DPW Procurement

Post on 11-Feb-2016

26 views 0 download

Tags:

description

DPW Procurement. Bidding and Contracts Project Bid Submittals. Project Bid Submittals. Plans and Specs Table of Content Bid Data Sheet Bid Release Assessment Checklist Bid Release Sheet. Electronic Files of the Plans & Specs. Specifications One (1) PDF File per Volume - PowerPoint PPT Presentation

transcript

DPW Procurement

Bidding and ContractsProject Bid Submittals

Project Bid Submittals

• Plans and Specs• Table of Content • Bid Data Sheet • Bid Release Assessment Checklist • Bid Release Sheet

Electronic Files of the Plans & Specs

• Specifications– One (1) PDF File per Volume

• Plans/Drawings– One(1) PDF File per Volume

• Table of Content– Check with us for the latest version– Word Document

Assessment Checklist

Bid Data Sheet

Bid Release

• http://www.ct.gov/dpw%2Dbdc/site/default.asp

• Bid Stage link• Bid Release link• Bid Release Assessment Checklist• Bid Release Procedures/Instructions -

tab• Form 600 – tab - The Bid Release Sheet

Bid Release Sheet

Procedures/Instructions

DAS Pre-qualification Classification

• DAS Pre-qualification is only required for projects with an estimated value over $500,000.

• If you use more than one classification then make sure you are clear whether you mean one or the other or both.– For example,

• Use “or” for either• Use “and” for both

• I prefer one classification

DAS Pre-qualification Classification

• The classification is in the “Invitation To Bid”

• The Bidder must be DAS Pre-certified in the classification on the Invitation To Bid

• Make sure you review the DAS List and its definitions before entering a classification – they are part of Bid Release Sheet Procedures

General Building Classification

• General Building A

– Building without interior finish

• Ex.– Warehouse– Dormitory

General Building Classification

• Gen. Bldg. Const. B

– Building with INTERIOR FINISH

• Ex.– Office Buildings– Classrooms– Adm. Offices– Auditoriums

General Building Classification

• Gen. Bldg. Const. C

– CUSTOM, SCIENTIFIC– COMPLEX Mechanical & Electrical

– Ex.– Hospitals– Historical

Supplementals

• Only up to the Maximum Available Amount.– This means that in your Bid Release, the

Base plus the Supplementals should not exceed the Maximum Available Amount.

– Make sure that the base and supplemental calculations in the Bid Release Sheet match with those in the Data Sheet.

Date Planning Began

• CGS 4-252(e) requirement for purchases at $50,000 or more

• For bonded projects this is the date B100S was accepted

Funding Authorized

• Date• Section

Pre-bid Meeting

• If the pool of bidders is limited and you make the pre-bid meeting mandatory then chances are that you may need to rebid.

• Make sure that you only allow SBSA contractors in pre-bid conference for SBSA projects (most Informals)

Sub-trades

• The sub-trades are for formal projects, those over $500,000 and the individual sub-trades over $25,000

• The sub-trades should only be the four (4) noted in the statue:– Electrical– Mechanical other than HVAC– HVAC– Masonry

Set-aside Waiver

• Set-aside waivers are request from Bruce Bockstael, Chief Architect

• You must explain in detail and verify your justification for your request for a Set-aside Waiver.

Special Requirements

• Any special requirement is intent for information that the bidders should know up-front before they bid because it may cause their bid to be rejected.

• This information will be place in the Invitation To Bid.

• So anything you want on the Invitation to Bid put it here.

Insurances

• Builders Risk• Special Hazard

– Asbestos Abatement– Type "X", "C", "U" – Explosion, Collapse,

Underground in accordance with Article 35 of the General Conditions.

Unit Prices

• Make sure that the Unit Prices in the Bid Release Sheet match with those in the Data Sheet.

Additional Remarks

• Additional remarks are NOT made part of the Invitation to Bid.

• Let us know here if the GC will be required to have asbestos removed.

Asbestos Abatement By GC

• Attached the Report.

Addenda

• Addenda must be submitted with enough time for the Bidding and Contracts staff to post on the Web site - this is seven (7) days in advance

• NO addenda on Fridays

• Addenda issues through AFAO

Addenda

• Bureau of Design & Construction Intranet• Bid Stage link• Addendum Format link• Addendum Transmittal link

Addendum Format

Addendum Format

• Addenda Number• Addenda Date• Project Number• Project Title• Changes

– Item No.– Name and Number of Section– Change From To

• End of Addendum

Sequence of Changes

• Changes to PRIOR ADDENDA• Changes to BIDDING REQUIREMENTS• Changes to GENERAL CONDITIONS • Changes to SPECIFICATIONS/Technical

Section• Changes to DRAWINGS/PLANS

Addendum Transmittal

Addenda

• Before you submit an addendum consider the future consequences– For example, some addenda generated more

addenda that in turn reverse the previous addenda– In one project, the outcome was ten (10) addenda– In this same project, some items were supposed to be

color code but this was not communicated; thus, requiring another addendum

Recommend

Start Date Notice to Proceed

Milestones• Bid Opening• Set-aside Schedule• Contractors Qualification Reviews• Recommends • Affirmative Action Plan [cc PMs] – CHRO approval• Bond Commission Funding Approval or Transfer posted• Letter of Intent [cc PMs] - Contract Documents • Contract Approval – Project Clearance Memo [to PMs]• Construction Schedule Approval• Start Date & Notice To Proceed

Time Line After Bid Opening• Set-aside Schedule – 10 Days• Affirmative Action Plan

– Contractor file w/i 30 days, CHRO accept or reject w/i 60 days• Recommends (?)• Bond Commission Funding Approval (?)• Letter of Intent – 15 Days• Contract Package – 2 days• Contract Approval – 2 weeks

– Legal– Commissioner– AG’s – average of 7 Days

• Project Clearance Memo (?)

Efficiency

• Project managers are copied on the AAP Letter, Letter of Intent, and are notified of the award via the Clearance Memo.

• Inquiries to fiscal officers for information they already provided time away from processing.

• Please be brief with your inquiries and comments to the fiscal officers.

Efficiency

• Please allow the staff to go through the bidding and contracting process for your request.– Are we there yet?

• Please keep in mind that the staff is working on multiple projects.

Questions