Final studio project - comprehensive design including mechanical, structural, site, and building design. Program includes reception, auditorium, exhibition hall, and support spaces.

transcript

SITE PLAN

STRUCTURAL BAY

UPPER LEVEL

LOWER LEVEL

MAIN EXHIBITION HALLNORTHEAST VIEW

EXHIBITION RECEPTIONSOUTHWEST VIEW

INTERGRITY. STRENGTH. CONTINUUM.

JAMES BOND HAS INSPIRED MOVIE GO-ERS FOR OVER FIFTY YEARS. A COMBINATION OF GADGETSEXOTIC LOCALES, MYSTERIOUS BEAUTIES, ANDDANGEROUS VILLIANS HAVE CAPTIVATED AUDIENCESSINCE 1962.

IT MAY BE SAID JAMES BOND REPRESENTS ACONTINUUM OF POP CULTURE STARTING IN THEPAST AND FLOW ING THROUGH THE FUTURE. THEBELOVED, HATED, FEARED, AND ADORED HERO PROVIDES STORIES OF PERSONAL STRENGTH,UNWAIVERING CHARACTER, AND UNQUESTIONABLEINTEGRITY.

AN EXHIBITION HALL DEDICATED TO SUCH A MANSHOULD EXHIBIT THE SAME CHARACTERISTICS ASMENTIONED ABOVE. THE MAIN BUILDING FORMIS ONE FLOWING HALL REPRESENTING THE CONTINUUM.STRENGTH AND STEADFASTNESS ARE REPRESENTED BY STRUCTURE.

JAMES BOND ALSO LEADS A SECONDARY LIFE. HE IS ACALCULATING KILLER BUT HE ALSO HAS AN ELUSIVE PERSONAL BACKGROUND. THIS DUALITY IS EXPRESSEDVIA THE BUILDING ENVELOPE, A MAIN GLAZING WALL COVERED BY A METAL PERFORATED SCREEN. THE ENVELOPECONSTRUCTION ALLUDES TO BOND’S TOUGH OUTERPERSONA PROTECTING HIS TRANSPARENT INNER SELF.

MAIN ENTRANCESOUTH VIEW

TRANSVERSE BUILDING SECTIONWALL SECTION

THE STRUCTURAL SYSTEM IS COMPRISES TWO SECTIONS. ONE SECTIONOF POST AND BEAM UTILIZING CONCRETE BEARING COLUMNS WITHCURVED TOPCHORD TRUSS MEMBERS. THE SECOND SYSTEM UTILIZESWIDE FLANGE STEEL BEAMS SEATED BETWEEN TWO CURVED REINFORCED CONCRETE BEARING WALLS.

0 10 20 40 0 10 20 40

MECHANICAL SYSTEM DIAGRAM

DRAINAGE DETAIL

MAIN ENTRANCETRANSVERSE SECTION

WALL SECTION

THE SITE INTERVENTIONS INCLUDE SWEEPING, FLOWING PATHS WHICH CUT TO THERIVER. THE BUILDING IS ELEVATED ON PIER TO COMBAT ANY DAMAGE VIA FLOODING.THIS OPEN SPACE BELOW THE BUILDING IS USED FOR A REFLECTING POOL AND DECK AREA.