Inserire Titolo EventoThis document contains information which are proprietary of CRF. Neither this document nor the information contained herein shall be used, duplicated nor communicated by any means to any third party, in whole or in part, except with the prior written consent of CRF
27-05-2011
AGENDA
• Topic & goals
• Tasks decomposition
• Relationships to other WPs
• Timing of tasks
• Proposed deliverables & delivery time
• Partners in the WP1 & tasks
• Proposed task leaders
Inserire Titolo EventoThis document contains information which are proprietary of CRF. Neither this document nor the information contained herein shall be used, duplicated nor communicated by any means to any third party, in whole or in part, except with the prior written consent of CRF
27-05-2011
WP1 covers the work on the specification of the business requirements and needs that the project is looking to answer. Commercial existing tools and European Patents will be analyzed in order to evaluate the needs about:
•learning from previous versions of the product
•hand-over of models to new engineering teams
•supporting product-management in steering the product requirements.
Precise and testable requirements will be identified in order to cover these main areas:
•DECISIVE application monitoring,
•interfaces between DECISIVE models,
•DECISIVE human-centric tools interfaces, and
•decision-support to product management during the decision phase.
An appropriated test methodology will be defined in order to verify the requirements fulfilling during the
verification and validation phases.
Topic & goals
Inserire Titolo EventoThis document contains information which are proprietary of CRF. Neither this document nor the information contained herein shall be used, duplicated nor communicated by any means to any third party, in whole or in part, except with the prior written consent of CRF
27-05-2011
WP1 will accomplish the following activities:
• Evaluate the current state-of-the-art approaches related to evolutionary development in the model-based engineering of embedded systems.
• Define requirements for tools and methodologies in order to provide:
non-intrusive analysis and monitoring techniques to systematically collect information during the evolutions
decision support for the synthesis of system architectures model management and visualization, to automate the management of
models and improve comprehension during the system evolution
• Identify safety and certification requirements
• Define test methodologies to apply during validation phase
• Preliminary definition of candidate validation cases and scenarios
Topic & goals
Inserire Titolo EventoThis document contains information which are proprietary of CRF. Neither this document nor the information contained herein shall be used, duplicated nor communicated by any means to any third party, in whole or in part, except with the prior written consent of CRF
27-05-2011
The tasks to be accomplished in Work Package 1 are summarized in the table below.
Tasks decomposition
Task Description
T1.1 State of the art. Collecting relevant and significant industry control use cases
T1.2 Identification of the monitoring requirements
T1.3 Identification of the interfaces requirements
T1.4 Identification of the human interface requirements
T1.5 Identification of the decision-support requirements
T1.6 Identification of safety and certification requirements
T1.7 Preliminary validation cases and test methodology definition
Inserire Titolo EventoThis document contains information which are proprietary of CRF. Neither this document nor the information contained herein shall be used, duplicated nor communicated by any means to any third party, in whole or in part, except with the prior written consent of CRF
27-05-2011
Relationships to other WPs
WP1 is the starting point for all the other WPs: • Requirements defined in this WP are input for WP2, WP3, WP4, WP5. • Preliminary validation cases and scenarios defined in this WP will be used in WP6 for the industrial validation phase
Main risks related to this WP are:• not well defined requirements• not well defined test methodologies• not correct or not enough candidate validation case definition
Inserire Titolo EventoThis document contains information which are proprietary of CRF. Neither this document nor the information contained herein shall be used, duplicated nor communicated by any means to any third party, in whole or in part, except with the prior written consent of CRF
27-05-2011
Timing of tasks
Inserire Titolo EventoThis document contains information which are proprietary of CRF. Neither this document nor the information contained herein shall be used, duplicated nor communicated by any means to any third party, in whole or in part, except with the prior written consent of CRF
27-05-2011
Proposed deliverables & delivery time
Two Deliverable are planned for WP1:• D1.1 – Business requirements and needs• D1.2 – Preliminary validation case
Inserire Titolo EventoThis document contains information which are proprietary of CRF. Neither this document nor the information contained herein shall be used, duplicated nor communicated by any means to any third party, in whole or in part, except with the prior written consent of CRF
27-05-2011
Partners in the WP1 & tasks
Task Partners
T1.1 Atego, IKER, NXP-A, NXP-D, UEF, UoO
T1.2 CEA, FHG-HHI, ISYS, UEF, UoO
T1.3 CEA, CISC, UoO
T1.4 BHL, CAU, CRF, LDZ, RTU, UES
T1.5 CRF, ISYS, LDZ, NXP-D, RTU
T1.6 Atego, AVL, IKER
T1.7 Atego, CRF, IKER, MU, NXP-A, NXP-D, PHILIPS, UES
WP Partners
WP1 Atego, AVL, BHL, CAU, CEA, CISC, CRF, FHG-HHI, IKER, ISYS, LDZ, MU, NXP-A, NXP-D, PHILIPS, RTU, UES, UEF, UoO
Inserire Titolo EventoThis document contains information which are proprietary of CRF. Neither this document nor the information contained herein shall be used, duplicated nor communicated by any means to any third party, in whole or in part, except with the prior written consent of CRF
27-05-2011
Partners in the WP1 & tasks
Partner T1.1 T1.2 T1.3 T1.4 T1.5 T1.6 T1.7 Total PHILIPS 12 12AVL 16 16CISC 4 4NXP-A 2 3 5UEF 6 6 12UoO 7 7 6 20Atego 4 4 4 12CEA 1 2 2 1 6BHL 4 4CAU 3 3FHG 6 6NXP‐D 2 1 2 5CRF 4 4 4 12 24LDZ 1 1 2RTU 2 3 5IKER 5 5 4 14ISYS 3 2 5MU 5 5UES 2 2 4
27 24 12 16 11 30 44 164
Inserire Titolo EventoThis document contains information which are proprietary of CRF. Neither this document nor the information contained herein shall be used, duplicated nor communicated by any means to any third party, in whole or in part, except with the prior written consent of CRF
27-05-2011
Proposed WP1 task leaders
Task Partner
T1.1 IKER
T1.2 FHG-HHI
T1.3 UoO
T1.4 BHL
T1.5 RTU
T1.6 AVL
T1.7 PHILIPS