Danger! Extreme Conditions!

Post on 22-Feb-2016

35 views 0 download

Tags:

description

Danger! Extreme Conditions! . What’s Possible…. Average Age of City School Buildings= 53 Years. 23% built before 1946. 3% built since 1985. 74% built between 1946 and 1985. School Buildings Get Failing Grade. 163 schools 85% in POOR condition 50 schools unsalvageable - PowerPoint PPT Presentation

transcript

1

2

3

4

Danger! Extreme Conditions!

Bebe Verdery
Did we want to stay with this title?

5

Bebe Verdery
title?

6

What’s Possible…

7

8

Average Age of City School Buildings= 53 Years

23% built before 1946

74% built between 1946 and 1985

3% built since 1985

Bebe Verdery
need to decide whether to read the slide or the comments, can't be both. Total at bottom: "97% of city schools were built before 1986-nearly 30 years ago! ??

9

163 schools 85% in POOR condition 50 schools unsalvageable Educational Adequacy = F $2.4 Billion Need

School Buildings Get Failing Grade

10

$60 Million per Year Availablevs.

$2.4 Billion Needed

Current System = Band Aid Approach!

11

Buildings Get Worse Costs Go Up

Year 0 Year 1 Year 2 Year 3 Year 4$1,000

$1,400

$1,800

$2,200

$2,600

$3,000

Scho

ol C

onst

ruct

ion

Nee

d in

Mill

ions

12

Greenville, SC$1 billion up front by leveraging existing funding streams

Rebuilt all 70 of its schools in 6 years

It’s Been Done Before!

13

Predictable 30 year funding stream

$

$

$$

State Funds

BCPS Funds

City Funds

Step 1: Predictable Funding

14

Financing Entity

$1 Billion for School Construction

Now!

Predictable 30 year funding

stream

Step 2: Leverage the Funding

15

80 New or Fully Renovated Schools!

$1 Billion in School Construction

Step 3: Rebuild City Schools

16

80 new or renovated

schools

vs.

Current System

A handful of new roofs, boilers, and

windows

$1 Billion in Capital Funding

New Schools or “Band Aids”

17

Buildings Get BetterTotal Cost Shrinks

Year 0 Year 1 Year 2 Year 3 Year 4$1,000

$1,400

$1,800

$2,200

$2,600

$3,000

Total Remaining School Construction Need with Project by ProjectTotal Remaining School Construction Need with Block Grant

Scho

ol C

onst

ruct

ion

Nee

d in

Mill

ions

18

Great Buildings for Kids NOW!

Economies of Scale!Jobs, Jobs, Jobs!Low Interest Rates

Benefits of Building Now

19

State and City leaders

embrace this new

financing approach

Current Funding Streams Leverage $1 Billion IF:

20

Build Schools. Build Neighborhoods.www.transformbaltimore.org