(Before Flight Activities Rarely Seen (Before Flight Activities Rarely Seen (Before Flight Activities Rarely Seen (Before Flight Activities Rarely Seen By The General Public)By The General Public)By The General Public)By The General Public)By The General Public)By The General Public)By The General Public)By The General Public)
DISCOVER DISCOVER DISCOVER DISCOVER ------------DISCOVERYDISCOVERYDISCOVERYDISCOVERY
Page 2
External Tank Arrives by Barge from MS
Page 4
Vertical Assembly Building
External Tank
Page 5
Removing
External Tank
From Carrier
Page 7
External Tank Enters VAB
Page 8
External Tank in VAB
Page 9
Preparing to Lift the Tank to Vertical
Page 11
Solid Rockets
Are Attached
Page 12
Engines Are
Attached To
Solids
Page 13
Engines Are Attached To The Shuttle In The Shuttle Processing Facility
Page 17
Shuttle In Sling Ready For Lift In VAB
Page 18
Shuttle Has Been
Moved To VAB And
And Will Be Attached
To External Tank
Page 20
Shuttle is Attached
Page 24
Payload
Preparation Room
(PPR)
Page 25
Cargo Package For ISS
Page 26
New Module For ISSNew Module For ISS
Page 27
Payload Ready To
Be Moved to The
Launch Pad
Page 29
Payload Carrier
Leaves PPR
Page 31
Payload Being Moved To Launch Pad
Page 33
Lifting Payload
Into Position For
Insertion Into
Discovery When
It Arrives At The
Pad
Page 36
Shuttle Discovery Leaves VAB
Page 38
Shuttle & Crawler
TRIP:
Length--- 3 ½ mi
Time--- 6-8 hours
Launch Pad
Time--- 6-8 hours
Page 42
DISCOVERY
ARRIVES
AT PAD