Dredging of Gold Tailings Dam (WA) (HDPE Lined …...Dredging of Gold Tailings Dam (WA) (HDPE Lined...

Post on 21-Apr-2020

2 views 0 download

transcript

DredgingofGoldTailingsDam(WA)(HDPELinedPond)

Material Pumped Gold Tailings

Depth Pumped 1-5 m

Pump Capacity 4000 L/min (clear water)

Slurry Ratio 15%

Slurry Pumping Flow Rate

202 m3/ hr

Average slurry extraction

1617 m3/day*

Average wet solid extraction

242 m3/day*

Pumping Distance 180 m