Post on 10-Apr-2017
transcript
The key objective of the IT war-room is to facilitate communications between all relevant parties in the event of a system go-live.
It is also to monitor and listen and respond to inquiries and synthesize opinions to determine the best course of actions during any cutover session.
It is the place which brings people together in a single location to collaborate and
solve problems.
During the crucial stages of cut-over, the war-room
should allows free flow of information between all relevant stakeholders.
War-room needs to simplify the transition by being
responsive to the needs with collective knowledge from the
participants.
War-room needs to facilitate the capture of information
and help to process the decisions by building shared
understanding.
It should also document what’s learned in the war room for reusing in the future and for providing feedback to the rest of the project team.
Attending a war-room would require its participants to be prepared for it.
War-room warriors should also be subject matter experts.
Flexible clothing
Have coffee and teaMake yourself
comfortable
Meet and greet
Have fun
SweetsDon't forget
chargers
Make good use of
Flip chart
Make good
use of sticky notes Fruits
Drink water
Beverages
Team work
Great listeners
Great tips for to be a great war-room warrior!
Follow me in tweeter: twitter.com/haquenamIf you want Power Point version of this document, please drop me a
message in LinkedIn: https://www.linkedin.com/in/haquenamThank you and Kind regards.