EGLINTON JUNIOR PUBLIC SCHOOL

Jamie Robinson Director, Community Relations & Communications, Toronto Transit Expansion, Capital Projects Group May 2015

Agenda

• Eglinton Crosstown LRT Project • Mount Pleasant Headwall Construction • Mount Pleasant Station Concept • Tunnel Ventilation at LRT Stations • Property Requirement • Traffic Management During Construction • Impacts on Transit Users and Pedestrians

2

MSF – Maintenance & Storage Facility

3

Eglinton Crosstown LRT

Project • $5.4 B (2010$), funded by the Province of Ontario • 19 kilometres east-west LRT from Kennedy to

Jane/Black Creek, including 10 kilometres of tunnel • Connections to Yonge-University-Spadina Subway,

Scarborough RT and GO Stouffville • Up to 25 stations and stops

4

Key Features and Timing

5

West Tunnels / East Tunnel West Tunnels Contract: ECLC1-15 Contractor: Crosstown Transit Constructors Award Date: October 1, 2012 Final Completion: December 16, 2016

East Tunnel Contract: ECLC1-17 Contractor: Aecon-Dragados Joint Venture Award Date: October 21, 2013 Final Completion: November 6, 2016

6

Tunnel Boring Machine

• The construction of new tunnels under Eglinton Avenue is done by tunnel boring machines (TBMs)

• Each TBM moves forward by pushing off against concrete segments it has placed behind it to line the tunnel

• The operator advances the machine as soil is removed from the TBM face through a conveyor system

• The launch pit remains active for removal of muck/spoils

7

Sequence of Tunnel Drive

8

Mount Pleasant Headwall Construction

Possible Jet Grout Plant location

9

Jet Grout Rig

Jet grout rigs will be used for headwall construction at future stations and the extraction shaft at Yonge Street

10

Jet Grout Plant - Sutherland / Donlea

Jet Grout rigs will be used for headwall construction at future stations, cross-passages and emergency exits.

11

Timeline for Mount Pleasant Headwall Works

With appropriate permissions in place, Metrolinx’ contractor will: • Conduct some utility relocation before headwall construction • Install fencing and secure the perimeter • Install grout lines in the roadway • Jet grout plant will be set up prior to the headwall

construction • Begin Mount Pleasant headwall construction in late Summer

2015 • Approximately 4-6 months anticipated at each wall

12

Mt Pleasant Station Preliminary Station Concept

13

Mount Pleasant Station Longitudinal Section

14

Mount Pleasant Station Primary Entrance

15

Mount Pleasant Station Secondary Entrance

16

West End TVF Plant

East End TVF Plant

Tunnel Ventilation at LRT Stations

17

Above Grade Ventilation Requirements

18

Passive Piston Action

Emergency Fan Boost

Typical Fan Plants

19

Mt Pleasant Station Emergency Ventilation Shafts

• East emergency ventilation shafts will be combined with the Secondary Entrance building

• West emergency ventilation shafts will be a stand alone structure in the Brownlow Avenue boulevard

• Further analysis and detailed design will be completed by Project Co

20

Example of TTC Vent Shaft at Bayview Station

21

Example of TTC Vent Shaft at Bessarion Station

22

Property Requirements

• Part 1 – Construction and maintenance access for ventilation shaft (permanent easement)

• Part 2 – Ventilation shaft equipment below grade (fee simple subsurface)

• Part 3 – Construction Staging (temporary)

23

Property Requirements

• Part 1 – Construction and maintenance access for ventilation shaft (permanent easement)

• Part 2 – Ventilation shaft equipment below grade (fee simple subsurface)

• Part 3 – Construction Staging (temporary)

24

Property Requirements

• TDSB has been engaged on the property requirements and discussions have been on-going with Metrolinx.

• Commencement date for permanent and temporary requirements is October 15, 2015.

• Duration is 4 years, plus an option to renew for 1 additional year.

25

TDSB Proposed Alternative

• TDSB proposed an alternative vent shaft location

• Vent shaft would be on TDSB property instead of City property (shift from blue area to red area on drawing)

• Intent to reduce construction impacts to parking area and site operations

26

Evaluation of TDSB Proposed Alternative • Vent shaft location proposed by TDSB – Pros:

– Closer to the station box – Could result in less disruption during construction

• Vent shaft location proposed by TDSB – Cons: – Vent shaft is more visible adjacent to the school and fronting on Eglinton – Vent shaft is closer to openings in the school buildings. The vent shaft must be a

minimum of 12 metres (horizontal distance) from any operable windows or 2.5 metres above any operable windows.

– Will cause permanent reduction in TDSB staff parking area – Depending on height of the vent shaft, it could block sightlines for service vehicles

entering and exiting the loading area – Could cause impacts to the existing school structure/ foundations – The work zone, including cranes and other large machinery, would be closer to the

school

27

Evaluation of TDSB Proposed Alternative

• Based on preliminary design and engineering by Metrolinx, the Brownlow boulevard was determined to be the best location from a technical perspective

• The vent shaft location proposed by TDSB will not eliminate disruption to normal parking, garbage and deliveries during construction

• In the long term, the current vent shaft location selected by Metrolinx is better for TDSB as it does not permanently affect parking, garbage or delivery operations 28

Roles and Responsibilities

• Metrolinx is managing the construction project. • City reviews Metrolinx proposals for interim traffic control

measures during construction. • Toronto Police, City Transportation and Metrolinx meet

regularly to discuss issues and project needs such as enforcement, traffic management and parking.

• City is responsible for approving any temporary and permanent changes to turn restrictions, traffic calming, etc.

29

Our Approach to Traffic Management

• Maintain a minimum of one lane eastbound and westbound on Eglinton in construction work zones

• Buses and general traffic will share this lane • Additional lanes will be provided if space allows • Metrolinx will work with City of Toronto Transportation,

local elected officials and neighbours to monitor local traffic

• Signal timing may be modified and turning restrictions may be added or relaxed to improve the flow

30

Traffic Lane Reductions

Temporary road closure, local traffic only

Traffic reduced to one lane in each direction

Proper City permitted traffic signage will be installed

31

Transit Services during Tunnel Construction

• Both eastbound and westbound TTC stops in the affected area may be shifted and relocated for the safety of transit riders

• Watch for TTC posted signs indicating the adjusted stop locations

32

Pedestrians

• In the construction zone, for temporary sidewalks or existing sidewalks the goal is to maintain minimum 1.5 metre sidewalk widths wherever possible

• Access to properties from sidewalks should be maintained

• Some sections of sidewalk may be closed and crossings will be available at traffic signals

• Please take care when travelling near construction. Watch for additional signage directing pedestrians

33

Pedestrian Detours

Sign directing pedestrians Temporary detour of pedestrian sidewalks may be required

34

Crosstown Community Relations Team