Dry Cask Storage

Defense-in-Depth

Jerry Stephenson

Manager, ISFSI Engineering

25

Dry Cask Storage Defense-in-Depth

“A

gin

g M

an

ag

em

en

t”

26

SCE’s Requirements for Dry

Cask Storage Systems

• SCE goal is to ensure fuel is prepared for both onsite and offsite storage

• Selection criteria

– Must be currently licensed for storage and transportation (at time of selection)

– Must meet SONGS seismic criteria

– Long enough to accommodate SONGS fuel assemblies

– Low Dose Rates

– Strong presence in the U.S. Nuclear industry

• Systems that did not meet criteria were disqualified

• Three vendors were identified that met the requirements

– AREVA (Now Orano,also called TN Nuhoms)

– Holtec

– NAC International

27

Bolted-Lid Cask Limitations

28

DOE Atlas Railcar

29

Railcar can accommodate Orano and Holtec transportation casks

30

• Design specifications– Licensed for storage and transportation

– Higher seismic design based on local seismic conditions

– Thicker shell at 5/8-inch vs standard 1/2-inch

– 316L low-carbon stainless steel for improved corrosion resistance

• Less susceptible to corrosion

• Holtec fabrication enhancements to address chloride-induced stress corrosion cracking– Laser peening to eliminate surface stresses

– Two-pass weld technique to minimize heat affected zone

– Shell over-rolling

Specifications

for Dry Cask Storage System

Safety and Technical FeaturesDry Cask Storage Systems at SONGS

31

Chloride Induced Stress

Corrosion Cracking (CISCC)

• CISCC requires three conditions to start:– Salt and water environment

– Susceptible material

– Tensile stresses in steel to enable crack to grow

• No instances of CISCC have been identified on canisters during inspections conducted to date

• Several design & fabrication improvements minimize potential for development of canister flaws

• 316L is resistant to CISCC

• Peening results in compressive stresses versus tensile stresses

32

33

Fabrication Improvement:

Peening Canister Welds

34

Canister Inspection

• Loaded canisters have been inspected worldwide

– Both horizontal (TN NUHOMS) and vertical (Holtec) systems have

been robotically inspected

– 8 Holtec UMAX canisters inspected at SONGS in 2019

• Canister Inspections will continue at SONGS in 2021

– TN NUHOMS baseline inspection for aging management program

(AMP)

– Holtec UMAX as designated by inspection & maintenance (I&M)

plan in 2024

• Robotic systems are currently available for these inspections

35

SCE Inspection Developments

• Holtec UMAX

– Implemented: SCE demonstrated that detailed visual inspections can be

performed at SONGS

– 8 canisters inspected in early 2019

– Available: Eddy current, ultrasonic inspection, and mitigation

technology available, if needed

36

SCE Inspection Developments

• TN NUHOMS

– Implemented: Other utilities have performed detailed visual

inspections with robotic technology

– Available soon: Inspection Ring undergoing final testing, will be

available for SONGS use in 2020

• First TN NUHOMS Inspections planned for 4Q 2021

37

Orano Inspection Ring

38

Orano Inspection Ring

• Orano Inspection Ring developed for the SONGS TN

NUHOMS System

– Allows for more detailed inspections if degradation is discovered

during initial robotic inspection

• Can perform more detailed Visual, Eddy Current, and Ultrasonic

inspections as necessary

• Remediation will also be available before 2021 planned

inspections

– Status

• Final Performance Testing will occur 4th Quarter 2019

• Inspection Ring will be operational and ready for deployment by

end of 2019

39

RemediationAddressing Potential Flaws

• SCE and nuclear industry are actively working to develop

remediation techniques to address a potentially degraded

canister

1. Robotic weld repair

• Mounted on inspection ring (Orano) or mobile robotics (Holtec)

2. Nesting or over-pack

40

Canister Remediation

• Remediation capability will be available in time to support

planned Orano inspections and Holtec I&M Plan submittal

– Orano TN/NUHOMS

• Inspections planned for 4Q 2021

– Holtec/UMAX

• I&M Plan submittal to CCC planned for October 2020

• Inspections based on I&M Plan, likely next inspections in 2024

–5-year inspection interval

–Regulations require first inspections in 2035

41

BREAKInformation Booths Available

42

Public Comment

Submit written comments to: nuccomm@songs.sce.com

For Internal Use Only

43

CLOSING COMMENTSDAVID VICTOR AND DOUG BAUDER

44

CEP Meetings

Topics Timing

Fuel Transfer Operations & Path Forward 6-5-19

Defense-In-Depth for Dry Cask Storage 8-22-19

SONGS Strategic Plan & the State of Private

Consolidated Interim Storage

11-21-19

Dry Fuel Storage Safety Workshop 1Q 2020

For Internal Use Only

45

For Internal Use Only

Acronyms

For Internal Use Only

46

APPENDIX

MCB Camp Pendleton22 Aug 2019

SONGS CEP Meeting

47

MCB Camp Pendleton Population: 85,650

Marines 38,802 Navy 4,177 Civilian 6,350 Army/Air Force 21Family members 36,300

Daily population surges well above 86,000

Numbers as of Feb 2019

Local Communities Population Oceanside 178,240 San Clemente 66,245 Fallbrook 31,707

48

For Internal Use Only

49

FUEL TRANSFER OPERATIONS

Used Fuel

Readiness for Transportation

50

• Some fuel qualified for transport now

• Remaining fuel qualifies over time

NOW ‘20 ‘21 ‘22 ‘23 ‘24 ‘25 ‘26 ‘27 ‘28 ‘29 ‘30 TOTAL

Units 2/3AREVA NUHOMS 24PT4

Unit 1AREVA NUHOMS 24PT1

Units 2/3HOLTEC MPC-37

6

1 95

1167 2 2

33

17

73

33

2

50

For Internal Use Only

51

DRY CASK STORAGE

Dry Cask Storage

Holtec License Renewal Plan

• Holtec Inspection and Maintenance (I&M) Plan– Required for California Coastal Commission (CCC) coastal

development permit

• Must be submitted to CCC by 10/6/2020

• Four elements are required for I&M Plan

– Canister inspection, monitoring, and maintenance techniques

– Data that will be collected, and frequency of submission to CCC

– Available evidence related to the physical condition of the casks

– Remediation measures that will be implemented if canister condition is not sufficient to allow on-site and off-site transportation

– Will be implemented after CCC approval of plan• I&M Plan will be effective for initial license period (until 10/15/2035)

52

Dry Cask Storage

Orano License Renewal Plan

• ORANO TN/NUHOMS/ License Renewal Application under review

by NRC

• Submitted by SCE to NRC May 2019

• 18-24 month review (normal NRC schedule)

• License expires 2/5/2023

– CA coastal development permit (CDP) renewal for NUHOMS system

• CDP application will be filed after NRC license renewal

• Submittal of CDP by SCE planned for 2/2022

53

Sites Which Have Performed ISFSI

Canister Robotic Inspections

54

Orano

Storage Module and Canister

55

Outlet Vent

For Internal Use Only

56

SONGS EMERGENCY SIRENS

This information is summarized in CEP Decommissioning Update handout

SONGS Emergency Sirens

• Fifty alert sirens depowered in local communities July 1, 2019

• NRC and Federal Emergency Management Agency (FEMA)

determined sirens were unnecessary

• Accident at defueled plant no longer exceed Environmental

Protection Agency (EPA) protective action guidelines (PAG) that

recommend evacuation or sheltering in place

• No credible radiological release beyond site boundary

57

SONGS Emergency Sirens

• Sirens only were to be activated for two highest emergencies

– Site and general emergency

• Neither can occur at SONGS now that reactors are retired

– Sirens never activated due to an emergency in 39 years of service

• SONGS continues to maintain a robust emergency planning and

preparedness program

• More on emergency planning during decommissioning:

– https://www.songscommunity.com/safety/emergency-planning58

For Internal Use Only

59

WHEELER NORTH REEF

EXPANSION PROJECT UPDATE

This information is summarized in CEP Decommissioning Update handout

Reef Expansion Project

60

Reef Expansion Project

61

Links to Important Topics on

SONGScommunity.com

• SCE White Paper on Incidental Canister Contact - June 3, 2019

– https://www.songscommunity.com/internal_redirect/cms.ipressroom.com.s3.amazonaws.co

m/339/files/20195/Effects%20of%20Incidental%20Contact%20White%20Paper%20FINAL

%20060319.pdf

• Drop Analysis of Fully Loaded Multi-Purpose Canister (Model MPC-37)

– https://www.songscommunity.com/internal_redirect/cms.ipressroom.com.s3.amazonaws.co

m/339/files/201810/Non-

proprietary%20SCE%20Summary%20of%20Hypothetical%20MPC-37%20Drop%2011-19-

18.pdf

• Frequently Asked Questions https://www.songscommunity.com/need-to-know/faq