle parking, Beach Road 135 135 135Aireys Inlet pedestrian refuge 160 160 160Street tree planting program for Jan Juc township 25 25 25Great Ocean Road Service Road at Forest Road - Construction 500 500 500
PathwaysPathway Ancillary Program 17 17 17Bicycle Lanes - Ongoing Program 10 10 10Torquay Precinct Pathways 632 632 301 331Winchelsea Walk of Honour 43 43 40 3Torquay - Cliff Street Pathway 42 42 42Lorne - Clissold St to Senior Citizens 42 42 42Torquay - Beach Rd (Alleyne Ave to Kooringa Pl)Lorne - IGA Splitter Island 10 10 10Torquay - Esplanade / Beach Rd Splitter Island 10 10 10Winchelsea - Hesse Street Bridge and connections - design 50 50 50Moriac - Senior Citizens - Trail Connection 45 45 45
Waste ManagementAnglesea Landfill Stormwater Improvements - Design 47 47 47Anglesea Landfill Rehabilition Stage 3A - Side of Cell 2 1,456 1,456 1,456Anglesea Landfill -Cell 2 Wall Liner Extension 224 224 224
Non Renewal Capital Works Program 556 254 6,130 2,437 9,378 2,259 56 2,627 301 4,135
Expenditure Funding
Works Description
External Funds Council Cash
Borrowings
Surf Coast Shire Council Annual Budget – 2015-2016 Page 79 of 106
Total
Renewal Upgrade Expansion New Expensed
Grants Contrib's Cash Reserve Funds
Special Rates
Asset Sales Shire Funds
$' 000 $' 000 $' 000 $' 000 $' 000 $'000 $' 000 $' 000 $' 000 $' 000 $' 000 $' 000 $' 000Works Carried Forward from Capital Program 2014/15
Community BuildingsAnglesea Bowls Club Upgrade 25 25 25
DrainageJan Juc Creek Daylighting 30 274 304 304
Open SpaceTorquay - Civic Precinct Playzone Banyul Warri Fields 291 73 364 364Torquay Shared Path on Surf Coast Hwy at Civic Precinct 12 12 12
TransportTorquay South Beach Road / Surfcoast Highway Intersection Upgrade 385 385 385
Waste ManagementAnglesea Transfer Station Roof Design 24 24 24
Total Capital Works carried forward from 2014/15 25 333 755 1,113 1,113
Total Capital Works Program 6,632 754 403 7,066 3,327 18,182 2,674 156 5,465 301 442 9,144
Expenditure Funding
Works Description
External Funds Council Cash
Borrowings
Surf Coast Shire Council Annual Budget – 2015-2016 Page 80 of 106
New Initiatives New Initiative projects for the year ending 30 June 2016
Project Description
Total
$'000
Anglesea
$,000
Lorne
$'000
Torquay
$'000
Winchelsea
$'000
Shire Wide
$'000
Storage Pods at Stribling Reserve Stadium 35 35
Torquay Plastic Bag Free 10 10
Community Consultation on Unconventional Gas Exploration 15 15
Aireys Inlet Masterplan 10 10
Revegetation of Embankment below the Historical Society 2 2
Eastern Reserve ‐ Drinking Water Fountain 3 3
Lorne Stribling Reserve Masterplan 50 50
Children's Hub Trainee to support Early Years Program 28 28
Home Support Program ‐ Assessment & Review Officer 30 30
G21 Regional Study into the Economic and other Benefits of Arts
and Culture10 10
Increase contribution to the GRLC to Expand Torquay Library Children's
and Youth Programs82 82
Workplace Health & Safety Sub Contractor at 1 day per week 20 20
Physical Works resulting from Lorne Hazard Street Tree Audits ‐ Stage 2 139 139
Undertake Building Disability Discrimination Act Audits 40 40
Infrastructure Development Contractor at 1 day per week 33 33
Increase in Maintenance Budget to match Increase in Civil Asset Base 33 33
Maintaining Agreed Service Levels for Landscape Maintenance on
New Subdivisions/Playgrounds24 24
Increase in Utilities and Maintenance Budgets for New Building Assets 167 57 35 32 43
Street Light Upgrade Program 100 100
Environmental Health Officer full time 90 90
Planning Scheme Amendments to Implement Approved Strategic Work 100 100
Local Law Signage Upgrades to Parks and Reserves Regarding Dog
Regulations5 5
National Surfing Museum & Anglesea Visitor Experience 40 40
Total New Inititatives 1,065 10 283 191 35 546
Surf Coast Shire Council Annual Budget – 2015-2016 Page 81 of 106
Appendix D ‐ Fees and charges schedule This appendix presents the fees and charges of a statutory and non‐statutory nature which will be charged in respect to various goods and services provided during the 2015/16 year.
Description Unit (per)
Fee Status
2014/2015
(GST if)
Description Unit Fee Status
2015/2016
(Inc GST if applic)
$
Includes
GST
Y/N
COMMUNITYCOUNCIL OPERATIONS
Full Copy Council Minutes Council 30.00 N
(minutes are available free of charge from Council’s website – www.surfcoast.vic.gov.au)
Facsimile/per page ‐ for information
which forms part of council 's database or recordsCouncil 2.00 N
Local Calls Council 2.00 Y
STD Call to 3 Minutes Council 6.50 Y
Receive Fax (per sheet) Council 0.70 Y
CUSTOMER SERVICE
Black & White Photocopying/Printing per page ‐
for information which forms part of council 's database or recordsCouncil 0.80 N
Colour Photocopying/Printing per page ‐
for information which forms part of council 's database or recordsCouncil 2.00 N
Photocopying/Printing per page : Charity Groups ‐
for information which forms part of council 's database or recordsCouncil 0.30 N
COMMUNITY TRANSPORT
Community Bus hire only (Petrol by User) km Council 0.77 Y
Winchelsea Large Capacity Community Bus (25 seat)
Youth activities per day Council 50.00 Y
Adult activities up to 120 km round trip per day Council 125.00 Y
Adult activities over 120 km round trip per day Council 250.00 Y
BUILDING HIRE
Public Hall Hire
Shire based Community Group hour Council 9.30 Y
Commercial and non‐Shire Community Group hour Council 18.60 Y
Functions, Weddings, Parties & Major Events
Funeral afternoon teas hour Council 9.30 Y
Bellbrae Hall ‐ Private Hirer Standard Function Rate (6pm‐12am) block Council 150.00 Y
Bellbrae Hall ‐ Private Hirer Half Day Function Rate (2‐5 hours) block Council 120.00 Y
Moriac Community Centre ‐ Private Hirer Standard Function Rate (6pm‐12am block Council 150.00 Y
Moriac Community Centre ‐ Private Hirer Half Day Function Rate (2‐5 hours) block Council 120.00 Y
Freshwater Creek Hall ‐ Private Hirer Standard Function Rate (6pm‐12am) block Council 150.00 Y
Freshwater Creek Hall ‐ Private Hirer Half Day Function Rate (2‐5 hours) block Council 120.00 Y
The Quay Pavil ion ‐ Private Hirer Standard Function Rate (6pm‐12am) block Council 247.00 Y
The Quay Pavil ion ‐ Private Hirer Half Day Function Rate (2‐5 hours) block Council 160.00 Y
Bob Pettit Pavil ion ‐ Private Hirer Standard Function Rate (6pm‐12am) block Council 247.00 Y
Bob Pettit Pavil ion ‐ Private Hirer Half Day Function Rate (2‐5 hours) block Council 160.00 Y
Wurdale Hall ‐ Private Hirer Standard Function Rate (6pm‐12am) block Council 150.00 Y
Wurdale Hall ‐ Private Hirer Half Day Function Rate (2‐5 hours) block Council 120.00 Y
Anglesea Hall ‐ Private Hirer Standard Function Rate (6pm‐12am) block Council 247.00 Y
Anglesea Hall ‐ Private Hirer Half Day Function Rate (2‐5 hours) block Council 160.00 Y
Security Bonds – no alcohol Council 300.00 N
Security Bonds – with alcohol Council 600.00 N
83
Description Unit Fee Status
2015/2016
(Inc GST if applic)
$
Includes
GST
Y/N
WINCHELSEA SWIMMING POOL
Family Season Pass Council 175.00 Y
Adult per swim person Council 5.20 Y
Child per swim person Council 4.20 Y
Schools person Council 3.10 Y
Spectator person Council 1.00 Y
School Carnival (plus entry fee person) hour Council 69.00 Y
Regional Carnival Council 1,060.00 Y
Season Swim Pass ‐ Single season Council 72.00 Y
Season Swim Pass ‐ Single Concession season Council 65.00 Y
EASTERN RESERVE GYMNASIUM
Membership ‐ individual
3 month Council 194.00 Y
6 month Council 340.00 Y
12 month Council 630.00 Y
monthly direct debit Council 53.50 Y
Membership ‐ concession
3 month Council 175.00 Y
6 month Council 305.00 Y
12 month Council 568.00 Y
monthly direct debit Council 43.50 Y
Membership ‐ youth
3 month Council 138.00 Y
6 month Council 235.00 Y
12 month Council 439.00 Y
monthly direct debit Council 38.00 Y
Membership ‐ family (max of 2 adults & 2 children)
3 month Council 272.00 Y
6 month Council 473.00 Y
12 month Council 878.00 Y
monthly direct debit Council 75.00 Y
10 visit pass Health Club or Group Fitness Council 95.00 Y
Casual single visit ‐ Health Club or Group Fitness Council 12.30 Y
Personal training Member hour Council 48.50 Y
Personal training Member half hour Council 33.00 Y
Personal training 2:1 Members hour Council 53.50 Y
Personal training 3:1 Members hour Council 65.00 Y
Personal training Non Member hour Council 53.50 Y
Personal training ½ hour ‐(Non Member) half hour Council 38.00 Y
SURF COAST SPORT & RECREATION CENTRE
Sport per game
Adults Basketball team Council 65.00 Y
Adults Netball team Council 70.00 Y
Junior Basketball and Netball team Council 52.00 Y
Badminton – Adults player Council 7.20 Y
Badminton – Child/student player Council 6.20 Y
Indoor soccer – Juniors player Council 7.20 Y
Indoor soccer – Seniors team Council 51.00 Y
Junior Basketball/Netball clinics 8 week term Council 61.00 Y
Minor Sports player Council 5.20 Y
Kindergym ‐ Casual week casual Council 13.40 Y
10 Visit Pass
Kindergym Council 119.00 Y
Fit for Fifties Council 95.00 Y
Little Champs Council 45.50 Y
Badminton Council 56.50 Y
Play Groups Council 29.00 Y
84
Description Unit Fee Status
2015/2016
(Inc GST if applic)
$
Includes
GST
Y/N
Adult registration per season Council 58.00 Y
Junior registration per season Council 48.00 Y
Insurance
Senior basketball per season (Set by Victorian Country Basketball Council) player (est) Council 42.00 Y
Junior basketball per year (Set by Victorian Country Basketball Council) player (est) Council 42.00 Y
Senior netball per year (Set by Netball Victoria) player (est) Council 73.00 Y
Junior (Under 18 years) netball per year (Set by Netball Victoria) player (est) Council 52.00 Y
Soccer – senior (set by Football Federation Victoria) player (est) Council 44.00 Y
Soccer – junior (set by Football Federation Victoria) player (est) Council 34.00 Y
Fitness Classes
Casual visit Council 13.50 Y
Concession visit Council 12.50 Y
10 visit concession card Council 104.00 Y
1 month membership Council 87.00 Y
3 month membership Council 187.00 Y
6 month membership Council 348.00 Y
12 month membership Council 520.00 Y
Crèche
Per child visit Council 5.20 N
10 visit concession card Council 48.00 N
Birthday Parties
Stadium/kitchen/staff memberparty up to 2 hours 26 ‐
50 childrenCouncil 253.00 Y
Stadium/kitchen/staff memberparty up to 2 hours up
to 25 childrenCouncil 186.00 Y
Multipurpose room/kitchen staff party up to 2 hours Council 186.00 Y
MAIN STADIUM
Sport – Casual Hire Day time Off peak use
Commercial Groups hour Council 47.50 Y
Registered Teams hour Council 29.00 Y
Community Groups hour Council 29.00 Y
Teams ½ court hour Council 18.60 Y
Individual hire ½ court person Council 5.20 Y
Functions – Social/Commercial
Peak use
Fri/Sat/Sun (6pm‐12am max hire) block Council 490.00 Y
½ hall only block Council 340.00 Y
Fri/Sat/Sun (6pm‐12am) per hour hour Council 86.50 Y
Community Group Rate 6pm‐12am block Council 324.00 Y
Bonds
Functions without alcohol Council 310.00 N
Functions with alcohol Council 620.00 N
MULTI‐PURPOSE ROOM
Social & Commercial Functions (Meetings/Workshops)
Sat/Sun (6pm‐12am max. hire) block Council 212.00 Y
Sat/Sun (6pm‐12am hourly rate) hour Council 40.00 Y
Mon/Fri (9am‐9pm hourly rate) hour Council 18.50 Y
Full room (day & evening hourly rate) hour Council 18.50 Y
Kitchen hire (fee applies in addition to room charge) hour Council 14.40 Y
Community group hire (non profit) hour Council 9.30 Y
Bonds
Functions without alcohol Council 300.00 N
Functions with alcohol Council 600.00 N
Equipment Hire
Trestle Table Hire each Council 14.40 Y
Chair Hire each Council 2.30 Y
Stage Hire day Council 40.00 Y
PA Hire (portable one speaker system) day Council 28.70 Y
($100 bond applies for all hire) Council 100.00 N
Volleyball posts / nets day Council 18.60 Y
85
Description Unit Fee Status
2015/2016
(Inc GST if applic)
$
Includes
GST
Y/N
RECREATION RESERVES
Recreation Reserve Licence Fees min fee Council 119.00 N
COMMUNITY & CIVIC PRECINCT RECREATION FACILITY (Banyul‐Warri Fields)
Playing Field/Court:
Tenant/Anchor Club Council No Charge
Incorporated Community Club/Group/School ‐
based in Surf Coast ShireCouncil No Charge
Surf Coast Shire Residents ‐
individual or group (non‐commercial activity)Council No Charge
Commercial Use and Non Surf Coast Shire Club/Group/School
‐ Oval & Synthetic/Grass Pitch ‐ per field half day Council 282.00 Y
‐ Oval & Synthetic/Grass Pitch ‐ per field full day Council 448.00 Y
‐ Netball Court ‐ per court half day Council 113.00 Y
‐ Netball Court ‐ per court full day Council 206.00 Y
Community Hub Change Rooms
(NB: fee applies to each pair of change rooms)
Tenant/Anchor Club Council Free access during
allocated periods
Incorporated Community Club/Group/School ‐
based in Surf Coast Shirecleaning fee Council 56.50 Y
Surf Coast Shire Residents ‐ individual or group
(non‐commercial activity)cleaning fee Council 56.50 Y
Commercial Use and Non Surf Coast Shire
Club/Group/School (Per Court/Field)cleaning fee Council 170.00 Y
Grant Pavilion
Peter Troy and China Gilbert Meeting Rooms
Tenant/Anchor Club Council
Free access to one
meeting room during
allocated training and
game‐day sessions.
Incorporated Community Club/Group/School hour Council 11.30 Y
‐ based in Surf Coast Shire
half day/4 hours Council 45.50 Y
full day/8 hours Council 78.00 Y
Surf Coast Shire Residents ‐ individual or group (non‐commercial activity) hour Council 22.70 Y
half day/4hours Council 67.00 Y
full day/8 hours Council 124.00 Y
Commercial Use and Non Surf Coast Shire Club/Group/School hour Council 40.20 Y
half day/4hours Council 134.00 Y
full day/8 hours Council 257.00 Y
Grant Pavilion – Tantau and Cooper Function Rooms
Note whole 2nd level available by booking both rooms
Tenant/Anchor Club Council
Free access for Surf Coast
Football (Soccer Club) for
home games and for up to
6 bookings per year.
Other tenant clubs have
up to 6 bookings per year.
Cleaning undertaken by
volunteers or by
contractor paid by hirer
$160.00 per function
Incorporated Community Club/Group/School ‐ based in Surf Coast Shire hour Council 22.70 Y
Incorporated Community Club/Group/School ‐ based in Surf Coast Shire half day Council 67.00 Y
Incorporated Community Club/Group/School ‐ based in Surf Coast Shire full day Council 124.00 Y
Surf Coast Shire Residents ‐ individual or group (non‐commercial activity) hour Council 27.70 Y
Surf Coast Shire Residents ‐ individual or group (non‐commercial activity) half day Council 90.00 Y
Surf Coast Shire Residents ‐ individual or group (non‐commercial activity) full day Council 170.00 Y
Commercial Use and Non Surf Coast Shire Club/Group/School hour Council 56.50 Y
Commercial Use and Non Surf Coast Shire Club/Group/School half day Council 227.00 Y
Commercial Use and Non Surf Coast Shire Club/Group/School full day Council 390.00 Y
86
Description Unit Fee Status
2015/2016
(Inc GST if applic)
$
Includes
GST
Y/N
Grant Pavilion
Grant Pavilion function cleaning Council 175.00 Y
Event Logistics Crew ‐ staff member hour Council 33.00 Y
Waste Removal 240L recycling bin each Council 21.70 Y
FAMILY & CHILDREN SERVICES
Family Day Care
Family Day Care Administration Levy hour Council 0.42 N
Children’s Services Hub
4 hour session session Council 34.00 N
3 hour session session Council 26.00 N
3 year old Activity Program term Council 263.00 N
Kindergarten
4 year old program (Jan Juc, Torquay, Lorne and Winchelsea) term Council 300.00 N
3 year old program (Lorne) term Council 355.00 N
3 year old program (Jan Juc) term Council 295.00 N
3 year old program (Winchelsea) term Council 265.00 N
Vacation Care
All day care per child Council 54.00 N
Excursion costs per child Council 32.00 N
Children’s Services, Community Groups & Non‐profit organisations
Business hours
Single room hour Council 14.50 Y
Playgroups hour Council 7.20 Y
After hours (5.30pm – 10pm)
Single room hour Council 23.00 Y
Commercial Use
Business hours
Single Room hour Council 29.00 Y
After hours (5.30pm – 10pm)
Single room hour Council 43.00 Y
Office hire
For‐profit organisations day Council 98.00 Y
Non‐profit organisations day Council 69.00 Y
AGED & DISABLILTY SERVICES
Delivered Meals – Low, Medium & High Income Clients
2 course & juice Council 9.00 ‐ 16.50 N
3 course & juice Council 9.20 ‐ 16.80 N
Domestic Assistance (General Home Care) hour Council 6.70 ‐ 32.80 N
(Low, Medium & High Income Clients) hour
Personal Care hour Council 6.20 ‐ 36.40 N
Respite Care hour Council 3.10 ‐ 33.50 N
Property Maintenance hour Council 11.95 ‐ 47.20 N
(Low, Medium & High Income Clients)
Morning Melodies includes meal & transport 5 event season Council 180.00 N
Client Travel Charge Council 0.60 N
Fees are income tested based on ranges set by Victorian Department of Health. Fees charged are within the range of fees recommended by the
Department.
87
Description Unit Fee Status
2015/2016
(Inc GST if applic)
$
Includes
GST
Y/N
CORPORATEFINANCIAL SERVICES
Rate Administration
Rate Searches – Hard Copy hour Council 118.00 N
Rate Searches – Computer Records Council 24.00 N
Land Information Certificate –Set by statute Statutory 21.00 N
Payment rejection Administration Fee Council 43.00 N
Recovery Referral Fee Council 35.00 N
Sales Register (issued quarterly not including names and addresses) Council 221.00 N
Sundry Debtors
Payment rejection Administration Fee Council 43.00 N
Interest on Sundry Debtors (Penalty Interest Act) Statutory 10.50% N
INFORMATION SERVICES
Freedom of Information
Freedom of Information Fee – set by statute Statutory 26.50 N
Administration Cost for FOI Searches hour Statutory 19.90 N
RISK MANAGEMENT
Insurance
Contents insurance for approved community groups
Contents up to $10,000 Council 44.00 Y
each additional $10,000 contents or part thereof Council 44.00 Y
GIS IMAGES
Low resolution images 40 dpi via email Council No Charge
Printed Images ‐ first copy of an image
Size A0 each Council 56.00 N
Size A1 each Council 45.00 N
Size A1 ‐ Gloss each Council 50.00 N
Size A2 each Council 33.00 N
Size A2 ‐ Gloss each Council 39.00 N
Size A3 each Council 23.00 N
Size A4 each Council 12.00 N
Printed Images ‐ additional copies of an image
Size A0 each Council 43.00 N
Size A1 each Council 33.00 N
Size A1 ‐ Gloss each Council 38.00 N
Size A2 each Council 26.00 N
Size A2 ‐ Gloss each Council 29.00 N
Size A3 each Council 17.00 N
Size A4 each Council 10.00 N
Laminating A3 each Council 22.00 N
Laminating A4 each Council 17.00 N
Job specific mapping (Including Digital Data Supply) hour Council 54.00 N
PLANNING & ENVIRONMENTEVENTS
Application Fee to stage new Commercial/Major events in Surf Coast Shire Council 280.00 N
VISITOR CENTRES
Marketing display fee ‐ Lorne visitor centre A3 display week Council 9.00 Y
Marketing display fee ‐ Lorne visitor centre Light box week Council 22.00‐35.00 Y
Marketing display fee ‐ Lorne visitor centre Floor display week Council 25.00‐70.00 Y
Marketing display fee ‐ Lorne visitor centre Local Arts Display week Council 12.00 Y
88
Description Unit Fee Status
2015/2016
(Inc GST if applic)
$
Includes
GST
Y/N
TOURISM
Commercial tour operator l icenses
Annual fee – standard one year l icence Statutory 275.00 N
Annual fee – standard l icence greater than one year (per year) Statutory 215.00 N
Use fee – general visitor visitor Statutory 2.40 N
Use fee – school student and child visitor Statutory 1.60 N
Use fee cap (maximum) Statutory 13,488.00 N
SURF WORLD SURFING MUSEUM
Theatre hire day rate hour Council 70.00 Y
Theatre hire night rate hour Council 90.00 Y
Whole facil ity (day or night) hour Council 150.00 Y
Bond (only for whole facil ity and dependent on group) Council 600.00 N
Bond (for hiring of theatre room alone) Council 200.00 N
Adult entry Council 12.00 Y
Child entry Council 8.00 Y
Children under 5yrs Council No Charge
Concession entry Council 8.00 Y
Family entry Council 25.00 Y
School groups entry Council 6.50 Y
Bells Tour School Groups Council 9.00 Y
Theatre hire day rate (community group) hour Council 50.00 Y
Theatre hire night rate (community group) hour Council 70.00 Y
Research fee without Museum Officer hour Council 10.00 Y
Research fee with Museum Officer hour Council 30.00 Y
Copying / Image reproduction
Books, magazines, newspapers and journals (PDF) Per 50 pages Council 17.00 Y
Books, magazines, newspapers and journals (TIFF) Page Council 15.00 Y
Pictures and Photographs Each Council 20.00 Y
LOCAL LAWS
Dog & Cat Registrations
Dog or cat eligible for reduced rate under the Domestic Animals Act 1994 Council 36.00 N
Includes: ‐ Steri l i sed Dog & Cat
‐ Dog or Cat kept for breeding in Regis tered Domestic Bus iness
‐ Cat regis tered with prescribed Fel ine Association
‐ Dogs regis tered with Victorian Canine Association
‐ Dogs that have undergone obedience tra ining compl ing with regulations
‐ Working Dog
‐ Dogs older than 10 years old
Dangerous, menacing or restricted breed dogs Council 325.00 N
All other Dogs & Cats Council 123.00 N
Pensioner fees for each registration category other than dangerous,
menacing or restricted breed dogsStatutory
50% of registration
fee N
Dog & Cat Fees
Cat Cage Hire week Council 13.50 Y
Cat Cage Deposit Council 60.00 N
Dogs Citronella collar Hire Council 43.00 Y
Dogs Citronella collar Deposit Council 60.00 N
Dogs Citronella collar Refil l Council 6.00 Y
Domestic Animal Business Council 345.00 N
Excess Dog Application and Inspection Fee Council 215.00 N
Dog Pound Release Fee Council 139.00 N
Cat Pound Release Fee Council 68.00 N
Replacement dog/cat tags Council No Charge
Impounding of Livestock (other than Dogs/Cats)
Cattle and Horses (varies to market price) head Council 77.00 N
Sheep, Pigs and Goats (varies to market price) head Council 15.50 N
Others (varies to market price) head Council 13.50 N
Sustenance Fee Cattle, Horses (varies to market price) head Council 15.50 N
Sustenance Fee Other – Daily head Council 13.50 N
89
Description Unit Fee Status
2015/2016
(Inc GST if applic)
$
Includes
GST
Y/N
Penalties
Parking for a period longer than fixed Statutory 75.00 N
Road Safety Act Parking Enforcement (Set by Statute) Statutory Various N
Towing of Disabled Vehicles Council 185.00 N
Release fee for impounded goods Council 36.00 N
Permits
Disabled Parking Permits Council No Charge
A Frame Inspection and Application Fee Council 68.00 N
A Frame Permit Council 195.00 N
Open for Inspection Signage Permit Council 222.00 N
Permit Inspection and Application Fee Council 35.00 N
To Occupy Public Place to Sell Merchandise –
Winchelsea, Deans Marsh and Moriacm
2 of used space Council 50.00 N
To Occupy Public Place to Sell Merchandise – all other areas m2of used space Council 57.00 N
Street Furniture (Alfresco Dining) – Annual Permit –
Winchelsea, Deans Marsh and Moriacm
2of used space Council 98.00 N
Street Furniture (Alfresco Dining) – Annual Permit – all other areas m2of used space Council 108.00 N
Camping Permit Fee (private property) Council 129.00 N
Occupy Temp Accommodation on Land 6 months Council 247.00 N
Occupy Road day Council 98.00 N
Skip Waste Bin (up to 3 m3) 7 days Council 57.00 N
Hopper Waste Bin (greater than 3m3) 7 days Council 82.00 N
Hopper Waste Bin (greater than 3m3) 30 days Council 325.00 N
Hoardings (fencing or barriers) Permit fee Council 247.00 N
Wedding Application Permit fee ‐
conduct a wedding on Council land and reserves Council 160.00 N
ELECTION FINES
Election Fines – set by State Government Statutory 74.00 N
STATUTORY PLANNING
Town Planning Application Fees (set by Statute) Statutory Various N
Advertising Fee – up to 15 notifications 1st property Council 119.00 N
Subsequent properties Council 8.25 N
Extension of Time Council 83.00 N
surcharge fee if history fi le is offsite Council 29.00 N
Property Enquiries Council 44.00 N
File retrieval Council 30.00 N
Demolition Consent Permit Statutory 61.00 N
Amendment of Plans/Permits Council 150.00 N
surcharge fee if history fi le is offsite Council 29.00 N
Subdivision Applications (Set by Statute) Statutory Various N
Subdivision Certification (Set by Statute) Statutory Various N
Building Approvals for Properties Search Statutory 48.60 N
Plans for Approval (Ocean Acres, SUZ etc.) Council 144.00 N
Written advice Council 124.00 N
Copy of Planning Permit Council 43.00 N
Copy of Plans
A3 or A4 size Council 10.50 N
A0 or A1 size Council 21.50 N
surcharge fee if history fi le is offsite Council 30.00 N
90
Description Unit Fee Status
2015/2016
(Inc GST if applic)
$
Includes
GST
Y/N
BUILDING CONTROL
Building Charges (Minister’s Guidelines + 25%)
Building Notice Resolution Council 264.00 N
Storm Water Application (Legal Point of Discharge) Statutory 60.90 N
Building over Easement Statutory 244.00 N
Form 10 (Statutory Charge) Legal Enquiry Statutory 48.60 N
Copy of Plans Council 144.00 N
Copy of Building Approval/Certificate of Occupancy Council 44.00 N
Variation of Regulations Statutory 244.00 N
Inspections Council 144.00 N
Lodgement Fee (Statutory Charge) Statutory 36.40 N
Issue of Building Approval Statutory Various N
Property request info Statutory 109.50 N
Property request info 2.10 (statutory) Statutory 48.60 N
ENVIRONMENT PROTECTION ACT 1970
Septic Tanks
Septic Tank Application Fee – Install Council 555.00 N
Septic Tank Application Fee – Alter Council 245.00 N
Building Regulation 801 Consent Request Council 220.00 N
FOOD ACT 1984
New Registration
Class 1 Premises(Aged Care/Hospitals) &
Class 2 Large (Supermarkets, licensed hotel, resort, large manufacturers)Council 1,190.00 N
Class 1 Small Premises (Child Care & Delivered Meals Organisation) Council 810.00 N
Class 2 Premises (includes mobile & temporary food premises) Council 645.00 N
Class 2 ‐ Each Additional Mobile and Temporary Food Premises Council 100.00 N
Class 3 Premises & Class 2 Small Premises (includes mobile & temporary food premises)
Council 375.00 N
Class 3 ‐ Each Additional Mobile and Temporary Food Premises Council 50.00 N
Class 3 Small Premises & Class 2 Community Groups (includes mobile & temporary food premises)
Council 180.00 N
Class 3 Minor Premises & Class 3 Community Groups (includes mobile & temporary food premises)
Council 110.00 N
Mobile and Temporary Food Premises Not for Profit/Community
Group (<12 single events per year)Council No charge
Bi‐annual pro‐rata rates apply
Renewal of Registration
Class 1 Premises(Aged Care/Hospitals) & Class 2 Large (Supermarkets, licensed hotel, resort, large manufacturers)
Council 790.00 N
Class 1 Small Premises (Child Care & Delivered Meals Organisation) Council 540.00 N
Class 2 Premises (includes mobile & temporary food premises) Council 430.00 N
Class 2 ‐ Each Additional Mobile and Temporary Food Premises Council 100.00 N
Class 3 Premises & Class 2 Small Premises (includes mobile & temporary food premises)
Council 250.00 N
Class 3 ‐ Each Additional Mobile and Temporary Food Premises Council 50.00 N
Class 3 Small Premises & Class 2 Community Groups (includes mobile & temporary food premises)
Council 120.00 N
Class 3 Minor Premises & Class 3 Community Groups (includes mobile & temporary food premises)
Council 70.00 N
Mobile and Temporary Food Premises Not for Profit/Community
Group (<12 single events per year)Council No charge
Renewal of Registration ‐ 5 Star Rating
Class 1 Premises(Aged Care/Hospitals) & Class 2 Large (Supermarkets, licensed hotel, resort, large manufacturers)
Council 715.00 N
Class 1 Small Premises (Child Care & Delivered Meals Organisation) Council 490.00 N
Class 2 Premises (includes mobile & temporary food premises) Council 390.00 N
91
Description Unit Fee Status
2015/2016
(Inc GST if applic)
$
Includes
GST
Y/N
Renewal of Registration ‐ 2 Star Rating
Class 1 Premises(Aged Care/Hospitals) & Class 2 Large (Supermarkets, licensed hotel, resort, large manufacturers)
Council 1,025.00 N
Class 1 Small Premises (Child Care & Delivered Meals Organisation) Council 700.00 N
Class 2 Premises (includes mobile & temporary food premises) Council 555.00 N
Renewal of Registration ‐ 1 Star Rating
Class 1 Premises(Aged Care/Hospitals) & Class 2 Large (Supermarkets, licensed hotel, resort, large manufacturers)
Council 1,105.00 N
Class 1 Small Premises (Child Care & Delivered Meals Organisation) Council 750.00 N
Class 2 Premises (includes mobile & temporary food premises) Council 600.00 N
Transfer of Registration
Application for Transfer of Registration – Food Premises Council 50% Renewal of
Registration Fee N
Request for Inspection/assessment and report fee Council 240.00 N
Urgent request for Inspection/assessment and report fee
(within 2 working days)Council 465.00 N
Note: Food premises are classed in accordance with section 19c of the Food Act 1984
PUBLIC HEALTH AND WELLBEING ACT 2008
Registered premises – new application:
Beauty therapy, hairdressing, colonic irrigation
new application Council 140.00 N
renewal Council 140.00 N
transfer Council 75.00 N
Skin penetration, tattooing
new application Council 195.00 N
renewal Council 195.00 N
transfer Council 95.00 N
Prescribed Accommodation – new application / renewal
6‐15 people Council 275.00 N
16‐25 people Council 390.00 N
26‐50 people Council 500.00 N
> 50 people Council 665.00 N
Prescribed Accommodation – transfer Council
50% of new
application / renewal
fee
N
Bi‐annual pro‐rata rates apply
CARAVAN PARKS
(1 Fee Unit = $13.24)
Caravan Park Registration ‐ fee lesser of Council fee
or cap under Residential Tenancies Act 1997site Council 10.00 N
Transfer of Caravan Park Registration Statutory 5 fee units N
IMMUNISATIONS
Immunisation (Vaccines) Council At cost per dose plus
30% N
Immunisation History Search Council 20.00 N
FIRE PREVENTION
CFA Act Infringement Notice (legislated penalty) Statutory 1,476.00 N
Block Clearing Council Cost + $150.00 plus
gst N
Application for Permit to Burn Council No Charge
Application for Permit to Plant Trees on Roadside Council 67.00 N
92
Description Unit Fee Status
2015/2016
(Inc GST if applic)
$
Includes
GST
Y/N
INFRASTRUCTUREINFRASTRUCTURE ADMINISTRATION
Vehicle Crossings (Non‐Utilities) Council 165.00 N
Road Opening Permit Council 70.00 N
Asset Protection Permit Council 165.00 N
Road Works Permits (Fee per unit) 1 Fee Unit = $13.65
Arterial Road
Works, other than Minor Works on roadway, shoulder or pathway Statutory 45 fee units N
Works, other than Minor Works not on roadway, shoulder or pathway Statutory 25 fee units N
Minor Works on roadway, shoulder or pathway Statutory 11.5 fee units N
Minor Works not on roadway, shoulder or pathway Statutory 10 fee units N
Other Roads speed over 50km/h
Works, other than Minor Works on roadway, shoulder or pathway Statutory 45 fee units N
Works, other than Minor Works not on roadway, shoulder or pathway Statutory 25 fee units N
Minor Works on roadway, shoulder or pathway Statutory 11.5 fee units N
Minor Works not on roadway, shoulder or pathway Statutory 5 fee units N
Works, other than Minor Works on roadway, shoulder or pathway Statutory 20 fee units N
Works, other than Minor Works not on roadway, shoulder or pathway Statutory 5 fee units N
Minor Works on roadway, shoulder or pathway Statutory 11.5 fee units N
Minor Works not on roadway, shoulder or pathway Statutory 5 fee units N
WATER PERMITS
Water Permits 0‐3,000 Litres Council 21.00 N
Water Permits 3,000‐6,000 Litres Council 26.70 N
Water Permits 6,000‐131,800 Litres Council Up to $414.00 N
(Graduated Scale see Appendix)
DEVELOPER LEVIES
Non‐Standard Public Lighting Levy Council 280.00 N
Admin. Fee – Special Rate Projects Council 5.00% N
Subdivision Supervision Fees Statutory 2.50% N
Subdivisions Plan ‐ Checking fees Statutory 0.75% N
Drainage Investigation for Unit developments (Up‐to three Units) Council 390.00 N
Drainage Investigation hourly rate Council 110.00 N
WASTE DISPOSAL
Domestic Garbage ‐ Uncompacted Waste cubic metre Council 74.00 Y
Domestic Hard Waste ‐ Uncompacted Waste cubic metre Council 74.00 Y
Commercial Garbage – Compacted Waste tonne Council 125.00 Y
Commercial Garbage ‐ Uncompacted Waste cubic metre Council 74.00 Y
Commercial Hard Waste – Uncompacted Waste cubic metre Council 74.00 Y
Clean Fill (Anglesea only – subject to demand) tonne Council 20.00 Y
Construction & Demolition – Waste Mixed tonne Council 125.00 Y
Construction & Demolition – Recyclable Timber (Anglesea ) tonne Council 28.00 Y
Construction & Demolition – Recyclable Timber cubic metre Council 35.00 Y
Construction & Demolition – Recycle Plaster (Anglesea) tonne Council 28.00 Y
Construction & Demolition – Recyclable Concrete/Bricks (Anglesea ) tonne Council 56.40 Y
Construction & Demolition – Recyclable Concrete/Bricks (Lorne) cubic metre Council 88.00 Y
Recyclable Material cubic metre Council 11.00 Y
Green Waste cubic metre Council 27.00 Y
Sand (disposal at Anglesea Landfil l only, subject to demand) tonne Council No Charge
93
Description Unit Fee Status
2015/2016
(Inc GST if applic)
$
Includes
GST
Y/N
General Items
Car Tyres each Council 7.50 Y
Light Truck Tyres each Council 9.00 Y
Truck Tyres each Council 20.50 Y
Car Bodies each Council 53.00 Y
Mattresses (& bases) each Council 21.50 Y
TVs each Council 6.50 Y
Sale of Mulch (Anglesea, Lorne and Winchelsea only – subject to availabilit cubic metre Council 13.50 Y
Sale of second hand bins (Anglesea only – subject to availabil ity) each Council 15.00 Y
Sale of compost bins each Council 55.00 Y
Sale of reusable items Council
Fee for items to be
determined by
Coordinator Waste
Management
Y
KERBSIDE WASTE COLLECTION
Residential garbage service upgrade ‐ 240L bin year Council 170.00 N
Additional residential recycle service – 240L or 360L bin year Council 62.00 N
Upgrade residential recycle service to 360L bin year Council 57.00 N
Additional residential green waste service – 240L or 360L bin year Council 67.00 N
Upgrade residential green waste service to 360L bin year Council 57.00 N
Event bin hire each Council 17.50 N
Infrequently occupied residence bin placement fee occasion Council 6.00 N
Gravity Lock bin (including l id) each Council 41.00 N
Replacement key each Council 2.00 N
94
STANDPIPE WATER CHARGES
Litres Gallons2015/2016
Cost $Total $
0‐3,000 600 20.60 20.60
3,000 ‐ 6,000 1,200 26.78 26.78
9,000 2,000 35.02 35.02
11,400 2,500 39.14 39.14
13,600 3,000 44.29 44.29
15,900 3,500 50.47 50.47
18,200 4,000 56.65 56.65
20,500 4,500 64.89 64.89
22,700 5,000 71.07 71.07
25,000 5,500 78.28 78.28
27,300 6,000 85.49 85.49
29,500 6,500 93.73 93.73
31,800 7,000 99.91 99.91
34,100 7,500 107.12 107.12
36,400 8,000 114.33 114.33
38,600 8,500 122.57 122.57
40,900 9,000 128.75 128.75
43,200 9,500 135.96 135.96
45,500 10,000 143.17 143.17
50,000 11,000 157.59 157.59
54,600 12,000 172.01 172.01
59,100 13,000 186.43 186.43
63,600 14,000 199.82 199.82
68,200 15,000 215.27 215.27
72,700 16,000 228.66 228.66
77,300 17,000 244.11 244.11
81,800 18,000 257.50 257.50
86,400 19,000 272.95 272.95
91,000 20,000 286.34 286.34
95,500 21,000 301.79 301.79
100,000 22,000 315.18 315.18
104,600 23,000 330.63 330.63
109,100 24,000 342.99 342.99
113,700 25,000 357.41 357.41
118,200 26,000 371.83 371.83
122,700 27,000 385.22 385.22
127,300 28,000 400.67 400.67
131,800 29,000 414.06 414.06
*note water charges do not attract GST
95
Appendix E ‐ Cash Reserves This appendix presents the Restricted and Unrestricted Cash Reserves held by Council and their Purposes. Restricted Reserves Open Space Reserve Purpose
The purpose of this reserve is to provide improved recreational facilities for the Surf Coast Shire, both of an active and a passive nature.
Typical Sources of Inflows and Outflows: Inflows to the open space reserve are solely composed of contributions from subdividers in lieu of the 5 per cent public open space requirement. It is noteworthy that substantial income flow into this Reserve annually and these funds will be critical in delivering key outcomes of the Open Space Strategy. Outflows have been limited to capital works on parks, playgrounds, and both active and passive recreation reserves. The level of anticipated growth in this reserve is not fully allocated in the capital works program over the life of the SRP. On the basis of our knowledge to‐date, it is difficult to predict requirements beyond the short term. For this reason, limited allocation of reserves has been made in later years of the SRP.
Forecast Balance as at 30 June 2015: $870,832 Budgeted Balance as at 30 June 2016: $1,147,832 Main Drainage Reserve Purpose
The purpose of this reserve is to hold developer contributions for main drainage works at a later point than the initial development. As such they are also tied to works within the catchment area from which funds were derived.
Typical Sources of Inflows and Outflows: Inflows are from contributions collected from developers and outflows are on the works specified.
Forecast Balance as at 30 June 2015: $205,062 Budgeted Balance as at 30 June 2016: $205,062 Aireys Inlet Units Reserve Purpose
The purpose of this reserve is as the funding source for the maintenance of social housing for disadvantaged low income earners. Four social housing units currently exist in Aireys Inlet.
Typical Sources of Inflows and Outflows: Inflows are received by way of rent. Outflows cover future maintenance and capital expenditure related to the units.
Forecast Balance as at 30 June 2015: $330,879 Budgeted Balance as at 30 June 2016: $324,132
96
Asset Development Reserve Purpose
The purpose of this reserve is to hold funds derived from the sale of council land or buildings to ensure that they are applied to the creation of new Council assets or debt reduction and not used to enhance Council’s operational outcomes. Funds in this reserve are tied to works within the geographical area from which funds were derived.
Typical Sources of Inflows and Outflows:
Cash inflows to the reserve accrue from sale proceeds of land or buildings and outgoings will be in the form of construction costs on new council assets.
Forecast Balance as at 30 June 2015: $60,037 Budgeted Balance as at 30 June 2016: $60,037 Developer Contributions Reserve Purpose
The purpose of this reserve is to hold funds contributed by developers for specific works associated with subdivisions. Funds are contributed for works such as footpaths, fencing, streetscape works, lighting and other such items where it is deemed that these works should occur at a later point than the initial development. Funds are also kept in this reserve for the Torquay/Jan Juc Developer Contributions Plan. Funds collected are very specific and tied to exact projects.
Typical Sources of Inflows and Outflows: Inflows are from contributions collected from developers and outflows are on the works specified.
Forecast Balance as at 30 June 2015: $3,579,851 Budgeted Balance as at 30 June 2016: $4,045,555 Waste Reserve Purpose
The purpose of this reserve is to ensure that the full cost of the waste function is met by the waste charges (garbage charge and fee income from landfill) and that surpluses and deficits on an annual basis can be covered without any adverse impact on the balance of Council’s budget. This facet is particularly relevant in terms of Council meeting its long‐term obligations for landfill rehabilitation where funds need to be set aside in the interim to plan for large‐scale costs in the future. The rehabilitation of the Anglesea Landfill is expected to take place in 2023/24.
Typical Sources of Inflows and Outflows: Cash inflows to the reserve arise from any surplus funds remaining from the combined income from garbage charges and landfill fees, less the cost of operating the landfills, waste administration, kerbside collection, recycling and other associated waste costs. Outflows are due to waste capital expenditures.
Forecast Balance as at 30 June 2015: $5,765,717 Budgeted Balance as at 30 June 2016: $5,763,342
97
Trust and Deposits Reserve Purpose
Whilst not technically a reserve, Trust and Deposits represent cash that Council holds under a contractual agreement, and therefore should be considered part of restricted cash holdings. Council has decided to utilise a reserve for this purpose to provide clarity.
Typical Sources of Inflows and Outflows: Cash inflows and to the Trust and Deposits Reserve will arise from contractual agreements between Council and other parties. Outflows generally occur when the agreement expires.
Forecast Balance as at 30 June 2015: $1,198,977 Budgeted Balance as at 30 June 2016: $1,198,977 Unrestricted Reserves Mayoral Charity This former reserve has been removed by Council, however has been listed for information for this year only. Plant Replacement Reserve Purpose
The purpose of this reserve is to establish a fund whereby Council’s heavy plant (graders, trucks, etc) can be replaced at the end of their useful lives. The changeover cost of small vehicles is also funded from this reserve.
Typical Sources of Inflows and Outflows: Inflows to this reserve accrue out of plant hire charges made to jobs on which the plant works. The total of plant hire income is then offset against the operating expenses of the plant, with the surplus amount being transferred to the plant reserve. Outflows from this reserve are typically the changeover cost of plant.
Forecast Balance as at 30 June 2015: $828,139 Budgeted Balance as at 30 June 2016: $788,784 Gherang Gravel Pits Reserve Purpose
The purpose of this reserve is to provide funding for road improvements for Council roads.
Typical Sources of Inflows and Outflows: Inflows to this reserve accrue revenue from operation Council’s gravel pits. The total of Gravel Pit income is then offset against the operating expenses of the facility, with the surplus amount being transferred to the Gherang Gravel Pits Reserve. Outflows from this reserve are earmarked for road improvement projects.
Forecast Balance as at 30 June 2015: $1,413,594 Budgeted Balance as at 30 June 2016: $1,496,626
98
Defined Benefits Reserve Purpose
The purpose of this reserve is to provide funding for future defined benefits superannuation fund shortfalls.
Typical Sources of Inflows and Outflows: Inflows to this reserve are at the discretion of Council, set via the Annual Budget process. Council will make an estimate on the future defined benefits superannuation funding shortfalls and build a reserve in order to meet the shortfall. Outflows from this reserve will fund defined benefit funding calls from Council’s superannuation provider.
Forecast Balance as at 30 June 2015: $274,000 Budgeted Balance as at 30 June 2016: $474,000 Carried Forward Capital Works Reserve Purpose
The purpose of this reserve is to act as a mechanism to carry over funding for capital works that are still in progress at year end.
Typical Sources of Inflows and Outflows: Inflows into this reserve will be funds allocated at end of financial year relating to incomplete projects. Outflows will be funds allocated in the new financial year to complete the projects in progress.
Forecast Balance as at 30 June 2015: $2,185,244 Budgeted Balance as at 30 June 2016: $1,600,000 Carried Forward New Initiatives Reserve Purpose
The purpose of this reserve is to act as a mechanism to carry over funding for new initiative projects that are still in progress at year end.
Typical Sources of Inflows and Outflows: Inflows into this reserve will be funds allocated at end of financial year relating to incomplete projects. Outflows will be funds allocated in the new financial year to complete the projects in progress.
Forecast Balance as at 30 June 2015: $95,000 Budgeted Balance as at 30 June 2016: $0 Adopted Strategy Implementation Reserve Purpose
The purpose of this reserve is to provide funding for projects in line with approved strategies adopted by Council and is funded from operations or grants received.
Typical Sources of Inflows and Outflows: Inflows into this reserve will be funds allocated via Council resolution. Outflows will be funds allocated to specific projects by Council resolution.
Forecast Balance as at 30 June 2015: $0 Budgeted Balance as at 30 June 2016: $0
99
Asset Renewal Reserve Purpose
The purpose of this reserve is to provide funding based on the Asset Renewal Funding Strategy.
Typical Sources of Inflows and Outflows: Inflows into this reserve will be funds allocated on a straight line basis increasing year on year at a predetermined rate as set by Council. Funds from renewal projects completed under budget will also be returned to this reserve. Outflows from this reserve will be spent on renewal of Council assets.
Forecast Balance as at 30 June 2015: $0 Budgeted Balance as at 30 June 2016: $0 Accumulated Unallocated Cash Reserve Purpose
The purpose of this reserve is to separately identify Council’s unallocated cash.
Typical Sources of Inflows and Outflows: Inflows into this reserve will be funds allocated by Council based on operational savings or unallocated sources of funding. Outflows from this reserve will be allocations based solely on Council resolutions.
Forecast Balance as at 30 June 2015: To be determined
100
Appendix F – Local Government Rates Capping Framework Terms of Reference
101
102
103
Appendix G – Council Contributions to External Parties
Organisation $
Business / Tourism / Traders Associations:
Aireys Inlet Tourism and Traders Association 2,000
Anglesea Business and Tourism Association 2,000
Growing Winchelsea 2,000
Lorne Business and Tourism Association 2,000
Torquay Commerce and Tourism Association 2,000
Committee for Geelong 5,600
Victorian Tourism Industry Council 700
Great Ocean Road Regional Tourism 150,000
Early Years / Education Providers:
Anglesea Kindergarten 4,000
Australian Breastfeeding Association 274
Early Childhood Australia 270
Moriac Pre‐School Centre 4,000
Surf Coast Toy Library 1,500
Torquay State School ‐ Stadium Joint Use Agreement 13,000
Local Government:
Australian Local Government Women's Association 600
G21 Geelong Regional Alliance 48,000
LG Pro 3,600
Municipal Association of Victoria 30,000
National Sea Change Taskforce 1,100
Peri Urban Group of Councils 15,375
Rural Finance 3,000
Timber Towns Victoria 5,734
Victorian Local Governance Association 7,300
Senior Citizens / Community Houses & Groups:
Anglesea & District Community House 15,000
Anglesea and Aireys Inlet Senior Citizens Club 3,485
Anglesea Community House 5,000
Deans Marsh Community Cottage 5,000
Lorne Community House 5,000
Lorne Senior Citizens Centre 3,485
Moriac and District Seniors Citizens Club 3,485
Spring Creek Community House 5,000
Torquay Senior Citizens Centre 3,485
Winchelsea Community House 5,000
Winchelsea Senior Citizens Centre 3,485
Funding Programs:
Events Partnership Program 83,000
Minor Community Grants 75,000
Donations of prizes to local not for profit organisations 500
Other Programs and Services:
Volunteering Victoria 1,152
Barwon Sports Academy 5,000
Geelong Heritage Centre 44,012
Geelong Regional Library Corporation 520,239
Victorian State Emergency Services 64,000
Mt Gellibrand Fire Tower Lookout Committee 1,600
Barwon South West Waste Management Group 18,553
Corangamite Catchment Management Authority 5,000
Total 1,179,534
104
Appendix H – Asset Renewal Backlog
Township Asset Location Works Description
Estimated
Replacement Cost
$'000
Lorne Dwyer Street Left Kerb ‐ Concrete Spoon 4
Anglesea Simmons Court ‐ Inverlochy St To End Of Court Reseal
26
Anglesea Wray Street ‐ Bingley Pde To Camp Rd Reseal
7
Moriac Lavinia Court ‐ Cooks Lane To End Reseal 15
Winchelsea Austin Street ‐ Mercer Street To Willis Street Footpath Replacement 7
Winchelsea Hesse Street ‐ Armytage Street To Princes Hwy Footpath Replacement 15
Winchelsea Main Street Service Rd ‐ Gosney St To Hesse
Street (North Side)
Footpath Replacement
23
Anglesea Gabba Court ‐ Arinya Cres To End Of Court Footpath Replacement 15
Anglesea Noble Street ‐ Reserve Rd To Roundabout at
Murray St
Footpath Replacement
21
Jan Juc Sunset Strip ‐ Alexander Ave to Cantala Dr ‐ right
lane
Footpath Replacement
19
Lorne Grove Road ‐ Mountjoy Parade To Otway St Footpath Replacement 5
Lorne Mountjoy Parade ‐ Beal St to Francis St (Roadside
Only)
Footpath Replacement
13
Lorne Mountjoy Parade Service Road ‐ Sealed section
outside Grand Pacific Hotel
Footpath Replacement
14
Lorne Ocean Road ‐ Doble St To Swing Bridge Footpath Replacement 10
Lorne Ocean Road ‐ Deans Marsh Rd To Erskine River
Bridge
Footpath Replacement
3
Lorne Otway Street ‐ Mountjoy Parade To Lower Otway
st
Footpath Replacement
10
Lorne Smith Street, Lorne ‐ Grove Road To William St Footpath Replacement 7
Lorne Smith Street, Lorne ‐ William St To Bay St Footpath Replacement 8
Lorne William Street ‐ Otway Street To Polwarth Road Footpath Replacement 5
Moriac Greenfields Drive ‐ Buttercup Dr To Cooks Lane Footpath Replacement 7
Torquay Almeida Close ‐ Conside Crescent To T‐ Junction Footpath Replacement 6
Torquay Beach Road ‐ Fischer Street To Surf Coast Highway Footpath Replacement
5
Torquay Frog Hollow Drive ‐ Messmate Road to Property
14
Footpath Replacement
5
Torquay Anderson Street ‐ Surf Coast Highway To Pearl
Street
Footpath Replacement
1
Winchelsea Austin Street ‐ Willis Street To Hopkins Street Footpath Replacement 25
Winchelsea Barwon Terrace ‐ Willis Street To Batson Street Footpath Replacement 1
Winchelsea Harding Street ‐ Hopkins St To Willis Street Footpath Replacement 20
Winchelsea Willis Street ‐ Harding St To Austin St Footpath Replacement 5
Jan Juc Jan Juc Creek Catchment 4 Replace 140m ‐ various locations 41
Jan Juc Jan Juc Creek Catchment 7 Replace 180m ‐ various locations 50
Torquay Spring Creek Catchment 1 Replace 750m ‐ various locations 160
Kerb
Footpaths
Drainage
Sealed Roads
105
Township Asset Location Works Description
Estimated
Replacement Cost
$'000
Lorne Lorne Fig Tree House Replace Joinery ‐ foyer & Childrens
Day Care, DDA Fixtures 8
Anglesea Anglesea Community Hall cladded walls, timber trimming,
brickwork painting, fascias, eaves
Overall external of building needs
good clean. 70
Jan Juc Jan Juc Recreation Centre DDA Fixtures 11
Bambra Bambra Hall Fridge, Stove 3
Anglesea Anglesea Bowling Club Roof Replacement 83
Lorne Lorne Senior Citizens Centre Carport structural support 12
Torquay Spring Creek Reserve ‐ Toilet Major refurbishment 50
Winchelsea Winchelsea Bowling Club Pavilion Refurbish toilets and changerooms 60
Mt Moriac Mt Moriac Rec Reserve Various items at reserve 33
Torquay Deep Creek Reserve Various items at reserve 21
Lorne Stribling Rec Reserve Various items at reserve 20
Deans Marsh Deans Marsh Rec Reserve Various items at reserve 20
Anglesea Ellimatta Rec Res Various items at reserve 17
Anglesea Fairyland Various items at reserve 14
Anglesea Lions Park Various items at reserve 14
Winchelsea Winch Eastern Rec Reserve Various items at reserve 14
Torquay Median Strip Various items at reserve 13
Aireys Inlet NS‐Gt Ocean Rd Various items at reserve 13
Gnarwarre Gnarwarre Reserve Various items at reserve 13
Bells Beach Bells Bch Res Various items at reserve 13
Torquay Walkway Various items at reserve 12
Torquay Road Reserve Various items at reserve 10
Lorne Stony Creek Reserve Various items at reserve 9
Jan Juc Apex Park Various items at reserve 9
Torquay Quay Pond Reserve Various items at reserve 9
Anglesea Anglesea Riverbank Various items at reserve 9
Aireys Inlet Inlet Crescent Res Various items at reserve 8
Lorne Duncan Street Reserve Various items at reserve 7
Fairhaven Walkway Various items at reserve 7
Connewarre Dans Reserve Various items at reserve 7
Anglesea Coogoorah Park Various items at reserve 6
Torquay Nature Strip Various items at reserve 6
Jan Juc Bob Pettit Reserve Various items at reserve 6
Buckley Lake Modewarre Various items at reserve 6
Torquay Spring Creek Reserve Various items at reserve 5
Bambra Greg Drayton Memorial Reserve Various items at reserve 5
Torquay Spring Creek West Nature Reserve Various items at reserve 5
Modewarre Cape Otway Rec Reserve Various items at reserve 5
Mt Duneed Kalkarra Park Various items at reserve 5
Lorne Stirling St Reserve Various items at reserve 5
Anglesea Anglesea Lookout Various items at reserve 5
Modewarre Modewarre Recreation Reserve Various items at reserve 5
Freshwater
Creek
Freshwater Creek Various items at reserve
5
Winchelsea Winch Riverbank Reserve Various items at reserve 5
Anglesea Carpark ‐ Bowls Club Various items at reserve 4
Buildings
Open Space
106
Township Asset Location Works Description
Estimated
Replacement Cost
$'000
Anglesea Anglesea Tennis Crts Various items at reserve 4
Aireys Inlet Anderson Roadnight Various items at reserve 4
Aireys Inlet NS‐GOR Svc Rd Nobles to Pain Ck Various items at reserve 4
Moriac Newling Reserve Various items at reserve 4
Aireys Inlet Bambra Rd Res Various items at reserve 4
Anglesea Civic Centre (Anglesea) Various items at reserve 3
Anglesea Colledge Place Various items at reserve 3
Bellbrae Bellbrae Reserve Various items at reserve 3
Lorne Walkway Various items at reserve 3
Winchelsea Nature Strip Various items at reserve 3
Jan Juc Jan Juc Creek Reserve Various items at reserve 3
Fairhaven Fairhaven Easement Reserve Various items at reserve 3
Moriac Moriac Reserve Various items at reserve 3
Torquay Price Street Community House Various items at reserve 3
Bellbrae Bellbrae Hall Various items at reserve 2
Torquay Ocean Views Various items at reserve 2
Winchelsea Winch Tennis Courts Various items at reserve 2
Various Various other reserves with less than $2000
renewal requirement at each reserve 33
Total Asset 1,300