The main objective of this study was to plan and

design the different elements of an integrated

and economical sewage treatment plant for wali

Al-had districts.

Population Available dataWater Consumption

1- Arithmetic method.

2- Uniform percentage method.

3- Curvilnear method.

4- Declining growth method.

5- Ratio method.

Population Available dataWater Consumption

Assume the average annual rate of water consumption

is 150 l/c/d .

Population Available dataWater Consumption

FIRST STAGE SECOND STAGE

275 23760 350 30240

550 47520 700 60480

137.5 11880 175 15120

Inlet Chamber

Purpose

Design Criteria

Design Calculation

Drawing

Spreadsheet

Inlet Chamber

Qdes = Qmax

Assume T = 30 sec

V = Q*T

Assume d = 3.0 m

A = V/d

Purpose

Design Criteria

Design Calculation

Drawing

Spreadsheet

Inlet Chamber

Purpose

Design Criteria

Design Calculation

Drawing

Spreadsheet

Inlet Chamber

Purpose

Design Criteria

Design Calculation

Drawing

Spreadsheet

Inlet Chamber

Purpose

Design Criteria

Design Calculation

Drawing

Spreadsheet

Screen

Purpose

Design Criteria

Design Calculation

Drawing

Spreadsheet

To remove only fairly large

suspended solids.

Screen

Purpose

Design Criteria

Design Calculation

Drawing

Spreadsheet

Screen

Purpose

Design Criteria

Design Calculation

Drawing

Spreadsheet

Screen

Purpose

Design Criteria

Design Calculation

Drawing

Spreadsheet

Screen

Purpose

Design Criteria

Design Calculation

Drawing

Spreadsheet

Screen

Purpose

Design Criteria

Design Calculation

Drawing

Spreadsheet

Screen

Purpose

Design Criteria

Design Calculation

Drawing

Spreadsheet

Screen

Purpose

Design Criteria

Design Calculation

Drawing

Spreadsheet

Grit Removal Chamber

Purpose

Design Criteria

Design Calculation

Drawing

Spreadsheet

To Removal grit particles .

Grit Removal Chamber

Purpose

Design Criteria

Design Calculation

Drawing

Spreadsheet

Grit Removal Chamber

Purpose

Design Criteria

Design Calculation

Drawing

Spreadsheet

Grit Removal Chamber

Purpose

Design Criteria

Design Calculation

Drawing

Spreadsheet

Grit Removal Chamber

Purpose

Design Criteria

Design Calculation

Drawing

Spreadsheet

Grit Removal Chamber

Purpose

Design Criteria

Design Calculation

Drawing

Spreadsheet

Grit Removal Chamber

Purpose

Design Criteria

Design Calculation

Drawing

Spreadsheet

Grit Removal Chamber

Purpose

Design Criteria

Design Calculation

Drawing

Spreadsheet

Primary Sedimentation Tank

Purpose

Design Criteria

Design Calculation

Drawing

Spreadsheet

To remove about 61 %

suspended solids.

To reduce the BOD by

about 33 % .

Primary Sedimentation Tank

Purpose

Design Criteria

Design Calculation

Drawing

Spreadsheet

Primary Sedimentation Tank

Purpose

Design Criteria

Design Calculation

Drawing

Spreadsheet

Primary Sedimentation Tank

Purpose

Design Criteria

Design Calculation

Drawing

Spreadsheet

Primary Sedimentation Tank

Purpose

Design Criteria

Design Calculation

Drawing

Spreadsheet

Primary Sedimentation Tank

Purpose

Design Criteria

Design Calculation

Drawing

Spreadsheet

Primary Sedimentation Tank

Purpose

Design Criteria

Design Calculation

Drawing

Spreadsheet

Primary Sedimentation Tank

Purpose

Design Criteria

Design Calculation

Drawing

Spreadsheet

Primary Sedimentation Tank

Purpose

Design Criteria

Design Calculation

Drawing

Spreadsheet

Primary Sedimentation Tank

Purpose

Design Criteria

Design Calculation

Drawing

Spreadsheet

Primary Sedimentation Tank

Purpose

Design Criteria

Design Calculation

Drawing

Spreadsheet

Primary Sedimentation Tank

Purpose

Design Criteria

Design Calculation

Drawing

Spreadsheet

Primary Sedimentation Tank

Purpose

Design Criteria

Design Calculation

Drawing

Spreadsheet

Primary Sedimentation Tank

Purpose

Design Criteria

Design Calculation

Drawing

Spreadsheet

Primary Sedimentation Tank

Purpose

Design Criteria

Design Calculation

Drawing

Spreadsheet

Primary Sedimentation Tank

Purpose

Design Criteria

Design Calculation

Drawing

Spreadsheet

Primary Sedimentation Tank

Purpose

Design Criteria

Design Calculation

Drawing

Spreadsheet

Aeration Tanks

Purpose

Design Criteria

Design Calculation

Drawing

Spreadsheet

Transfer of oxygen to the liquid

from the air and from the liquid to

the bacterial slime

Aeration Tanks

Purpose

Design Criteria

Design Calculation

Drawing

Spreadsheet

Aeration Tanks

Purpose

Design Criteria

Design Calculation

Drawing

Spreadsheet

Aeration Tanks

Purpose

Design Criteria

Design Calculation

Drawing

Spreadsheet

Aeration Tanks

Purpose

Design Criteria

Design Calculation

Drawing

Spreadsheet

Aeration Tanks

Purpose

Design Criteria

Design Calculation

Drawing

Spreadsheet

Aeration Tanks

Purpose

Design Criteria

Design Calculation

Drawing

Spreadsheet

Aeration Tanks

Purpose

Design Criteria

Design Calculation

Drawing

Spreadsheet

Aeration Tanks

Purpose

Design Criteria

Design Calculation

Drawing

Spreadsheet

Aeration Tanks

Purpose

Design Criteria

Design Calculation

Drawing

Spreadsheet

Aeration Tanks

Purpose

Design Criteria

Design Calculation

Drawing

Spreadsheet

Aeration Tanks

Purpose

Design Criteria

Design Calculation

Drawing

Spreadsheet

Final Sedimentation Tank

Purpose

Design Criteria

Design Calculation

Drawing

Spreadsheet

To remove the soluble and

colloidal organic matter

Final Sedimentation Tank

Purpose

Design Criteria

Design Calculation

Drawing

Spreadsheet

Final Sedimentation Tank

Purpose

Design Criteria

Design Calculation

Drawing

Spreadsheet

Final Sedimentation Tank

Purpose

Design Criteria

Design Calculation

Drawing

Spreadsheet

Final Sedimentation Tank

Purpose

Design Criteria

Design Calculation

Drawing

Spreadsheet

Final Sedimentation Tank

Purpose

Design Criteria

Design Calculation

Drawing

Spreadsheet

Final Sedimentation Tank

Purpose

Design Criteria

Design Calculation

Drawing

Spreadsheet

Final Sedimentation Tank

Purpose

Design Criteria

Design Calculation

Drawing

Spreadsheet

Final Sedimentation Tank

Purpose

Design Criteria

Design Calculation

Drawing

Spreadsheet

Sludge Thickener

Purpose

Design Criteria

Design Calculation

Drawing

Spreadsheet

Relatively thin sludges are

increased in solids content in order

to reduce the total volume and

thus the size of subsequent units .

Sludge Thickener

Purpose

Design Criteria

Design Calculation

Drawing

Spreadsheet

Sludge Thickener

Purpose

Design Criteria

Design Calculation

Drawing

Spreadsheet

Sludge Thickener

Purpose

Design Criteria

Design Calculation

Drawing

Spreadsheet

Sludge Thickener

Purpose

Design Criteria

Design Calculation

Drawing

Spreadsheet

Sludge Thickener

Purpose

Design Criteria

Design Calculation

Drawing

Spreadsheet

Sludge Thickener

Purpose

Design Criteria

Design Calculation

Drawing

Spreadsheet

Sludge Thickener

Purpose

Design Criteria

Design Calculation

Drawing

Spreadsheet

Sludge Thickener

Purpose

Design Criteria

Design Calculation

Drawing

Spreadsheet

Sludge Thickener

Purpose

Design Criteria

Design Calculation

Drawing

Spreadsheet

Sludge Thickener

Purpose

Design Criteria

Design Calculation

Drawing

Spreadsheet

Sludge Thickener

Purpose

Design Criteria

Design Calculation

Drawing

Spreadsheet

Sludge Thickener

Purpose

Design Criteria

Design Calculation

Drawing

Spreadsheet

Drying Beds

Purpose

Design Calculation

Drawing

Spreadsheet

To divided into air drying and

mechanical methods

Drying Beds

Purpose

Design Calculation

Drawing

Spreadsheet

Drying Beds

Purpose

Design Calculation

Drawing

Spreadsheet

Drying Beds

Purpose

Design Calculation

Drawing

Spreadsheet

Drying Beds

Purpose

Design Calculation

Drawing

Spreadsheet

Contact Tank

Purpose

Design Calculation

Drawing

Spreadsheet

To remove the bacteria .

Contact Tank

Purpose

Design Calculation

Drawing

Spreadsheet

Contact Tank

Purpose

Design Calculation

Drawing

Spreadsheet

Contact Tank

Purpose

Design Calculation

Drawing

Spreadsheet

انذي طح أ يف اخلتاو شكز اهلل انعه انقدز أ ي عهنا بعم ىذا ادلشزع تقدو بانشكز اجلشم نسعادة ك قد حاس عهى رضاكى

دلا بذنو ي جيد ألجهنا يف ادلشزع تجياتو انقت انيت انبسيسى / د شكز خاص نسعادة كات ننا رباسا أثناء انعم يف ادلشزع

ننصائحو انقت تفضهو حبضر يناقشت أمي مجال /د انسعدحمد / د.أ ادلشزع

راجنا ي ادلىل عش جم تفقنا خلديت ىذا انط بهده احلزاوسهى صهى اهلل بارك عهى سدا حمد صهى اهلل عهو