Designing for the customer and the bottom line: Costs and benefits of user-centred design

Post on 08-Jan-2016

21 views 2 download

Tags:

description

Designing for the customer and the bottom line: Costs and benefits of user-centred design. Gitte Lindgaard Carleton University Ottawa, Canada. To convey your …. message you must know what that message is and how to convey it (Chapanis, 1988). Traditional UCD focus. User experience - PowerPoint PPT Presentation

transcript

Designing for the customer and the bottom line: Costs and

benefits of user-centred design

Gitte Lindgaard

Carleton University

Ottawa, Canada

2

• To convey your …. message you must know what that message is and how to convey it

(Chapanis, 1988)

3

Traditional UCD focus

• User experience– Who are the application users?– What tasks will the application support?– What other tools do users employ?– What is the environment like?

4

UCD cost-benefit analysis

• 10 years ago• Estimated costs of applying usability methods (time

to set up, run tests, analyse data, write up)

• Estimated benefits of finding x number of usability problems

5

UCD cost-benefit analysis now

• What are you selling?

• Who are you selling to?

• Can you substantiate your claims?• Hypothetical numbers are low in credibility

• Case studies may not look like they are similar to the current situation

• Is the time right?

6

Who is our immediate client?

• Marketing: promote snazzy features• But don’t give them ideas that IT can’t deliver

• IT: technical wizardry and miracles• But must be linked to the business case

• Project manager: deliver on time and to budget• Finance: keep costs within budget• Training: cannot increase training costs

• So must know the implications of your great idea

• Corporate ID: must reflect our image

7

Who owns the user experience?

• Hardware ... Shape, size, weight, labels…• Software … installation procedure Ok?• QA …fault free products• Tech writers … user manuals, instructions• Training … sufficient, efficient, economic• CSRs … cope with customer questions• Marketing … position products• etc. etc.

8

Different owners & cultures

Har

dwar

e

Sof

twar

e

QA

Tec

h w

rite

rs

Tra

inin

g

Cus

tom

er s

ervi

ces

9

What’s your business?

• Consumer products– Generic hardware/software (PDAs, games,

smart watches)– For a specific target audience (business DSS,

financial planning SW, scheduling SW)

• Customer-specific products– Internal to your organization– For outside customers (EMS, WMS)

10

What’s your business?

• Consumer products– Generic hardware/software (PDAs, games,

smart watches)– For a specific target audience (business DSS,

financial planning SW, scheduling SW)

• Customer-specific products– Internal to your organization– For outside customers (EMS, WMS)

11

Targeted consumer products

• Dental support system• 7 manyears

• > $2million development costs

• Worked with dentists … employed at a Unversity

• Special features:– Multimedia data storage & manipulation

– Video camera … to confirm diagnosis

– Speech I/O … to avoid keyboard

– Excellent scheduling capability … if > 4 dentists

12

User instructions

• Problems installing a printer driver• 50,000 calls to help desk

• + send out patch on disk

• Cost > $900,000 + between $600,000 and $12,5 mill

• Evidently no user testing prior to release

• User manual style and template• 50% of $1,68 mill per year

• Cost of style & template $80K

13

The Cordis story

1993 •$223m Annual sales•$20 share value•<1% market share of angioplasty balloons•Goal: 5% market share

•$443m annual sales•Stent was born...•$1billion sales in year 1

1995

1996

•Johnson & Johnson acquired Cordis at•$109 share value

14

15

Know thy users’ goals

• Cordis focused on desired outcomes• Outcome-based interviews

• Desired outcomes

• Decompose the process

• Organise the outcomes in categories corresponding to each step in the process

• Rate outcomes for importance and satisfaction

• Use outcomes to jump-start innovation (Ulwick, A.W., 2002)

16

Outcome-based interviews

• Began to define every step underlying usage process

• Inserting catheter into an artery

• Placing the balloon at the lesion or blockage

• Opening the artery by inflating the balloon

• Removing the catheter

17

Stakeholders, yes but…

• Know precisely who to focus on• Cardiologists who perform the procedure

• Nurses who assist the procedure

• Hospital administrators who sit on the purse strings

18

Capture desired outcomes

• Moderator • clarifies and validates customers’ statements

• digs beneath the surface of words

• makes sure every aspect of the process/activity is gone through

• Each statement translates into one desired outcome containing– Type of improvement required (increase minimize)

– Unit of measure (time, n, frequency)

– Outcome statement used later in benchmarking, competitive analysis, concept evaluation

– Rephrases statements until they are free of solutions

– Then confirms statements with participants

19

Organise the outcomes

• List collected outcomes, remove duplicates• Categorise into groups corresponding to each step

in the process, here• Inserting catheter into an artery

• Placing the balloon at the lesion or blockage

• Opening the artery by inflating the balloon

• Removing the catheter

• With this we can measure value to the customer

20

Rate and use outcomes

• Rate outcomes for• Importance and satisfaction, i.e. how well is each

outcome currently satisfied?

• Use outcomes to jump-start innovation• Cordis identified several new product opportunities

and set new goals (e.g. 20% reduction in restenosis)

21

[Importance + (Importance – Satisfaction) = opportunity]

Desired outcome Importance Satisfaction Opportunity

Minimize restenosis 9.5 3.2 15.8

Minimize force to cross lesion w. balloon

8.3 4.2 12.4

Minimize damage (dissection)

9.5 7.5 11.5

Minimise time to place balloon

9.1 8.4 9.8

Minimise time to complete procedure

5.1 1.0 9.2

22

Changing UCD focus

• Who are the application stakeholders?– Includes users

• What are their goals?– Includes tasks

• What products compete with this one? – Includes other tools used

23

Product life cycle

Amount of effort Product 1

Time

Product 2

24

Now, to the web

Fortune 1000 companies spend on average $1,5 - 2,1 mill/year redesigning their web sites without knowing whether this actually improves them for users

Kalin (1999)

25

Overall goals1a Business goals

•Customer conversion•Increase retention•Increase transactions

Back-end systemand processes

Engagement and Interaction process, Including content and transactions

3

Customer goals•Easy to learn•Easy to find & buy•Access to help when I need it

1b

Satisfaction of Customer goals leadsTo satisfaction ofBusiness goals

4

from Donahue (2002)

User interface2

26

Novice Target user zone Early adopter

New user-Tentative-May need proactive help

Early adopter- fast- aggressive- needs little /no help- values fast, efficient user experience

from Donahue (2002)

27

Web development life cycle

Strategic planningDefine user and businessgoals

ArchitectureInformation and Technology architecture

Visual designLook & feel

Validationusability tests

Execution

Launch

Maintenance

Business evolution8

76

5

4

32

1

from Donahue (2002)

28

Deliver value to all segmentsBusiness goals User Online experience Directed user behaviours

must driveConvert browsers Prospective customer Relationship Researching firmto customers and (i.e. browser) establishing activity requesting informationIncrease client base and follow-up

Increase Existing customer Relationship- Increasing frequency ofRetention rate retaining engagement, level of

behaviour membership

Deepen existing Existing customer Relationship- Increase number of pointsCustomer deepening activity of contact with customerrelationships

Increase productivity Employee Creation of usable Action based onInside the firm inside the firm data about profitable understanding and analysis

and cost-efficient of transaction and data transactions usage

from Donahue (2002)

29

What’s your business?

• Consumer products– Generic hardware/software (PDAs, games,

smart watches)– For a specific target audience (business DSS,

financial planning SW, scheduling SW)

• Customer-specific products– Internal to your organization– For outside customers (EMS, WMS)

30

Hidden costs

• In the U.S. 31% large development projects (budget > $100,000) cancelled before completion

• Of those that were completed, 52.7% were 189% over budget on average and cost an additional $59billion in 1995 (Ewusi-Mensah, 1997)

• A 6-month delay in release adds 33% after-tax profits (House & Price, 1991)

31

Creeping costs

• Fixing a problem worth $1 during project definition costs

• $10 if fixed during development, and

• $100+ if fixed after product release

32

Creeping costs

Requirement Development DeploymentPhase Phase Phase

N possible design alternatives

Cost of changes

33

Creeping costs

• Total maintenance costs $20-30billion/year• Backlog maintenance minimum 167% of

this (Martin & McClune, 1998)

• … 80% of all problems are identified during maintenance, and it is estimated that 80% of these could be saved with a thorough UNA!

34

Calculating costs and benefits

• 2 parameters are important:– Cost/benefit ratio

• Relationship between projected use of resources and post-implementation/post-sale value of the investment (and savings during development)

– Payback period• The amount of time it will take before the product

starts to outweigh the cost of the investment

35

Costs and benefits

– Cost/benefit ratio• Relationship between projected use of resources and

post-implementation/post-sale value of the investment (and savings during development)

– Cost• Team of 4, 2 hours @ $60 = $480

– Saving • 4 person days = 32 hours @ $60/hour = $1,920

– Cost/benefit ratio = 1:4

36

An example

• Core system - customer records– customer requests– services & equipment for every telephone

number (n lines, n sockets, cables, exchanges)– linked with other systems (billing, cables,

faults, WP/YP, service orders, scheduling)

37

OEO50I INIT ENTRY:ANDREW MEDICI

I11489 SERV#: _______ EXT#: _________ EE#: _____

*** TPIS/2 ORDER S&E ENTRY ***

EXCH ACT: J EXCH CODE: ______ INPLACE: _________ IP DATE: ______EXCH RMK: ____________________________________________________________________SERVICE NAME: ________________________________________________________________ADD ADDR INFO: _______________________________________________________________SUB ADDR TYPE: ______________________________ SUB ADDR#: ____________________STREET#SFX: _______ ________ NAME: ____________________ TP/SFX: ______________LOCALITY: __________________________ POSTCODE: ________FLT CLR PTY: ___ TEMPORARY: _ AL CONN: _______ ROT CONN: ___ PEXT? __LINE TYPE: _____ NEXT FAC: _ LN SEL: __ ARE CODE:REM/CCN(R/N): __ - SERV STATUS: ___ DISC TYPE: PAL#: _______RENTAL RATE: ___ METER RATE: ___ CONC AUTH: _________ CAB#: ______ASIC: _________DIRECTORY ACTION REQ (Y/N): _ DIRECTORIES#=-> WH: __ YE: _ COM: ___

COMMAND: ______

38

OEO50I INIT ENTRY:ANDREW MEDICI

I11489 SERV#: _______ EXT#: _________ EE#: _____

*** TPIS/2 ORDER S&E ENTRY ***

EXCH ACT: J EXCH CODE: PBX334 INPLACE: 3374606 IP DATE: 04089996EXCH RMK: N/A QREMMSERVICE NAME:PETER JAMES HOUSTONADD ADDR INFO: ROWANVILLE MELASUB ADDR TYPE: SEMI-ATT. DUAL H/H DWELLING SUB ADDR#: 337ASTREET#SFX: CRESCENT NAME: ST BARTHOLOMEW TP/SFX: PMT/YYLOCALITY: ROWANVILLE WEST POSTCODE: 3957FLT CLR PTY: ROP TEMPORARY: N AL CONN: P/T ROT CONN: 3F PEXT? YLINE TYPE: PBX NEXT FAC: N LN SEL: PR ARE CODE:TTYP-MREM/CCN(R/N): 2X - SERV STATUS: INP DISC TYPE: PAL#: POTT/PRENTAL RATE: RES METER RATE: PM1 CONC AUTH: MELA CAB#: 228FS/476PWASIC: 338PYDIRECTORY ACTION REQ (Y/N): N DIRECTORIES#=-> WH: N YE: N COM: PB

COMMAND: EXT

39

Through the operator’s eyes

• Activity analysis of 2,000+ calls (Wilson, 1995)

– Typical call activities:Interacting with computer 190 sec Interacting with customer 148 secWalkabouts 33 sec 33 min/dMaking phone calls 28 sec 28 min/dPaperwork 24 sec 24 min/dOther behaviour 12 sec Total time wasted 85 min/d

40

Other problems

• Data accuracy rate (for accepted transactions only) = 70%

• Database not in place at cutover

• On-the-spot system rejections = ?%

• Absenteeism increased >200% during study– 2 suicide attempts, 2 nervous breakdowns, numerous staff

on long term stress-leave

• Staff turnover rates ~120% in 3 months

41

CostCommunication

$M1.6

Tech time $M3.7CSR Training

$M10.4

Help, support$M0.5

Enhancements$M.8

CSR time $M13

Total $M30!!!

42

• Cost-benefit ratio:– Total costs of waste year 1$ 30 million

– Total cost of study $ 90K

At least 50% could be fixed easily at a cost of $1million and within 1 year

– Waste after 1 year $15 million

– Cost-benefit ratio 1:1.38

43

Another example

• HR processing applicants– Current process time 4hours/applicant– Data entry costs $25/applicant $100/applicant– HR processes 1,000/year $100,000– Programming time 40 hrs @ $60/hr $ 2,400

• Usability work shows 50% user time saved, but say 25%– Cost/applicant now $75 or $75,000/year– Benefit per applicant $25 or $25,000/year– Benefit in year 1($25,000-$2,400) $22,600– Benefit in year 2 $25,000– Benefit in year 3 $25,000– Total benefit (year 1 + 2 + 3) $72,600– Cost-benefit ratio 72,600:2,400 1:30.25

44

What’s your business?

• Consumer products– Generic hardware/software (PDAs, games,

smart watches)– For a specific target audience (business DSS,

financial planning SW, scheduling SW)

• Customer-specific products– Internal to your organization– For outside customers (EMS, WMS)

45

Warehouse Management System

• Bottlenecks: Assemblers• Handheld devices sometimes miss an entry

• Voice Recognition System freezes

• …Assemblers work to standards

• ….they can’t offload orders in bay specified

• Bottlenecks: Loaders• Can’t find orders

• Loads are too tall for trucks

• Loads must be dismantled and reassembled

• …2/3 of loaders’ job spent re-doing assemblers’ work

46

Subject Object OutcomeOutcome

Tools

Rules CommunityDivision of Labour

Transformation

47

Changing UCD focus

• Who are the application stakeholders?– Includes users

• What are their goals?– Includes tasks

• What products compete with this one? – Includes other tools used

• What is the context like?– Includes community of work, division of labour, rules

48

UCD opportunities

• Strategic planning (web)

• Product definition stage (Cordis)

• User Requirements capture stage (dental support system)

• Outside of development cycle (Customer records system)

• During SDLC (traditional usability studies)

49

UCD methods

• Social/behavioural science methods– Opinion-based (interviews, surveys, reviews,

focus groups)– Performance based (activity analyses, user

tests, observations)

50

UCD challenges

• Must expand– User focus to business focus– Single product to product range focus – Understanding of business goals, processes– Notion of “team” beyond project team

• Must move outside the usability box

51

Lindgaard’sBackyard

November 2002

52

Lindgaard’s BackyardMay 2003