David Rodríguez Piñeiro GSI Darmstadt PANDA Collaboration Meeting Turin 15. 06. 2009

Post on 12-Jan-2016

43 views 0 download

Tags:

description

David Rodríguez Piñeiro GSI Darmstadt PANDA Collaboration Meeting Turin 15. 06. 2009. EMC BW Endcap. Backward Endcap EMC. 1.– Extension of BW Endcap in Z Direction 2.– Support Structure 3.– Tracking Supplies 4. – ToF Supplies 5. – MVD Supplies 6. – Summary. Backward Endcap EMC. - PowerPoint PPT Presentation

transcript

EMC BW Endcap

David Rodríguez PiñeiroDavid Rodríguez PiñeiroGSI DarmstadtGSI Darmstadt

PANDA Collaboration MeetingPANDA Collaboration MeetingTurinTurin

15. 06. 200915. 06. 2009

15/06/200915/06/2009 David Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration MeetingDavid Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration Meeting 22

Backward Endcap EMCBackward Endcap EMC

1.– Extension of BW Endcap in Z Direction

2.– Support Structure

3.– Tracking Supplies

4. – ToF Supplies

5. – MVD Supplies

6. – Summary

15/06/200915/06/2009 David Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration MeetingDavid Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration Meeting 33

Backward Endcap EMCBackward Endcap EMC

Extension of BW Endcap in Z Direction 1. – Extension of BW Endcap in Z Direction

2.– Support Structure

3.– Tracking Supplies

4. – ToF Supplies

5. – MVD Supplies

6. – Summary

It extends further backwards as compared to official drawings

15/06/200915/06/2009 David Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration MeetingDavid Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration Meeting 44

Backward Endcap EMCBackward Endcap EMC

Support Structure (I)

DIN 1025-IPB360-1.0112

1. – Extension of BW Endcap in Z Direction

2.– Support Structure

3.– Tracking Supplies

4. – ToF Supplies

5. – MVD Supplies

6. – Summary

15/06/200915/06/2009 David Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration MeetingDavid Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration Meeting 55

Backward Endcap EMCBackward Endcap EMC

Support Structure (II) 1. – Extension of BW Endcap in Z Direction

2.– Support Structure

3.– Tracking Supplies

4. – ToF Supplies

5. – MVD Supplies

6. – Summary

- Rails for placing

- Order installation/ desensitization

- Cylindrical space upstream

- Interaction with beam pipe

Rail

15/06/200915/06/2009 David Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration MeetingDavid Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration Meeting 66

Backward Endcap EMCBackward Endcap EMC

Support Structure (III) 1. – Extension of BW Endcap in Z Direction

2.– Support Structure

3.– Tracking Supplies

4. – ToF Supplies

5. – MVD Supplies

6. – Summary

Too Tight

Placing the pump further

15/06/200915/06/2009 David Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration MeetingDavid Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration Meeting 77

Backward Endcap EMCBackward Endcap EMC

Support Structure (IV.a)

Max Stress: 26,14 MPa

Steel: Safety factor = 10

1. – Extension of BW Endcap in Z Direction

2.– Support Structure

3.– Tracking Supplies

4. – ToF Supplies

5. – MVD Supplies

6. – Summary

Ansys Stress Analysis

1 Ton

15/06/200915/06/2009 David Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration MeetingDavid Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration Meeting 88

Backward Endcap EMCBackward Endcap EMC

Support Structure (IV.b) 1. – Extension of BW Endcap in Z Direction

2.– Support Structure

3.– Tracking Supplies

4. – ToF Supplies

5. – MVD Supplies

6. – Summary

Vertical displacement 0,8 mm

Ansys Deformation Analysis

15/06/200915/06/2009 David Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration MeetingDavid Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration Meeting 99

Backward Endcap EMCBackward Endcap EMC

Tracking Supplies (I) 1. – Extension of BW Endcap in Z Direction

2.– Support Structure

3.– Tracking Supplies

4. – ToF Supplies

5. – MVD Supplies

6. – Summary

15/06/200915/06/2009 David Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration MeetingDavid Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration Meeting 1010

Backward Endcap EMCBackward Endcap EMC

Tracking Supplies (II)

Available area = = 4x1350 = =

5400 mm2

1. – Extension of BW Endcap in Z Direction

2.– Support Structure

3.– Tracking Supplies

4. – ToF Supplies

5. – MVD Supplies

6. – Summary

Held by 4 rollers in the common rail

15/06/200915/06/2009 David Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration MeetingDavid Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration Meeting 1111

Backward Endcap EMCBackward Endcap EMC

Tracking Supplies (III.a)

3 mm Polyethylene

Max Stress: 4,29 MPa

Polyethylene: Safety factor > 5

1. – Extension of BW Endcap in Z Direction

2.– Support Structure

3.– Tracking Supplies

4. – ToF Supplies

5. – MVD Supplies

6. – Summary

Ansys Stress Analysis

15/06/200915/06/2009 David Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration MeetingDavid Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration Meeting 1212

Backward Endcap EMCBackward Endcap EMC

Tracking Supplies (III.b)

Max deformation < 1 mm

1. – Extension of BW Endcap in Z Direction

2.– Support Structure

3.– Tracking Supplies

4. – ToF Supplies

5. – MVD Supplies

6. – Summary

Ansys Deformation Analysis

3 mm Polyethylene

15/06/200915/06/2009 David Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration MeetingDavid Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration Meeting 1313

Backward Endcap EMCBackward Endcap EMC

Tracking Supplies (IV.a) 1. – Extension of BW Endcap in Z Direction

2.– Support Structure

3.– Tracking Supplies

4. – ToF Supplies

5. – MVD Supplies

6. – Summary

Ansys Stress Analysis

Max Stress: 66,04 MPa

Aluminium: Safety factor > 4

1 mm Aluminium

15/06/200915/06/2009 David Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration MeetingDavid Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration Meeting 1414

Backward Endcap EMCBackward Endcap EMC

Tracking Supplies (IV.b)

Max deformation < 0,5 mm

1. – Extension of BW Endcap in Z Direction

2.– Support Structure

3.– Tracking Supplies

4. – ToF Supplies

5. – MVD Supplies

6. – Summary

Ansys Stress Analysis

1 mm Aluminium

15/06/200915/06/2009 David Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration MeetingDavid Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration Meeting 1515

Backward Endcap EMCBackward Endcap EMC

ToF Supplies (I) 1. – Extension of BW Endcap in Z Direction

2.– Support Structure

3.– Tracking Supplies

4. – ToF Supplies

5. – MVD Supplies

6. – Summary

Gross Area > 16000 mm2

Space Reserved for ToF Supplies

15/06/200915/06/2009 David Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration MeetingDavid Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration Meeting 1616

Backward Endcap EMCBackward Endcap EMC

ToF Supplies (II) 1. – Extension of BW Endcap in Z Direction

2.– Support Structure

3.– Tracking Supplies

4. – ToF Supplies

5. – MVD Supplies

6. – Summary

Integrate ToF supplies Support into DIRC and Tracking Support

15/06/200915/06/2009 David Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration MeetingDavid Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration Meeting 1717

Backward Endcap EMCBackward Endcap EMC

ToF & Tracking Supplies 1. – Extension of BW Endcap in Z Direction

2.– Support Structure

3.– Tracking Supplies

4. – ToF Supplies

5. – MVD Supplies

6. – Summary

Posibility to switch the spaces for Tracking and ToF, depending on the needed area.

15/06/200915/06/2009 David Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration MeetingDavid Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration Meeting 1818

Backward Endcap EMCBackward Endcap EMC

MVD Supplies (I) 1. – Extension of BW Endcap in Z Direction

2.– Support Structure

3.– Tracking Supplies

4. – ToF Supplies

5. – MVD Supplies

6. – Summary

New proposal: Rectangular Shape

15/06/200915/06/2009 David Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration MeetingDavid Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration Meeting 1919

Backward Endcap EMCBackward Endcap EMC

MVD Supplies (II) 1. – Extension of BW Endcap in Z Direction

2.– Support Structure

3.– Tracking Supplies

4. – ToF Supplies

5. – MVD Supplies

6. – Summary

- Better use of the space

- Easier and safer insulation system

- 24 crystals gain!

- MVD Demand: 44000mm2

With this proposal:

Free Area around Beam Pipe for MVD Supplies ~ 50000 mm2

15/06/200915/06/2009 David Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration MeetingDavid Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration Meeting 2020

Backward Endcap EMCBackward Endcap EMC

Summary 1. – Extension of BW Endcap in Z Direction

2.– Support Structure

3.– Tracking Supplies

4. – ToF Supplies

5. – MVD Supplies

6. – Summary

Extension of BW in Z Direction: at least 1000 mm

Supporting Structure: Advanced

Space for Tracking Supplies: Feasible

Space for ToF Supplies: To Be Determined

Space for MVD Supplies: Rectangular Solution

15/06/200915/06/2009 David Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration MeetingDavid Rodríguez Piñeiro - GSI Darmstadt - Turin Collaboration Meeting 2121

Backward Endcap EMCBackward Endcap EMC

Thank you!

Personal Contact:

d.rodriguezpineiro@gsi.deTel: +49 (0) 615971/1634

www-panda.gsi.de