S. No. Name of Project Name of Division
Sanctioned Amount
Exp. upto 31/03/2016
1 2 3 4 5
RIDF-XIII1 C/O Bhud Gullarwala Bhatoli kalan Ghared Patta road km. 15/0
to 30/600 I/c bridge at Rd. 16/105.Kasauli 233.51 195.62
2 C/O road from Lalsa to Shandal Chiksa Majhoti (Bahlidhar) km. 0/0 to 9/500.
Rampur 342.14 279.92
3 C/O 51.816 mtr span bridge at Rd. 0/885 over Spiti River in Lahour and Spiti district Between Kiamo & Hansa.
Kaza 175.43 212.21
4 C/O Balance work on Rohru Chirgaon Dodra Kawar road km. 21/195 to 32/375.
Rohru 349.65 249.49
6 C/O Pulbahal to Sarahan road (Portion Lihat to Sarahan). Chopal 315.28 128.99
7 C/O road from Batara to Kaundal in G.P. Dhanel. Chopal 232.63 232.63
8 C/O Marog to Rewalpur via Gharin Koti G.P.Mahavag. Chopal 177.38 197.65
9 C/O Kothi Sadhayani road via Gamol km. 0/0 to 10/495. Mandi No.II 157.34 230.1710 C/O 68.00 mtr span steel truss bridge over Neri khad on
Tattapani Slapper road at Rd. 31/725Sundernagar 231.56 217.55
11 C/O 90.00 mtr span Suspension foot bridge over Alshed khad . Sundernagar 84.24 100.99
12 C/O Harabag Baila Badon via Trihnvi road km. 0/0 to 6/400. Sundernagar 131.58 48.0913 C/O Bagsaid Rahi Dharkathyali Dhanwar Sikari road in Tehsil
Thunag Distt. Mandi km. 0/0 to 19/0.Sundernagar 196.06 96.35
14 C/O Segli to Burahta road in km. 0/0 to 7/500. Sundernagar 107.57 93.5115 C/O Balance work of Bahari to Marhi road via Tanehar km. 0/0
to 6/825.Dharampur 120.77 126.63
16 C/O Manai to Bhandrella via Mowa. Kangra 265.69 152.3817 C/O Balance work on Chowari to Hobar road km. 7/0 to 12/0. Dalhousie 193.80 107.00
RIDF-XIV1 Road from Tikkar to Barog via Chakhana Banala in G.P.
Bassadhar.Theog 241.91 157.86
2 C/O Gihilar Koti Optwa Aneod Khad road km. 0/0 to 5/905. Chopal 237.94 28.343 C/O Jashla Ghat Tikker via Gujandli road km. 0/0 to 7/690. Rohru 300.24 180.534 M/T on Katindhi Jhatingari road km. 0/0 to 28/280. Padhar 448.07 346.435 C/O Baligad Mugarugala Gagan Janehar Thensar road. Karsog 270.38 265.736 C/O Gheru to Balh road km. 0/0 to 4/0. Mandi No.II 169.40 0.007 C/O Pithu Ka Paruva to palag Kumarhda road. Sarkaghat 80.56 32.978 C/O Talwara Patta Bid Parnoh Rasehar road km. 0/0 to 5/100. Sarkaghat 102.53 4.20
9 C/O Balance work of Rissa Beri road km. 0/0 to 9/0. Sarkaghat 269.41 247.2410 C/O Bharai-Khouda via Rosho road. Dharampur 290.84 142.1311 C/O road Daulatpur Harkher Km. 0/0 to 9/0. Kangra 243.10 167.6912 Bridge over Luni khad on Baijnath-Diyol road. Baijnath 124.11 180.5613 C/O link road from Suan Bridge to Bhodi (via Kharjan) km. 0/0
to 6/045.Baijnath 237.37 251.78
14 C/O Seorwala to Bhalet road i/c bridge oer Beas. Palampur 488.96 733.8815 C/O link road and bridge over Batran to Balpatiyal via Taan
Basaral.Barsar 317.37 305.20
DETAIL OF ON-GOING PROJECTSAmount: Rs in lacs
Page 1
S. No. Name of Project Name of Division
Sanctioned Amount
Exp. upto 31/03/2016
1 2 3 4 516 C/O Balance work of Panyali to Reepul road via village
Baloh,Amroh, Karsai, Jharmani, Dadoh, Ropari, Narain Tal upto village Mair km. 0/0 to 8/0.
Barsar 132.67 123.00
17 C/O link road from Jangal Beri to Bouru via Chamarara km. 0/0 to 3/815 i/c 1 No. bridge.
Touni Devi 339.91 340.06
18 C/O Balance work of link road from Kangoo-Da-Galu to Kalahu road.
Touni Devi 142.70 137.04
1 C/O road from Lehan Kotla Sunnu Tikkari-Ser Chirag road km. 0/0 to 8/315.
Solan 326.58 55.69
2 C/O Jatoli Gadog road via Village Koti km. 0/0 to 5/570. Solan 173.48 111.863 C/O Manjyat Patti- Deora road km. 0/0 to 7/145. Arki 205.38 0.004 C/O Balance work of Berghat Kathloh Gunai road km. 0/0 to
12/705.Kasauli 403.45 353.63
5 C/O Kanda Katal Ka Bag road km. 5/510 to 14/885. Kasauli 532.98 469.846 C/O & M/T Shardighat Diggal road km. 0/0 to 5/0. Kasauli 86.27 57.977 Balance work Deothi Barakoon road km. 0/0 to 10/500. Kasauli 255.82 108.508 C/O & M/T and improvement of Reru, Bhatoli, Malpur,
Adduwal, Mahadev road km. 0/0 to 9/520.Nalagarh 391.10 348.15
9 C/o Ria- Kapoli Siyarli-Bakrori- Kiyardu-Charog- Talawti-Nerli road km. 0/0 to 10/580.
Nalagarh 437.33 46.13
10 C/O road from Phayal to Dawnti via Dhanol km. 0/0 to 5/810. Shimla Divn.No.I
246.07 0.00
11 C/O & M/T Thachi seri Shali road km. 0/0 to 3/285. Kumarsain 153.27 45.1012 C/O Kewal Bandli Tharu road km. 0/0 to 5/360. Rajgarh 172.95 85.0013 C/O Balance work on Rajpur-Nagetha -Shiva-Banour . Shillai 581.19 304.6514 M/T work on Marathu Tharolla Tahu road km. 0/0 to 16/600. Jubbal 446.67 434.40
15 C/O Balance work on Mandhol Manguata road km. 0/0 to 8/645.
Jubbal 466.31 371.36
16 C/O Balance work i/c M/T on Kharapather Tahu Jashla road km. 0/0 to 13/960.
Jubbal 498.77 487.41
17 C/O Balance work i/c M/T on Gumma Jashla to (Sararoo) Umladawar road km. 16/0 to 29/300.
Jubbal 612.96 655.31
18 Balance work i/c M/T on Mandal Jagtan Jarashli road km. 20/0 to 25/525 with link to village Rohtan km. 0/0 to 3/0.
Jubbal 351.96 290.50
19 C/O road from Ranvi to Porna via Chilla Pouria km. 0/0 to 5/105.
Chopal 178.72 68.20
20 C/O Kuttkhetru Chandani road in Gram Panchayat main Bharola km. 0/0 to 4/300.
Joginder Nagar
137.91 72.10
21 C/O road from Mohanghatti to Rada Bakher, Malu, Bharwara, Ghatagla Bhajrala matroo road at Rd. 1/360 to 5/360 i/c 3 No.
bridges.
Joginder Nagar
420.49 401.21
22 C/O Balance work on Gharwasra Bhadoo Chaswal Sajao Piplu Parchu road km. 0/0 to 7/330.
Dharampur 378.80 278.49
23 C/O Tihra Manyoh Nalyana Hiun Galoo road via Bakkar khad km. 0/0 to 13/300.
Dharampur 536.35 497.77
24 C/O 25.00 mtr span RCC Box girder bridge over Thothu khad at Rd. 7/165 on Dharampur Sandhole road via Seoh.
Dharampur 75.69 36.45
25 M/T on kataula Batheri Arang road km. 0/0 to 15/285. Mandi Divn. No.I
184.63 189.11
26 C/O Jarol, Jughand Chakudhar road km. 0/0 to 6/0. Gohar 222.87 229.17
RIDF-XV
Page 2
S. No. Name of Project Name of Division
Sanctioned Amount
Exp. upto 31/03/2016
1 2 3 4 527 C/O Thachdhar Naloti road Balwar Kilan Dawada road km. 0/0
to 8/0.Gohar 373.98 0.00
28 C/O Bilgad to Magroogalla Gagan Janed Thenesar road 9Portion Thanesar to Magroogalla km. 0/0 to 6/510).
Gohar 239.99 55.14
29 C/O road from Kuklah (Pandoh Dam) to Mata Shri Baglamukhi Temple km. 0/0 to 6/960.
Gohar 207.00 175.51
30 C/O Ranabag to Bihni Seri road km. 0/0 to 7/0 (out of Rd. 0/0 to 9/0).
Karsog 284.88 0.00
31 C/O Chhatri Janjehli road via Lassi km. 0/0 to 8/250. Karsog 246.07 127.3432 C/O Sarouni to Tali road km. 0/0 to 5/810. Sundernagar 209.41 122.6733 C/O Sehli to Salwana via Baila road upto village Baila road km.
0/0 to 8/570.Sundernagar 273.39 48.33
34 C/O Chandyal- Pipli Kuthari-Karshora kandhi- Tarapur -kharshi-Bangoan -Bari Jagar-Dola-Tikkar road km. 0/0 to 15/840.
Mandi Divn. No.II
299.60 310.91
35 C/O Kashan Log Beer road km. 0/0 to 5/0. Mandi Divn. No.II
161.13 108.79
36 C/O Rasher Hawani-Trangla-Bhalyana road km. 0/0 to 5/200. Sarkaghat 242.09 100.54
37 C/O 70.00 mtr steel truss bridge over river Chandra at yangley on link road to village Yangley .
Udaipur 319.33 182.85
38 C/O Balance work of link road from Upper Dadh to Western Dadh km. 0/0 to 1/500.
Palampur 68.54 89.67
39 C/O 60 mtr span Prestressed box cantilever bridge over Binwa khad on balh Bajouri (Dhandoee) to Janthala Lad Bhadol roa at
km. 10/495.
Balakrupi 380.18 175.34
40 C/O link road from Thanapuri to Jassour km. 0/0 to 3/450. Dharamshala 86.08 78.3141 C/O link road from Sidhpur to Patola km. 0/0 to 1/960. Dharamshala 81.53 12.7242 C/O link road from Piru Singh Chowk to Tikka Banni to link
road km. 0/0 to 3/0.Dharamshala 102.31 91.21
43 C/O 82.50 mtr span PSC Box Girder bridge over Dehar khad to connect village Jolna khad on Sihunta Jolna Kotla road at km.
12/570.
Dalhousie 335.10 221.54
44 C/O link road from Takoli to Dungru via Khera (Karnerd) Mandrala km. 0/0 to 4/280.
Dalhousie 206.36 138.78
45 C/O Shaheed Joginder Singh road from Hindora Gharat Hatlu Jamwalan Bhanodu via pachan road km. 0/0 to 4/675 (Phase-
II) i/c two bridges.
Nurpur 445.67 429.56
46 C/O link road from Swan khad to Kashanpur via Ranoh km. 0/0 to 2/690.
Dehra 107.93 26.45
47 C/O balance work of Durgain to Sanda Bari road km. 0/0 to 7/825.
Dehra 313.85 217.71
48 C/O road from Rihri to Bhalar kalan via Thati road in km. 0/0 to 2/690.
Dehra 378.59 186.43
49 C/O Balance work of link road from Pihri to Sihoti (Galoti) in km. 0/0 to 7/300.
Dehra 317.21 251.20
50 C/O link road from Vagdela to Nahalian via Thada Vadehar km. 0/0 to 8/510.
Dehra 390.19 203.36
51 C/O link road from Sanahi School to village Jol Sapper via Sanahi Khurd and Lahar km. 0/0 to 2/390.
Barsar 122.18 114.94
52 C/O link road to Daar- Dheli-Jassi road with 1 no. bridge over Dheni Nallah km. 0/0 to 3/0.
Barsar 203.77 87.67
Page 3
S. No. Name of Project Name of Division
Sanctioned Amount
Exp. upto 31/03/2016
1 2 3 4 553 C/O link road from Kalau More to upto Bhareri Gudhu
Bhunkhar Beri, sal-da-Ghat, Namlakh, Jaroh road km. 0/0 to 7/780.
Barsar 275.63 244.68
54 C/O link road from Kharwar to Jakhyol via Dhamrola road km. 0/0 to 2/155.
Barsar 102.22 95.14
55 C/O link road to village Kot road km. 0/0 to 2/045. Barsar 122.37 34.6556 C/O link road from Piplu to Dhanwin via Buthvin Agnihotri km.
0/0 to 2/0.Barsar 101.76 94.33
57 C/O road from Ghumarwin to GPS Bara Baliah via village Karma with 1 no. bridge over khawaja khad /Sirhali khad km.
0/0 to 3/540. (Phase-I).
Barsar 180.25 167.25
58 C/O link road Bara to Chakmoh via Tajiar km. 0/0 to 3/400 i/c 53.80 m span bridge over Gawal khad at km. 0/840.
Barsar 360.54 302.62
59 C/O link road from Sohari to Kuthiana via Dughiar Tanger Barla Sariyana km. 0/0 to 3/195.
Barsar 124.09 111.60
60 C/O Bara Khalot Suddar Nandal Batlahu Joreghat road km. 0/0 to 8/180.
Barsar 307.96 270.98
61 C/O Nariana Tal to Gahalian via Harijan Basti, Ropru, Bushiar, Satpura, Dodwin, Upper Hareta, Lower Hareta, Rehan km. 0/0
to 7/720.
Barsar 163.26 128.13
62 C/O link road to village Jasour km. 0/0 to 2/120. Barsar 107.09 89.9763 C/O link road from Salasi Bridge to village Kheraru km. 0/0 to
1/240.Hamirpur 53.43 53.16
64 C/O Balance work of Tikkar Khatrain to Kulehra km. 0/0 to 2/0. Touni Devi 128.86 90.81
65 C/O link road from Jhanikarto village Barin km. 0/0 to 1/225. Touni Devi 68.62 36.09
66 C/O Balance work of 317.50 mtr span RCC cantilever bridge at Bagchhal over Govind Sagar Reservoir on Panjpiri (Hiyarain)
Kutehla Bagchhal road at Rd. 14/950 (Phase-II).
Bilaspur No.II 1603.00 791.40
67 C/O link road Swahan to Katirad Pangwana km. 0/0 to 6/930 (i) Pangwana Portion km. 0/0 to 5/510 (ii) Katirad portion km. 0/0
to (bifurcates at Rd. 1/810) to 1/420 (Phase-I).
Bilaspur No.II 200.21 70.31
68 C/O link road to village Baddu via Upper Kurnadi km. 0/0 to 2/285.
Bilaspur No.I 87.55 61.76
69 C/O link road from Bard to Duhak via Morthal km. 0/0 to 6/270. Ghumarwin 210.69 0.00
70 C/O link road from Bachrin Bhatoli Matyal Delhwin road km. 0/0 to 3/690.
Ghumarwin 191.74 191.74
71 C/O Circular road around Nagar Panchayat Ghumarwin km. 0/0 to 25/0 (Phase-I).
Ghumarwin 76.94 0.00
72 CD & MT link road from Una bridge to village Arniala via Muhalla Bazigran to Shiv Mandir to village Ajnouli and Dangoli
km. 0/0 to 6/350.
Una 261.43 202.91
73 C/O link road from Ghalore chowk to Thakurdwara marolian to Bangarh via Jakhera to Pukhru Pharian Mohalla Bangarth via
Khui Jorowal km. 0/0 to 10/085.
Una 334.57 276.74
RIDF-XVI1 C/O Sahid Sudesh Marg- Subathu to village Kothi Chapla G.P.
Shadyana km. 0/0 to 4/525.Kasauli 146.28 151.66
Page 4
S. No. Name of Project Name of Division
Sanctioned Amount
Exp. upto 31/03/2016
1 2 3 4 52 C/O Balance work of Tikkari Talanji Lakhoti road Km. 0/0 to
11/580.Solan 451.67 314.41
3 C/O Balance work of Malon Kusri (Loharghat to Beunkhari) road Km.0/0 to 15/0.
Arki 598.17 390.75
4 Improvement/Up-gradation of Nanoo-Kuthar-Basadhar road Km. 0/0 to 21/840.
Theog 935.66 308.58
5 M/T, CD work and C/O Balance work on Jhamiria Ramadhon Dhagera jainthal road.
Nahan 511.62 335.73
6 Up-gradation of Jagothi Nallah Androuthi road Km.0/0 to 6/0. Rohru 188.23 155.37
7 M/T drain & Parapets etc. of Bhuira Rajgarh Sakroha road Km. 2/225 to 5/000.
Mandi No.II 112.21 98.90
8 M/T & CD on Gokhra Nichla Lot Khajron road Km. 0/0 to 6/0. Mandi No.II 188.58 166.87
9 M/T & CD on Sain Gujra-Ra-Ropru road Km. 9/0 to 14/0. Mandi No.II 196.73 202.0510 M/T & CD on Roda Nallah Karkoh Dhalwani Arthi road Km.
4/500 to 12/300 i/c 2No.bridges.Mandi No.II 348.71 308.97
11 M/T of Chnoun Galoo Sadyana kot road km. 0/0 to 4/750 and Gird Nallah Sadyana.
Mandi No.II 145.5 153.90
12 C/O Jablahi Nallah- Barnota-Karkoh road km. 0/0 to 5/50 i/c one bridge in Distt. Mandi.
Mandi No.II 276.20 88.88
13 C/O Gadagoshani Thanwari Thatta road km. 0/0 to 8/0. Gohar 308.00 0.0014 C/O Bethiwan Pendapani road via Karsut km. 0/0 to 11/0. Gohar 306.34 0.0015 C/O 40.00 mtr span box girder bridge over Bakhli khad at Chari
at Rd. 3/870 on Thunag Jainshal patakri road.Gohar 139.51 0.00
16 C/O 50.00 mtr span PSC/RCC Box girder bridge over Jeuni khad on Khandal Nandi road at km. 1/215.
Gohar 150.19 129.88
17 C/O Keodhar Parwara road km. 0/0 to 5/0. Karsog 191.01 166.7818 C/O Banish Shakelar road km. 0/0 to 7/0. Karsog 197.14 62.3019 C/O Nayapul Bhuwana to Gumohu road via village Bhangla in
km. 0/0 to 4/825.Sundernagar 115.35 152.59
20 C/O Balance work & M/T of Patti to Dwarado road km. 0/0 to 5/0 (Part-A of Bararta-Jajjar-Patti-Janjhel-Khataili-Reyur ).
Dharampur 177.77 153.55
21 C/O road from Janjhel- Dharkhu-Khataili-Reyur road km. 6/510 to 12/255 (Part-B of Bararta-Jajjar-Patti-Janjhel-Khataili-Reyur )
i/c 75 mtr span bridge at Rd.7/525 over Sun khad (Phase-I).
Dharampur 449.27 199.50
22 C/O Khaddar Rahar Rangra Saroon Bhargawin Saroon Antola Traibmli road km. 0/0 to 6/0.
Joginder Nagar
191.84 0.05
23 C/O Kuni Katkal Bhalara Rains road i/c 3 Nos bridges over Katkal Nallah.
Joginder Nagar
321.98 250.90
24 C/O link road from Kiari (Chartrer) to Chamdera km. 0/0 to 3/855.
Kangra 130.34 111.27
25 C/O 30.00 mtr span RCC Box girder bridge over Leod Nallah on Bhaled Kakra Dulli Chamiara road along with both sides
approaches at km.0/285.
Kangra 93.67 75.45
26 M/T of Jogipur Rihalpura road km. 0/0 to 1/300. Kangra 28.49 23.4527 C/O Balance work of link road from Lahar Thakaran to Sadun
Baragran via village Ranger km. 0/0 to 4/630.Palampur 189.62 134.99
28 C/O road from Tamloh to Bharanta from km. 0/0 to 1/300 i/c bridge at km. 0/626 over Neogal khad.
Palampur 253.92 243.07
29 C/O link road from Ghanetta Jol Ballah km. 0/0 to 2/705. Palampur 107.44 65.73
Page 5
S. No. Name of Project Name of Division
Sanctioned Amount
Exp. upto 31/03/2016
1 2 3 4 530 C/O Balance work of link road from Santoshi mata Malandar
Umari Garthoon via Sarotar Lahar km. 0/0 to 11/390.Balakrupi 473.18 385.95
31 C/O road from Balhara to Baradoon via Barballa, Tehri Jharundi km. 0/0 to 7/150.
Balakrupi 246.96 181.83
32 C/O 2 No. bridges (40 mtr & 30 mtr) over Manjhi khad on Chetru to Maned passu Sukkar road (Portion Passu to Sukkar)
at rd. 0/050 & 4/965.
Dharamshala 166.02 159.56
33 C/O Balance work of Parel-Kohlari road km. 9/0 to 12/500. Chamba 109.10 111.6134 C/O Balance work of Rakh Dhanara road km. 0/0 to 2/880. Chamba 73.40 46.4135 C/O 2 No. bridges on Chamba Sahu road at Sangera Nallah &
Kahala Nallah (19.75 mtr span RCC T -Beam bridge over Sangera Nallah at Rd. 9/760 & 50 mtr span box girder bridge
over Kehlala Nallah at Rd.8/280).
Chamba 246.59 202.81
36 C/O Kodu bela Thathi Haler road km. 0/0 to 8/705 (i/c portion 1/600).
Fatehpur 246.28 154.78
37 C/O balance work of Baglamukhi temple to Naushera road. Dehra 155.79 122.1138 C/O Balance work of road from Dehrain to paisa rd.0/0 to 5/960
via Salehar i/c 40 mtr span bridge at rd. 2/300.Dehra 320.19 136.87
39 C/O link road Ukhli to Samtana via Dharamshala Tudan Durban road km. 0/0 to 6/0.
Barsar 182.90 57.91
40 C/O Jole to Upper Hareta road via Sangahara Biar Tangol Raien Kohlwin Lamiana Gandoli Barayan Tal Roproo.
Barsar 105.78 88.93
41 C/O link road from Jandroo to Mehlaroo km. 0/0 to 2/640 Phase-I.
Tauni Devi 90.71 69.75
42 C/O Charian-Di-Dhar to Baura via Lambran- Di-Dhar km. 0/0 to 5/130 i/c 1 No. bridge at Rd.1/290.
Tauni Devi 303.89 185.03
43 C/O 44.00 mtr span (2 Nos of 22.00 mtr span each) RCC T-Beam on Sangri khad on Kasiri Mahadev Duhak Chhatruru
road at km. 0/177.
Hamirpur 73.88 102.44
44 C/O Rahian Vijaypur Auhar road km. 0/0 to 5/995. Bilaspur No.I 269.31 149.4745 C/O M/T & drain on Kuhghat Amarsinghpura via Balh Churani
km. 0/0 to 8/735.Bilaspur No.I 337.83 232.62
46 C/O road from Solag, Rorri, Kohal, Jurrasi km. 0/0 to 5/120 (Phase-I).
Bilaspur No.II 233.73 32.55
47 C/O link road from Dhaun Bani- Malkri Khalot Lamlu Salaon Bum Jahu road km. 0/0 to 3/750.
Ghumarwin 295.86 274.58
48 C/O Jarora ket Naswal Matoli Kassaru road km. 3/420 to 7/150 (Phase-I) i/c 32 mtr span Box Girder bridge.
Ghumarwin 203.30 151.84
49 C/O road from Bohru to Olinda via Chowkhat Sanahal Salangri road km. 0/0 to 11/090 (Phase-I).
Bangana 483.71 0.00
50 C/O road from Dangera Jole to Takka via Chhalvar Kuryala Haler km. 0/0 to 11/030.
Bangana 331.71 259.70
RIDF-XVII1 C/O Balance work of Arki Manjhu Khanalag (Rouri) road km.
3/465 to 12/465.Arki 372.28 364.76
2 Balance work of Parwanoo Gadayar km. 0/0 to 13/795. Kasauli 622.81 426.943 C/O Swarghat Fakred Kohla Dungi Plate Luttani Jhimgi road
km. 0/0 to 11/640.Nalagarh 596.83 0.00
4 C/O Poghat Kot Kadaur Bodhan road km. 3/0 to 4/370. Solan 221.64 191.305 C/O road from Phayal Dawanti via Samleeg km. 0/0 to 4/135. Shimla No.I 142.05 62.86
Page 6
S. No. Name of Project Name of Division
Sanctioned Amount
Exp. upto 31/03/2016
1 2 3 4 56 C/O Galog Nehra Okhru Keru road km. 0/0 to 12/0. Shimla No.II 353.09 286.997 C/O Summer Hill Sangti road km. 0/0 to 2/555. Shimla No.II 131.01 95.808 Up-gradation of Matiana Mohari Guthan road km. 0/0 to 24/0. Theog 906.45 478.31
9 C/O road from Chouradhar to Paneo km. 0/0 to 8/015. Nirmand 335.90 289.4010 C/O Rasat- Manal Chunoti road km. 3/890 to 15/960 (Phase-I). Shillai 296.05 294.92
11 C/O Balance work of Dalyanoo Pulliani road Nenidhar road km. 0/0 to 30/0 (Portion km. 0/0 to 13/0).
Sangrah 453.88 322.23
12 M/T Drain & parapets of Leda Gharwashra Tarwak road km. 0/0 to 5/500.
Mandi No.II 189.85 172.40
13 M/T & CD on Ratti Bridge of Saini Mohari (Alathu road ) km. 0/0 to 5/500.
Mandi No.II 196.69 164.27
14 M/T Drainage parapets on Talyar Pingla Thouna Sarkaghat road km. 8/0 to 11/0.
Mandi No.II 81.94 90.13
15 M/T & CD on Bari Dhanyari road km. 0/0 to 5/300. Mandi No.II 131.64 176.8316 M/T , CD & Parapets of Halyater Gushali Taryambla road km.
0/0 to 8/500.Mandi No.II 292.51 325.39
17 M/T , CD & Parapets of Bagla Barsu Bharnot, Thalakana i/c bridge over Pung khad km. 0/0 to 4/855.
Mandi No.II 112.51 87.94
18 C/O Dali Rakhoh Jandharu Kothi Paplog Mortan Rosso road km. 0/0 to 26/705.
Sarkaghat 603.19 489.12
19 C/O 68.00 mtr span motorable bridge across river Bhaga near vilage Gawazang .
Udaipur 341.20 0.00
20 C/O Balance work of Ahju Khajoor Traimbali Basahi road i/c Metalling and tarring in km. 12/0 to 33/0.
Joginder Nagar
736.82 469.36
21 C/O Draman Naroli Gangoti Nimelary road km. 0/0 to 6/375 (Phase-I).
Joginder Nagar
185.85 30.55
22 C/O Balance work of link road from Rajhoon Gadiara to Khatin via Makrehar km. 0/0 to 3/210.
Palampur 99.25 102.66
23 C/O Link road from Mallahoo to Nag Baba Mandir km. 0/0 to 1/315.
Palampur 28.54 13.88
24 C/O Balance work of link road from Bagri to Manimahesh via Bashmehar Rakh Society road km. 0/0 to 4/370.
Palampur 241.49 303.37
25 C/O road from Dhatehar- Mahrana- Duhak road km. 0/0 to 6/495.
Palampur 389.43 155.36
26 C/O Harer to Pather via Taras road km. 0/0 to 2/0 i/c 50 mtr span bridge over Binwa khad .
Baijnath 197.63 52.39
27 C/O road from Indrunag to Bhangrothu Triunnd road (Portion Indrunag to Tilla Mata Mandir km. 0/0 to 6/345).
Dharamshala 229.20 36.56
28 C/O link road to village Khirku km. 0/0 to 2/810. Dharamshala 108.04 0.0029 C/O Balance work of link road from Dari to Dehru road km. 0/0
to 3/750.Dharamshala 108.2 99.49
30 C/O link road from Jandnah Aerta Dola Kardand road km. 8/0 to 13/765 to 16/295 i/c bridge over Nakkar khad at Rd. 16/295.
Dharamshala 418.71 321.02
31 C/O link road from Gheena to lohar Lahri Jandrah km. 0/0 to 6/980.
Dharamshala 143.27 94.38
32 C/O link road from Baroi Mohalkar Nihunda linking Kawari i/c bridge over Baner khad km. 0/0 to 4/0.
Dharamshala 386.95 203.11
33 C/O link road from Lilly Amtrar Mundla road km. 0/0 to 3/0 i/c 2 No. bridges .
Dharamshala 383.36 155.89
Page 7
S. No. Name of Project Name of Division
Sanctioned Amount
Exp. upto 31/03/2016
1 2 3 4 534 C/O 56.00 mtr span Bailey bridge over Kumar Nallah on Kumar
Parmar Bhaton road at Rd. 4/735.Killar 273.59 234.64
35 C/O 68.00 mtr span steel truss bridge over Pallani Nallah on Bharmour Badgram road at Rd. 19/624 i/c approaches.
Bharmour 213.49 0.00
36 C/O 3 No. bridges on Tissa Seikothi Jhajja Kothi road over Juthed Nallah Shakti Nallah and Parved Nallah.
Chamba 255.65 264.68
37 C/O link road from Bagdhar to Khuin km. 0/0 to 4/200. Chamba 363.77 182.9438 C/O link road to village Sirna in G.P. Janghi km. 0/0 to 5/250. Chamba 328.9 73.31
39 C/O 82.00 mtr span PSC Box Girder Bridge over Chakki khad on Dangari Bai- ka- Bag Katchi Kalapat road at Rd. 0/755.
Dalhousie 355.69 180.30
40 C/O Balance work of Kaloha to Shantla via Saleti road km. 0/0 to 16/720 i/c 4 No. bridges.
Dehra 786.06 454.00
41 C/O link road from Lumb Chatra to Masroor Kaphari km. 0/0 to 4/0.
Dehra 158.00 76.11
42 C/O Balance work Nihari to Kheran khad via Kural Khera khad road in km. 0/0 to 2/735.
Dehra 115.75 75.98
43 C/O Balance 3 Nos. bridge on Gopipur chamukha road at chainage 04/495 , 05/605 , 07/180 alongwith approaches.
Dehra 211.83 197.63
44 C/O link road from Bully to Seorballa km. 0/0 to 4/525. Dehra 237.25 143.9645 C/O link road from Dhatehar to Duhak via Kuri Balrere i/c link to
village Dib in km. 0/0 to 9/270.Dehra 544.76 217.55
46 C/O Theda to Dhanot via Jurahi road i/c bridge. Dehra 83.03 7.6747 C/O link road from Adhe-Di-Hatiyan to Sihorpai village upper
Dhanui, Guga Temple i/c bridge over Chhamba & Nagrota khad.
Dehra 258.56 172.23
48 C/O 60.00 mtr span PSC Box girder bridge over Naluna Nehar on Majra and Mohtli Panchayat, Tikka Kharar at Rd. 0/203
alongwith appriaches.
Fatehpur 178.48 0.00
49 C/O 5/7 mtr wide road from Ban Devi Kohlari Dhanuna road km. 0/0 to 8/051.
Fatehpur 298.62 193.48
50 C/O road from Garan basti Harizan and Brahaman basti-Karari- Di- Khui km. 0/0 to 1/960.
Jawali 78.67 58.85
51 C/O link road from Sangroh to Bakkar khad via Bhuana km. 0/0 to 3/900.
Touni Devi 138.73 110.25
52 C/O Amroha Baldhook via Banal road km. 0/0/ to 4/555. Hamirpur 185.27 149.9953 C/O link road khiah to Bhatera via Bharnot, Thalakana i/c
bridge over Pung khad km. 0/0 to 4/855.Hamirpur 277.89 166.18
54 C/O link road from Bumbloo Bridge to Kathiana via Saman kothi upper kothi Dugwar Kulhera Sulhari Gori km. 0/0 to 7/900.
Barsar 314.37 204.75
55 C/O Mair to Tikker via markanda Khugan Fahal Lahara Phahal road km. 0/0 to 19/120.
Barsar 566.17 220.91
56 C/O Ghumarwin to GPS Bara Balyah School via Harma Bara Balyah road i/c 1 No. bridge (Phase-II).
Barsar 55.91 44.08
57 C/O 32.00 mtr span PSC Box Girder Bridge over Jajjar khad on Behal Baloli road at Rd. 2/330.
Bilaspur No.II 89.40 82.72
58 C/O Balance work of Namhol Ashamajhan road km. 0/0 to 10/555.
Bilaspur No.II 234.46 197.17
59 C/O link road from NH-21 Jamli to Village Neri km. 0/0 to 1/720.
Bilaspur No.II 65.60 65.60
Page 8
S. No. Name of Project Name of Division
Sanctioned Amount
Exp. upto 31/03/2016
1 2 3 4 560 C/O Link road from Khalota Mandir to Gutrahan km. 0/0 to
2/420.Bilaspur No.II 113.00 104.35
61 M/T of Deoth-Dbour road km. 0/0 to 10/960. Bilaspur No.II 267.97 196.74
62 C/O link road from Dolra to Bag Mehla km. 0/0 to 3/810. Bilaspur No.II 144.49 107.46
63 C/O Balance work of Gwal Muthani Khughat via Galeta road km. 0/0 to 5/900.
Bilaspur No.I 219.29 219.52
64 C/O Balance work of link road from Raghunathpura to village Mandi Bharari km. 0/0 to 3/540.
Bilaspur No.I 95.26 68.64
65 Up-gradation of Samoh Geherwin Thuran road km. 0/0 to 13/0. Ghumarwin 241.57 102.32
66 C/O Link road from Slashi to Hairapur km. 0/0 to 2/735 i/c 35 mtr single span bridge.
Ghumarwin 217.00 0.00
67 C/O link road GTB road to Jol Peerthan Pump House km. 0/0 to 1/530.
Ghumarwin 76.31 62.74
68 Up-gradation of Kothi Jungle Malhot road km. 0/0 to 20/0. Ghumarwin 419.07 385.4969 C/O Sannour to patta via karyalag Nagroan & harizan Basti
Churan Gugga Temple road km. 0/0 to 6/095.Ghumarwin 367.79 343.61
70 C/O link road from Kosherian (Brahmanli kallan) to Jadu via Banged Pungali road km. 0/0 to 6/0.
Ghumarwin 622.04 613.59
71 C/O link road from Una Takka road to Kotla Khurd Muhalla Haber Muhalla Phasan upto Himtkarsh college km. 0/0 to
3/435.
Una 131.93 96.54
72 C/O Balance work of link road from lower Badehera to lower Kangar via Abadi Pharian km. 0/0 to 1/915.
Una 83.89 62.14
73 Improvement & widening of Mehatpur , Jakhera, Bhabour Sahib, Bangarh, Fatehwal road km. 0/0 to 8/0.
Una 350.65 291.04
74 Improvement & widening of Behdala Upper Dehian Basdehra to Ajouli upto Punjab Boundary km. 0/0 to 12/400.
Una 301.12 217.41
75 Improvement & widening of Chattara from Trisma Resort Behdala Jakhera Dehlan road km. 0/0 to 10/650.
Una 512.63 434.57
76 Strengthening of raod C/O Rampur (through Gas Agency Godown ) to Una bridge near IPH Rest House via TCP office
and village kuthar khurd & Kuthar kalan roads km. 0/0 to 7/215.
Una 378.36 314.04
77 C/O link road to Basal Harizan Basti to GMS lower Basal road km. 0/0 to 2/0.
Una 176.92 131.85
78 Improvement / Up-gradation with CC pavement in Patches for the link road Rakkar to Basoli km. 0/0 to 6/020.
Una 265.97 213.48
79 Improvement /widening of Bharolian Badehar Charatgarh road km. 0/0 to 9/700.
Una 301.87 236.73
80 C/O link raod from Kandehar to Beedi via Ambali km. 0/0 to 3/670.
Bharwain 195.21 183.10
81 C/O link road from GagretOell Ispur road km. 9/195 to Loharli Upper Upto Govt. Middle School Khad Gujran km. 0/0 to 3/600.
Bharwain 206.00 135.73
82 C/O link road from Ambota Bus Stand to nag Nath Mandir via Mohalla Jindwar km. 0/0 to 3/205.
Bharwain 176.19 99.77
83 C/O link road from NMT road 69/0 to Raipur Society via Napian-Da- Talab Rana Mohalla, Lohara Mohalla, Bari and Marwari
Society km. 0/0 to 3/220.
Bharwain 136.15 115.72
Page 9
S. No. Name of Project Name of Division
Sanctioned Amount
Exp. upto 31/03/2016
1 2 3 4 584 C/O 30.00 mtr span c/c of bearing RCC Box Girder Bridge over
Chambi khad to link village Tharot i/c approaches at Rd. 0/540.Bangana 101.57 91.74
RIDF-XVIII1 C/O Balance work of Mamligh- Kuftu road km. 0/0 to 13/400. Arki 633.42 400.25
2 C/O Balance work of Galog Kunihar in km. 8/630 to 15/330. Arki 346.09 133.50
3 C/O Balance work of Kimughat Chakki-Ka-More road km. 0/0 to 15/180.
Kasauli 396.22 220.19
4 M/T on Lohanji Mari Ka Ghat via Behli road km. 0/0 to 13/200. Kasauli 590.45 363.82
5 Up-gradation /Improvement of Bhakhalty-Sarog-Barog-Kiartoo road km. 0/0 to 13/060.
Theog 442.78 185.64
6 C/O Ghorna Deothi road km. 0/0 to 5/435. Theog 237.01 222.627 Improvement of Gadhana to Banari road km. 7/0 to 20/615. Theog 543.40 436.208 M/T on Behna-Dalash-Kotadhar road upto Kandagai km. 0/0 to
17/345.Nirmand 639.91 157.71
9 C/O Balance work of Magwa Siun road upto village Lagnoo km. 0/0 to 16/015.
Sangrah 732.57 185.38
10 M/T, CD work and C/O Balance work on Jabal Kanoti upper Surla Kathana road km. 0/0 to 5/225.
Nahan 319.13 254.42
11 C/O Bridge across river Bata on Kishanpura Santoshgarh road at Rd. 1/180.
Paonta Sahib 1872.02 324.09
12 C/O Bridge over Giri River Bata on Rampurghat manpur Deora road at Rd. 3/290.
Paonta Sahib 1907.15 357.94
13 C/O Balance work of Chamain Chouri Baghal road km. 0/0 to 10/780.
Jubbal 159.60 109.54
14 C/O Balance work on Dochi- Mehana sarhana Sarot Raika road km. 0/0 to 6/225.
Jubbal 269.03 164.94
15 C/O Link road from Sawra- Kathasu road km. 8/0 to 13/250. Jubbal 235.73 233.84
16 C/O link road from Chamaru Jachi km. 0/0 to 4/0. Jubbal 178.96 200.4117 C/O 40.00 mtr span steel truss bridge over Satluj river at Nanj
on Kotlu to Luhri road via Nanj at km. 5/735 i/c approach road km. 4/350.
Karsog 188.57 156.92
18 C/O Kahnoo to Pargan road via Durkano km. 0/0 to 5/585. Karsog 331.65 106.6419 C/O link road Segali Radu Dadoh Bhiyarta via Dinak road km.
0/0 to 3/225.Sundernagar 367.80 168.60
20 C/O M/T on katyandi Tandi Thunag road km. 0/0 to 6/525. Gohar 251.87 54.8921 C/O M/T and balance work on Neri Shiva Bihandhar Gharan
road km. 0/0 to 17/810.Padhar 446.00 261.15
22 M/T & CD work to Majhwar- Movi Seri via Rakhoon road km. 0/0 to 10/600.
Mandi No.II 360.83 258.19
23 C/O Nagla-Redu-Kaner-Lower Barot road km. 0/0 to 3/945. Sarkaghat 153.87 123.4624 C/O balance work of Rissa Surangri Bhaderwas via Garoru
road km. 0/0 to 8/250 i/c 30 mtr span bridge at km. 0/165.Sarkaghat 369.39 209.02
25 C/O Spangni to Kanda road km. 4/640 to 12/0. Kullu No.I 320.06 231.9126 C/o Grahoun to Dalwar road km. 0/0 to 2/700. Kullu No.I 122.90 119.6127 C/O 85.00 mtr span steel trussover river Chenab at Lobber i/c
approaches on Hinsa Shakoli Bardang Lobber road at km. 7/400.
Udaipur 524.68 274.97
Page 10
S. No. Name of Project Name of Division
Sanctioned Amount
Exp. upto 31/03/2016
1 2 3 4 528 C/O 75.00 mtr span bridge over River Chenab at Thanwani. Udaipur 327.07 0.0029 C/O 45.72 mtr span Bailey Bridge over Miyar Nallah at
Chhaling.Udaipur 166.78 103.40
30 C/O Bridge over Beas River at Sanda . Joginder Nagar
2285.62 404.56
31 C/O Balance work i/c MT of Darkoti Nichala Bharyara upto village Gharlon.
Joginder Nagar
419.46 235.76
32 C/O link road from Darang Block to Madhya Marg Gadiara Jamwal Awadi & Harizan Basti via Forest hut to link NH-20 km.
0/0 to 3/780.
Palampur 312.21 181.23
33 C/O link road to village Chori-Da-Lahar Nagni Pump House km. 0/0 to 2/255.
Palampur 88.54 36.61
34 Improvement & Strengthening of jalag dali Nalhana Dhupkiara road km. 0/0 to 8/906.
Baijnath 352.89 108.97
35 Improvement & M/T on Charri to Ghera road (Purana Gaj Project road ) km. 0/0 to 8/555.
Kangra 414.74 333.35
36 C/O Bhaled Dulli Kakra Chamiara road km. 0/0 to 9/200. Kangra 269.09 109.2537 C/O 110.00 mtr span stiffened suspension bridge over Gaj
khad between villages Spail & Kalru .Kangra 420.24 126.44
38 C/O Morchh Gharghuni road km. 0/0 to 3/240 i/c 2 No. Bridges 60 mtr span PSC BoxGirder bridge at Rd. 1/726 & 25.00 mtr
span RCC Box Girder Bridge at Rd. 2/625 i/c approache.
Kangra 374.12 11.96
39 C/O 2 No. Bridges (RCC T-Beam bridge over bandla Nallah at km. 0/300 & RCC T Beam Bridge over Jhullar Nallah at km.
1/123 on Shahpur Kiari-Shahpur Dohab chowk road.
Kangra 74.51 60.55
40 C/O link road Tarkhankar to Chatreta km. 0/0 to 1/600. Kangra 62.09 59.9041 Removal of formation deficiency and M/T to Katharu to Bhatti
Dehru sandh Rajal road km. 0/0 to 3/810.Kangra 254.29 215.92
42 C/O Bridge over Awa khad at km. 11/300 on link road from kulani to Speedu i/c approaches.
Palampur 220.13 35.08
43 C/O link road to village Jamula km. 0/0 to 1/330. Dharamshala 56.82 40.0444 C/O link road from Ankhan Khola Sudhed road km. 0/0 to
2/540.Dharamshala 158.97 108.65
45 C/O link road Brana Mariyari Chowki Nihar Palahchaklu road km. 0/0 to 8/300 i/c bridge over Hounsty khad at Rd. 8/300.
Dharamshala 384.97 61.22
46 C/O link road from Thana Bargran to Bushal km. 0/0 to 4/300 i/c 65 mtr span PSC Box Girder bridge over Bathu Khad at
Balah at km. 1/890. Thana Bargran to Bushal via Thana Lahal road.
Dharamshala 422.35 162.24
47 C/O 45.00 mtr span of Steel truss foot bridge over Daroon khad joining chhanwar Serathan road at Rd. 0/160.
Dharamshala 53.38 75.33
48 C/O link road from Patka to Hathidhar portion kathed (Patka) to Druma km. 0/0 to 10/400.
Dalhousie 516.11 55.58
49 C/O Ghoom to Janjla road km. 0/0 to 4/800. Chamba 207.64 85.8050 C/O Tikru Machyari Panjla road km. 0/0 to 1/200. Chamba 73.61 31.0351 C/O 40.00 mtr span steel truss bridge over Suil River on
Bhandal Panoga road at km. 0/550.Salooni 146.54 0.00
52 C/O Nana Banderu Gheli Dhewa road km. 0/0 to 6/435. Jawali 330.92 235.0753 C/O 5/7 mtr wide motorable road from Houri Devi, Banaharr
(Harizan /Brahaman) latwal, km. 0/0 to 4/300.Jawali 234.77 118.54
Page 11
S. No. Name of Project Name of Division
Sanctioned Amount
Exp. upto 31/03/2016
1 2 3 4 554 C/O link road from Jounta High School Tattal via Math Meaner
km. 0/0 to 2/195.Nurpur 189.88 156.69
55 C/O Balance work of Guler Nandpur road in km. 0/0 to 5/135. Dehra 135.98 31.57
56 C/O link road from Guler to Dhangar khas in km. 0/0 to 5/360. Dehra 152.57 83.18
57 C/O Balance work of Har Pukhar to Bill-Ka-Bharoo road km. 0/0 to 3/255.
Dehra 66.68 36.00
58 C/O Balance work of Chintpurni to Baldwara road km. 5/0 to 10/0.
Dehra 137.55 105.52
59 C/O balance work of Lag Balina to Amb Tilla with link road chanauta via lag Thakran i/c causeway Rd. 0/0 to 3/125.
Dehra 180.91 106.46
60 C/O Bragram to kalwal road via than, chaleli , Manjru km. 0/0 to 5/840 i/c 2 No. bridges.
Barsar 599.04 324.72
61 C/O 69.00 mtr span PSC Box girder bridge over Garli/Jhanjiani khad at Rd. 0/585 on Darkoti to Shah Talai road i/c
approaches.
Barsar 216.56 202.83
62 M/T Dasmal lagmanwain road via Tooh Tihra maira jar Bhounkhar Gadru road km. 2/825 to 6/500.
Barsar 89.71 12.75
63 C/O Tarkwari to Jalahu via Bhater Kosed Takotta km. 0/0 to 2/825.
Barsar 184.33 0.00
64 C/O link road from Utpur to Bakker khad via Tap km. 0/0 to 4/260.
Touni Devi 228.26 147.80
65 C/O link road from NH-70 Kaloor to Kohla Nadaun Amtar Bilvkaleshwar road km. 0/0 to 10/360.
Hamirpur 556.68 351.66
66 Up-gradation of Panol Nihan Ser via Kajal road km. 0/0 to 10/390.
Ghumarwin 172.36 198.42
67 Up-gradation of link road from Gangloh to Malroun km. 0/0 to 22/0.
Ghumarwin 477.07 415.82
68 C/O link road to Kothipura Deothi (Parohi to Keoth ) km. 4/200 to 8/780(i/c 19.75 mtr span RCC T-Beam bridge over Jarad
khad.
Bilaspur No.II 229.86 234.66
69 C/O link road from Swarghat to Manjher via Matnoh km. 0/0 to 5/950.
Bilaspur No.II 281.54 281.54
70 C/O link road from NH-21 to village Mehrog km. 0/0 to 1/180. Bilaspur No.II 42.61 0.00
71 C/O Kothi Bhareri Gallyana via Balh Bural road km. 0/0 to 3/390.
Bilaspur No.I 171.62 150.04
72 C/O link road to Mohalla Gujjran km. 0/0 to 3/0 in Gram Panchayat Saghnai .
Bharwain 179.91 128.04
73 C/O link road from Gondpur Banehra to nangal Jariyalan km. 0/0 to 2/885.
Bharwain 295.79 225.19
74 C/O link road from Police station Gagret to Industrial Area Shiv Bari km. 0/0 to 2/685.
Bharwain 195.19 168.60
75 C/O link road from Jawar to Lahar km. 0/0 to 3/180. Bharwain 283.36 160.2976 C/O link road from Thana upper to kut, Chhatrer to Alsan
Harizan Basti Bhiambi and Jhigla Thana km. 0/0 to 6/115.Bangana 190.54 110.59
RIDF-XIX1 C/O Bridge over Sirsa Nadi on Baddi Sitalpur road at Rd.
1/338.Nalagarh 630.52 259.00
2 C/O Bridge over Sirsa Nadi on Khera Nanowal road at Rd. 2/700.
Nalagarh 648.58 236.44
Page 12
S. No. Name of Project Name of Division
Sanctioned Amount
Exp. upto 31/03/2016
1 2 3 4 53 C/O road to village Ali Bhurjani km. 0/0 to 6/135. Arki 204.42 29.964 CD &MT on Baddi Sai Ramshehar road km. 22/0 to 30/0. Nalagarh 535.92 77.905 C/O road from Grauni to Bohren & Sari km. 0/0 to 6/510. Kasauli 345.91 107.256 C/O road from Danoghat to Sahjada Neri Plata km. 0/0 to
5/360.Arki 253.23 0.00
7 M/T of link road to Vatsayla Gram km. 0/0 to 3/0. Nalagarh 112.01 50.008 Improvement, CD and MT on Bhud Gullarwala Ghare Patta km.
0/0 to 13/130.Nalagarh 221.12 80.35
9 MT i/c CD on Jadli Grown Ghatti Bodari road km. 0/0 to 9/135. Kasauli 328.98 114.13
10 C/O Tarashari to Perri road km. 0/0 to 300. Kasauli 165.84 38.3611 C/O Shalaghat to Galot Soriya road km. 0/0 to 9/0. Arki 421.71 52.5212 Improvement of Shakildar-Aloti-Drawal-Devban road km. 0/0 to
18/390.Theog 727.08 305.71
13 M/T of Hari Devi Seri road km. 0/0 to 3/700. Rural Dhammi.
179.95 47.25
14 M/T from Rugada-Gawahi to Shalaghat via Kohbag Rangol road km. 0/0 to 14/0.
Rural Dhammi.
464.28 451.26
15 Bridge over Giri at Belewog G.P.Balag. Theog 158.47 172.9516 Widening / Metalling & Tarring from Shari-Garkhan-Khatnol
road G.P. Deola Khatnol , Majhewar(Pargna Chaultha) km. 5/500 to 10/0.
Shimla Rural (Dhami)
709.51 150.37
17 M/T & Improvement of link road from Paoghat to Shahal bridge via Pavabo and Chanog GP km. 0/0 to 7/420.
Shimla Rural (Dhami)
161.63 58.20
18 MT Jabli Bathmana road and Dhalaya Kangti road km. 0/0 to 8/060.
Shimla Rural (Dhami)
210.14 203.63
19 M/T of Khalwan to Bankoti via Saroga road km. 0/0 to 3/910 . Kumarsain 144.47 48.18
20 C/O link road from Hurling to Gue km. 0/0 to 9/730. Kaza 275.65 0.0021 C/O link road from Shalabag Kuhl Daranghatti road km. 0/0 to
3/645.Rampur 244.40 75.32
22 C/O Bhutti Karahan Dealth road (Portion Lahru to Kharela) in km. 5/840 to 10/360.
Rampur 419.36 126.95
23 C/O Kholvi Kenchi to Bhadevag road km. 0/0 to 2/990. Kumarsain 148.84 93.6424 C/O link road from Chaklot to Chunagai (Nirmand Block). Nirmand 356.44 207.9825 M/T of Nohradhar-Bogdhar-Methli road km. 0/0 to 34/0. Shillai 1684.14 935.7926 Up-gradation/Metalling & Tarring of Gumma Tapri-Pahal-Pohal-
Bakhol road Km.0/0 to 6/0.Jubbal 276.67 151.67
27 Up-gradation of Metalling/ Tarring on Kupvi Sail Pav road. Chopal 929.26 50.0028 Widening & MT on Kuddu Naliya-Chhajpur -Attu (Trailer) via
Sansog road.Jubbal 522.86 117.22
29 Widening / MT on Ramnagar to Thana-Adayog Fanail -Mihani road.
Jubbal 439.40 219.54
30 M/T of Chopal Jhikanipul via Chikiya road km. 0/0 to 16/135. Chopal 748.97 20.00
31 Improvement and MT of Ganasidhar Kadiwan Ghasni road km. 0/0 to 10/655.
Rohru 560.63 111.74
32 Improvement and MT of Tutu Pani Kuthari Khaigar Deoli road km. 0/0 to 3/0 and 9/300 to 19/680.
Rohru 620.69 113.27
33 Up-gradation of Metalling & Tarring ofKathrot Kanchi to Himri & Jangroli road Km.0/0 to 8/705.
Jubbal 440.43 270.27
34 C/O Pungh Kapahi via Patsal road km. 0/0 to 9/300 i/c 45 mtr bridge over Suketi khad at Rd. 6/565.
Sundernagar 483.30 286.75
Page 13
S. No. Name of Project Name of Division
Sanctioned Amount
Exp. upto 31/03/2016
1 2 3 4 535 C/O Slapper-Tattapani road km. 0/0 to 30/690. Sundernagar 506.08 103.9336 C/O Roda Nallah to Dhandhal road km. 0/0 to 2/900. Mandi No.II 193.04 128.6437 C/O Balance work of link road Ballah to lower Khation Trutti Bat
km. 0/0 to 3/230.Palampur 126.38 107.63
38 C/O link road from Village Galu to kheel Jhanijharda Bhol & Soham km. 0/0 to 4/525.
Palampur 281.19 205.13
39 C/O link road from Dramanpul to Subedar Patial House km. 0/0 to 1/045 i/c bridge over Rangru Nallah on Balh Gujreda road at
km. 0/120.
Baijnath 255.05 0.00
40 C/O link road from Daka to Bandla and Harizan basti (kholi) km. 0/0 to 3/100.
Kangra 146.55 45.01
41 C/O Kedara Chandar Datti Samba Kona road km. 2/400 to 8/400.
Palampur 165.34 8.03
42 C/O road from Kasba Narwana to Bagaira km. 0/0 to 3/510 i/c bridge over Ikku khad at km. 1/060.
Dharamshala 418.42 119.25
43 C/O 34.107 mtr span RCC T-Beam bridge over Salangi Nallah on link road from upper Chetru to lower Chetru at Rd. 2/170.
Dharamshala 127.49 79.99
44 C/O Dhanju Nallah bridge on Tissa Satyas road at km. 4/090. Chamba 49.56 42.24
45 C/O Pangola Nallah bridge on Pathankot Banikhet Chamba Tissa road (19.75 mtr span).
Chamba 94.53 95.93
46 C/O Sukrali Nallah bridge on Tissa Satyas road at km. 7/540. Chamba 249.47 162.68
47 C/O bridge over Surdwam khad on Indora Rey road at km. 30/105.
Fatehpur 289.58 220.30
48 C/O Balance work of Dhounta to Samnoli road km. 0/0 to 3/120.
Dehra 147.35 111.12
49 C/O link road from Gurer Tory Adhwani i/c bridge over Toru khad and link road Mangtayal to Seri km. 3/750 to 7/880.
Dehra 297.18 38.96
50 C/O link road from Bag to Ambi via Bagedhar Pant km. 0/0 to 2/600.
Dehra 123.88 31.10
51 C/O Pucca Tiala Mehla road to village Paplother via Rajput Basti km. 0/0 to 2/600.
Dehra 162.98 45.53
52 C/O Balance work of link road from Masroor to Gharia km. 0/0 to 2/780.
Dehra 123.56 0.00
53 C/O road from Baduhi Jatoli to Jabbar khad bridge via Thora School i/c C/O 2 No. bridges km. 0/0 to 5/680.
Nurpur 284.42 121.46
54 C/O 10.37 mtr span RCC Slab bridge over Lohla Nallah at Rd. 4/638.
Nurpur 74.07 14.92
55 C/O Baleer to Dakwan via Sammon Randoh road km. 0/0 to 6/0.
Fatehpur 287.02 51.80
56 C/O Bassin to Khalag road km. 0/0 to 1/260. Dehra 91.21 16.5157 C/O RCC Box Cell Bridge over Sanjwan khad on Khatiar
Damtal Indora road at Rd. 25/150.Jawali 259.83 16.92
58 C/O Pucca Bharo to lower Chalali road km. 0/0 to 2/655. Dehra 156.78 33.7159 C/O link road from Banal to Chamiana via manglair Daddar km.
0/0 to 7/185.Hamirpur 179.78 67.32
60 C/O Jeoli Devi to kanoh via Saheli, Baditar, Karsai road km. 0/0 to 8/0 i/c 2 No. bridges.
Barsar 600.24 236.89
61 C/O Farsi to Upper Hareta, Patnehri ,Kotlu , Makrana, Ropru, Satpura, Bushiar, Galhian, Lower hareta road and bridge over
Kotlu Nallah.
Barsar 391.86 58.64
Page 14
S. No. Name of Project Name of Division
Sanctioned Amount
Exp. upto 31/03/2016
1 2 3 4 562 C/O road from Chakmoh to Sathavi via Samaila Dhariyani
Maharal Jaglu i/c 2 No. bridges.Barsar 524.05 30.88
63 C/O link road from Dhirar to Bhaleri via Dadu mandir Manjho Saplahu Kot km. 0/0 to 3/165.
Barsar 185.46 99.65
64 C/O Dhanpur Pathariya Karlooi Dhamander road km. 0/0 to 3/0.
Hamirpur 140.95 31.26
65 C/O Balance work of link road from Nara Galot via Balh Doda road km. 0/0 to 3/795.
Hamirpur 104.96 34.37
66 C/O 153.348 mtr span RCC Box Girder Bridge over Sukhar khad on Bhota Bijhari road.
Barsar 373.94 20.19
67 C/O 101.50 mtr span Pre-stressed concrete box girder bridge over Seer khad on Bhollu Ballori road at Rd. 4/450.
Ghumarwin 220.78 179.98
68 C/O Chhatyal Balh to Dabbar road km. 0/0 to 2/650. Ghumarwin 56.92 38.3969 C/O road from Krishan Nagar to Checksarai via Barrian. Bangana 530.90 325.7870 C/O link road from Dangoh Bijli ghar via Dauran- da- Tubewell
up Satsang Ghar Chalet road km. 0/0 to 2/430.Bharwain 143.64 99.78
71 C/O Bridges on Dhussara to upper Dhussara via Satother road km. 0/0 to 1/150 i/c MT.
Bharwain 140.26 119.03
72 C/O road from Sayali to Handola via Kamoon Pattian km. 0/0 to 11/120 i/c 2 no. bridges at Rd. 2/225 & 8/170.
Bangana 524.77 307.25
RIDF-XX1 M/T of Guggahat-Dangri Jayola road Km.0/0 to 2/00. Solan 67.11 9.282 M/T and balance work of Kaithlighat Basha Kehlog road
(Portion Kehlog to Basha Km.0/0 to 12/0).Solan 694.00 3.40
3 C/O road from Khadyana to Ranopul via kothi G.P.Deothi road Km.0/0 to 2/460.
Kasauli 121.13 42.10
4 CD & MT of Gambhar Pul to Marheta via Malera Anji road Km.0/0 to 5/330 i/c bridge over Gambhar Khad at RD.0/400.
Kasauli 606.06 0.00
5 CD & MT of Bhat-Ki-Hatti Bughar Bania Devi Km.4/630 to 8/735 i/c bridge over Gamber Khad.
Kasauli 516.21 0.00
6 CD & MT of Sai Bawasni road Km.16/0 to 20/240. Nalagarh 246.25 0.007 M/T & Balance work Shimloh Mandhorghat-Annu road Km.0/0
to 11/00.Shimla Rural
(Dhami)369.56 125.00
8 M/T & Balance work Dhami Bainsh road Km.0/0 to 6/150. Shimla Rural (Dhami)
180.48 97.48
9 C/O Kot to Sadhupul G.P.Kot Geha Km.0/0 to 5/600. Shimla Rural (Dhami)
442.45 0.00
10 C/O Dhapan, Sandoa, Galleah, Sarech road at Km.0/0 to 9/195.
Shimla Rural (Dhami)
645.18 0.00
11 ROFD & M/T of road from Sr.Secondary School Baychari to village Jawag Km.0/0 to 2/130.
Shimla Rural (Dhami)
168.27 0.00
12 M/T of Ghanatti Bhajol Bhaghar Km.4/700 to 15/300. Shimla Rural (Dhami)
511.65 0.00
13 C/O 32.00mtr. Span Arch Bridge over Giri Khad at Kavanti Km.15/020.
Theog 272.59 156.29
14 Improvement & Up-gradation of Basadhar Gian Kot via Tikker road Km.0/0 to 14/00.
Theog 692.35 5.26
15 Improvement/Up-gradation of Kargoli Nallah to Deha road Km.0/0 to 8/00.
Theog 434.21 15.45
16 C/O road from Ahar to Bartanighatti Kangal in Km.0/0 to 3/555. Kumarsain 218.84 65.88
Page 15
S. No. Name of Project Name of Division
Sanctioned Amount
Exp. upto 31/03/2016
1 2 3 4 517 C/O Loga Badubagain Changadhar Dadesh Banot Nallah road
Km.0/0 to 6/970.Kumarsain 382.14 110.13
18 Balance work for C/O 97.60mtr. Span Bailey suspension type motorable bridge at Tangti Yogma Gogma to village Khar at
RD.0/379.
Kaza 577.28 0.00
19 C/O culvetrts/drain and M/T on Dinger Sikkon Kinner Bhagyan Ghat road Km.0/0 to 9/330.
Rajgarh 481.24 63.80
20 C/O link road from Khari Changan to Mahipur and Kainthghat to Chanlag Km.11/500 to 1/270.
Nahan 159.60 28.83
21 C/O Bakholi Magwani Nandla road Km.0/0 to 3/200. Rohru 149.10 0.5722 Up-gradation of Rohru Barara Sharog road Km.0/0 to 8/0. Rohru 375.19 30.0723 Up-gradation of road Madarli to Karchhari via Shallan Kupri
Melthi Sheelghat (Kharapather) road Km.0/0 to 12/200.Jubbal 554.53 23.92
24 C/O Link road Kawalta to G.P.Giltari Km.0/0 to 2/870. Jubbal 161.75 9.5625 M/T & Up-gradation of Mural Kelvi Dadot Dhapli road Km.0/0 to
8/600.Jubbal 422.20 0.00
26 M/T of Gazta Joney Garag road Km.0/0 to 5/00. Jubbal 219.28 57.5127 M/T of link road to village Saskir Km.0/0 to 4/450. Jubbal 239.47 56.3828 M/T and Up-gradation of Deorighat Jashla road Km.0/0 to
7/225.Jubbal 361.19 74.42
29 C/O Balance work and Metalling Tarring of Kaina Kot Jubbal road Km.0/0 to 5/615.
Jubbal 298.48 0.00
30 M/T of Bhollar Nallah to village Poakta Bhollar and Chopari road Km.0/0 to 10/890.
Jubbal 671.87 191.81
31 Improvement & MT Deoli, Khalai Dharikuper, Khera road Km.0/0 to 8/765.
Jubbal 401.85 0.00
32 M/T & Up-gradation of road from Tikkari, Gurti Sagroti via Janog and Shamtah road Km.0/0 to 17/135.
Chopal 617.10 0.00
33 C/O link road from Saroot to Chapreher road Km.0/0 to 2/0 i/c Bridge over Saroot Khad at RD.0/360.
Dharamshala 212.14 0.00
34 C/O link road from Lower Jadrangal to Shiund linking Baldhar Jassour roa Km.0/0 to 6/690 i/c Bridge over Ikku Khad at
RD.2/008.
Dharamshala 451.53 4.77
35 C/O Balance work/Improvement of road from Nagrota to Pathiar in Km.0/0 to 4/900 i/c bridge over Chor Nallah at
RD.4/377.
Dharamshala 336.17 41.37
36 C/O road from Thural to Challah Dhagera road and C/O Bridge over Neogal Khad Km.0/0 to 4/960.
Balakrupi 944.73 0.00
37 C/O road from Bhadal Devi Mandir to Salloh Km.0/0 to 1/150. Palampur 185.39 114.11
38 C/O road from Bandhua to Bairghatta Km.0/0 to 4/885 i/c 2No.Bridges over Kotlu Nallah and Moul Khad.
Balakrupi 847.48 0.00
39 C/O of balance work of M/T of Gahlian Bari Behi Chhoti Behi road Km.0/0 to 4/150.
Kangra 112.53 29.22
40 C/O of link road from Kulthi to Balol Km.0/0 to 1/625 i/c Bridge over Naheli Khad at RD.0/785.
Kangra 211.10 44.18
41 C/O Balance work of link road from Rajal to Balehar Km.0/0 to 1/690.
Kangra 68.42 41.68
42 C/O Balance work/Improvement of Sidhbari Tapovan, Kaned Mashrehar Jheol Yol road Km.0/0 to15/0.
Dharamshala 630.63 359.16
43 M/T & Balance work on Kheri to Bhunad roa Km.0/0 to 9/450. Salooni 422.19 0.00
Page 16
S. No. Name of Project Name of Division
Sanctioned Amount
Exp. upto 31/03/2016
1 2 3 4 544 C/O Balance work i/c M/T of Chhudra to Thuin road Km.0/0 to
2/225.Salooni 208.73 0.00
45 M/T on Raja-Ka-Talab Batrahan Golwan Chatter Lohali to connect Rehan Samlet road Km.0/0 to 16/525.
Fatehpur 741.82 184.29
46 C/O link road from Darkat Tripal road to Sandlor via Billpar Km.0/0 to 1/660.
Dehra 123.95 0.00
47 C/O Link road frommangarh to Bankhandi viaGher road Km.0/0 to 4/830.
Dehra 285.57 0.00
48 C/O road from Govt. High School Lag to Didiyan Km.0/00 to 1/630.
Dehra 104.31 16.07
49 C/O link road from Kahru to Panchyat Ghar lower Tippri via Kothi in Km.0/00 to 3/045.
Dehra 211.88 30.79
50 C/O link road from Dhatti Parmala to Kural via Gal road in Km.0/0 to 4/100.
Dehra 329.07 0.00
51 C/O link road from Silh to Gagruhi via Dhareen Jangal in Km.0/0 to 5/00.
Dehra 324.09 0.00
52 C/O 55.00mtr. Span Suspension Type foot Bridge over Brahal Khad from PCM road at 33mile near village Seouni Bhalli to
connect village Kalri with Bhalli.
Jawali 79.59 67.56
53 C/O Bridge over Sarola Khad at Km.0/492 on Sarola Ludhiar road.
Jawali 49.69 32.36
54 C/O Nana Banderu Gheli Dhewa Durana padar Bassa Jol Ghatnalu road Km.0/0 to 27/115 (Portion Padar to Jol Km.15/0
to 23/015).
Jawali 432.11 76.10
55 M/T Reyur Baral Chah Kaloga, Chhatter Bhadyar road Km.0/0 to 5/420.
Dharampur 656.51 0.00
56 C/O, MT & CD on Bag-Saroli road Km.0/0 to 4/750. Sarkaghat 357.18 60.2057 C/O Chahari School to Trambi Dehri Galu Shil Kunt Bhyii
Gadvahan Doh Rewalshan Naina Devi road Km.0/0 to 2/150.Mandi No.II 209.39 0.00
58 M/T work on Kasan Rachhora Scheduled Casste Basti road Km.0/0 to 4/700.
Mandi No.II 166.17 0.00
59 C/O Balance work of Bhootnath Bridge at Kullu. Kullu No.I 209.66 141.0160 C/O 120.00mtr. Span Bridge over Solang Nallah at RD.0/170. Kullu No.II 371.68 60.31
61 C/O link road from Pung Khad in Village Chamyola Km.0/0 to 1/610 i/c 1No.Bridge at RD.0/165.
Hamirpur 144.75 21.56
62 C/O 30.00mtr. Span RCC Box Girder Bridge over Ghori Nallah on link road to village Bahal at Km.0/525.
Hamirpur 55.30 0.00
63 Widening & M/T of link road to village Marhana Km.0/0 to 1/345.
Hamirpur 68.87 0.00
64 C/O link road from Kotlu to Naungin Km.0/0 to 2/405. Touni Devi 189.97 0.0065 C/O main road Jalari Parmaran to Jalari Bhadiaran Km.0/0 to
1/885.Hamirpur 58.77 38.93
66 C/O link road from Kangoo to Malag-Khatrod via Charada Km.0/0 to 2/360 i/c C/O 40.00mtr. Span Bridge over Charada
Nallah at Km.2/310.
Hamirpur 281.16 0.00
67 C/O link road from Vety.Hospital to Amroh via Fakruhi hanoh Garli Bunga road Km.0/00 to 2/420.
Barsar 301.56 0.00
68 C/O Bijhari to Chaisai, Chakrala Ambota Ghangot road Km.0/0 to 7/900.
Barsar 407.00 14.50
69 C/O Balance work of link road from Chandpur to Dali road via Miyan Bandla Km.0/0 to 5/240.
Bilaspur No.I 104.95 2.18
Page 17
S. No. Name of Project Name of Division
Sanctioned Amount
Exp. upto 31/03/2016
1 2 3 4 570 C/O 144.00mtr. Span PSC Box Girder Bridge over Seer Khad
at Matyal RD.3/405 on Lethwin Lanjta Dharwara road.Bilaspur No.I 426.32 0.00
71 C/O link road Beri Jamla to Salnoo Km.0/0 to 3/285. Bilaspur No.I 150.32 0.0072 M/T of link road Cheli Tank to Dhinwan Kaghdhani Simolol
road Km.0/0 to 4/120.Ghumarwin 124.12 0.00
73 Link road from NMT road Touriwala Mohalla Bhangal Km.0/0 to 2/005.
Bharwain 124.85 57.04
74 C/O link road to Abadi Khatrian Village Saloh Km.0/0 to 1/150. Una 112.65 56.66
75 C/O link road from G.P.S. Baliwal to Dalit Basti Mohalla Jhorian Km.0/0 to 1/575.
Una 177.21 102.62
76 C/O link road from Panjuwana to Baliwal via Bhanewal Km.0/0 to 1/0.
Una 75.88 55.62
77 C/O & MT of link road from Takarala to Basuni Ambotu Awadi Km.0/0 to 7/915.
Bharwain 438.39 116.42
78 C/O & MT of link road to Harijan Basti Rumbal Nali Jawal Km.0/0 to 1/00.
Bharwain 80.70 5.55
79 C/O 165.725mtr. Span RCC Box Cell Bridge over Garni Khad on Baruhi Takrala road at Km.0/140.
Bharwain 638.12 227.50
80 C/O & M/T of link road from Upper Badehra to Mohalla Paharian via HIMCAPES College Km.0/00 to 1/480.
Una 97.05 91.76
RIDF-XXI1 Improvement ,CD & Metalling Tarring on Seri, Jhandian,
Plasra, Jamala, Kalyanpur road km. 0/0 to 9/180.Nalagarh 271.72
2 C/o 41.50 mtr span box girder bridge over Palli khad on Ambwala Gurdaspur Chanobri Vaid- Ka-Johar road km.0/645
including both side approaches.
Nalagarh 171.98
3 C/o Balance work of cross drainage & MT on Kohu- Sour to Bain-Da-Ghat road km. 3/0 to 11/800.
Arki 544.05
4 C/O balance work of Kiari Banglow Malga via Majhol road km. 0/0 to 11/760.
Solan 348.49
5 C/O balance work of Kandaghat Chausha via Kawarg road km. 0/0 to 6/480.
Solan 621.17
6 Metalling Tarring & Up-gradation of Shananghatti Dargi Katal via Shoal road km. 0/0 to 12/450.
Shimla Rural Dhami
340.71
7 Construction & Improvement of link road Goro Kanowan to Kanechi, Ohri, Geha km. 0/0 to 7/520.
Shimla Rural Dhami
219.12
8 Construction & MT on link road from Chailly Beont to Bhung Batol School km. 0/0 to 2/150.
Shimla Rural Dhami
84.50
9 M/T link road Shakoli Koti Hanuman Mandir via Masn Jadari km. 0/0 to 1/450.
Shimla Rural Dhami
132.63
10 C/O link road from Karachi to Tabog km. 0/0 to 3/300 (G.P. Dummi & Pahal).
Shimla Rural Dhami
220.90
11 M/T of Matiana Thathal Kotighat Kangal Chamola road km. 0/0 to 42/635 (Portion Thathal to Chamola km. 26/0 to 42/635).
Kumarsain 637.24
12 M/T Kepu -Kirti road in km. 0/0 to 7/0. Kumarsain 278.62 19.8913 Up-gradation of Barach to Bevat road km. 0/0 to 9/700. Rampur 630.8214 C/O link road to Spiti Valley via Leo km. 0/0 to 11/500 i/c 75.00
mtr steel truss bridge over Spiti khad at Rd. 11/500.Kaza 1043.04
Page 18
S. No. Name of Project Name of Division
Sanctioned Amount
Exp. upto 31/03/2016
1 2 3 4 515 C/O Link raod Mimyad (Shivpur) to Choriyan (Sainj) km. 0/0 to
5/500.Sangrah 376.80
16 C/O road from Bandol to Chunoti via Shilahan Kuna km. 0/0 to 5/255 i/c 2 No. Bridges.
Sangrah 533.06
17 C/O link road from Tirmalti to Devana in G.P. Khud Drabil km. 0/0 to 8/0.
Sangrah 581.04
18 C/O link road to village Talangna km. 0/0 to 8/0. Sangrah 483.7019 M/T on Chourighat Sarsoo road km. 0/0 to 5/800. Rajgarh 387.9520 C/O RCC Box cell type bridge over Sunkar khad on Dhaulkuan
to Giri Nagal road at Rd. 0/345 & C/O 6.00 mtr span RCC Slab culvert at Rd. 0/518.
Paonta 245.58
21 C/O & Imp. Of Shyampur Bhood, manpur Deora Guruwala Bhagani road km. 0/0 to 6/810.
Paonta 399.41
22 C/O link road from Kothewala bridge to Ghuttanpur , Patlion, Surajpur i/c 1 No. solid cuaseway bridge.
Paonta 249.13
23 Balance work of Nadheta, Taru, danda, Kalatha, Badhana Killor road km. 0/0 to 16/670.
Paonta 323.77
24 C/O 48.00 mtrs span PSC Box Cell Girder lane bridge over Mandi Khala on Dhaulakuan Giri Nagar road at Rd. 3/402.
Paonta 314.75
25 C/O 52.00 mtr span RCC bridge over Bata Khalla (Konthri Khalla) on Dhaulakuan Giri Nagar road at Rd. 1/948 to 2/0.
Paonta 358.43
26 C/O Bridge over Markanda river on Shambhuwala to Bankala road at Rd. 0/180.
Nahan 582.11
27 MT & CD on Nalka Shamalka Vikram Bag Transformer to Kairwala & link road to village Chassi km. 0/0 to 4/200.
Nahan 231.65
28 C/O 52.00 mtr span double lane bridge at Andheri over Roon Nadi on Palion Andheri road at Rd. 4/200.
Nahan 383.08
29 C/O 180.00 mtr span bridge over Markanda river on Salani Devni Pipalwala road at Rd. 1/240.
Nahan 925.60
30 Improvement/ MT on Shilla Gundha road km. 0/0 to 33/0 (Portion 17/0 to 23/0).
Shillai 327.66
31 M/T & Up-gradation of Saraidhar-Tilludhar -Koti road via Jagterli in km.5/300 to 16/0.
Jubbal 572.66
32 C/O Barvi Garaog road km. 0/0 to 7/0. Jubbal 313.7433 M/T & Up-gradation of Chandigarh, Sayri link road in G.P.
Pujarli-3 km.0/0 to 6/300.Jubbal 360.68
34 Widening& Up-gradation of Jubbal link road upto Santoshi Nagar.
Jubbal 329.89
35 MT & Up-gradation of Chebri link road km. 0/0 to 8/570. Jubbal 513.6136 Up-gradation of Parsa Dhara Shekhal road km. 0/0 to 12/645. Rohru 758.18
37 M/T & Up-gradation of Kansakoti Kanerwa Bham Nallah Jakher to Khashkandi road km. 0/0 to 6/800.
Rohru 405.33
38 C/O Link road Bhaloon Kainchi to village Bhaloon via Marthi & Kupper in G.P. Bhaloon road km. 0/0 to 3/460.
Rohru 264.91
39 Up-gradation of Badiyara Tikkar Diswani road km. 0/0 to 7/500. Rohru 484.36
40 C/O road from Andhra Jhanjwani & Giyari road km. 0/0 to 8/500.
Rohru 418.71
41 Balance work of Machoti Sarasa road i/c M/T. Rohru 101.8642 C/O Gunsari-Ruasi via Gokswari road G.P. Gonsari. Rohru 276.4643 C/O Bye Pass road Rohru i/c Bridge km. 0/0 to 6/025. Rohru 318.0844 C/O Bakhirna to Kotsari via Mandli km. 0/0 to 5/075. Rohru 269.00
Page 19
S. No. Name of Project Name of Division
Sanctioned Amount
Exp. upto 31/03/2016
1 2 3 4 545 C/O Kateru Slapper via Paura Kothi road km. 0/0 to 16/0. Sunder Nagar 725.12
46 C/O 58.00 mtr Span PSC Box Girder Bridge over Suketi khad on Sunder Nagar Meramasit via Dharnda road at Chandpur Rd
2/240.
Sunder Nagar 200.83
47 C/O Proun, Ranger, Kharoon Saklana Khanour road km. 0/0 to 10/585.
Dharampur 540.70
48 MT on Trohla Richhi Dhar (Manudhar) road km. 0/0 to 4/900. Dharampur 276.65
49 C/O 84.00 mtr span stiffened suspension bridge over river Chinab at Nalda.
Udaipur 432.74
50 Improvement & Widening of Shilla Hallan road km. 6/0 to 9/555.
Kullu No.II 221.65
51 C/O 85.00 mtr span bridge over river Beas at 17 Miles i/c approaches.
Kullu No.II 908.64
52 C/O Babeli Jindodur road km. 0/0 to 9/840. Kullu No.II 550.2753 Improvement & Metalling & Tarring on Karal Himari road km.
0/0 to 7/960.Kullu No.II 311.78
54 C/O link road to village Chaluhi km. 0/0 to 1/600 i/c 40.00 mtr span bridge over Awa Khad at Rd.1/245.
Baijnath 199.63
55 C/O link road from NH to Kukaaina Nouri Trehal Labol Behru km. 0/0 to 5/345.
Baijnath 318.08
56 M/T on main road Ropri to Nalhana via Masand Basti (Stage-II) km. 0/0 to 3/105.
Baijnath 94.11
57 Balance work on Bahroo Nadli Gharchindi Malli road. Baijnath 254.6458 Balance work of Subhash Nagar, Sapehar, Nakki, Chath,
Amotu Lad-Galu road km. 0/0 to 6/475.Baijnath 374.98
59 C/O road from Kuddan to Dehl km. 0/0 to 2/105. Palampur 152.1660 C/O link road from Chandpur to Kandwari via Speru km. 0/0 to
1/150 i/c 40.00 mtr span PSC Box Girder Bridge over Awa khad.
Palampur 297.33
61 Up-gradation of road from SSB Chowk to connect Lohna via Goswami Awadi i/c 10.00 mtr span culvert over Moul khad km.
0/0 to 6/020.
Palampur 255.41
62 Improvement & Up-gradtion of rathan to Maniara via Ropa Ghar Kapoor Basti Maniara road km. 0/0 to 6/120.
Palampur 182.58
63 M/T link road from Harnera to Chellian (Chellian) km. 0/0 to 3/0.
Kangra 96.68 30.09
64 Balance work & Improvement of Yol Rajiana 53 miles road km. 0/0 to 10/555.
Dharamshala 811.15
65 Improvement & Metalling /Tarring on Bushal Naryalkar Sippanpatt Broh road km. 0/0 to 4/425.
Kangra 267.3
66 C/O Bandi Maitiari, Gallu Kasrehra, Mumta road km. 0/0 to 3/560 i/c bridge over Chor Nallah at Rd. 2/165 & Joggal at Rd.
2/255.
Dharamshala 648.15
67 C/O 60.837 mtr Span centre to centre bearing (2 span of 30.00 mtr each) RCC Box Girder Bridge over baner Khad on Dadh to
Subidha Complex Baroi Chowk at Rd. 0/486.
Dharamshala 293.34
68 C/O road from Majheen Chowki Dhorian Jaman Mehera Harwah via Jandar Chirr km. 0/0 to 5/270.
Jaisingpur 212.36 8
69 C/O Link road from Khanyara to rakkar via Tillu Naddi road km. 0/0 to 2/390 i/c bridge over Manooni khad at Rd. 0/900.
Dharamshala 279.74
Page 20
S. No. Name of Project Name of Division
Sanctioned Amount
Exp. upto 31/03/2016
1 2 3 4 570 C/O link road from Sambhar lahar to village Thathri km. 0/0 to
3/570.Dharamshala 328.54
71 C/O Balance work/ Improvement of Fatehpur Sukkar, Mashrehar, Matour road km. 0/0 to 9/500.
Dharamshala 355.16
72 C/O Balance work Improvement of Dharamshala Dhugiari road km. 0/0 to 10/300.
Dharamshala 684.11
73 Improvement & strengthening of Marhoon Kural, Akshina Mandir road from km. 0/0 to 6/890.
Palampur 244.08
74 C/O link road from Mundi lahroo via Sippanpatt. Palampur 97.2575 C/O Balance work i/c Metalling Tarring of Gunnu Nallaha
Kainthly Ladhan road km. 0/0 to 4/220.Chamba 311.97
76 Improvement/ MT of khud Patruma road km. 5/030 to 7/030. Salooni 173.72
77 C/O 75.00 mtr span suspension jeepable bridge over river Ravi at Ghera on link road to village Lech at Rd. 0/390 i/c C/O
approaches.
Bharmour 271.62
78 C/O 68.00 mtr span steel Truss bridge over River Ravi at luna on Luna Ohra road in Tehsil Bharmour Distt. Chamba.
Bharmour 429.92
79 C/O Samoon road km. 0/0 to 1/700 i/c bridge one Chhounch khad.
Fatehpur 356.52
80 C/O Haler khad Bridge to Indpur via Changrara road km. 0/0 to 3/24.
Fatehpur 217.83
81 C/O Link road from Ade-Di- Hatti to Gagruhi via Masrehar Rehar road km. 0/0 to 5/630.
Dehra 435.81
82 C/O link road from Jeen to Banaha via Kumbhker Kaseti in km. 0/0 to 1/840.
Dehra 231.92
83 C/O Bridge over Pole Nallah on Jakhbar Dhanuna road alongwith approaches at Rd. 14/170.
Fatehpur 94.28
84 Up-gradation of road from Charuri to Gheta via Mehta Ghura road km. 0/0 to 6/360.
Nurpur 329.4
85 C/O Bhaglahar Chowk to Chabwan Papahan Dungi Ambe- Di-Kawali road km. 0/0 to 2/465.
Jawali 185.01
86 C/O road from Chouri Ranger to Village Sanu km. 0/0 to 2/520. Hamirpur 134.62
87 Widening & M/T of link road from Jandral to Lambri km 0/0 to 2/810.
Hamirpur 197.33
88 Widening & MT of link road to village Jiar km. 0/0 to 1/405. Hamirpur 108.3789 C/O link road from Pounch village to Andral road km. 0/0 to
3/695 i/c 1 No. bridge at km. 1/485.Touni Devi 384.62
90 C/O Jhiralari to Aghar raod via Chhek Loader Meena- Ka- Dehra Mansuhi Sour, Chakroha Chowkar km. 0/0 to 7/342.
Barsar 546.56
91 C/O link road from Beri to Harijan Basti Village Khatwin in km. 0/0 to 1/700.
Hamirpur 119.96
92 C/O link road NH-88/70-Kallar-Darol-Chunan Kotla road km. 0/0 to 4/300.
Hamirpur 182.63
93 C/O 40.15 mtr span (2 span 19.75 mtr each c/c) RCC T-Beam bridge over Sunehal khad on Dasmal lagmanwin road via
Tohu, Tihra, Maira, Bhounkhar Gadru at Rd. 6/390.
Barsar 128.87
94 C/O link raod Kothi Bhulsai to Barri road km. 0/0 to 3/105 i/c 19.75 mtr span RCC-T-Beam bridge over Doderi khad at Rd.
1/735.
Bilaspur No.I 240.72
95 M/T on Kothi Bhareri Ghalyana via Balh Bural road km. 0/0 to 3/390.
Bilaspur No.I 127.22
Page 21
S. No. Name of Project Name of Division
Sanctioned Amount
Exp. upto 31/03/2016
1 2 3 4 596 C/O Village Bachrin Bhatoli Matyal Dehlwin road km. 4/0 to
6/360 (Phase-II).Ghumarwin 136.27
97 Widening, Strengthening & Improvement of Bangana to Shanthla road km. 0/0 to 10/750.
Bangana 856.59
98 C/O Bangana Hathoon Talmet road from km. 1/150 to 2/975 including 2 No. bridges over Lunkhari khad at km. 1/240 to
2/00.
Bangana 375.61
99 C/O road from Mansoh to Kudu via Charola Nangal Salangri road km. 0/0 to 9/0.
Bangana 564.12
100 C/O M/T link road Bhatehar to Baret road km. 0/0 to 2/600. Bharwain 192.92 3.00101 Widening Strengthening & Improvement of Baruhi to Khurwain
road km. 0/0 to 17/730 ( 8.70/10.20 mtr wide road).Bharwain 1009.69
102 C/O & MT Kuthera Kherla to Katauhar khurd Katauhar Kalan to Una main road km. 0/0 to 4/900.
Bharwain 444.17 0.03
103 C/O road from Ispur Gagret road to Lower Panjawar via patwar Khana Bhaira, Border road km. 0/0 to 7/040.
Una 506.65 26.85
104 C/O & M/T link road from Gagret Oel Ispur road to Mohalla Tiperian (Tippra) upto Swan river in km. 0/0 to 6/650.
Una 404.32 66.86
105 Imp. & balance work of Daulatpur to Behra road km. 0/0 to 5/075.
Bharwain 330.19 47.78
106 C/O link road Kuha Devi to Satsang Ghar Babehar via Babehar up to Co-operative Society km. 0/0 to 2/015.
Bharwain 153.88 9.38
107 C/O & MT of link road from Daulatpur Dholbeh road km. 0/585 to Harijan Basti Behal km. 0/0 to 1/450 i/c solid causeway.
Bharwain 126.81 6.48
107 38561.46