QUANG NINH PROVINCIAL PEOPLE’S COMMITTEE
QUANG NINH PROVINCIAL DEPARTMENT OF
NATURAL RESOURCES AND ENVIRONMENT --------------------------------------
ENVIRONMENTAL IMPROVEMENT PROJECT
OF QUANG NINH PROVINCE
FINAL REPORT
Quang Ninh, July 2014
QUANG NINH PROVINCIAL PEOPLE’S COMMITTEE
QUANG NINH PROVINCIAL DEPARTMENT OF
NATURAL RESOURCES AND ENVIRONMENT --------------------------------------
ENVIRONMENTAL IMPROVEMENT PROJECT
OF QUANG NINH PROVINCE
FINAL REPORT
CONSULTANT UNIT INVESTOR
NIPPON KOEI CO.,LTD QUANG NINH DONRE
KENGO NAGANUMA
Quang Ninh, July 2014
1
TABLE OF CONTENT
Trang
CHAPTER 1 INTRODUCTION ................................................................................................ 1-1
1.1 Background .......................................................................................................... 1-1
1.2 Objectives of the Project ...................................................................................... 1-1
1.3 Framework of the Environmental Planning of Quang Ninh Province ................. 1-2
1.4 Long List of the Projects Proposed by the Environmental Plan of Quang Ninh
Province ............................................................................................................... 1-7
1.5 Long List of the Projects Proposed by VINACOMIN ....................................... 1-22
1.6 Proposed Priority Projects by the Environmental Plan of Quang Ninh Province
........................................................................................................................... 1-24
CHAPTER 2 PROPROTY PROJECTS ON WATER ENVIRONMENT MANAGEMENT .... 2-1
2.1 Approach on Selection of Priority Projects .......................................................... 2-1
2.2 Improvement of Domestic Wastewater Treatment Capacity ............................... 2-2
2.3 Improvement of Coal Mining Wastewater Treatment Capacity ........................ 2-25
2.4 Improvement of Rural Wastewater Treatment Capacity ................................... 2-30
CHAPTER 3 PRIORITY PROJECTS FOR AIR ENVIRONMENT MANAGEMENT ............ 3-1
3.1 Approach on Selection of Priority Projects .......................................................... 3-1
3.2 The Project for Strengthening Capacity for Environmental Management ........... 3-1
3.3 Capacity Development on Air Quality Monitoring and Plant Emission Monitoring
by International Expert ........................................................................................ 3-3
3.4 The Project for Mandatory reporting of Flue gas measurement value to local
government .......................................................................................................... 3-5
CHAPTER 4 PRIORITY PROJECTS ON SOLID WASTE MANAGEMENT ........................ 4-1
4.1 Approach on Selection of Priority Projects .......................................................... 4-1
4.2 Development of Solid Waste Management System ............................................. 4-2
CHAPTER 5 PRIORITY PROJECTS FOR FOREST MANAGEMENT ................................. 5-1
5.1 Approach on Selection of Priority Projects .......................................................... 5-1
5.2 Enhancing Function of Protected Areas for Environmental Management........... 5-2
CHAPTER 6 BIODIVERSITY CONSERVATION ................................................................. 6-1
6.1 Approach on Selection of Priority Projects .......................................................... 6-1
6.2 Planning of Biodiversity Conservation Plan of Quang Ninh Province ................ 6-1
6.3 Restoration and Rehabilitation of Coral Reefs, sea grass and seaweed vegetation
............................................................................................................................. 6-3
6.4 Promotion of Eco-tourism and Establishment of Ramsar Site ............................. 6-4
2
CHAPTER 7 CLIMATE CHANGE ISSUES ............................................................................. 7-1
7.1 Approach on Selection of Priority Projects .......................................................... 7-1
7.2 Communication for Raising of Knowledge on Climate Change Management
Mechanism at All Levels as well as Communities in Quang Ninh Province....... 7-1
7.3 Study on Development of the ASEAN Green Growth Centre ............................. 7-2
7.4 Capacity Enhancement for Organizations in Responding to Climate Change ..... 7-3
7.5 Development of Local Regulations for Climate Change Issues .......................... 7-4
7.6 Construction, Upgrading, and Renovation of Hydrometeorology Station in Co To
District ................................................................................................................. 7-5
7.7 Development of Environment and Hazard Database, and Automatic System for
Natural Disaster Monitoring and Warning in Quang Ninh Province ................... 7-6
7.8 Promotion of Efficient Operation of Tourist Boats in Halong Bay ..................... 7-7
7.9 Promotion of Energy Efficiency to Major Manufacturers ................................... 7-8
CHAPTER 8 ENVIRONMENTAL MONITORING ................................................................. 8-1
8.1 Approach on Selection of Priority Projects .......................................................... 8-1
8.2 Project for Construction of Automatic Environmental Monitoring Stations in
Quang Ninh Province ........................................................................................... 8-1
8.3 Development of Construction Plan of Regional GIS Center ............................... 8-3
CHAPTER 9 SOLUTION FOR IMPLEMENTATION OF ENVIRONMETAL PLANNING . 9-1
9.1 Solutions on investment capitals mobilization ..................................................... 9-1
9.2 Solutions on organization and capacity building for the environmental
management apparatus ......................................................................................... 9-1
1
LIST OF TABLES
Table 1.4-1 List of Proposed Projects in the Quang Ninh Environmental Master Planning .. 1-8 Table 1.5-1 Summary of Environmental Protection Program in 2012-2015 ....................... 1-23 Table 1.5-2 Summary of Environmental Protection Program in 2016-2020 ....................... 1-23 Table 1.6-1 Priority Projects for Water Environment Management .................................... 1-25 Table 1.6-2 Priority Projects for Air Quality Management ................................................. 1-26 Table 1.6-3 Priority Projects for Solid Waste Management ................................................ 1-27 Table 1.6-4 Priority Projects for Forest Management .......................................................... 1-28 Table 1.6-5 Priority Projects for Biodiversity Conservation................................................ 1-29 Table 1.6-6 Priority Projects for Adaptation and Mitigation on Climate Change................ 1-30 Table 1.6-7 Priority Projects for Environmental Monitoring ............................................... 1-31
1
LIST OF ABBREVIATIONS
3R Reduce Reuse Recycle
AAS Atomic Absorption Spectrophotometer
A-Cmax Allowable Concentration maximum
AHP ASEAN Heritage Parks
AQM Air Quality Monitoring
AQS Air Quality Standard
ASEAN Association of Southeast Asian Nations
ASEON ASEAN Senior Officials on the Environment
AVG Average
BAP Biodiversity Action Plan
BOD5 Biochemical Oxygen Demand in 5 days
BTL Bai Tu Long National Park
BTNMT Ministry of Natural Resources and Environment, MONRE/Bộ Tài nguyên và Môi trường
CaCl2 Calcium chloride
CBD Convention on Biological Diversity
CD Capacity Development
CEPC Coastal Environment Protection Corridor
CFB Circulating Fluidised Bed
COD Chemical Oxygen Demand
COP Conference of the Parties
DANIDA Danish International Development Agency
DARD Department of Agriculture and Rural Development
DCST Department of Culture, Sports and Tourism
DOC Department of Construction
DOET Department of Education and Training
DOH Department of Health
DOIT Department of Industry and Trade
DONRE Department of Natural Resources and Environment
DOST Department of Science and Technology
DOT Department of Transport
DPI Department of Planning and Investment
EIA Environmental Impact Assessment
EMAC Environment Monitoring and Analyzing Center
EU European Union
EVN Electricity Vietnam
FS Feasibility Study
GC-MS Gas Chromatography/ Mass Spectrometry
GDP Gross Domestic Product
GHG Greenhouse Gas
GIS Geographical Information System
GPS Global Positioning System
HBMD Halong Bay Management Department
IBA Important Bird Areas
IDB International Day for Biodiversity
INDEVCO Industrial Development Company
IP Industrial Park
IUCN International Union for Conservation of Nature
JICA Japan International Cooperation Agency
JSC Joint Stock Company
Kp Capacity Coefficient
kPa Kilopascal
Kv Regional Coefficient
2
kVA Kilo Volt Ampere
L/min Litter per Minute
LUP Land Use Plan
M/P Master Plan
MB Management Board
MCST Ministry of Culture, Sport and Tourism
MOF Ministry of Finance
MOH Ministry of Health
MONRE Ministry of Natural Resources and Environment
MPA Marine Protected Area
MPI Ministry of Planning and Investment
MSW Municipal Solid Waste
Mw Mega Watt
NDVI Normalized Difference Vegetation Index
NGO Non-governmental Organization
NKER Northern Key Economic Region
NORAD Norwegian Agency for Development Cooperation
NP National Park
NTFP Non-Timber Forest Products
ºC Degree Celsius
ODA Official Development Assistance
OJT On the Job Training
PEM Plant Emission Monitoring
PES Payment for Environmental Services
PM Particulate Matter
PM10 Particulate Matter which diameter less is less than 10μm / Bụi ≤ 10 μm
PM2.5 Particulate Matter which diameter less is less than 2.5μm
PMU Project Management Unit
PPC Provincial People’s Committee
PSD Pollution Source Database
PSI Pollution Source Inventory
PSM Pollution Source Map
PST Pollution Source Table
QA/QC Quality Assurance/Quality Control
QCVN Vietnamese Technical Regulations /
QD-TTg Decision-Prime Minister
QN Quang Ninh Province
RRD Red River Delta
SEDP Socio-Economic Development Master Plan for Quang Ninh Province to 2020 with Vision towards 2030
SOP Standard Operation Procedure
SUF Special Use Forest
SW Solid Waste
SWM Solid Waste Management
TCVN National standards of Vietnam / Tiêu chuẩn Việt Nam
TSP Total Suspended Particulates/ Bụi lơ lửng
TSS Total suspended solids
UK United Kingdom
UNDP United Nations Development Programme
UNESCO United Nations Educational, Scientific and Cultural Organization
UPS Uninterruptible Power Supply
URENCO Urban Environment Company
US United States of America
US EPA United States Environmental Protection Agency
UV Ultraviolet
3
VEA Vietnam Environment Administration
VEPF Vietnam Environmental Protection Fund
VINACOMIN Vietnam National Coal - Mineral Industries Group / TỔNG CÔNG TY ĐIỆN LỰC – TKV (TNHH NHÀ
NƯỚC MỘT THÀNH VIÊN)
WG Working Group
WQI Water Quality Index
WQM Water Quality Monitoring
WWTP Wastewater Treatment Plant
WWV Wastewater Volume
Environment Improvement Project in Quang Ninh Province
1-1
CHAPTER 1 INTRODUCTION
1.1 Background
Quang Ninh Province is one of the foremost production centers of coal in Vietnam and
plays a key role in the regional distribution system, where it has been functioning as a
main industrial development zone in northern Vietnam, and where urban
industrialization has progressed rapidly. At the same time, Quang Ninh Province is the
location of the Halong Bay World Heritage Site, and tourism is another important sector
in the province; therefore, provincial socio-economic development strategies should
harmonize with environment protection strategies.
In recent years, Quang Ninh Province has gained important achievements and
comprehensive development. The gross domestic product (GDP) growth is
approximately 12% per year on average. However, due to the requirements of economic
development, the impacts on the environment has recently become apparent, such as
deterioration of water quality due to domestic, industrial, and coal mining wastewater,
issues on generated municipal and industrial solid waste, air pollutants discharged from
thermal power plants and cement factories, impacts on regional natural environment and
biodiversity.
In line with the current situation mentioned above, Quang Ninh Province is proceeding
with the “Green Economy Approach”, the objective of which is to internalize
environmental protection measures into socio-economic development. To adopt the
“Green Economy Approach”, a provincial environmental master plan is expected to be
formulated to address actualized and potential environmental issues to be solved on air,
water, soil quality control, solid waste management, biodiversity conservation/forest
management, and climate change issues.
Based on the above matter, Quang Ninh province is plannig the Quang Ninh province
environment master plan to 2020 vision to 2030 and Ha Long Bay environment master
plan to 2020, vision to 2030. Pursuant to Notice No.108 - TB/TW dated on 01 October
2012 by Political Bureau of the Project “Rapid, sustainable socio-economic
development; ensuring strong defense, security and pilot building two administrative
units especially Van Don, Mong Cai”, it is required to clarify priority projects in the
above master plans.
1.2 Objectives of the Project
The goals are following the Environmental Planning to 2020 and vision to 2030.
Proposing projects in order to implement the Environmental Planning of Quang Ninh
Province and Environmental Planning of Halong Bay following goals set in the Planning
Environment Improvement Project in Quang Ninh Province
1-2
(Annexes attached).
The total number of proposed projects is 91, covering 7 fields:
(1) Water environmental management: 21 projects.
(2) Air quality management: 5 projects.
(3) Solid waste management: 16 projects.
(4) Forest management: 17 projects.
(5) Biodiversity conservation: 12 projects.
(6) Climate change mitigation and adaptation: 15 projects.
(7) Environmental monitoring: 5 projects.
1.3 Framework of the Environmental Planning of Quang Ninh Province
(1) Basic Policy and Strategy to be referred for Setting Goals and Vision of the
Environmental Plan for Quang Ninh Province
1) National Environmental Protection Strategy to 2020, with vision to 2030
Currently, the Law on Environmental Protection, the fundamental law for
environmental protection in Vietnam, is under revising for introducing latest ideas for
environmental protection and sustainable management. Such latest ideas were also
reflected to the national policy on environmental management, the “Decision No.
1216/QD-TTg of the Prime Minister approving the National Environmental Protection
Strategy to 2020, with a vision to 2030”, which came to force on 5th May 2012. The
strategy was recognized as a milestone in Vietnam to harmonize sustainable economic
growth with environmental protection by attaining the concept called “Green Growth
Strategy”, with aiming at reducing environmental pollution, the degradation of natural
resources and biodiversity by 2020, and at preventing and reversing these trends by
2030. The objectives and visions held in the national environmental protection strategy
should be referred to set goals and visions of the Environmental Plan in Quang Ninh
province.
(a) Objectives of the Environmental Protection Strategy to 2020
The objective of the environmental protection strategy to 2020 is as follows;
To fundamentally control and restrict increases in environmental pollution,
degradation of natural resources and biodiversity; to continue improving the quality
of the environment; and to improve capacities to proactively respond to climate
change, to achieve sustainable development of the country.
Under the above objective, the following specific objectives were set;
- To reduce environmental pollution sources significantly,
- To remediate and rehabilitate polluted and degraded areas,
Environment Improvement Project in Quang Ninh Province
1-3
- To improve people’s living condition,
- To reduce natural resources degradation and depletion levels, and control
decline of biodiversity condition, and
- To strengthen capacity to respond to climate change impacts with reduction of
greenhouse gas (GHGs) emissions levels.
Considering above objectives, the Environmental Plan of Quang Ninh province should
address on reduction of pollution sources, improving of people’s living condition,
conservation of provincial natural resources, natural environment and biodiversity
condition, and proposing mitigation and adaptation measures on climate change issues.
(b) Vision of the Environmental Protection Strategy toward 2030
The vision of the national environmental protection strategy toward 2030 is as follows;
Trends in increasing environmental pollution, natural resources degradation and
biodiversity decline should be halted and reversed; the quality of living
environments
should be improved; climate change should be proactively addressed; and basic
conditions should be created to develop a lower waste, low-carbon green economy
aiming at achieving economic prosperity and sustainable development of the
country.
The vision expects that the environmental management in Vietnam will contribute to
not only mitigating or preventing negative impacts by economical activities like
“passive environmental management, but also shifting economical activities
themselves to have environmental-friendly characteristics as “active environmental
management”.
2) Promotion of Green Growth Strategy
According to OECD, green growth is defined as “Fostering economic growth and
development while ensuring that natural assets continue to provide the resources and
environmental services on which our well-being relies. To do this it must catalyze
investment and innovation which will underpin sustained growth and give rise to new
economic opportunities..”1 The definition shows that green growth strategy covers
various fields not only environmental management sector but also different sectors
such as energy sector or economic sector. To achieve green growth strategy, all
relevant sectors should consider the way of contribution to achieve the Green Growth
1 Multilingual Summaries for Towards Green Growth
http://www.oecd-ilibrary.org/environment/towards-green-growth_9789264111318-en/summaries;jsessioni
d=d1i8i98i9fp15.delta
Environment Improvement Project in Quang Ninh Province
1-4
Strategy. Environmental Plan of Quang Ninh province will be also expected to
contribute to actualize the Green Growth Strategy.
So far, Quang Ninh province has conducted the actions for actualizing the concept of
green growth strategy. On June 5, 2012, Quang Ninh Provincial People's Committee
held the Workshop on “Green Economy and Sustainable Development”. At this
Workshop, Mr. Dang Huy Hau, Vice-chairman of Quang Ninh PPC described about
the Green Growth Strategy of Quang Ninh Province. He stated that Quang Ninh
Province should shift the growing model from “Brown Growth“ to “Green Growth”
followed by the same concept with National Strategy of “Green Growth”. In order to
achieve the goal of "Green Growth", associating economic growth with sustainable
development, Quang Ninh Province considers some key tasks need to focus as
follows:
a) To find the solutions to overcome and minimize environmental pollution
b) To increase investment and strengthen socialization of environmental protection
activities
c) To promote scientific research and application of high technology, clean and
environment friendly technology
d) To deploy synchronic planning for environmental protection at provincial and
district levels
e) To promote communication, education, enhance awareness and sense of
responsibility for Environmental Protection
On December 16, 2012, Quang Ninh Provincial People's Committee held the seminar
“Green Growth and measures to attract Japanese investors to invest in Quang Ninh"
with Japan International Cooperation Agency (JICA), Japan External Trade
Organization(JETRO), Japan Business Association in Vietnam (JBAV) the Japan Inter
Culture Association, and representative companies from Japan. In this Workshop,
Quang Ninh province signed an agreement with JICA to cooperate for proceeding
relevant activities for Green Growth in Quang Ninh province.
Quang Ninh province prepares the Socio-Economic Master Plan to 2020 with Vision
toward 2030 (SEDP). In term of the relationship between the SEDP and Green-growth
Strategy, SEDP has been mentioned as follows:
a) Development scheme: SEDP states that 3 pillars of sustainable development,
those are economy, society and environment, are the key parts of the
master-plan The shifting of economic structure from “brown” to “green” that
reflects the tourism – service increasing, accounting for above 50% of GDP. The
open coal mining will be stopped by 2018 and some of mines will be planned to
be renovated as tourism spots.
Environment Improvement Project in Quang Ninh Province
1-5
b) Introduction of severe environmental standards: SEDP proposes to introduce
developed countries’ environmental and emission / wastewater standard at the
primary residential and tourism areas.
c) Promotion of green tourism / eco-tourism: SEDP recommends to promote green
tourism / eco-tourism as the dominant tourism activities for contributing not
only environmental protection but also economical development.
d) Proposal on environment protection measures: SEDP suggests to construct
water waste treatment plans and solid waste treatment facilities, and other
environmental protection measures such as promotion of composting,
improvement of environmental protection measures on coal mining related
facilities.,
As mentioned above, the Green Growth Strategy is one of the key concepts to prepare
vision and goal of the Environmental Plan of Quang Ninh province.
3) Adaptation on Announcement of Opinion of the Politburo on Socio-economic
Development on Quang Ninh Province
On 1st October 2012, the Central Executive Committee announced the opinion on the
project for rapid and sustainable socio-economic development to ensure the national
defense and security with setting up a pilot of the two special administrative -
economic units of Van Don and Mong Cai district in Quang Ninh Province. The
announcement stated that Quang Ninh province locates at the strategic important area
from the political and economical viewpoints, and has potential advantages compared
to other localities in the region. Quang Ninh Province is considered to perform a role
as the powerful economic center of the Red River Delta and the Northern Economic
Belt in Vietnam. To 2020, Quang Ninh Province is expected to become a province of
modern services, industry, an international tourist centre of the northern part of
Vietnam. Another important expectation in Quang Ninh Province is to develop
measures to shift economic structure from "brown" to "green". The living standards of
the people are also expected to be upgraded, and natural and cultural assets which are
represented by the world heritage site of Halong Bay should be preserved and their
worth would be maximized. The Environmental Plan of Quang Ninh Province should
contribute to actualization of these concepts suggested by the announcement.
(2) Goal and Target of the Environmental Plan of Quang Ninh Province
Considering the national environmental protection strategy and concept of green
growth strategy, tentatively, the goal of target of the Environmental Plan for Quang
Ninh province is proposed as follows;
Vision to 2030
Quang Ninh Province will be a key leading actor for successful implementation of
Environment Improvement Project in Quang Ninh Province
1-6
environmental protection targets within framework of green growth strategy
inVietnam; The province will have the capability to send information and experiences
to other countries, such as members of the Association of Southeast Asian Nations
(ASEAN).
Goal to 2020
Quang Ninh Province will be a leading actor in Vietnam for successful implementation
of environmental protection targets within framework of green growth strategy
inVietnam.
Targets by 2020
(1) Halong City: will be a typical locality in environmental protection field and
implementation of sustainable tourism in Quang Ninh Province.
a) Development and completion of wastewater collection and treatment systems
and solid waste management systems;
b) Development of sustainable tourism such as ecotourism combining with
environmental awareness raising;
c) Stopping of open mining, minimization of air environment pollution;
d) Construction of sustainable urban via ensuring of natural green areas, solid
waste sorting, limiting number of transportation means that cause smokes and
dust in the city center areas.
(2) Enhance values of provincial natural environment and provincial natural
resources management network
a) Implementation of sustainable management of natural resources and land on
the basis of the environmental zoning, multi-axis management consisting of
two headwater forests systems and three ecological corridors (mountain
ecological corridor, coastal ecological corridor and marine ecological
corridor);
b) Establishment, upgrading and expansion of natural protected areas in the key
areas of Quang Ninh Province; improve the natural conditions of important
headwater forests (special-use forest, protective forest, production forest) for
protection of water resources.
c) Enhancement of regional natural environment worth and sustainable regional
natural resource use by actualization according to categorized as an
internationally well-known criteria such as a Ramsar site or an ASEAN
Heritage Park.
(3) Mitigate the forecasted major environmental impacts in high-risk areas in the
future
a) Development of wastewater treatment facilities and sewerage systems in high
priority areas.
b) Development of solid waste management system in high priority areas.
Environment Improvement Project in Quang Ninh Province
1-7
c) Implementation of strategic environmental assessment (SEA) on major areas
affected by large-scale development such as in Quang Yen Town and Van Don
District.
d) Implementation of adaptation measures to address climate change issues.
(4) Approve the Provincial Green Growth Strategy and carry out implementation
a) Promotion to introduce an ASEAN Green Growth Center in Quang Ninh
Province.
b) Implementation of climate change mitigation measures using international
schemes.
(5) Enhance the provincial level capacity on environmental management and
monitoring
a) Establishment of geographic information system (GIS) center to supervise
environmental information in Quang Ninh Province.
b) Enhancement of environmental monitoring capacity to respond to
development targets of the country.
c) Participation in international environmental monitoring network such as Acid
Deposition Monitoring Network in East Asia (EANET) to address
inter-provincial environmental issues.
1.4 Long List of the Projects Proposed by the Environmental Plan of Quang Ninh
Province
Table 1.4-1 shows the long list of the projects proposed by the Environmental Plan of
Quang Ninh Province. Totally, 91 of the projects were proposed in the Environmental
Plan of Quang Ninh Province, comprising of 21 projects in water management sector,
5 projects for air quality management sector, 16 projects for solid waste management
sector, 17 projects for forest management sector, 12 projects for biodiversity
conservation sector, and 15 projects for climate change adaptation and mitigation
sector, and 5 projects for environmental monitoring sector.
Environment Improvement Project in Quang Ninh Province
Table 1.4-1 List of Proposed Projects in the Quang Ninh Environmental Master Planning
No Name Objectives Cost
(Million USD)
Schedule Priorit
y Project
Possible sources
Note
ODA loan
Non-refundable
ODA
FDI
Budget from
private compan
ies
Budget from
Central
Budget from
Province
Budget from
Vinacomin
Water environment management
1 Development of Wastewater Treatment System for Halong City (Component applied to JICA Yen loan)
The Project to develop wastewater management system in each city, town and district.
95.0 2013-2020 x x x
West-1: Hung Thang
East-1: Ha Tu
2
Development of Wastewater Treatment System for Halong City (other components)
" 170.0 2014-2022 x x x
West-2: Gieng Day
West-3: Dai Yen West-4:
Bai Chay East-2:
Hong Hai
3 Development of Wastewater Management System for Mong Cai City
" 98.0 2014-2022 x x x
4 Development of Wastewater Management System for Cam Pha city
" 135.0 2014-2022 x x x
5 Development of Wastewater Management System for Uong Bi city
" 98.0 2014-2022 x x x
6
Development of Wastewater Management System for Van Don District
" 23.0 2014-2022 x x x
7
Development of Wastewater Management System for Quang Yen Town
" 15.0 2016-2027 x x
Study policy and mechanizm to call
for private investment base on
waste water
treatment for groups
8
Development of Wastewater Management System for Dong Trieu District
" 54.0 2016-2027 x x
9 Development of Wastewater Management System for Binh Lieu
" 6.0 2018-2030
x x
1-8
En
viron
men
t Imp
rovem
ent P
roject in
Qu
an
g N
inh
Pro
vince
Environment Improvement Project in Quang Ninh Province
No Name Objectives Cost
(Million USD)
Schedule Priorit
y Project
Possible sources
Note
ODA loan
Non-refundable
ODA
FDI
Budget from
private compan
ies
Budget from
Central
Budget from
Province
Budget from
Vinacomin
District of residents
10
Development of Wastewater Management System for Tien Yen District
" 15.0 2018-2030
x x
11
Development of Wastewater Management System for Dam Ha District
" 8.0 2018-2030
x x
12 Development of Wastewater Management System for Hai Ha District
" 129.0 2018-2030
x x
13
Development of Wastewater Management System for Ba Che District
" 11.0 2018-2030
x x
14
Development of Wastewater Management System for Hoang Bo District
" 41.0 2018-2030
x x
15 Development of Wastewater Management System for Co To District
" 4.0 2018-2030
x x
16
Project for Planning Rural Wastewater Treatment System in Quang Ninh Province
The project is to examine individual wastewater treatment system in rural area in Quang Ninh province.
1.0
2014-2016 x x x
17
Project for Preparing Guidelines to Control Industrial Wastewater to Satisfy EU Standards
The project is to prepare guidelines for controlling industrial wastewater by EU level effluent standards.
0.5
2015-2017 x x
18
Improving of environment in areas of Lo Phong, Khe Re streams and Mong Duong River
The Project to construct wastewater treatment system for coal mining industry
10.3 2014-2020 x x
19 Project for planning to decrease the amount of non-revenue water
The Project is to examine possible measures to decrease non-revenue water.
0.3 2015-2016 x
20 Project for Planning of Livestock Wastewater
The project aims at planning and implementing a pilot 1.0 2016-2020
x x
1-9
En
viron
men
t Imp
rovem
ent P
roject in
Qu
an
g N
inh
Pro
vince
Environment Improvement Project in Quang Ninh Province
No Name Objectives Cost
(Million USD)
Schedule Priorit
y Project
Possible sources
Note
ODA loan
Non-refundable
ODA
FDI
Budget from
private compan
ies
Budget from
Central
Budget from
Province
Budget from
Vinacomin
Treatment Improvement project to introduce advanced treatment system for wastewater from livestock
21
Project for Planning Aquaculture wastewater Treatment Improvement
The project aims at planning and implementing a pilot project to introduce advanced treatment system for wastewater from aquaculture
1.0 2016-2020
x x
Air Quality Management
22 Project for Strengthening Capacity for Environmental Management
The project invests in instruments /equipment, including 1)Equipment for environmental inspection, 2)Field monitoring equipment (air & water), 3)Laboratory equipment, 4)Auxiliary equipment.
0.65 2014-2015 x x
23
Project for Enhancing EMAC’s Capacity on Science and Technology
Main objectives of project are to (1) Improving technical infrastructure in terms of working room, essential specialized area (2) Supplementing required equipment and upgrading existing one (3) Increasing the quantity and quality of staff
3.0 2016 x
24
Capacity Development on Air Quality Monitoring and Plant Emission Monitoring by International Expert
The project is to solve the difficulties of dust measurement in field and laboratory, and to promote smooth initial operation of “Auto AQM station” and “Auto PEM Station”, with support from international experts
0.24 2014-2016 x x x
1-1
0
En
viron
men
t Imp
rovem
ent P
roject in
Qu
an
g N
inh
Pro
vince
Environment Improvement Project in Quang Ninh Province
No Name Objectives Cost
(Million USD)
Schedule Priorit
y Project
Possible sources
Note
ODA loan
Non-refundable
ODA
FDI
Budget from
private compan
ies
Budget from
Central
Budget from
Province
Budget from
Vinacomin
25 Project on Mandatory Reporting of Flue Gas Measurement Value to Local Government
The project is to introduce self monitoring of flue gas in the stack/duct for large scale plants as a mandatory report containing flue gas measurement result on a quarterly basis.
The budget will be covered
by annual budget
for environmental
monitoring
sector.
2014-2016 x x
26
Project for Introduction of Severer “Western Air Quality Standards” to Quang Ninh Province
After 3 years accumulation of “Auto AQM station” data at least, and to establish the scientific committee to discuss own AQS in Halong Bay Area, it is desirable to adopt Quang Ninh independent PM10 standard as a leading environmental province. The limitation value might be between 50μg/m3 to 100μg/m3
0.02 2016-2020
x
Solid Waste Management
27
Project on awareness raising on solid waste management
The project includes 3R component as follows: - Promotion of 3R at provincial level - Promotion of 3R on tourism solid waste - Awareness raising for enterprises in improvement of industrial solid waste management.
0.7 2014-2018 x x x
28
Preliminary Study on regional solid waste management
The Project is for study the regional solid waste management by grouping a number of districts, cities and towns.
0.2 2014-2015 x x x
1-1
1
En
viron
men
t Imp
rovem
ent P
roject in
Qu
an
g N
inh
Pro
vince
Environment Improvement Project in Quang Ninh Province
No Name Objectives Cost
(Million USD)
Schedule Priorit
y Project
Possible sources
Note
ODA loan
Non-refundable
ODA
FDI
Budget from
private compan
ies
Budget from
Central
Budget from
Province
Budget from
Vinacomin
29 Development of regional solid waste management system for Halong City, Cam Pha City, and Hoanh Bo District
The Project for development of solid waste management includes construction of landfill, improvement of collection system, construction of bio composting plant to serve recycling of solid waste.
21.3 2014-2018 x x x x x
30 Development of solid waste management system for Uong Bi city
" 3.6 2014-2018 x x x x x x
31 Development of solid waste management system for Hai Ha District
" 1.6 2014-2018 x x x x x x
32 Development of solid waste management system for Van Don District
" 1.6 2014-2018 x x x x x x
33 Development of solid waste management system for Quang Yen Town
" 3.0 2014-2018 x x x x x x
34 Development of solid waste management system for Co To District
" 0.9 2014-2018 x x x x x x
35 Development of solid waste management system for Mong Cai City
" 6.2 2014-2019 x x x x x
36 Development of solid waste management system for Binh Lieu District
" 1.4 2014-2019 x x x x x
37 Development of solid waste management system for Tien Yen District
" 1.7 2014-2019 x x x x x
38 Development of solid waste management system for Dam Ha District
" 1.3 2014-2019 x x x x x
39 Development of solid waste management system for Ba Che District
" 1.3 2014-2019 x x x x x
40 Development of solid waste management system for Dong Trieu District
" 2.9 2014-2019 x x x x x
1-1
2
En
viron
men
t Imp
rovem
ent P
roject in
Qu
an
g N
inh
Pro
vince
Environment Improvement Project in Quang Ninh Province
No Name Objectives Cost
(Million USD)
Schedule Priorit
y Project
Possible sources
Note
ODA loan
Non-refundable
ODA
FDI
Budget from
private compan
ies
Budget from
Central
Budget from
Province
Budget from
Vinacomin
41 Study on Improvement of Industrial Solid Waste Management
The project is to prepare a loadmap to actualize suitable industrial solid waste managent
1.0 2014-2015 x x x x x
x
42 Assessment of stability, identifying potential risks of soil and rock slides areas and proposing prevention solutions for the Outer Dumping Sites in Halong and Cam Pha areas.
The project is to improve condition of coal mining waste dumping site; ensure safety for resident areas.
4.8 2014-2025 x
x
Forest management
43
Project for Coastal Ecological Corridor Improvement in QN Province
Mangrove and coastal forest in the province is rehabilitated and the sustainable management model is established.
11 2014-2022 x
x
44
Project for Management of Bai Tu Long National Park with Registration of ASEAN Heritage Site
Management capacity of Bai Tu Long National Park is strengthened.
3.6 2014-2020 x
x x
45
Project for Establishment and Upgrading of Yen Tu National Forest to National Park
Yen Tu National Forest is upgraded to be Yen Tu National Park and sustainably managed.
6.0 2014-2019 x
x x
46 Project for Management of Dong Son-Ky Thuong Nature Reserve
Management of Dong Son – Ky Thuong Nature Reserve is improved.
5.6 2016-2021
x
47
Project for Management of North-eastern Region Forest Area
Natural forest cum headwater protection forest area is conserved as a new nature reserve area.
2.1 2016-2020
x x
48
Project for Management of Headwater Protection Forest (Yen Lap and Trang Vinh)
Three headwater protection forest areas are conserved for supplying water.
3.3 2014-2020 x
x x
49
Project for Afforestation in Communes along China-Vietnam Border Line
Forest area in the bordering with China is appropriately managed.
4.5 2016-2022
x x
1-1
3
En
viron
men
t Imp
rovem
ent P
roject in
Qu
an
g N
inh
Pro
vince
Environment Improvement Project in Quang Ninh Province
No Name Objectives Cost
(Million USD)
Schedule Priorit
y Project
Possible sources
Note
ODA loan
Non-refundable
ODA
FDI
Budget from
private compan
ies
Budget from
Central
Budget from
Province
Budget from
Vinacomin
50 Project for Capacity Building on Forest Protection, Forest-Fire Control, Biodiversity Conservation and Law Enforcement in the Forestry Sector
Enhance the capacity of concerned management staffs at all levels as well as the related economic parties on forest protection, forest fire prevention and law enforcement in the forestry sector.
1.8 2016-2020
x x
51 Project for Improvement of Forest Related Industry
Forest Industry in the province is improved and Forestry Production Amount is Increased.
1.4 2016-2021 x x x
52 Study on Plantation Technology
Forestry technologies to achieve sustainable forest management are developed.
1.7 2017-2022 x x x
53
Project for Sustainable Forest Management
Sustainable forest management is practiced in the province and 30% of the production forest gets the forest certificate on SFM.
5.5 2017-2025 x x
54
Project for Eco-tourism Development
Ecotourism potential is studied and eco-tourism activities in Quang Ninh Province are diversified.
2.4 2014-2020 x x x
55
Rehabilitation and Monitoring Project for Rehabilitation of Coal Mines
Pollution from coal mining areas and dumping sites including landscape degradation is appropriately rehabilitated.
11.5 2015-2030 x
x
56
Project for Control and Minimize Sedimentation in Coastal Zone in Cua Luc Bay and Halong Bay
Condition of sedimentation and siltation pollution in Cua Luc and Halong Bay and their shorelines are studied and mitigated
1.5 2018-2021 x
x
57
Enhancement of forest planting to improve forest coverage and quality, and encouragement of development and regeneration of natural forest
Aiming at working as a sink of CO2 and disaster prevention, to improve forest quality and coverage areas in Quang Ninh Province
4,8 2016-2020
x
1-1
4
En
viron
men
t Imp
rovem
ent P
roject in
Qu
an
g N
inh
Pro
vince
Environment Improvement Project in Quang Ninh Province
No Name Objectives Cost
(Million USD)
Schedule Priorit
y Project
Possible sources
Note
ODA loan
Non-refundable
ODA
FDI
Budget from
private compan
ies
Budget from
Central
Budget from
Province
Budget from
Vinacomin
58 Developing of Green Belt in Halong and Cam Pha Cities
To create green trees belt, rehabilitate landscapes and environment of Halong and Cam Pha Cities.
12.0 2014-2018 x
x
59
Planning and Testing the Models of Land Use toward Environmental Friendly around Closed Coal Mines
Land use towards environmental friendly at closed coal mining area 2.6 2015 - 2017 x
x
Biodiversity
60 Planning of Biodiversity Conservation Plan of Quang Ninh Province
This project is to prepare Biodiversity Conservation Plan.
0.25 2015-2019 x
x x
61
Project for Promotion and Encourage of Public Education and Awareness
This project is to promote and encourage understanding of the importance of, and the measures required for, the conservation of biodiversity.
0.3 2015-2020
x x x
62
Institutional Development and Capacity Building for Relevant Organizations
This project is to disseminate the policies, laws, and institutions about the biodiversity conservation for the institutional development and capacity building in Quang Ninh Province based on the prepared Biodiversity Conservation Plan.
0.1 2015-2016
x x x
63
Survey and Control of Invasive Alien Species
This project is to control of the damage for ecosystems, agriculture and tourism by invasive alien species, survey of current status and examination of controlling method of invasive alien species in Quang Ninh Province.
0.2 2015-2016
x x
64
Restoration and Rehabilitation of Coral Reefs, sea grass and seaweed vegetation
This project is to recover marine ecosystem damaged by illegal fishing, the restoration and rehabilitation of coral reefs, sea grass and
0.25 2014-2015, x x x
1-1
5
En
viron
men
t Imp
rovem
ent P
roject in
Qu
an
g N
inh
Pro
vince
Environment Improvement Project in Quang Ninh Province
No Name Objectives Cost
(Million USD)
Schedule Priorit
y Project
Possible sources
Note
ODA loan
Non-refundable
ODA
FDI
Budget from
private compan
ies
Budget from
Central
Budget from
Province
Budget from
Vinacomin
seaweed vegetation.
65 Development for cultivation and plantation technology of endangered and indigenous plant species
This project is to prevent the extinction of endangered and restore the natural vegetation, the cultivation and plantation technology of endangered and indigenous plant species in Quang Ninh Province.
0.1 2015-2016
x x
66
Capacity buildings for management skills of endangered species traffic control
This project is to prevent the illegal traffic of endangered species, capacity building of management skills for relevant organization staff should be conducted.
0.2 2014-2015,
2019 x x x
67
Establishment of ex-situ conservation center of plants and animals
This project is to develop ex-situ conservation center. The ex-situ conservation center should be consisted of botanical garden for conserving the endangered plants and rescue center for first aid and rehabilitation of injured wildlife.
1.3 2015-2016 x x x
68
Promotion of Eco-tourism and Establishment of Ramsar Site
This project is to conserve the SATOYAMA wetlands and promote the sustainable use and ecotourism, the three coastal wetlands (Quang Yen , Tien Yen and Mong Cai) in Quang Ninh Province with registration with the Ramsar Sites.
0.98 2013-2020 x x x x x
69
Conservation and Beneficial Use of Genetic Resources
This project is to establish the genetic resources research center for promoting the beneficial use of genetic resources in Quang Ninh Province
1.8 2016-2018 x x x
1-1
6
En
viron
men
t Imp
rovem
ent P
roject in
Qu
an
g N
inh
Pro
vince
Environment Improvement Project in Quang Ninh Province
No Name Objectives Cost
(Million USD)
Schedule Priorit
y Project
Possible sources
Note
ODA loan
Non-refundable
ODA
FDI
Budget from
private compan
ies
Budget from
Central
Budget from
Province
Budget from
Vinacomin
70 Implementation of Comprehensive Biodiversity Survey and Monitoring
This project is to get basic information for conservation and sustainable use of biodiversity, the comprehensive biodiversity survey and monitoring (flora, fauna, genetic diversity, etc,) in Quang Ninh Province. In addition, database system to store and utilize the results of the survey should be constructed.
0.1 2015-2020 x
71 Promotion of Environmental Education
This project is to promote and encourage understanding of the importance of, and the measures required for, the conservation of biodiversity, public education and awareness should been conducted through education in the school in Quang Ninh Province.
0.4 2014-2020 x
Climate change
72
Communication for raising of knowledge on climate change for management mechanism at all levels as well as communities in Quang Ninh Province (priority for coastal communities)
Prioritizing the coastal areas, to improve awareness and knowledge about climate change and sea level rise among all stakeholders in Quang Ninh Province
0.1 2014-2016 x x
73 Study on development of the ASEAN Green Growth Center
Aiming at promoting to establish ASEAN Green Growth Center in Quang Ninh province
0.3 2014-2015 x x x
74
Capacity enhancement for organizations in responding to climate change
Aiming at effective implementation of measure to the climate change issues, to prepare an annual working plan, to clarify tasks and to develop coordination scheme in the current organizational
0.1 2014-2015 x x x
1-1
7
En
viron
men
t Imp
rovem
ent P
roject in
Qu
an
g N
inh
Pro
vince
Environment Improvement Project in Quang Ninh Province
No Name Objectives Cost
(Million USD)
Schedule Priorit
y Project
Possible sources
Note
ODA loan
Non-refundable
ODA
FDI
Budget from
private compan
ies
Budget from
Central
Budget from
Province
Budget from
Vinacomin
structure
75 Development of local regulations for the climate change issues
To development local regulations as the basis for promotion of adaptation and mitigation measures in Quang Ninh Province
0.1 2014-2016 x x x
76 Preparation of five-year action plan and its implementation
Aiming at promoting comprehensive and effective implementation of actions to climate change, to prepare five-year action plan periodically and conduct PDCA management
112.6 2014-2030 x x x
77 Review and consolidation of sea and river dykes
Aiming at minimize impacts by extreme weather, to reinforce dyke systems in Quang Ninh Province
55.7 2014-2015 x x x
78
Construction, upgrading and renovation of hydrometeorology station in Co To District
Aiming at improving weather forecast and early warning system, to renovate the hydrometeorology station in Co To District and improve staffs’ capacity
0.5 2014-2016 x x
79
Development of environment and hazard database, and automatic system for natural disaster monitoring and warning
Aiming at mitigate disaster as much as possible, to develop a system for natural disaster monitoring and warning
1.3 2014-2018 x x x
1-1
8
En
viron
men
t Imp
rovem
ent P
roject in
Qu
an
g N
inh
Pro
vince
Environment Improvement Project in Quang Ninh Province
No Name Objectives Cost
(Million USD)
Schedule Priorit
y Project
Possible sources
Note
ODA loan
Non-refundable
ODA
FDI
Budget from
private compan
ies
Budget from
Central
Budget from
Province
Budget from
Vinacomin
80
Establishment of water resource management resilient to climate change impacts
Aiming at developing the water resource management for sustainable use under the economic development and climate change, to implement 10 sub-projects proposed in the Water Resource Planning in Quang Ninh Province Period of 2010 to 2020, Orientation to 2030
3.6 2014-2020 x x
81 Construction of water reservoir to serve economic development and life of people
Aiming at providing sufficient water and preventing natural disaster, to construct and rehabilitate reservoirs in Quang Ninh Province
9.6 2014-2017 x x
82
Development of GHG inventory and measurement, reporting and verification (MRV) system
Development of GHG inventory and measurement, reporting and verification (MRV) system in Quang Ninh Province
0.1 2017-2020 x x
83 Promotion of energy efficiency in hotels in Bai Chay area
To promote efficient energy management in hotels in Bai Chay area
0.1 2016-2018 x x
84 Promotion of efficient operation of tourism boats in the Halong Bay
To improve operation efficiency of tourism boats and introduce bio-diesel aiming at reducing GHG emissions
0.3 2014-2017 x x x
85 Promotion of efficiency of traffic management in Bai Chay area
To improve traffic management in Bai Chay area aiming at reducing GHG emissions
0.1 2016-2018 x x
86 Promotion of energy efficiency in major manufacturers
To improve energy efficiency of major manufacturers aiming at reducing GHG emissions
0.3 2014-2017 x x x
Environment monitoring
1-1
9
En
viron
men
t Imp
rovem
ent P
roject in
Qu
an
g N
inh
Pro
vince
Environment Improvement Project in Quang Ninh Province
No Name Objectives Cost
(Million USD)
Schedule Priorit
y Project
Possible sources
Note
ODA loan
Non-refundable
ODA
FDI
Budget from
private compan
ies
Budget from
Central
Budget from
Province
Budget from
Vinacomin
87
Project for Construction of Automatic
Environmental monitoring Stations in Quang Ninh
Province
The project will be implemented by construction and installation of automatic environmental monitoring stations to grasp the quality of air and water environment in Quang Ninh province (1) Automatic monitoring stations for measuring ambient air quality: 10 stations located in populated area or the area impacted by industrial activities. (2) Automatic monitoring stations for measuring surface water (2 stations) and coastal water (5 stations) (3) Automatic monitoring stations for measuring flue gases from stacks of important thermo power and cement production plants: 7 stations
28.6 (10.8
million USD for construction, and
17.8 million
USD for maintenance and repairin
g)
2014-2030 (including maintenanc
e and repairing)
x x
88 Development of construction plan of regional GIS center
Reason for establishment of the GIS and Remote Sensing center, to: (1) Safety for tourism (2) Response to climate changes (3) Management of sea-island economy as well as support to people who live along the coast line and on islands. (4) Management of natural hazard (5) Management of natural resources and environment protection
0.5 2014-2015 x
x
1-2
0
En
viron
men
t Imp
rovem
ent P
roject in
Qu
an
g N
inh
Pro
vince
Environment Improvement Project in Quang Ninh Province
No Name Objectives Cost
(Million USD)
Schedule Priorit
y Project
Possible sources
Note
ODA loan
Non-refundable
ODA
FDI
Budget from
private compan
ies
Budget from
Central
Budget from
Province
Budget from
Vinacomin
89
Project for soil quality monitoring in Quang Ninh Province
- Equip with modern mechanical equipment systems to monitor and supervise the soil environment, - Develop mobile monitoring stations to measure quality and take soil samplings in areas contaminated affected by industrial activities (due to coal mining, industrial activities...) - Analysis of toxic substances in the samples
5,0 2016-2030
x
90
Project for Implementation of radioactive substances monitoring
The project aims at strengthening the radioactive substances monitoring capacity, particularly in the border region between Quang Ninh province and China.
1,0 2021-2023
x
91
Project for Biodiversity monitoring and supervision in Halong Bay
- Equip with modern mechanical equipment systems to monitor and supervise the marine biodiversity environment, - Develop mobile monitoring stations to measure and monitor the quality of the major marine ecosystems of Ha Long Bay and Bai Tu Long Bay (sea grass ecosystems, coral ecosystems) and biodiversity sampling in degraded areas in the Bay). - Analysis of the status and quality of biodiversity samples
2,0 2016-2018
x
Source: Study Tea
1-2
1
En
viron
men
t Imp
rovem
ent P
roject in
Qu
an
g N
inh
Pro
vince
Environment Improvement Project in Quang Ninh Province
1-22
1.5 Long List of the Projects Proposed by VINACOMIN
For sound environmental management in Quang Ninh Province, it is required to examine the
measures for harmonizing development of coal mining sector and environmental protection to
avoid serious impacts from coal mining sector. Therefore, under the Environmental Planning of
Quang Ninh Province, the proposal on environmental improvement projects concerned with the
coal mining sector are reviewed in September 2013 based on the instruction by the Department of
Natural Resource and Environment.
“The Master Plan on the Development of Vietnam’s Coal Sector to 2020, with Orientation toward
2030”, approved by the prime minister with Decision No.60 QĐ-TTg on 9th January 2012 states
strategies and plans of developing coal mining sector. The plan examines not only measures for
developing coal mining industry, but also examination of predicted environmental impacts. The
plan has a chapter describing environmental impacts, and the following general approaches to
avoid serious environmental impacts due to coal mining activity;
To control pollutants at pollution sources,
To apply advanced mining technology for environmental management of coal
mining,
To set higher priority on exploitation of underground mine than open mine,
To plan logical clusters of coal mining area and relevant infrastructures,
considering appropriate spatial plan and scheduling,
To plan reasonable transport routes and appropriate transportation mode such
as railroad and conveyor transportation,
To plan appropriate coal mining waste treatment sites, and
To plan operation and maintenance plan of coal mining facilities considering
environmental management.
Based on the master plan of development of coal mining sector, VINACOMIN has prepared “The
Planning for Environmental Protection of Quang Ninh Coal Mining Zone to 2020, Orientation
towards 2030”. The environmental protection plan has proposed the list of projects for
environmental protection, of which total estimated required costs are 1,601,840 million VND
from 2012 to 2015, 2,254,150 million VND from 2016 to 2020.
Environment Improvement Project in Quang Ninh Province
1-23
Table 1.5-1 Summary of Environmental Protection Program in 2012-2015
STT Name of project/program Number of
projects/programs
Expenditure
(mil. VND)
I Environmental rehabilitation and restoration of dumping sites,
mining sites
9 533,510
II New wastewater treatment plant 16 580,830
III Truck and carriages washing station 9 90,000
IV Specialized transportation road 7 236,400
V Rehabilitation of drainage system 3 40,000
VI Other environment projects 3 75,000
VII Environmental protection schemes 5 11,500
Total 1,569,240
Source: Summarized by Study Team based on the “Decision 1052/QD-VINACOMIN on the approval of Planning for Environmental
Protection of Quang Ninh Province for Coal Mining Sector to 2020, Orientation towards 2030”
Table 1.5-2 Summary of Environmental Protection Program in 2016-2020
STT Name of project/program Number of
projects/programs
Expenditure
(mil. VND)
I Environmental rehabilitation and restoration of dumping sites,
mining sites
14 835,250
II New wastewater treatment plant 21 800,000
II.1 Expansion of existing WWTP for existing mines 14 447,700
II.2 WWTP for new mining projects 7 352,300
III Truck and carriages washing station 9 144,000
IV Specialized transportation roads 7 84,000
V Rehabilitation of drainage system 3 74,000
VI Other environment projects 3 260,000
VII Environmental protection schemes 5 12,500
Total 2.209.750
Source: Summarized by Study Team based on the “Decision 1052/QD-VINACOMIN on the approval of Planning for Environmental
Protection of Quang Ninh Province for Coal Mining Sector to 2020, Orientation towards 2030”
Environment Improvement Project in Quang Ninh Province
1-24
1.6 Proposed Priority Projects by the Environmental Plan of Quang Ninh Province
Table 1.6-1 to 1.6-7 show the list of proposed priority projects on each sector, comprising of 4
projects in water management sector, 3 projects for air quality management sector, 3 projects for
solid waste management sector, 5 projects for forest management sector, 3 projects for
biodiversity conservation sector, and 8 projects for climate change adaptation and mitigation
sector, and 2 projects for environmental monitoring sector.
In July 2013, Quang Ninh DONRE selected the important priority projects among the proposed
ones. The selected priority projects were as follows;
(1) Development of Wastewater Treatment System for Halong City (on-going projects, applied to
JICA Yean loan)
(2) Construction of Automatic Environmental Monitoring Stations
(3) Development of Wastewater Treatment System for Cam Pha City
(4) Development of Solid Waste Management System for Halong City, Cam Pha City and Hoanh
Bo District
(5) Restoration and Rehabilitation Supervision of Coal Mining Areas (Ha Tu, Suoi Lai, and Nui
Beo coal mining areas)
(6) Development of construction plan of regional GIS center
(7) Planning of Biodiversity Conservation Plan for Quang Ninh Province
En
viron
men
t Imp
rovem
ent P
roject in
Qu
an
g N
inh
Pro
vince
1-2
5
Table 1.6-1 Priority Projects for Water Environment Management
Project Cost
(millionUSD)
95.0
170
5.0
1.0
10.3
NOTE 1) Wastewater treatment process of each plant will be designed the advanced treatment process which can remove : Approval in QNPPC, Preparation of Feasibility Study & EIA
Nitrogen and Phosphorous as well as BOD and SS.
2) In the F/S stage, methods for reduction of volume and recycling of sewer sludge will be studied as a countermeasure : Request of International Loan, Appraisal of ODA Donor, Selection of Consultant
against the limitation of landfill sites.
3) Wastewater from hospitals, public facilities, restaurants and other commercial facilities can be discharged : Detailed Design, Tendering, Procurement of Materials, Construction Works
to sewer lines after construction of wastewater treatment facilities and sewerage system.
4) The owners and the operators of hospitals, public facilities, restaurants and other commercial facilities must : Implementation of project
treat the effluent before discharging to sewer lines as required to comply with a wastewater treatment plant.
5) Budget for the project is provided by VINACOMIN and other coal mining companies, such as deposit for environmental improvement for coal mining industry.
Total project cost is 354 million USD.
WEM-2
Development of
Wastewater Treatment
System in Priority Area
Mong Cai City
Cam Pha City
Uong Bi City
Van Don District
Construction of
wastewater treatment
facilities and sewerage
system in Mong Cai City,
Cam Pha City, Uong Bi
City and Van Don
District
National or
provincial budget
and ODA (To be
applied)
It is recommended to prepare
pre-F/S study and EIA study
by National or provincial
budget.
For F/S, B/D and D/D,
applying for ODA will be
considered.
2 millionUSD 93 millionUSD
ODA (To be
applied)
It is recommended to prepare
pre-F/S study and EIA study
by National or provincial
budget.
For F/S, B/D, D/D and
construction, applying for
ODA will be considered.
2 millionUSD 100 millionUSD 68 millionUSD
2022 2023 2024 2025
WEM-1
Development of
Wastewater Treatment
System for Halong
City
Construction of
wastewater treatment
facilities and sewerage
system in Halong city
ODA (under the
process to apply
for JICA yen loan)
It is recommended to carry out
F/S study to update existing
plan by National or provincial
budget.
or
to request JICA to conduct
Special Assistance for Project
Formation (SAPROF).
It is possible to consider to
include the wastewater
treatment project in all area
of Halong city by JICA yen
loan.
Year
2013 2014 2015 2016 2017 2018 2019 2020 2021No. Project Content of Project Budget Sources Actions to be taken in 2014 Remarks
It is recommended to conduct
a feasibility study to update the
current plan by the central
budget or the provincial
budget.
To ensure the budget, it is
recommended to cooperate
with VINACOMIN.
2 million USD
Project for Planning
Rural Wastewater
Treatment System in
Quang Ninh Province
The project is to examine
individual wastewater
treatment system in rural
area in Quang Ninh
province.
ODA loan
Provincial budget
It is recommended to prepare
budget.
-
8.3 million USD
WEM-3
WEM-4
0.7 million USD 0.3 million USD
Improving of
environment in areas of
Lo Phong, Khe Re
streams and Mong
Duong River
The Project to construct
wastewater treatment
system for coal mining
industry
Central budget or
provincial budget,
cooperation with
VINACOMIN
Source: Study Team
En
viron
men
t Imp
rovem
ent P
roject in
Qu
an
g N
inh
Pro
vince
1-2
6
Table 1.6-2 Priority Projects for Air Quality Management
Budget million
USD2013 2014 2015 2016 2017 2018 2019 2020
: Implementation of project
Year
No. Name of Project Contents of ProjectFinancial
sources
Actions to be
Taken in 2014
Recommended
reached
inception in
2014.
Project on Mandatory
Reporting of Flue Gas
Measurement Value to
Local Government
The project is to introduce self monitoring
of flue gas in the stack/duct for large scale
plants as a mandatory report containing
flue gas measurement result on a quarterly
basis.
Provincial
Budget
Project for Strengthening
Capacity for Environmental
Management
The project invests in instruments
/equipment, including 1)Equipment for
environmental inspection, 2)Field
monitoring equipment (air & water),
3)Laboratory equipment, 4)Auxiliary
equipment.
Provincial
Budget
Recommended
reached
inception in
2014.
Funding will
come from the
annual budget
for
environmental
monitoring
AEM-1
AEM-2
AEM-3
0.65
0,24
-
Capacity Development on
Air Quality Monitoring and
Plant Emission Monitoring
by International Expert
The project is to solve the difficulties of
dust measurement in field and laboratory,
and to promote smooth initial operation of
“Auto AQM station” and “Auto PEM
Station”, with support from international
experts
Provincial
Budget
Non-
refundable
ODA
Source: Study Team
En
viron
men
t Imp
rovem
ent P
roject in
Qu
an
g N
inh
Pro
vince
1-2
7
Table 1.6-3 Priority Projects for Solid Waste Management
Project Cost
(millions)
: Approval in QNPPC, Preparation of Feasibility Study & EIA
: Request of International Loan, Appraisal of ODA Donor, Selection of Consultant
: Detailed Design, Tendering, Procurement of Materials, Construction Works
0.2 million USD
10.7
0.20 million USD
10.5 million USD
(Local JSC: 4.8 million USD,
ODA or provincial budget: 5.7 million USD)
SWM-4
Development of solid
waste management system
for Uong Bi City, Hai Ha
District, remind area of
Van Don District, Quang
Yen Town, and Cot To
District
The Project for development of
solid waste management includes
construction of landfill,
improvement of collection system,
construction of bio composting
plant to serve recycling of solid
waste.
ODA budgets or
provincial budget with
private investors to
entrust the operation of
the collection system,
composting and landfill
It is recommended
to update the existing
F/S by provincial or
central budget
The towns and districts are listed as
priority areas, as existing capacity of
each landfill will be finished soon.
Preliminary study on
regional solid waste
managementSWM-2
The project is for study the
regional solid waste management
by grouping a number of districts,
cities and towns.
It is recommended
to ensure budget for
the project.
At present, Halong city, Cam Pha
town and Hoanh Bo district, and a
part of Van Don district are
considering grouping for solid waste
management.
0.2
SWM-1
Project on awareness
raising on solid waste
management
The project includes 3R
component as follows:
- Promotion of 3R at provincial
level
- Promotion of 3R on tourism
solid waste
- Awareness rising for enterprises
in improvement of industrial solid
Provincial and National
budget
Content of Project Budget SourcesPriority City/town/districtYear
2013 20202014 2015 2016
Provincial and National
budget
2017 2018 2019
Actions to be taken
in 2014Remarks
It is recommended
to ensure budget for
the project
- 0.7
0.35 million USD
To ensure the budget, it is
recommended to cooperate with
VINACOMIN.
SWM-3
Development of regional
solid waste management
system for Halong City,
Cam Pha City, Hoanh Bo
District, and a part of Van
Don District
The Project for development of
solid waste management includes
construction of landfill,
improvement of collection system,
construction of bio composting
plant to serve recycling of solid
waste.
ODA budgets or
provincial budget with
private investors to
entrust the operation of
the collection system,
composting and landfill0.4 million USD
It is recommended
to update the existing
F/S by provincial or
central budget
Research results on the system of
solid waste management by region
(SWM-2) will be reflected.
21.3
4.8
0.07 million USD
20.9 million USD
(Local JSC: 9.5 million USD,
ODA or provincial budget: 11.4 million USD)
0.35 million USD
31.4 million USD
(Local JSC: 1.3 million USD,
ODA or provincial budget: 17.1 million USD)
SWM-5
Assessment of stability,
identifying potential risks
of soil and rock slides
areas and proposing
prevention solutions for
the Outer Dumping Sites in
Halong and Cam Pha
areas.
The project is to improve
condition of coal mining waste
dumping site; ensure safety for
resident areas.
The central budget or
provincial budget,
cooperation with
VINACOMIN
It is recommended
to update the existing
F/S by provincial or
central budget
En
viron
men
t Imp
rovem
ent P
roject in
Qu
an
g N
inh
Pro
vince
1-2
8
Table 1.6-4 Priority Projects for Forest Management
Project Cost
(million USD)
11
3.6
6.0
3.3
1.5
12.0
2.6
: Approval in QNPPC, Preparation of Feasibility Study & EIA
: Detailed Design, Tendering, Procurement of Materials, Construction Works
No. Project Name Content ProjectFinancial
Source
Actions to be
Taken in 2014Remark
Year
2013 2014 2015 2016 2017 2018 2019 2020 2021
FM-2
Project for development of
Bai Tu Long National Park,
registration as ASEAN
Heritage Park
The project is to developed a national park
cum marine protected area , and register as
an ASEAN Heritage Park.
National and
provincial
budget
It is
recommended to
request budget
for starting the
project.
With the registration as an
ASEAN Heritage Park, the
values of Bai Tu Long Bay
area will be more widely
recognized. Eco-tourism will
be boosted more
FM-3
Project of Establishment
and Upgrade of Yen Tu
National Park (Expansion)
The project is to upgrade Yen Tu National
Forest to Yen Tu National Park.
National and
provincial
budget
It is
recommended to
request budget
for starting the
project.
Eco-truism activity will be
promoted.
: Request of Investment (National/provincial budget, international loan, other sources), Approval of authority, Selection of Consultant
FM-4
Project for Management of
Headwater Protection
Forest
The project is to carry out protect important
watersheds for major surface water supply
source in Quang Ninh province, such as
carrying out of baseline survey, preparation
of management plan with setting buffer
zone, conducting forest fire protection
work, and soil erosion prevention work.
National and
provincial
budget
It is
recommended to
start preparation
work for this
project.
The project is expected to
contribute to protect major
water supply source in
Quang Ninh province.
1.5millionUSD
2027 2028 2029 2030
1.8millionUSD
1.5millionUSD 2.1millionUSD
0.8millionUSD 5.2millionUSD
2022
Project for Coastal
Ecological Corridor
Improvement in QN
Province
Mangrove and coastal forest in the province
is rehabilitated and the sustainable
management model is established.
Provincial
Budget
NDE achieve the
necessary budget
allocation
Management of mangrove
areas are restored or
renovated conceptual model
proposed by Japan
Satoyama to sustainable
management of the natural
environment
20262023 2024 2025
2.0 million USD 9.0 million USD
FM-5
Rehabilitation and
Monitoring Project for
Rehabilitation of Coal
Mines
Nghiên cứu và giảm thiểu được những điều
kiện ô nhiễm trầm tích và bùn lắng ở vịnh
Cửa Lục và Vịnh Hạ Long và đường bờ
biển của các vịnh này
Funds from
VINACOMIN
- -
1.5 million USD
FM-1
FM-6
Developing of Green Belt in
Halong and Cam Pha Cities
To create green trees belt, rehabilitate
landscapes and environment of Halong and
Cam Pha Cities.
Funds from
VINACOMIN
It is
recommended to
discuss with
VINACOMIN to
start the project.
-
FM-7
Planning and Testing the
Models of Land Use toward
Environmental Friendly
around Closed Coal Mines
Land use towards environmental friendly
at closed coal mining area
Funds from
VINACOMIN
- -
9.0 million USD
2.0 million USD
3.0 million USD
0.6 million USD
Source: Study Team
En
viron
men
t Imp
rovem
ent P
roject in
Qu
an
g N
inh
Pro
vince
1-2
9
Table 1.6-5 Priority Projects for Biodiversity Conservation
Project Cost(million USD)
50 ## 50
0.25
57 57 57
0.25
50 ## ## ## ## ## ## ##
0.98
: Implementation of project
BDC-3
Project on Establishment
of Ramsar Site with
promotion of Eco-
tourism and Sustainable
Environment
Management.
This project is to conserve the
SATOYAMA wetlands and promote
the sustainable use and ecotourism, the
three coastal wetlands (Quang Yen ,
Tien Yen and Mong Cai) in Quang
Ninh Province with registration with
the Ramsar Sites.
ODA loan or Central
Budget, together with
Private sector investor
It is recommended to start to
prepare request documents if the
project apply for ODA fund.
The Ramsar sites will be expected
to contribute to promote eco-
tourism activities in Quang Ninh
province.
The SATOYAMA initiative is the
Japanese idea to manage regional
environment with local people
promoted by COP 10.
BDC-2
Restoration and
Rehabilitation of Coral
Reefs, sea grass and
seaweed vegetation
Project for rehabilitation the situations
of coral reefs, sea grass and seaweed
vegetation, example in offshore area of
Co To Island
National and provincial
budget.
It is recommended to start
preparation work.
-
BDC-1
Planning of Biodiversity
Action Plan of Quang
Ninh Province
Project on Detailed Planning of
Biodiversity Action Plan
National and provincial
budget.
It is recommended to request
budget to PPC.
-
Year2013 2014 2015 2016 2017 2018 2019 2020
No. Project Content of Project Financial Source Actions to be Taken in 2014 Remark
Source: Study Team
En
viron
men
t Imp
rovem
ent P
roject in
Qu
an
g N
inh
Pro
vince
1-3
0
Table 1.6-6 Priority Projects for Adaptation and Mitigation on Climate Change
Project Cost
(million
USD)2013 2014 2015 2016 2017 2018 2019 2020
CC-1
Communication for raising of
knowledge on climate change for
management mechanism at all
levels as well as communities in
Quang Ninh Province (priority for
coastal communities)
Communication for raising of
knowledge on climate change for
management mechanism at all
levels as well as communities in
Quang Ninh Province (priority for
coastal communities)
Provincial Budget It is recommended to
request budget to PPC.
- 0.1
CC-2
Study on development of the
ASEAN Green Growth Center
Promotion the establishment of the
ASEAN Green Growth Center in
Quang Ninh.
Provincial Budget It is recommended to
request budget to PPC.
Quang Ninh province is a
candidate for establishing
the Green Growth Centre of
ASEAN.
0.3
CC-3
Capacity enhancement for
organizations in responding to
climate change
Capacity enhancement for
organizations in responding to
climate change
Provincial Budget It is recommended to
request budget to PPC. - 0.1
CC-4
Development of local regulations
for the climate change issues
Development of local regulations
for the climate change issues
Provincial Budget It is recommended to
request budget to PPC. - 0.1
CC-5
Construction, upgrading and
renovation of hydrometeorology
station in Co To District
Construction, upgrading and
renovation of hydrometeorology
station in Co To District
Provincial Budget It is recommended to
request budget to PPC.- 0.5
CC-6
Development of environment and
hazard database, and automatic
system for natural disaster
monitoring and warning
Development of environment and
hazard database, and automatic
system for natural disaster
monitoring and warning
Provincial Budget It is recommended to
request budget to PPC.
- 1.3
CC-7
Promoting efficient operations of
tourist boats in Halong Bay
Promoting efficient operations of
tourist boats in Halong Bay
Private donor It is recommended to
request budget to PPC.
JCM/BOCM mechanism
proposed by Japanese
Government can be applied
0.3
CC-8
Promotion of energy efficiency in
major manufacturers
Promotion of energy efficiency in
major manufacturers
Private donor It is recommended to
request budget to PPC.
JCM/BOCM mechanism
proposed by Japanese
Government can be applied0.3
: Project Implementation
No. Project content Financial sourcesActions to be taken in
2014Remark
YearProject
Source: Study Team
En
viron
men
t Imp
rovem
ent P
roject in
Qu
an
g N
inh
Pro
vince
1-3
1
Table 1.6-7 Priority Projects for Environmental Monitoring
Project Cost
(million USD) 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030
EM-1
The project for
construction of
automatic
environmental
monitoring
stations in Quang
Ninh (DONRE)
including
Construction
The Project will carry out construction and
installation of automatic environment
monitoring stations to grasp quality status of
air environmetn and water environment in
Quang Ninh Province
(1) Automatic envrionment monitoring
station to measure ambient air quality: 10
stationsto be installed in dense populated
areas or in areas affected by industrial
activities.
(2) Automatic envrionment monitoring
station to measure surface water quality (2
stations) and coastal water quality (5
stations)
(3) Automatic envrionment monitoring
station to measure emissions from stacks of
major thermal power plant and cement
plants: 7 stations
under proposal
process to Quang
Ninh PPC
The project shall
commence depending
on the approval of the
PPC
To operate and maintain
these automatic
monitoring statsion, it
requires certain budget
allocation per annum.
28.6
EM-2
Development of
construction plan
of regional GIS
centre
Reason for establishment of the GIS and
Remote Sensing centre, to:
(1) safety for tourism
(2) Response to climate changes
(3) Management of sea - island economy as
well as support to people who live along the
coast line and on islands.
(4) Management of natural hazard
(5) Management of natural resources and
environment protection
National and
provincial budget
It is recommended to
start the procedures
to apply for provincial
budget
The GIS centre is
expected to implement
many fucntions to
formulate Environmental
information database,
such as biodiversity
conservation, protection
of resources on sea and
inland, and management
of hazards
0.5
: Implementation of project
Year
No. Project Name Content Project Financial SourceActions to be Taken
in 2014Remark
Source: Study Team
Environment Improvement Project in Quang Ninh Province
2-1
CHAPTER 2 PROPROTY PROJECTS ON WATER ENVIRONMENT
MANAGEMENT
2.1 Approach on Selection of Priority Projects
For improving water environment in Quang Ninh province, control of water pollution
sources should be enhanced. Especially, capacity for controlling organic pollutants and
suspended solids discharged from various pollution sources should be enhanced.
Regarding the impacts by coal mining wastewater, the streams affected by coal mining
wastewater are planned to be treated. Additionally, the projects proposed by “The
Planning for Environmental Protection of Quang Ninh Coal Mining Zone to 2020,
Orientation towards 2030” under the Decision No.60 QĐ-TTg in 2012 by
VINACOMIN are proposed to be implemented as priority projects, for preventing
erosion impacts, securing water course of relevant rivers by dredging, and treating coal
mining wastewater by construction of coal mining wastewater treatment plants.
2.1.1 Proposed Priority Projects
(1) Improvement of Domestic Wastewater Treatment Capacity
For improvement of domestic wastewater treatment capacity, the following projects
were proposed as the priority projects.
Development of Wastewater Treatment System in Halong City
(sub-component using JICA Loan)
Development of Wastewater Treatment System in Halong City (other
components)
Development of Wastewater Treatment System in Mong Cai City
Development of Wastewater Treatment System in Cam Pha City
Development of Wastewater Treatent System in Uong Bi City
Development of Wastewater Treatment System in Van Don District
For the other areas than above areas, it is proposed that the feasibility study for
development of wastewater treatment system will be carried out by 2020. Based on
this proposal, for all areas of urban areas in Quang Ning provice, wastewater treatment
system will be developed or planned. By these activities, it is considered that Quang
Ninh Province can have the capacity to achieve developed countries standards in
provincial level.
(2) Improvement of Coal Mining Wastewater Treatment Capacity
For improvement of coal mining wastewater treatment capacity, the following projects
were proposed as the priority projects.
Environment Improvement Project in Quang Ninh Province
2-2
Improving of environment in areas of Lo Phong, Khe Re streams and Mong
Duong River
VINCOMIN also proposes the following projects in “The Planning for Environmental
Protection of Quang Ninh Coal Mining Zone to 2020, Orientation towards 2030”
under the
The group of the projects for improvement of river environmental condition
by preventing erosion and securing water course with dredging
Construction of WWTP for treatment of coal mining wastewater (for open
and underground mines)
(3) Improvement of Rural Wastewater Treatment Capacity
For improvement of rural wastewater treatment capacity, the following projects are
proposed as the priority projects. The project is to examine individual wastewater
treatment system such as septic tank like “Jokasho” or human waste treatment system
introducing bio-gas reactor system.
Project for Planning Rural Wastewater Treatment System in Quang Ninh
Province
The detail of all proposed priority project are described in the following section.
2.2 Improvement of Domestic Wastewater Treatment Capacity
2.2.1 Development of Wastewater Treatment System in Halong City (sub-component using
JICA Loan)
(1) Hung Thang Area, Ha Long City
No. Items Description
01 Project Name: Project for Development of Wastewater Treatment System in Ha
Long City – Hung Thang Area
02 Necessity Wastewater from urban area is one of the major pollutant sources
of public water bodies such as creeks, rivers and inner bays in
Quang Ninh Province. However, only 14% of wastewater from
urban area in Quang Ninh Province is treated before discharging
as of 2012. Wastewater generation from urban area will be
estimated to increase more and more in accordance with the
growth of population and improvement of living standard, the
forecast of wastewater generation of whole Quang Ninh Province
in 2030 is more than three times of that in 2012.
Environment Improvement Project in Quang Ninh Province
2-3
Ha Long City is the center of politics, economics and tourism of
Quang Ninh Province, and the most populated in the province.
Therefore, the wastewater from the urban area of Ha Long City is
one of the most major sources of water pollution, and the
development of treatment system for urban wastewater will be
directly linked to the environmental improvement of Ha Long
Bay and the formulation of environmentally-advanced region.
In addition, the project for development of wastewater treatment
system in Hung Thang area in Ha Long City is being proposed to
JICA yen loan and requested to JICA from the government of
Quang Ninh Province. Therefore, this is the most urgent project
to improve the water environment in Quang Ninh Province.
03 Objectives In order to treat the wastewater from the urban area appropriately
before discharging to public water body, a centralized wastewater
treatment plant and sewer pipelines will be constructed.
04 Scope of Work Construction of the following structures as a urban wastewater
treatment system
1. Wastewater Treatment Plant (WWTP)
Capacity = 10,000m3/day
Wastewater Treatment Process = Conventional Activated
Sludge Process with Removal of Nitrogen and Phosphorous
2. Sewer Pipelines (Interceptor Pipes)
D 400mm: 1.7km
D 500mm: 0.7km
D 600mm: 0.8km
D 800mm: 2.3km
05 Location Hung Thang Area – Ha Long City
06 Implementation DPI / DOC
Target Area
Western Area of Ha Long City
Environment Improvement Project in Quang Ninh Province
2-4
Agency
07 Investment Agency Quang Ninh Government, Japan International Cooperation
Agency (JICA) or other ODA donor
08 Implementation Refer to Chapter 4.4
09 Indicative Cost 1. WWTP: US$ 23.0 million
2. Sewer Pipelines: US$ 2.8 million
3. Engineering Fee: US$ 3.1 million
4. Administration Cost: US$ 2.6 million
5. Contingency: US$ 2.6 million
TOTAL: US$ 34.1 million (see Note 1)
10 Remark It is necessary to go through the following steps to achieve the
project with the use of ODA loan.
1. Special Assistance for Project Formation (SAPROF) by an
International Cooperation Agency (ODA Donor)
It is necessary to review, update and complement the existing
feasibility study in order to implement this project by ODA Loan.
(1) Review of the Existing F/S
(2) Update of the Urban Wastewater Generation and the Required
Wastewater Treatment Capacity
(3) Formulation of the Basic Configuration of Urban Wastewater
Treatment System
- Capacity and location of WWTP
- Capacities and locations of pumping stations
- Capacities, diameters and route of sewer pipelines
(4) Site Investigation
- Topographical survey for the proposed sites of WWTP and
pumping stations
- Route survey along the proposed route of sewer pipelines
- Geotechnical survey and laboratory test at the proposed sites
of WWTP and pumping stations, and the proposed route of
sewer pipelines
(5) Preliminary Design of Urban Wastewater Treatment System
- WWTP (detailed location, wastewater treatment process,
structure of each facility, layout planning, construction
method)
- Pumping Stations (detailed location, structure of each facility,
layout planning, construction method)
Environment Improvement Project in Quang Ninh Province
2-5
- Sewer Pipelines (detailed route, size, depth, material,
construction method)
(6) Preliminary Design Drawings
(7) Project Cost Estimation
(8) Economic and Financial Analysis
(9) Environmental Impact Assessment
(10) Project Implementation Planning
2. Land Acquisition of Sites for WWTP and Pumping Stations
3. Request of International Loan and Appraisal of ODA Donor
4. Selection of Consultant
5. Detailed Design (D/D)
(1) Review of F/S
(2) Site Surveys
(3) Detailed Design Calculations for WWTP & Pumping Stations
(4) Detailed Design Calculations & Planning for Sewer Pipelines
(5) Construction Plan
(6) Preparation of Drawings
(7) Technical Specification Preparation
(8) Cost Estimation
6. Preparation of Tender Documents
7. Tender of Construction Company
8. Procurement of Materials and Construction Works
(1) WWTP
(2) Pumping Stations
(3) Sewer Pipelines
9. Operation of the Wastewater Treatment System
11 Possible Financial
Source
International donor with the budget of Quang Ninh Province (see
Note 2).
12 EIA Required
Note 1: This component has been planned to be applied for JICA yen loan. In the document of application, the target year of this component is 2015. In this report, the target year is 2030, and the estimated indicative cost is different from one in the document of application to JICA.
Note 2: This component has been planned to be applied for JICA yen loan.
(2) Ha Tu Area, Ha Long City
No. Items Description
01 Project Name: Project for Development of Wastewater Treatment System in Ha
Long City – Ha Tu Area
02 Necessity Wastewater from urban area is one of the major pollutant sources
Environment Improvement Project in Quang Ninh Province
2-6
of public water bodies such as creeks, rivers and inner bays in
Quang Ninh Province. However, only 14% of wastewater from
urban area in Quang Ninh Province is treated before discharging
as of 2012. Wastewater generation from urban area will be
estimated to increase more and more in accordance with the
growth of population and improvement of living standard, the
forecast of wastewater generation of whole Quang Ninh Province
in 2030 is more than three times of that in 2012.
Ha Long City is the center of politics, economics and tourism of
Quang Ninh Province, and the most populated in the province.
Therefore, the wastewater from the urban area of Ha Long City is
one of the most major sources of water pollution, and the
development of treatment system for urban wastewater will be
directly linked to the environmental improvement of Ha Long
Bay and the formulation of environmentally-advanced region.
In addition, the project for development of wastewater treatment
system in Ha Tu area in Ha Long City is being proposed to JICA
yen loan and requested to JICA from the government of Quang
Ninh Province. Therefore, this is the most urgent project to
improve the water environment in Quang Ninh Province.
03 Objectives In order to treat the wastewater from the urban area appropriately
before discharging to public water body, a centralized wastewater
treatment plant and sewer pipelines will be constructed.
04 Scope of Work Construction of the following structures as a urban wastewater
treatment system
1. Wastewater Treatment Plant (WWTP)
Capacity = 22,000m3/day
Wastewater Treatment Process = Conventional Activated
Sludge Process with Removal of Nitrogen and Phosphorous
2. Pumping Station
Capacity = 15m3/min
3. Sewer Pipelines (Interceptor Pipes)
D 400mm: 0.6km
D 500mm: 2.1km
D 600mm: 0.7km
D 1000mm: 1.0km
D 1100mm: 1.5km
Environment Improvement Project in Quang Ninh Province
2-7
D 1200mm: 0.2km
05 Location Ha Tu Area – Ha Long City
06 Implementation
Agency
DPI / DOC
07 Investment Agency Quang Ninh Government, Japan International Cooperation
Agency (JICA) or other ODA donor
08 Implementation Refer to Chapter 4.4
09 Indicative Cost 1. WWTP: US$ 39.6 million
2. Pumping Station: US$ 3.5 million
3. Sewer Pipelines: US$ 3.3 million
4. Engineering Fee: US$ 5.6 million
5. Administration Cost: US$ 4.6 million
6. Contingency: US$ 4.6 million
TOTAL: US$ 61.2 million (see Note 2).
10 Remark It is necessary to go through the following steps to achieve the
project with the use of ODA loan.
1. Special Assistance for Project Formation (SAPROF) by an
International Cooperation Agency (ODA Donor)
It is necessary to review, update and complement the existing
feasibility study in order to implement this project by ODA Loan.
(1) Review of the Existing F/S
(2) Update of the Urban Wastewater Generation and the Required
Wastewater Treatment Capacity
(3) Formulation of the Basic Configuration of Urban Wastewater
Treatment System
- Capacity and location of WWTP
- Capacities and locations of pumping stations
- Capacities, diameters and route of sewer pipelines
Target Area
Eastern Area of Ha Long City
Environment Improvement Project in Quang Ninh Province
2-8
(4) Site Investigation
- Topographical survey for the proposed sites of WWTP and
pumping stations
- Route survey along the proposed route of sewer pipelines
- Geotechnical survey and laboratory test at the proposed sites
of WWTP and pumping stations, and the proposed route of
sewer pipelines
(5) Preliminary Design of Urban Wastewater Treatment System
- WWTP (detailed location, wastewater treatment process,
structure of each facility, layout planning, construction
method)
- Pumping Stations (detailed location, structure of each facility,
layout planning, construction method)
- Sewer Pipelines (detailed route, size, depth, material,
construction method)
(6) Preliminary Design Drawings
(7) Project Cost Estimation
(8) Economic and Financial Analysis
(9) Environmental Impact Assessment
(10) Project Implementation Planning
2. Land Acquisition of Sites for WWTP and Pumping Stations
3. Request of International Loan and Appraisal of ODA Donor
4. Selection of Consultant
5. Detailed Design (D/D)
(9) Review of F/S
(10) Site Surveys
(11) Detailed Design Calculations for WWTP & Pumping
Stations
(12) Detailed Design Calculations & Planning for Sewer
Pipelines
(13) Construction Plan
(14) Preparation of Drawings
(15) Technical Specification Preparation
(16) Cost Estimation
6. Preparation of Tender Documents
7. Tender of Construction Company
Environment Improvement Project in Quang Ninh Province
2-9
8. Procurement of Materials and Construction Works
(1) WWTP
(2) Pumping Stations
(3) Sewer Pipelines
9. Operation of the Wastewater Treatment System
11 Possible Financial
Source
International donor with the budget of Quang Ninh Province (see
Note 2).
12 EIA Required
Note 1: This component has been planned to be applied for JICA yen loan. In the document of application, the target year of this component is 2015. In this report, the target year is 2030, and the estimated indicative cost is different from one in the document of application to JICA.
Note 2: This component has been planned to be applied for JICA yen loan.
2.2.2 Development of Wastewater Treatment System in Halong City (other components)
(1) Gieng Day Area, Ha Long City
No. Items Description
01 Project Name: Project for Development of Wastewater Treatment System in Ha
Long City – Gieng Day Area
02 Necessity Wastewater from urban area is one of the major pollutant sources
of public water bodies such as creeks, rivers and inner bays in
Quang Ninh Province. However, only 14% of wastewater from
urban area in Quang Ninh Province is treated before discharging
as of 2012. Wastewater generation from urban area will be
estimated to increase more and more in accordance with the
growth of population and improvement of living standard, the
forecast of wastewater generation of whole Quang Ninh Province
in 2030 is more than three times of that in 2012.
Ha Long City is the center of politics, economics and tourism of
Quang Ninh Province, and the most populated in the province.
Therefore, the wastewater from the urban area of Ha Long City is
one of the most major sources of water pollution, and the
development of treatment system for urban wastewater will be
directly linked to the environmental improvement of Ha Long
Bay and the formulation of environmentally-advanced region.
03 Objectives In order to treat the wastewater from the urban area appropriately
before discharging to public water body, a centralized wastewater
treatment plant and sewer pipelines will be constructed.
04 Scope of Work Construction of the following structures as a urban wastewater
treatment system
Environment Improvement Project in Quang Ninh Province
2-10
1. Wastewater Treatment Plant (WWTP)
Capacity = 10,000m3/day
Wastewater Treatment Process = Conventional Activated
Sludge Process with Removal of Nitrogen and Phosphorous
2. Pumping Station
Capacity = 12m3/min
3. Sewer Pipelines (Interceptor Pipes)
D 400mm: 2.0km
D 500mm: 3.0km
D 600mm: 2.0km
05 Location Gieng Day Area – Ha Long City
06 Implementation
Agency
DPI / DOC
07 Investment Agency Quang Ninh Government, Japan International Cooperation
Agency (JICA) or other ODA donor
08 Implementation Refer to Chapter 4.4
09 Indicative Cost 1. WWTP: US$ 23.0 million
2. Pumping Station: US$ 2.8 million
3. Sewer Pipelines: US$ 3.4 million
4. Engineering Fee: US$ 3.5 million
5. Administration Cost: US$ 2.9 million
6. Contingency: US$ 2.9 million
TOTAL: US$ 38.5 million
10 Remark It is necessary to go through the following steps to achieve the
project with the use of ODA loan.
1. Feasibility Study (F/S)
2. Land Acquisition of Sites for WWTP and Pumping Stations
Target Area
Western Area of Ha Long City
Environment Improvement Project in Quang Ninh Province
2-11
3. Request of International Loan and Appraisal of ODA Donor
4. Selection of Consultant
5. Detailed Design (D/D)
6. Preparation of Tender Documents
7. Tender of Construction Company
8. Procurement of Materials and Construction Works
9. Operation of the Wastewater Treatment System
Work contents of the F/S and D/D are referred to (1) Hung
Thanga.
11 Possible Financial
Source
International donor with the budget of Quang Ninh Province
12 EIA Required
(2) Dai Yen Area, Ha Long City
No. Items Description
01 Project Name: Project for Development of Wastewater Treatment System in Ha
Long City – Dai Yen Area
02 Necessity Wastewater from urban area is one of the major pollutant sources
of public water bodies such as creeks, rivers and inner bays in
Quang Ninh Province. However, only 14% of wastewater from
urban area in Quang Ninh Province is treated before discharging
as of 2012. Wastewater generation from urban area will be
estimated to increase more and more in accordance with the
growth of population and improvement of living standard, the
forecast of wastewater generation of whole Quang Ninh Province
in 2030 is more than three times of that in 2012.
Ha Long City is the center of politics, economics and tourism of
Quang Ninh Province, and the most populated in the province.
Therefore, the wastewater from the urban area of Ha Long City is
one of the most major sources of water pollution, and the
development of treatment system for urban wastewater will be
directly linked to the environmental improvement of Ha Long
Bay and the formulation of environmentally-advanced region.
03 Objectives In order to treat the wastewater from the urban area appropriately
before discharging to public water body, a centralized wastewater
treatment plant and sewer pipelines will be constructed.
04 Scope of Work Construction of the following structures as a urban wastewater
Environment Improvement Project in Quang Ninh Province
2-12
treatment system
1. Wastewater Treatment Plant (WWTP)
Capacity = 17,000m3/day
Wastewater Treatment Process = Conventional Activated
Sludge Process with Removal of Nitrogen and Phosphorous
2. Sewer Pipelines (Interceptor Pipes)
D 400mm: 1.5km
D 500mm: 1.6km
D 600mm: 0.8km
D 700mm: 0.8km
D 800mm: 1.0km
D 900mm: 1.2km
D 1100mm: 1.2km
05 Location Dai Yen Area – Ha Long City
06 Implementation
Agency
DPI / DOC
07 Investment Agency Quang Ninh Government, Japan International Cooperation
Agency (JICA) or other ODA donor
08 Implementation Refer to Chapter 4.4
09 Indicative Cost 1. WWTP: US$ 34.9 million
2. Sewer Pipelines: US$ 4.3 million
3. Engineering Fee: US$ 4.7 million
4. Administration Cost: US$ 3.9 million
5. Contingency: US$ 3.9 million
TOTAL: US$ 51.7 million
10 Remark It is necessary to go through the following steps to achieve the
project with the use of ODA loan.
1. Feasibility Study (F/S)
Target Area
Western Area of Ha Long City
Environment Improvement Project in Quang Ninh Province
2-13
2. Land Acquisition of Sites for WWTP
3. Request of International Loan and Appraisal of ODA Donor
4. Selection of Consultant
5. Detailed Design (D/D)
6. Preparation of Tender Documents
7. Tender of Construction Company
8. Procurement of Materials and Construction Works
9. Operation of the Wastewater Treatment System
Work contents of the F/S and D/D are referred to (1) Hung Thang
Area.
11 Possible Financial
Source
International donor with the budget of Quang Ninh Province
12 EIA Required
(3) Bai Chay Area, Ha Long City
No. Items Description
01 Project Name: Project for Expansion of Bai Chay Wastewater Treatment Plant in
Ha Long City
02 Necessity Bai Chay area in Ha Long City is the center of tourism of Quang
Ninh Province, and many tourists come and stay in Bai Chay area
for sightseeing of the world heritage, Ha Long Bay. Therefore,
the wastewater from households and tourists has made an impact
on the environment of Ha Long Bay. As an improvement
measure Bai Chay wastewater treatment plant (Capacity =
3,500m3/day) was constructed and has been operated since 2007.
However, wastewater generation from Bai Chay area will be
estimated to increase more and more in accordance with the
growth of population and improvement of living standard as well
as the other cities in Quang Ninh Province, the forecast of
wastewater generation of Bai Chay area in 2030 is more than
three times of that in 2012. Therefore, Bai Chay wastewater
treatment plant will become capacity shortage after a few years.
From the above situation, it is necessary to increase the
wastewater treatment capacity of Bai Chay WWTP.
03 Objectives In order to treat the wastewater from the urban area appropriately
before discharging to public water body, Bai Chay WWTP will be
expanded.
Environment Improvement Project in Quang Ninh Province
2-14
04 Scope of Work Increasing the Wastewater Treatment Capacity of Existing Bai
Chay WWTP
Capacity = 3,500m3/day 11,000m
3/day
05 Location Bai Chay Area – Ha Long City
06 Implementation
Agency
DPI / DOC
07 Investment Agency Quang Ninh Government, Japan International Cooperation
Agency (JICA) or other ODA donor
08 Implementation Refer to Chapter 4.4
09 Indicative Cost 1. WWTP: US$ 17.3 million
2. Engineering Fee: US$ 2.1 million
3. Administration Cost: US$ 1.7 million
4. Contingency: US$ 1.7 million
TOTAL: US$ 22.8 million
10 Remark It is necessary to go through the following steps to achieve the
project with the use of ODA loan.
1. Feasibility Study (F/S)
2. Land Acquisition of Sites for WWTP (if any)
3. Request of International Loan and Appraisal of ODA Donor
4. Selection of Consultant
5. Detailed Design (D/D)
6. Preparation of Tender Documents
7. Tender of Construction Company
8. Procurement of Materials and Construction Works
9. Operation of the Wastewater Treatment System
Work contents of the F/S and D/D are referred to (1) Hung Thang
Area.
11 Possible Financial International donor with the budget of Quang Ninh Province
Bai Chay WWTP
Western Area of Ha Long City
Environment Improvement Project in Quang Ninh Province
2-15
Source
12 EIA Required
(4) Hong Hai Area, Ha Long City
No. Items Description
01 Project Name: Project for Expansion of Hong Hai Wastewater Treatment Plant in
Ha Long City
02 Necessity Hong Hai area in Ha Long City is the center of politics and
economy of Quang Ninh Province and is the most populated area
in Ha Long City. Therefore, the wastewater from households,
commercial facilities and public institutions has made an impact
on the environment of Ha Long Bay. As an improvement
measure Hong Hai wastewater treatment plant (Capacity =
7,200m3/day) was constructed and has been operated since 2009.
However, wastewater generation from Hong Hai area will be
estimated to increase more and more in accordance with the
growth of population and improvement of living standard as well
as the other cities in Quang Ninh Province, the forecast of
wastewater generation of Hong Hai area in 2030 is more than
three times of that in 2012. Therefore, Hong Hai wastewater
treatment plant will become capacity shortage after a few years.
From the above situation, it is necessary to increase the
wastewater treatment capacity of Hong Hai WWTP.
03 Objectives In order to treat the wastewater from the urban area appropriately
before discharging to public water body, Hong Hai WWTP will be
expanded.
04 Scope of Work Increasing the Wastewater Treatment Capacity of Existing Hong
Hai WWTP
Capacity = 7,000m3/day 31,000m
3/day
05 Location Hong Hai Area – Ha Long City
Hong Hai WWTP
Western Area of Ha Long City
Environment Improvement Project in Quang Ninh Province
2-16
06 Implementation
Agency
DPI / DOC
07 Investment Agency Quang Ninh Government, Japan International Cooperation
Agency (JICA) or other ODA donor
08 Implementation Refer to Chapter 4.4
09 Indicative Cost 1. WWTP: US$ 43.2 million
2. Engineering Fee: US$ 5.2 million
3. Administration Cost: US$ 4.3 million
4. Contingency: US$ 4.3 million
TOTAL: US$ 57.0 million
10 Remark It is necessary to go through the following steps to achieve the
project with the use of ODA loan. 1. Feasibility Study (F/S) 2. Land Acquisition of Sites for WWTP (if any) 3. Request of International Loan and Appraisal of ODA Donor 4. Selection of Consultant 5. Detailed Design (D/D) 6. Preparation of Tender Documents 7. Tender of Construction Company 8. Procurement of Materials and Construction Works 9. Operation of the Wastewater Treatment System Work contents of the F/S and D/D are referred to (1) Hung Thang Area.
11 Possible Financial
Source
International donor with the budget of Quang Ninh Province
12 EIA Required
2.2.3 Development of Wastewater Treatment System in Mong Cai City
No. Items Description
01 Project Name: Project for Development of Wastewater Treatment System in
Mong Cai City
02 Necessity Wastewater from urban area is one of the major pollutant sources
of public water bodies such as creeks, rivers and inner bays in
Quang Ninh Province. However, only 14% of wastewater from
urban area in Quang Ninh Province is treated before discharging
as of 2012. Wastewater generation from urban area will be
estimated to increase more and more in accordance with the
growth of population and improvement of living standard, the
forecast of wastewater generation of whole Quang Ninh Province
Environment Improvement Project in Quang Ninh Province
2-17
in 2030 is more than three times of that in 2012.
Mong Cai City is located at the border with China, so Mong Cai
City has a role of one of the centers of trade between Vietnam and
China. In addition, there is a large economic zone in Mong Cai
City. Therefore, Mong Cai City is more populated than the other
town and districts, the wastewater from the urban area of Mong
Cai City is one of the most major sources of water pollution. To
develop the treatment system for urban wastewater in Mong Cai
City will be directly linked to the environmental improvement of
public water bodies and the formulation of
environmentally-advanced region.
03 Objectives In order to treat the wastewater from the urban area appropriately
before discharging to public water body, a centralized wastewater
treatment plant and sewer pipelines will be constructed.
04 Scope of Work Construction of the following structures as a urban wastewater
treatment system
1. Wastewater Treatment Plant (WWTP)
Capacity = 50,000m3/day
Wastewater Treatment Process = Conventional Activated
Sludge Process with Removal of Nitrogen and Phosphorous
2. Sewer Pipelines (Interceptor Pipes)
D 400mm: 11.5km
D 600mm: 14.6km
D 800mm: 3.8km
D 1000mm: 2.0km
D 1200mm: 3.2km
05 Location Mong Cai City
06 Implementation DPI / DOC
Target Area
Environment Improvement Project in Quang Ninh Province
2-18
Agency
07 Investment Agency Quang Ninh Government, Japan International Cooperation
Agency (JICA) or other ODA donor
08 Implementation Refer to Chapter 4.4
09 Indicative Cost 1. WWTP: US$ 55.0 million
2. Sewer Pipelines: US$ 19.6 million
3. Engineering Fee: US$ 9.0 million
4. Administration Cost: US$ 7.5 million
5. Contingency: US$ 7.5 million
TOTAL: US$ 98.6 million
10 Remark It is necessary to go through the following steps to achieve the
project with the use of ODA loan.
1. Feasibility Study (F/S)
2. Land Acquisition of Sites for WWTP and Pumping Stations
3. Request of International Loan and Appraisal of ODA Donor
4. Selection of Consultant
5. Detailed Design (D/D)
6. Preparation of Tender Documents
7. Tender of Construction Company
8. Procurement of Materials and Construction Works
9. Operation of the Wastewater Treatment System
Work contents of the F/S and D/D are referred to 4.1.1(1) Ha
Long City – Hung Thang Area.
11 Possible Financial
Source
International donor with the budget of Quang Ninh Province
12 EIA Required
Environment Improvement Project in Quang Ninh Province
2-19
2.2.4 Development of Wastewater Treatment System in Cam Pha City
No. Items Description
01 Project Name: Project for Development of Wastewater Treatment System in
Cam Pha City
02 Necessity Wastewater from urban area is one of the major pollutant sources
of public water bodies such as creeks, rivers and inner bays in
Quang Ninh Province. However, only 14% of wastewater from
urban area in Quang Ninh Province is treated before discharging
as of 2012. Wastewater generation from urban area will be
estimated to increase more and more in accordance with the
growth of population and improvement of living standard, the
forecast of wastewater generation of whole Quang Ninh Province
in 2030 is more than three times of that in 2012.
Cam Pha City is the center of coal mining and power generation
in Quang Ninh Province, many people related to these activities
are in the urban area. Therefore, Cam Pha City is more
populated than the other town and districts, the wastewater from
the urban area of Cam Pha City is one of the most major sources
of water pollution. To develop the treatment system for urban
wastewater in Cap Pha City will be directly linked to the
environmental improvement of public water bodies and the
formulation of environmentally-advanced region.
03 Objectives In order to treat the wastewater from the urban area appropriately
before discharging to public water body, a centralized wastewater
treatment plant and sewer pipelines will be constructed.
04 Scope of Work Construction of the following structures as a urban wastewater
treatment system
1. Two Wastewater Treatment Plants (WWTPs)
Capacity of WWTP-1 = 34,000m3/day
Capacity of WWTP-2 = 29,000m3/day
Wastewater Treatment Process = Conventional Activated
Sludge Process with Removal of Nitrogen and Phosphorous
2. Sewer Pipelines (Interceptor Pipes)
D 400mm: 4.0km
D 500mm: 5.5km
D 700mm: 3.6km
D 900mm: 3.3km
Environment Improvement Project in Quang Ninh Province
2-20
D 1000mm: 2.4km
D 1100mm: 2.5km
D 1200mm: 1.3km
D 1500mm: 2.5km
05 Location Cam Pha City
06 Implementation
Agency
DPI / DOC
07 Investment Agency Quang Ninh Government, Japan International Cooperation
Agency (JICA) or other ODA donor
08 Implementation Refer to Chapter 4.4
09 Indicative Cost 1. WWTP-1: US$ 47.8 million
2. WWTP-2: US$ 40.6 million
3. Sewer Pipelines: US$ 13.9 million
4. Engineering Fee: US$ 12.3 million
5. Administration Cost: US$ 10.2 million
6. Contingency: US$ 10.2 million
TOTAL: US$ 135.0 million
10 Remark It is necessary to go through the following steps to achieve the
project with the use of ODA loan.
1. Feasibility Study (F/S)
2. Land Acquisition of Sites for WWTP and Pumping Stations
3. Request of International Loan and Appraisal of ODA Donor
4. Selection of Consultant
5. Detailed Design (D/D)
6. Preparation of Tender Documents
7. Tender of Construction Company
8. Procurement of Materials and Construction Works
9. Operation of the Wastewater Treatment System
Target Area
Environment Improvement Project in Quang Ninh Province
2-21
Work contents of the F/S and D/D are referred to 4.1.1(1) Ha
Long City – Hung Thang Area.
11 Possible Financial
Source
International donor with the budget of Quang Ninh Province
12 EIA Required
2.2.5 Development of Wastewater Treatment System in Uong Bi City
No. Items Description
01 Project Name: Project for Development of Wastewater Treatment System in
Uong Bi City
02 Necessity Wastewater from urban area is one of the major pollutant sources
of public water bodies such as creeks, rivers and inner bays in
Quang Ninh Province. However, only 14% of wastewater from
urban area in Quang Ninh Province is treated before discharging
as of 2012. Wastewater generation from urban area will be
estimated to increase more and more in accordance with the
growth of population and improvement of living standard, the
forecast of wastewater generation of whole Quang Ninh Province
in 2030 is more than three times of that in 2012.
Uong Bi City is the center of coal mining and power generation
in Quang Ninh Province, many people related to these activities
are in the urban area. Therefore, Uong Bi City is more
populated than the other town and districts, the wastewater from
the urban area of Uong Bi City is one of the most major sources
of water pollution. To develop the treatment system for urban
wastewater in Uong Bi City will be directly linked to the
environmental improvement of public water bodies and the
formulation of environmentally-advanced region.
03 Objectives In order to treat the wastewater from the urban area appropriately
before discharging to public water body, a centralized wastewater
treatment plant and sewer pipelines will be constructed.
04 Scope of Work Construction of the following structures as a urban wastewater
treatment system
1. Wastewater Treatment Plant (WWTP)
Capacity = 52,000m3/day
Wastewater Treatment Process = Conventional Activated
Sludge Process with Removal of Nitrogen and Phosphorous
Environment Improvement Project in Quang Ninh Province
2-22
2. Sewer Pipelines (Interceptor Pipes)
D 400mm: 2.6km
D 500mm: 6.6km
D 700mm: 3.3km
D 800mm: 1.1km
D 1000mm: 2.6km
D 1200mm: 2.5km
D 1800mm: 1.2km
05 Location Uong Bi City
06 Implementation
Agency
DPI / DOC
07 Investment Agency Quang Ninh Government, Japan International Cooperation
Agency (JICA) or other ODA donor
08 Implementation Refer to Chapter 4.4
09 Indicative Cost 1. WWTP: US$ 57.2 million
2. Sewer Pipelines: US$ 17.2 million
3. Engineering Fee: US$ 8.9 million
4. Administration Cost: US$ 7.4 million
5. Contingency: US$ 7.4 million
TOTAL: US$ 98.1 million
10 Remark It is necessary to go through the following steps to achieve the
project with the use of ODA loan.
1. Feasibility Study (F/S)
2. Land Acquisition of Sites for WWTP and Pumping Stations
3. Request of International Loan and Appraisal of ODA Donor
Target Area
Environment Improvement Project in Quang Ninh Province
2-23
4. Selection of Consultant
5. Detailed Design (D/D)
6. Preparation of Tender Documents
7. Tender of Construction Company
8. Procurement of Materials and Construction Works
9. Operation of the Wastewater Treatment System
Work contents of the F/S and D/D are referred to 4.1.1(1) Ha
Long City – Hung Thang Area.
11 Possible Financial
Source
International donor with the budget of Quang Ninh Province
12 EIA Required
2.2.6 Development of Wastewater Treatment System in Van Don District
No. Items Description
01 Project Name: Project for Development of Wastewater Treatment System in Van
Don District
02 Necessity Wastewater from urban area is one of the major pollutant sources
of public water bodies such as creeks, rivers and inner bays in
Quang Ninh Province. However, only 14% of wastewater from
urban area in Quang Ninh Province is treated before discharging
as of 2012. Wastewater generation from urban area will be
estimated to increase more and more in accordance with the
growth of population and improvement of living standard, the
forecast of wastewater generation of whole Quang Ninh Province
in 2030 is more than three times of that in 2012.
Currently, Van Don District is not more than cities in Quang Ninh
Province. However, Van Don District has a plan to develop a
large economic zone and a commercial port, thus Van Don is
expected to be more populated and urbanized in the future.
Therefore, the wastewater from the urban area of Van Don
District will be one of the most major sources of water pollution.
To develop the treatment system for urban wastewater in Van Don
District will be directly linked to the environmental improvement
of Bai Tu Long Bay and the formulation of
environmentally-advanced region.
03 Objectives In order to treat the wastewater from the urban area appropriately
before discharging to public water body, a centralized wastewater
Environment Improvement Project in Quang Ninh Province
2-24
treatment plant and sewer pipelines will be constructed.
04 Scope of Work Construction of the following structures as a urban wastewater
treatment system
1. Wastewater Treatment Plant (WWTPs)
Capacity = 13,000m3/day
2. Sewer Pipelines (Interceptor Pipes)
D 300mm: 4.0km
D 400mm: 1.5km
D 600mm: 1.0km
06 Implementation
Agency
DPI / DOC
07 Investment Agency Developer and/or Operator of Van Don Economic Zone
Government of Quang Ninh Province
08 Implementation Refer to Chapter 4.4
09 Indicative Cost 1. WWTP-1: US$ 14.3 million
2. Sewer Pipelines: US$ 3.6 million
3. Engineering Fee: US$ 1.7 million
4. Administration Cost: US$ 1.7 million
5. Contingency: US$ 1.7 million
TOTAL: US$ 23.0 million
10 Remark It is necessary to go through the following steps to achieve the
project with the use of ODA loan.
1. Feasibility Study (F/S)
2. Land Acquisition of Sites for WWTP and Pumping Stations
3. Request of International Loan and Appraisal of ODA Donor
4. Selection of Consultant
5. Detailed Design (D/D)
6. Preparation of Tender Documents
7. Tender of Construction Company
8. Procurement of Materials and Construction Works
9. Operation of the Wastewater Treatment System
Work contents of the F/S and D/D are referred to (1) Ha Long
City – Hung Thang Area.
11 Possible Financial
Source
International donor with the budget of Quang Ninh Province
12 EIA Required
Environment Improvement Project in Quang Ninh Province
2-25
2.2.7 Improvement of Rural Wastewater Treatment Capacity
No. Content General information about the project
1 Name of
Project
Project for Planning Rural Wastewater Treatment System in Quang Ninh Province
03 Objectives - The project is to examine individual wastewater treatment system in rural area
in Quang Ninh province.
04 Items for
implementat
ion
1. Plan for constructing individual wastewater treatment system in rural area in
Quang Ninh province
2. Technical training to operate individual wastewater treatment system such as
Jokaso and bio-gas reactor
3. Awareness raising program for operating individual wastewater treatment
system for local residents in rural areas
4. Pilot project for operating individual wastewater treatment system
06 Implementi
ng Agency
DOC, DONRE
08 Execution
time
2014-2016
09 Estimated
budget
1.0 million USD
2.2.8 Improving of environment in areas of Lo Phong, Khe Re streams and Mong Duong River
No. Content General information about the project
01 Name of
Project
Improving of environment in areas of Lo Phong, Khe Re streams and Mong Duong
River
02 Necessity Coal mining activities impact strongly on the environment. The impacts not only to
the mining area itself, but in fact they significantly affect the basin systems,
especially in the downstream areas.
The waste dumping sites from coal the mines always have potential of risks and
complications. Height of many dumping sites is up to 200 meters with thickness
of a waste layer up to over 100m, large slopes at sides. When flood and rain,
under impacts of climate change, catastrophic phenomena of landslide and debris
flood can arise. Landslide occurred at the Phan Me dumping site in April 2012,
breaking of Khe Re dam in July 2006 causing a lot of damages, mental confusion
and anxiety for communities surrounding the mines are typical examples.
Due to active erosion and landslide phenomena in the coal mining areas, especially
at the dumping sites providing significant amount of materials to the streams and
rivers. In the rainy and typhoon seasons, materials from coal mining areas are swept
into the flows, brought to downstream, causing sedimentation of canals, economic
activities at downstream, especially causing sedimentation and pollution to the
coastal bays with serious impacts on mangrove forest ecosystems, such as in
estuaries of the Dien Vong River and Lo Phong stream.
Environment Improvement Project in Quang Ninh Province
2-26
Sedimentation from coal mining activities have caused substantial shallow and
narrow conditions of Cua Luc Bay area. Mong Duong River at the North of Cam
Pha previously been considered as a clean, transparent river but now it is muddy
flooded, dark water, drying up the flow. The cause is determined to be by waste soil
and rocks from the mining of coal production units in the area following stormwater
runoff into the river. Between the years of 2005-2007, the Mong Duong Coal Joint
Stock Company - Vinacomin has invested several billion VND for dredging and
building 4km of embankment along 2 sides where with densely populated area of
Mong Duong river. However, the large amount of sediment had been transported to
Bai Tu Long bay, widen quickly the sediment ground at the estuary.
To reduce source of deposition materials to Halong Bay, Bai Tu Long Bay,
renovating the mangrove ecosystems and especially creating environmentally
friendly landscaping in accordance with the World Natural Heritage Halong Bay,
need to make planning and renovate the environment at the frontier of estuaries at
downstream of rivers and streams derived from the mineral exploitation areas,
immediately in the areas which are at high risk of sedimentation and pollution such
as streams Lo Phong, Mong Duong river.
03 Objectives Evaluate status of landscape, environment and levels of impacts to the ecosystem of
Halong Bay, Bai Tu Long Bay by sediment transporting processes of river, stream
basins derived from coal mining operations; Make planning /designing the space of
land use which is environmentally friendly for estuaries and investment to
environment improvement model in the Lo Phong stream, Khe Re and Mong
Duong river towards environmentally friendly.
04 Items for
implementatio
n
The main contents of the project include:
1. Investigation, assessment of the status of landscape, environment and features
of water - stone motivation and levels of impacts to the ecosystems of Halong
Bay, Bai Tu Long Bay by transportation processes of sediment of the river and
stream basins derived from coal mining operations;
2. Plan/design in detail the spatial architectural landscape, spatial land use
environmentally friendly for the estuaries of the Lo Phong stream, Khe Re and
Mong Duong river;
3. Invest as a trial in environment improvement model towards using land
environmentally friendly (infrastructure, technology, materials, ...) for the
estuary area of Lo Phong stream.
05 Locations for
implementatio
n
The estuary areas of Lo Phong stream, Khe Re and Mong Duong river (including the
coastal sea water to a depth of 6m).
Environment Improvement Project in Quang Ninh Province
2-27
06 Implementing
Agency
DONRE, DARD, in collaboration with VINACOMIN.
07 Investors Quang Ninh province
08 Execution
time
2014 - 2020
09 Estimated
budget
Quang Ninh provincial budget: 215 billion VND, with two sub-projects:
- Sub-project 1: 15 billion VND
- Sub-project 2: 200 billion VND
11 Funds can be
mobilized
State Budget / International loans
12 EIA Necessary (for sub-project 2)
Environment Improvement Project in Quang Ninh Province
3-1
CHAPTER 3 PRIORITY PROJECTS FOR AIR ENVIRONMENT MANAGEMENT
3.1 Approach on Selection of Priority Projects
Considering current status and characteristics of pollution sources, the most important
parameter to be taken cared is particle matters including PM10
from stationary sources,
such as thermal power plant, cement industry, and coal mining industry. Air quality
management will focus on this matter. Additionally, the capacity for environmental
inspection to confirm compliance on advanced environmental and emission standards
same level as the development country standards which are aimed to achieve them by
the Socio-economic Development Master Plan. The proposed priority projects are as
follows;
Project for Strengthening Capacity for Environmental Management
Capacity Development on Air Quality Monitoring and Plant Emission
Monitoring by International Expert
Project on Mandatory Reporting of Flue Gas Measurement Value to Local
Government
The detail of each proposed priority project is described in the following section.
3.2 The Project for Strengthening Capacity for Environmental Management
No. Items Description
01 Project Name The Project for Strengthening Capacity for Environmental
Management.
02 Necessity As mentioned in Preparation of Environmental Planning of Quang
Ninh Province/Halong Bay Area to 2020, vision to 2030, in air
quality monitoring and stack emission measurement activities,
there are many difficulties In the present situation. Among of
them, the difficulties in the laboratory such as 1) Balance, 2)Low
volume air sampler, 3) Digital dust meter, 4) Portable Gas
Analyzer will be solved by the project.
03 Objectives In QN, air quality monitoring on SO2, CO, NOx O3 and TSP by
EMAC. The objectives of the project are 1) To equip EMAC with
necessary equipment/devices 2) Replace broken or out of order
equipment in order to maintain and enforce environmental
monitoring activities and inspection activities.
04 Scope of Work There are four types of instruments invested, including
equipment for environmental inspection, field monitoring
Environment Improvement Project in Quang Ninh Province
3-2
No. Items Description
equipment (air & water), laboratory equipment, and
auxiliary equipment.
1) Equipment for environmental check and inspection
No. Specifications Unit Quantity
1 Satellite navigator (GPS) Piece 3 2 Portable pH meter Piece 3 3 Laptop Piece 3 4 Digital camera Piece 3 5 HD camcorder (used at night) Piece 3 6 Portable printer (used for field trip) Piece 3 7 Portable meteorological meter Piece 3 8 Noise measurement equipment Piece 1 9 Vibration measurement equipment Piece 1 10 Flue emission measurement equipment Piece 1
11 Radioactivity measurement equipment Piece 1
12 Portable water multi-parameter equipment Piece 1 13 DO meter Piece 1 14 Portable turbidity meter Piece 1 15 Field salinity meter Piece 1
16 Clothes, glasses, glove, boots, jacket Set 1
2) Field monitoring equipment
No. Specifications Unit Quantity
I Air environment 17 Flue dust sampling equipment Piece 1
18 Light intensity measurement equipment
Piece 1
19 VOCs sampling system Piece 1
20 Equipment for measuring temperature, pressure of flue emission
Piece 1
21 Quick dust measurement equipment PM10, PM2.5, PM1
Piece 1
22 Ambient air dust sampling equipment, high flow
Piece 1
23 Flue emission measurement equipment
Piece 1
24 Ambient air sampling equipment Piece 1 25 Noise measurement equipment Piece 1
26 Satellite navigator (GPS) Piece 1
27 IR area measurement equipment Piece 1
II Water environment
28 Open-channel water flow measurement equipment
Piece 1
29 Portable water parameter equipment (pH, T)
Piece 1
30 Portable DO meter Piece 1 31 Portable turbidity meter Piece 1 32 TSS measurement equipment Piece 1 33 Marine organism sampling equipment Piece 1
34 Marine water depth measurement equipment
Piece 1
35 Sediment sampling equipment Piece 1
3) Laboratory equipment
No. Specifications Unit Quantity
36 ICP/MS system Piece 1 37 Aerator (for BOD, COD analysis) Piece 1 38 Laboratory DO meter Piece 1
39 Analytical balance (5 digits) Piece 1
40 COD analyzing system Piece 1 41 Laboratory pH meter Piece 1
Environment Improvement Project in Quang Ninh Province
3-3
No. Items Description
42 Equipment for determining mechanical composition of soil (compaction, humus)
Piece 1
43 Vacuum pump Piece 1
4) Auxiliary equipment
No. Specifications Unit Quantity
44 Large dehumidifier Piece 1
45 Fridge 320L Piece 1
46 Cabinet for storing chemicals,
solvent with fume hood function Piece 1
47 Balance chamber Piece 2
48 Laboratory chair Piece 5
49 Laboratory table Piece 5
05 Location EMAC
06 Implementation
Agency
PPC
07 Investment Agency PPC
08 Implementation
schedule
2013 to 2014 for one year
09 Indicative Cost Quang Ninh Government: US$ 0.65 million
10 Remark Project is approved by PPC already.
Basically, equipment listed in the project is necessary for better
operation. Among of them following item is to be put a priority in
order below and is needed to purchase/replace as soon as possible.
Especially, Analytical balance (5 digits) is needed urgently.
a) No.39: Analytical balance (5 digits): sensitivity/detection limit
(0.00001g: 10μg)
b) No.22: Ambient air dust sampling equipment, high flow (High
Volume Air Sampler)
c) No.21: Quick dust measurement equipment PM10, PM2.5, PM1
d) No.17: Flue dust sampling equipment
e) No.1: GPS
11 Possible Financial
Source
By PPC, already
12 EIA Not required
Environment Improvement Project in Quang Ninh Province
3-4
3.3 Capacity Development on Air Quality Monitoring and Plant Emission
Monitoring by International Expert
No. Items Description
01 Project Name Capacity Development on Air Quality Monitoring and Plant
Emission Monitoring by International Expert
02 Necessity Some international projects in relation to capacity development
for environmental protection, emission control, planning of
monitoring and pollution source inventory were conducted
recently. But unfortunately the contents of activities are relating to
water quality only. It is indispensable for DONRE to have a
project or technical cooperation on capacity building for air
quality management field. Together with “the project for
construction of automatic environmental monitoring stations in
Quang Ninh”, Capacity Development on AQM (Air Quality
Monitoring) and PEM (Plant Emission Monitoring) for
DONRE/EMAC staff is required through technical support of
international expert, who has experiences in air quality
monitoring of the ambient air and stack emission measurement at
the factory, to solve the difficulties of dust measurement in field
and laboratory, and to promote smooth initial operation of “Auto
AQM station” and “Auto PEM Station.
In Vietnam, auto AQM stations had been established in HCMC
and Hanoi almost 12 years ago, the number of the stations in total
were more than 30. But most of them have been out of operation
now. Of course there are some Vietnamese experts in this field,
but taking account of the lesson learned in past 10 years,
international expert with enough experience is necessary.
03 Objectives To promote smooth initial operation of “Auto AQM station” and
“Auto PEM Station”.
To solve the difficulties of dust measurement in field and
laboratory,
04 Scope of Work 1. Enhancement of capacity for operating “Auto AQM
station” and “Auto PEM Station”
2. Introduction of international standard method, isokinetic
sampling, and flue gas dust measurement of stack/chimney
3. Introduction of Standard Oxygen Concentration for
calculation/conversion
Environment Improvement Project in Quang Ninh Province
3-5
4. Strengthening of Inspection/measurement by
DONRE/EMAC
5. Strengthening of Air Pollution Source Inventory
6. Introduction of QA/QC (Quality Assurance/Quality
Control) for the air quality monitoring
05 Location DONRE/EMAC
06 Investment Agency International Donor
07 Implementation Application to international Donor in 2013 to 2014
Joint implementation International Expert with DONRE and
EMAC staff in 2015
08 Indicative Cost US$: 0.24 Million
09 Possible Financial
Source
International Donor
3.4 The Project for Mandatory reporting of Flue gas measurement value to local
government
No. Items Description
01 Project Name The Project for Mandatory reporting of Flue gas measurement value to
local government
02 Necessity Flue gas measurement on the stacks by factory and periodical
reporting to the local government is a kind of commonsense in EU
countries, US and Japan. It is called “Self Monitoring”. In QN
Quarterly monitoring and reporting to DONRE for ambient air is
conducted as an obligation of EIA procedure in the most of plants
listed in Table below, except the plants which had not been
conducted EIA. Among of them, Quang Ninh Power Plant and Cam
Pha Cement Plant issue the reports containing flue gas measurement
result on a quarterly basis. Introduction of self monitoring to large
scale plant is approach to the air quality management by industries.
Name of Plant
Flue gas result in Report
Remarks
Quang Ninh Power Plant
Reported regularly
Quarterly
Cam Pha Cement Plant
Reported regularly
Quarterly
Uong Bi Power Plant
Not reported regularly
Irregularly for phase 1 Unit
Cam Pha Power Plant
Not reported regularly
One time in EIA procedure on approval
Thang Long Cement
Reported but it is not stack gas concentration
Some figures for production control
Environment Improvement Project in Quang Ninh Province
3-6
No. Items Description
Mao Khe Power Plant
Not reported at all
-
Lam Thach Cement
Not reported at all
-
Halong Cement
Not reported at all
-
03 Objectives As part of the CSR(corporate social responsibility), the plants itself
should make effort to meet emission standards and open the data to
DONRE, and to public in the future. In this way, the plant to fulfill
its social responsibilities, by adopting the standard of international
companies in developed countries.
04 Scope of Work It is recommended to introduce self monitoring of flue gas in the
stack/duct for large scale plants as a mandatory report containing
flue gas measurement result on a quarterly basis.
The example of result table for Power Plant and cement plant is
shown in Table below.
Item Unit QCVN(19,22,23) A-Cmax Kp=*.*, Kv=*.*
Measured Value
General condition at the measurement
Height of Stack measured
m
Stack Diameter on the top
m
Flue gas velocity
m/s
Flue gas volume
m3/h
Temperature ºC Oxygen concentration (O2)
%
Concentration of air pollutants
DUST mg/Nm3
CO mg/Nm3
SO2 mg/Nm3
NOx mg/Nm3
Operating conditions at the measurement
Power generation at measurement for Power plant
Mw/hour
Production (clinker) amount at measurement for Cement Plant
Ton/hour
Fuel/Coal consumption at measurement
Ton/hour Ton/day
05 Location 1. Uong Bi Power Plant (Phase1, Phase 2 and Phase 3)
Environment Improvement Project in Quang Ninh Province
3-7
No. Items Description
2. Quang Ninh Power Plant (Phase 1 and Phase 2)
3. Cam Pha Power Plant (Phase 1 and Phase 2)
4. Mao Khe Power Plant (Phase 1 and Phase 2)
5. Lam Thach Cement
6. Lam Thach Cement 2
7. Halong Cement
8. Thang Long Cement
9. Cam Pha Cement Plant
06 Investment
Agency
DONRE/Sub Department of Environmental Protection
07 Implementation 2013 to 2014 for one and half years.
08 Indicative Cost Basically, within operation of Quang Ninh DONRE
Assuming that extra job compared with regular job will be;
2 persons x 20days (1 month) =US$ 0.0013 million
One day cost; 700,000 VND
09 Remark Quang Ninh Power Plant and Cam Pha Cement Plant are issuing the
reports containing flue gas measurement result on a quarterly basis
already.
Environment Improvement Project in Quang Ninh Province
4-1
CHAPTER 4 PRIORITY PROJECTS ON SOLID WASTE MANAGEMENT
4.1 Approach on Selection of Priority Projects
Although Quang Ninh province has made efforts to improve solid waste management,
several projects will be required to achieve targets in 2020. In the Environment Plan,
integrated solid waste management systems including collecting and recycling system
and final disposal site by sanitary measures are proposed. Additionally, advanced
measures for solid waste management are examined, such as development of regional
solid waste management system by cooperating of several adjacent administrations
such as Halong City, Cam Pha City, and Hoanh Bo District, districts.
Regarding the issues on coal mining solid waste, “The Master Plan on the
Development of Vietnam’s Coal Sector to 2020, with Orientation toward 2030”,
approved by the prime minister with Decision No.60/QĐ-TTg on 9th January 2012
states strategies and plans or management of coal mining solid waste. Based on the
master plan of development of coal mining sector, VINACOMIN has prepared “The
Planning for Environmental Protection of Quang Ninh Coal Mining Zone to 2020,
Orientation towards 2030”, and proposed projects for rehabilitation of coal mining
dumping site and expansion of hazardous waste treatment plant.
Considering above approaches, the priority projects were proposed.
4.1.1 Proposed Priority Projects
(1) Development of Solid Waste Management System
In the several local areas of Quang Ninh Province, the capacity of landfill site will be
finished soon. To address solid waste management issues in such areas, the advanced
solid waste management system including collecting and recycling system and final
disposal site by sanitary measures will be developed. At the same time, awareness
raising activities to promote 3R activities will be implemented. For the above activities,
the following priority projects are proposed.
Project on awareness raising on solid waste management
Preliminary study on regional solid waste management
Development of solid waste management system for Halong city, Cam Pha
City, and Hoanh Bo district
Development of solid waste management system for Uong Bi city
Development of solid waste management system for Hai Ha District
Development of solid waste management system for Van Don District
Environment Improvement Project in Quang Ninh Province
4-2
(remained parts)
Development of solid waste management system for Quang Yen Town
Development of solid waste management system for Co To District
(2) Improvement of Coal Mining Waste Management
The coal mining activities, especially opencast coal mining, always create the huge
volume of waste soil and rocks including hazardous waste. To improve coal mining
waste management, the following priority projects were proposed, cooperating with
VINACOMIN by “The Planning for Environmental Protection of Quang Ninh Coal
Mining Zone to 2020, Orientation towards 2030” of which legal basis is Decision
No.1052/QD-VINACOMIN in 2013.
Assessment of stability, identifying potential risks of soil and rock slides areas
and proposing prevention solutions for the Outer Dumping Sites in Halong and
Cam Pha areas.
The detail of all proposed priority project are described in the following section.
4.2 Development of Solid Waste Management System
4.2.1 Project on awareness raising on Solid waste management
No. Items Description
1 Project Name Promotion of 3R Activity for Solid Waste Management
2 Necessity A huge amount of plastic (PET) bottle drinks, canned beer, glass
jars are consumed on a daily basis, and these wastes are
threatening the landfill volume of the final waste disposal site.
Waste reduction by 3R is required urgently for SWM in Quang
Ninh Province.
3 Objectives In order to reduce the volume of wastes in the future, 3R activity
shall be promoted in Quang Ninh Province. 3R for waste
treatment is required to be promoted. Solid waste management
cannot be implemented smoothly without the cooperation of the
local resident and local community’s involvement. For promoting
3R and introduction of segregated collection in the future, the
cooperation of the households is indispensable. For the smooth
implementation of 3R, public education is essential and necessary
education and enhancement activities urgently.
4 Scope of Work Preparation of leaflet for promotion of 3R
Preparation of leaflet for waste segregation
Promotion using TV, radio and newspaper
Environment Improvement Project in Quang Ninh Province
4-3
Planning of workshop of 3R in each district
Advertisement of family composting
Others
5 Location All of Cities and Districts in Quang Ninh Province
6 Investment Agency PPC
7 Implementation 2014 - 2018
8 Budgetary Cost Total: $ 700,000
4.2.2 Preliminary Study on Regional Solid Waste Management
No. Items Description
1 Project Name Preliminary Study on Regional Solid Waste Management
2 Necessity In the existing operation of MSW, the management of landfill
operation is conducted by each district as responsible
organization. In the small scale landfill site, no permanent staff is
assigned for the landfill operation. Presently, it is quite difficult to
construct a sanitary landfill facilities based on the government
guidelines and laws governing each small district due to the
following reasons:
Construction cost is a huge amount and the arrangement of
funds resource will be difficult for each small district.
Operation of leachate treatment system for landfill will
require special technical skills and it is difficult to employ a
skilled staff for a landfill site especially for small scale
landfill.
3 Objectives It is recommend that landfills be operated jointly by small
districts. In this case a large scale landfill which has a capacity to
cover the waste volume for 2-3 districts will be constructed at one
site. For the clarification of site condition, site survey and study
of grouping are essential for smooth implementation of the
improvement project.
4 Scope of Work Collection of data and information
Discussion with operators and responsible organizations for
SWM in district/city
Study of proposed site for facilities
Study of transportation routes
Others
Environment Improvement Project in Quang Ninh Province
4-4
5 Location All of Cities and Districts in Quang Ninh Province
6 Investment Agency PPC
7 Implementation 2014 - 2015
8 Budgetary Cost Total: $ 20,000
4.2.3 Improvement of Solid Waste Management for Halong City, Cam Pha City and Hoanh
Bo District
No. Items Description
1 Project Name: Improvement of Solid Waste Management in Halong City, Cam
Pha City and Hoanh Bo District
2 Necessity Existing collection system just handles mixed waste without any
official recycling or reuse as well as separation at source, and
there are no recycling facilities and almost all collected waste is
transported to each landfill, a lot of environmental problems
emerged through the operation.
The existing landfill sites are expected to be reaching its full
capacity within a few years, it is essential that site selection and
planning of new sanitary landfill according to Government
regulations be proceeded.
3 Objectives In order to reduce the volume of wastes in the future, 3R activity
shall be promoted in Halong City, Cam Pha City and Hoanh Bo
District. For the conservation of natural environment of Halong
bay area, the quality of solid waste management has to be
improved. 3R activity of waste generated from household shall
be started in Halong City and coastal area of Halong Bay. For the
treatment of collected waste, the construction of a Recycle Center
in Halong City shall be completed and construction of a
Composting Plant shall also be completed and the operation be
started as soon as possible.
4 Scope of Work 1. Construction of sanitary landfill with leachate treatment
system
Volume of Generated Solid Waste in 2020:
81,941 ton/year (Halong City)
28,583 ton/year (Cam Pha City)
4,008 ton/year (Hoanh Bo District)
Environment Improvement Project in Quang Ninh Province
4-5
Landfill area: Approx. 14.2 ha
(Height 5m, service life 10 years, not including areas for leachate
treatment facilities operation yard such as access road, office,
stockpile area of covering soil, etc.)
2. Construction of administration facilities (building, site
preparation, external fence and planting, access roads, power
supply, external lighting system, water supply etc.)
3. Construction of recycle center (building, site preparation,
external fence and planting, access roads, power supply,
external lighting system, water supply etc.)
4. Construction of composting plant (building, site preparation,
external fence and planting, access roads, power supply,
external lighting system, water supply etc.)
5. Equipment and materials
Environment Improvement Project in Quang Ninh Province
4-6
(1) Equipment for Collection and transportation
- Truck
- Compactor truck
- Handcart
(2) Equipment for landfill operation
- Bulldozer
- Wheel loader
- Dump truck
- Truck scale 40ton
(3) Equipment for Composting and Recycling
- Belt conveyor
- Wheel loader
- Crusher
- Weighing scale
- Trommel
- Hydraulic compactor
5 Location Halong City, Cam Pha City, and Hoanh Bo District
6 Implementation
Agency
PMU/DOC
7 Investment Agency Quang Ninh Government: Construction of Sanitary landfill,
recycling center, compost plant.
JSC: Procurement of all equipment for the operation
8 Implementation 201 - 2018
9 Indicative Cost 21.3 million USD
Environment Improvement Project in Quang Ninh Province
4-7
4.2.4 Improvement of Solid Waste Management for Uong Bi City
No. Items Description
1 Project Name: Improvement of Solid Waste Management in Uong Bi City
2 Necessity Population at 2020: 113,809
Existing collection system just handles mixed waste without any
official recycling or reuse as well as separation at source, and there are
no recycling facilities and almost all collected waste is transported to
each landfill, a lot of environmental problems emerged through the
operation.
Landfill sites are not sanitary landfills, i.e., they do not have liner systems,
leachate collection, leachate treatment and gas venting system, like open
landfill sites without cover soil.
3 Objectives In order to reduce the volume of wastes in the future, 3R activity shall be
promoted in Uong Bi City For the conservation of natural environment
of Halong bay area, the quality of solid waste management has to be
improved. 3R activity of waste generated from household shall be
started in Uong Bi City. For the treatment of collected waste, the
construction of a Recycle Center shall be completed and construction
of a Composting Plant shall also be completed and the operation be
started as soon as possible.
4 Scope of Work 1. Construction of sanitary landfill with leachate treatment system
Volume of Generated Solid Waste : 14,954 ton/year (2020)
Environment Improvement Project in Quang Ninh Province
4-8
Landfill area: Approx. 2.1 ha
(Height 5m, service life 10 years, not including areas for leachate
treatment facilities operation yard such as access road, office, stockpile
area of covering soil, etc.)
2. Construction of administration facilities (building, site
preparation, external fence and planting, access roads, power
supply, external lighting system, water supply etc.)
3. Construction of recycle center (building, site preparation, external
fence and planting, access roads, power supply, external lighting
system, water supply etc.)
4. Construction of composting plant (building, site preparation,
external fence and planting, access roads, power supply, external
lighting system, water supply etc.)
5. Equipment and materials
(1) Equipment for Collection and transportation
- Truck
- Compactor truck
Environment Improvement Project in Quang Ninh Province
4-9
- Handcart
(2) Equipment for landfill operation
- Wheel loader
- Truck scale 40ton
(3) Equipment for Composting and Recycling
- Min wheel loader
- Belt conveyor
- Crusher
- Weighing scale
- Trommel
- Hydraulic compactor
5 Location Uong Bi City
6 Implementation
Agency
PMU/DOC
7 Investment
Agency
JSC: Construction of all facilities including sanitary landfill, recycling
center, composting plant and procurement of all equipment for the
operation.
8 Implementation
schedule
2014-2018
9 Indicative
Cost
JSC: US$ 3.6 million
10 Remark Coverage area of landfill site (grouping) shall be studied according to the
estimation of economical distance, conditions of roads and collection
route of waste. For the unification of SWM, it is necessary to establish a
consensus for each targeted districts by Local Government level. (see
attached drawing: Group 1: Uong Bi City, Quang Yen Town, Dong
Trieu District))
11 Possible
Financial
Source
Private Sector
12 EIA Required
Environment Improvement Project in Quang Ninh Province
4-10
4.2.5 Improvement of Solid Waste Management for Hai Ha District
No. Items Description
1 Project Name: Improvement of Solid Waste Management in Hai Ha District
2 Necessity Population at 2020: 63,042
The existing landfill sites are expected to be reaching its full capacity
within a few years, it is essential that site selection and planning of
new sanitary landfill according to Government regulations be
proceeded.
Existing collection system just handles mixed waste without any
official recycling or reuse as well as separation at source, and there
are no recycling facilities and almost all collected waste is
transported to landfill, a lot of environmental problems emerged
through the operation.
Landfill site is not sanitary landfills, i.e., they do not have liner systems,
leachate collection, leachate treatment and gas venting system, like open
landfill sites without cover soil.
3 Objectives In order to reduce the volume of wastes in the future, 3R activity shall
be promoted in Halong City. For the conservation of natural
environment of Hai Ha District, the quality of solid waste
management has to be improved. 3R activity of waste generated
from household shall be started in Hai Ha District. For the treatment
of collected waste, the construction of a Recycle Center shall be
completed and construction of a Composting Plant shall also be
completed and the operation be started as soon as possible.
4 Scope of Work 1. Construction of sanitary landfill with leachate treatment system
Volume of Generated Solid Waste : 4142 ton/year (2020)
Environment Improvement Project in Quang Ninh Province
4-11
Landfill area: Approx. 0.6 ha
(Height 5m, service life 10 years, not including areas for leachate
treatment facilities operation yard such as access road, office,
stockpile area of covering soil, etc.)
2. Construction of administration facilities (building, site
preparation, external fence and planting, access roads, power
supply, external lighting system, water supply etc.)
3. Construction of recycle center (building, site preparation,
external fence and planting, access roads, power supply, external
lighting system, water supply etc.)
4. Construction of composting plant (building, site preparation,
external fence and planting, access roads, power supply, external
lighting system, water supply etc.)
5. Equipment and materials
(1) Equipment for Collection and transportation
- Truck
- Compactor truck
Environment Improvement Project in Quang Ninh Province
4-12
- Handcart
(2) Equipment for landfill operation
- Tractor
- Trailer
(3) Equipment for Composting and Recycling
- Belt conveyor
- Crusher
- Weighing scale
- Trommel
- Hydraulic compactor
5 Location The solid waste master plan recommended a site at Duong Hoa area
in Hai Ha District. The site can be considered as a candidate site of a
new landfill site. It is recommended to implement a feasibility study
to examine suitability of the site for landfill site.
6 Implementation
Agency
PMU/DOC
7 Investment
Agency
JSC: Construction of all facilities including sanitary landfill,
recycling center, composting plant and procurement of all equipment
for the operation.
8 Implementation
schedule
2014-2018
9 Indicative Cost JSC: US$ 1.6 million
10 Remark Coverage area of landfill site (grouping) shall be studied according to
the estimation of economical distance, conditions of roads and collection
route of waste. For the unification of SWM, it is necessary to establish a
consensus for each targeted districts by Local Government level. (see
attached drawing: Group 3:Mon Cay City and Hai Ha District)
11 Possible
Financial Source
Private Sector
12 EIA Required
Environment Improvement Project in Quang Ninh Province
4-13
4.2.6 Improvement of Solid Waste Management for Van Don District (remained parts)
No. Items Description
1 Project Name: Improvement of Solid Waste Management in Van Don District
2 Necessity Population at 2020: 48,351
Existing collection system just handles mixed waste without any
official recycling or reuse as well as separation at source, and there
are no recycling facilities and almost all collected waste is
transported to landfill, a lot of environmental problems emerged
through the operation. Van Don District is faced along coastal area
of Halong Bay and improvement of landfill is essential for
environmental preservation and beautification. The existing Landfill
site is not sanitary landfill, i.e., they do not have liner systems, leachate
collection, leachate treatment and gas venting system, like open landfill
sites without cover soil.
3 Objectives In order to reduce the volume of wastes in the future, 3R activity shall
be promoted in Van Don District. For the conservation of natural
environment of Halong bay area, the quality of solid waste
management has to be improved. 3R activity of waste generated
from household shall be started in Van Don District. For the
treatment of collected waste, the construction of a Recycle Center
shall be completed and construction of a Composting Plant shall
also be completed and the operation be started as soon as possible.
4 Scope of Work 1. Construction of sanitary landfill with leachate treatment system
Volume of Generated Solid Waste : 3,971 ton/year (2020)
Environment Improvement Project in Quang Ninh Province
4-14
Landfill area: Approx. 0.6 ha
(Height 5m, service life 10 years, not including areas for leachate
treatment facilities operation yard such as access road, office,
stockpile area of covering soil, etc.)
2. Construction of administration facilities (building, site
preparation, external fence and planting, access roads, power
supply, external lighting system, water supply etc.)
3. Construction of recycle center (building, site preparation,
external fence and planting, access roads, power supply,
external lighting system, water supply etc.)
4. Construction of composting plant (building, site preparation,
external fence and planting, access roads, power supply,
external lighting system, water supply etc.)
5. Equipment and materials
(1) Equipment for Collection and transportation
- Truck
- Compactor truck
Environment Improvement Project in Quang Ninh Province
4-15
- Handcart
(2) Equipment for landfill operation
- Tractor
- Trailer
(3) Equipment for Composting and Recycling
- Belt conveyor
- Crusher
- Weighing scale
- Trommel
- Hydraulic compactor
5 Location Van Don District
6 Implementation
Agency
PMU/DOC
7 Investment
Agency
JSC: Construction of all facilities including sanitary landfill,
recycling center, composting plant and procurement of all
equipment for the operation.
8 Implementation
schedule
2014-2018
9 Indicative Cost JSC: US$ 1,6 million
10 Remark Small scale landfill
11 Possible
Financial Source
Private Sector
12 EIA Required
Environment Improvement Project in Quang Ninh Province
4-16
4.2.7 Improvement of Solid Waste Management for Quang Yen Town
No. Items Description
1 Project Name: Improvement of Solid Waste Management in Quang Yen Town
2 Necessity Population at 2020: 154,669
Existing collection system just handles mixed waste without any
official recycling or reuse as well as separation at source, and there
are no recycling facilities and almost all collected waste is
transported to each landfill, a lot of environmental problems
emerged through the operation.
Landfill sites are not sanitary landfills, i.e., they do not have liner
systems, leachate collection, leachate treatment and gas venting
system, like open landfill sites without cover soil.
3 Objectives In order to reduce the volume of wastes in the future, 3R activity shall
be promoted in Quang Yen Town. For the conservation of natural
environment of Halong bay area, the quality of solid waste
management has to be improved. 3R activity of waste generated
from household shall be started in Quang Yen Town. For the
treatment of collected waste, the construction of a Recycle Center
shall be completed and construction of a Composting Plant shall
also be completed and the operation be started as soon as possible.
4 Scope of Work 1. Construction of sanitary landfill with leachate treatment system
Volume of Generated Solid Waste : 10,162 ton/year (2020)
Environment Improvement Project in Quang Ninh Province
4-17
Landfill area: Approx. 1.6 ha
(Height 5m, service life 10 years, not including areas for leachate
treatment facilities operation yard such as access road, office,
stockpile area of covering soil, etc.)
2. Construction of administration facilities (building, site
preparation, external fence and planting, access roads, power
supply, external lighting system, water supply etc.)
3. Construction of recycle center (building, site preparation,
external fence and planting, access roads, power supply,
external lighting system, water supply etc.)
4. Construction of composting plant (building, site preparation,
external fence and planting, access roads, power supply,
external lighting system, water supply etc.)
5. Equipment and materials
Environment Improvement Project in Quang Ninh Province
4-18
(1) Equipment for Collection and transportation
- Truck
- Compactor truck
- Handcart
(2) Equipment for landfill operation
- Wheel loader
(3) Equipment for Composting and Recycling
- Min wheel loader
- Belt conveyor
- Crusher
- Weighing scale
- Trommel
- Hydraulic compactor
5 Location Quang Yen Town
6 Implementation
Agency
PMU/DOC
7 Investment
Agency
JSC: Construction of all facilities including sanitary landfill,
recycling center, composting plant and procurement of all
equipment for the operation.
8 Implementation
schedule
2014-2018
9 Indicative Cost JSC: US$ 3.0 million
10 Remark Coverage area of landfill site (grouping) shall be studied according to
the estimation of economical distance, conditions of roads and
collection route of waste. For the unification of SWM, it is necessary to
establish a consensus for each targeted districts by Local Government
level. (see attached drawing: Group 1: Quang Yen Town, Uong Bi
City Dong Trieu District)
11 Possible
Financial Source
Private Sector
12 EIA Required
Environment Improvement Project in Quang Ninh Province
4-19
4.2.8 Improvement of Solid Waste Management for Co To District
No. Items Description
1 Project Name: Improvement of Solid Waste Management in Co To District
2 Necessity Population at 2020: 6,187
The existing landfill sites are expected to be reaching its full capacity
within a few years, it is essential that site selection and planning of
new sanitary landfill according to Government regulations be
proceeded.
Existing collection system just handles mixed waste without any
official recycling or reuse as well as separation at source, and there are
no recycling facilities and almost all collected waste is transported to
landfill, a lot of environmental problems emerged through the
operation.
Landfill sites are not sanitary landfills, i.e., they do not have liner systems,
leachate collection, leachate treatment and gas venting system, like open
landfill sites without cover soil.
3 Objectives In order to reduce the volume of wastes in the future, 3R activity shall be
promoted in Improvement of Solid Waste Management in Co To
District. For the conservation of natural environment of Halong bay
area, the quality of solid waste management has to be improved. 3R
activity of waste generated from household shall be started in
Improvement of Solid Waste Management in Co To District. For the
treatment of collected waste, the construction of a Recycle Center
shall be completed and construction of a Composting Plant shall also
be completed and the operation be started as soon as possible.
4 Scope of Work 1. Construction of sanitary landfill with leachate treatment system
Volume of Generated Solid Waste :452 ton/year (2020)
Environment Improvement Project in Quang Ninh Province
4-20
Landfill area: Approx. 0.2 ha
(Height 5m, service life 10 years, not including areas for leachate
treatment facilities operation yard such as access road, office, stockpile
area of covering soil, etc.)
2. Construction of administration facilities (building, site
preparation, external fence and planting, access roads, power
supply, external lighting system, water supply etc.)
3. Construction of recycle center (building, site preparation, external
fence and planting, access roads, power supply, external lighting
system, water supply etc.)
4. Construction of composting plant (building, site preparation,
external fence and planting, access roads, power supply, external
lighting system, water supply etc.)
5. Equipment and materials
(1) Equipment for Collection and transportation
- Truck
- Handcart
Environment Improvement Project in Quang Ninh Province
4-21
(2) Equipment for landfill operation
- Tractor
- Trailer
(3) Equipment for Composting and Recycling
- Belt conveyor
- Crusher
- Weighing scale
- Trommel
- Hydraulic compactor
5 Location Improvement of Solid Waste Management in Co To District
6 Implementation
Agency
PMU/DOC
7 Investment
Agency
JSC: Construction of all facilities including sanitary landfill, recycling
center, composting plant and procurement of all equipment for the
operation.
8 Implementation
schedule
2014-2018
9 Budgetary Cost JSC: US$ 0.9 million
10 Remark Small scale landfill
The experience of pilot project on incineration plant should be shared
with other districts for operation of incinerator in the future.
11 Possible
Financial
Source
Private Sector
12 EIA Required
4.2.9 Technical and technology measures to minimize negative impacts of the outer
dumping sites in areas of Halong and Cam Pha areas.
ST
T
Content General information about the Project
01 Name of Project Assessment of stability, identifying potential risks of soil and rock slides areas
and proposing prevention solutions for the outer dumping sites in Halong and
Cam Pha areas.
02 Necessity Coal mining activities have been causing significant impacts on environment,
multiple and severe natural disasters (rock & landslide, debris flood… ) seriously
affect production, properties and lives of the adjacent residents, environmental
quality, sedimentation in Cua Luc Bay, Ha Long Bay and Bai Tu Long Bay, such
as:
- Coal mining activities create new terrains - the outer dumping sites stretching
from Ha Khanh of Hon Gai to Duong Mong of Cam Pha ..
Environment Improvement Project in Quang Ninh Province
4-22
- To be a province with the largest coal reserves with an output of nearly 16
million tons / year, profits from the coal industry has contributed significantly to
GDP of Quang Ninh province. However, the mining industry has generated
annually a great volume of soil and rock waste.
According to the development plan for Vietnam's coal industry to 2020, vision to
2030 , the amount of soil and waste rock in Quang Ninh from now until 2025 is
estimated at 7 to 8 billion m3. On average from 2005 to 2010, only in 5 major
mines of Cao Son, Coc Sau, Deo Nai, Ha Tu, Nui Beo, the volume of soil and rock
waste rock has been from 21-30 million m3 per year. This volume increases also
means the dumping sites areas grow continuously. Currently, the dumping sites
areas have been already in Cam Pha nearly 900 ha, Hon Gai nearly 750 ha, many
sites with the height up to 100 - 200m such as the Nui Beo, Deo Nai, Coc Sau
dumping sites. The dumping sites have created the high hills such as: Coc Sau
280 m high , South Deo Nai 200 m, East Cao Son 200m, and Nui Beo 250m
high ...
In rainy seasons, the dumping sites erode strongly, forming deep grooves from
2-5m wide. Soil, rock and sludge are washed away by rain water, brought to the
downstream causing sedimentation in flows, streams, rivers and arable land.
According to research, the average amount of soil and rock eroded from dumping
sites is about 2,960 tons/ha/ year. This eroded soil and rock amount is the basic
source of materials causing sedimentation and pollution in Halong Bay.
- Soil and rocks waste form the hill ranges, together with the heavy rainfall
intensity are the basic causes of cumulative impacts affecting largely to the
production and living of residents surrounded.
- To overcome the negative impacts of mining activities, the Government of
Vietnam has issued many policies and solutions related to environmental
restoration, being shown most clearly in the Decision No. 18/2013/QD, dated
March 29, 2013 of the Prime Minister on environmental renovation and
restoration and signing of Fund for environmental rehabilitation and
restoration for minerals mining operations; the Circular No.34/
2009/TT-BTNMT, dated December 31, 2009 of the Ministry of Natural
Resources and Environmental regulating on Establishment, approval,
inspection and certification of environmental renovation and restoration
projects and signing of fund for environmental rehabilitation and restoration
for minerals mining operations.
In the strategic environmental impact assessment of the Vietnam Coal Sector
planning as well as the environmental impact assessment report of the particular
mines also gave solutions to rehabilitate and restore of environment after the
mines closure, however, implementation has been difficult.
To minimize the adverse impacts of coal mining as well as of soil and rock waste
to the environment, need to have appropriate solutions. In addition to designing of
the dumping sites as height restrictions, appropriate layering as well as creating
drainage water channels around, tree planting and greening the dumping sites,
controlling erosion, landslides etc. Need to have the comprehensive solutions
towards coal mining with less adversely affect to the surrounding environment.
03 Objectives - Evaluate and identify potential areas of risk, the risks of soil & rock slides
and mud floods of the outer dumping sites due to opencast coal mining in
Ha Long and Cam Pha;
- Identify the space being affected by soil & rock slides, mud floods due to the
opencast coal mining in Ha Long and Cam Pha,
- Selection and application of engineering solutions, advanced and appropriate
technologies to minimize the adverse impacts on the surrounding areas and
the Cua Luc Bay, Halong Bay and Bai Tu Long due to transportation of
Environment Improvement Project in Quang Ninh Province
4-23
sedimentation to streams and rivers derived from the outer coal mining waste
dumps.
04 Items for
implementation
The main contents of the project include:
1. Investigate, evaluate and determine the overall levels of stability, the dangers
and risks of rock & landslide, debris flood from the outer dumping site
areas from Ha Khanh to Mong Duong,
2. Identify the flows of debris the areas surrounding the outer dumping sites
at risk of influence (Prioritize the areas for residents, industries ...),
3. Selection and application of engineering solutions and technology for:
stabling the dumping sites, solidifying foot of dumping sites and construction
of water drainage ditches from the mining sites (priority given to areas with
high landslide risk and large impacts)
05 Locations for
implementation
- Study the entire outer dumping sites from Ha Khanh to Mong Duong areas
- Priority is given to the outer dumping sites which are of highly dangerous
06 Implementing
Agency
DONRE in collaboration with VINACOMIN
07 Investors VINACOMIN, Quang Ninh PPC
08 Execution time 2014 – 2025
09 Estimated
budget
4.8 mil.USD
10 Note The project can be split into two sub-projects or two phases:
- Sub-project 1: Implementing content 1 & 2
- Sub-project 2: Implementing content 3
11 Funds can be
mobilized
State budget
12 EIA
Environment Improvement Project in Quang Ninh Province
5-1
CHAPTER 5 PRIORITY PROJECTS FOR FOREST MANAGEMENT
5.1 Approach on Selection of Priority Projects
Quang Ninh province has a large potential of forest resources in inland area and
coastal area. These forests should be linked each other to sustain natural environment
of Quang Ninh province as good condition in provincial level. One of the key
approaches to link well-conditioned forest environment is to improve quality and
increase areas of protected area in the province, and make a network of suitable forest
environment. Inland forest and coastal forest including mangrove forest has close
relationship each other, so the approaches to protect both environments together are
proposed in the Environmental Plan. The priority projects were selected to secure the
required function of protected area by enhancing its characteristics on environmental
management in Quang Ninh province.
The forest management sector is also expected to contribute to reduce impacts by coal
mining activity by reforestation and developing buffer zone. From this viewpoint, the
several priority projects were proposed.
5.1.1 Proposed Priority Projects
The proposed priority projects in the forest management sector are as follows. Detail
of each project is shown in the following section.
(1) Enhancing Function of Protected Areas for Environmental Management
For enhancing the function of the protected areas for environmental management, the
following priority projects were proposed. These projects are expected to contribute
not only to environmental management of Quang Ninh province but also enhancing
natural resources for developing sustainable tourism.
Project for Coastal Ecological Corridor Improvement in QN Province
Project for Management of Bai Tu Long National Park with Registration of
ASEAN Heritage Site
Project for Establishment and Upgrading of Yen Tu National Forest to
National Park
(2) Enhancing Function of Important Forest Areas as Source of Domestic Water
The some forest areas such as headwater of Yen Lap lake have important role as
sources of domestic water for Quang Ninh Province. To 2020, required water demand
will be increase due to increase of population. Nevertheless, it is considered that such
forests are affected by industrial activities such as open coal mining, and current forest
conditions are considered to be improved. To actualize better management of such the
main forest areas supplying domestic water, the following project was proposed.
Project for Management of Headwater Protection Forest (Yen Lap and Trang
Environment Improvement Project in Quang Ninh Province
5-2
Vinh)
(3) Mitigating Impacts by Coal Mining Activities
In 2020, open mining activities will be prohibited based on the policy of Quang Ninh
Province. However, existing open coal mining areas will affect by erosion if no action
is implemented. To mitigate prospective impacts from existing coal mining area, the
following priority projects were proposed.
Examination for Minimizing of Sedimentation in the Coastal Zone in Cua Luc
Bay and Halong Bay
Developing of Green Belt for Reducing Erosion Impact from Coal Mining
Area in Halong and Cam Pha Cities
Planning and Testing the Models of Land Use toward Environmental Friendly
around Closed Coal Mines
5.2 Enhancing Function of Protected Areas for Environmental Management
5.2.1 Project for Coastal Ecological Corridor Improvement
No. Items Description
1 Project Name Project for Coastal Ecological Corridor Improvement
2 Necessity The marine ecological corridor includes marine protected areas (MPA),
areas designated for the marine resource conservation distributed from the
northern eastern part of the provincial marine area and the corridor
stretches along the coastline of the province up to Cat Ba National Park of
Hai Phong City. This corridor protects the marine resources and
biodiversity, ensuring the sustainable fishery activities for the people of
Quang Ninh Province and sustainable tourism for the province.
By the climate change, the impact on ecosystem may be expected, and
regular and continuous monitoring and careful resource management is
the key to sustain the fishery and tourism activities which are very
important economic sectors of the province.
The major areas included in this corridor are: Dao Tran and Dao Co To
Proposed National Park (proposed MPA), Bai Tu Long Bay National Park
(Currently National Park, and proposed as MPA), the core zone of Halong
Bay National Heritage and several areas for the marine resources
conservation.
Not only the marine environment, island ecosystem will also be conserved
such as forest ecosystem on Co To islands and the islands of Bai Tu Long
Bay National Park. The limestone islands in Halong Bay and Bai Tu Long
Bay are also so special that the further research and conservation which
contributes to the sustainable tourism activities are expected.
Environment Improvement Project in Quang Ninh Province
5-3
3 Objectives Mangrove and coastal forest in the province is rehabilitated and the
sustainable management model is established.
4 Scope of Work The main activities and primary estimated scope of work in this project
are as follows
1. 3,000 ha of mangrove and coastal forest are established, and 20,000 ha
is regenerated, or sustainably managed.
2. Model for community based coastal management is established
3. Technologies of mangrove-friendly aquaculture in the province
4. Plantation and rehabilitation technologies for mangrove and coastal
plantation is established and compiled as a manual.
5. In Tien Yen District, Quang Yen Town, the model of community based
mangrove management system through SATOYAMA initiative is
established and the area will be designated as Ramsar Site.
6. Peoples’ awareness on the importance of the mangrove and coastal
vegetation is enhanced.
The Coastal Ecological Corridor
5 Location Quang Yen Town, Halong City, Hoanh Bo District, Cam Pha City, Van
Don District,, Tien Yen District, Dam Ha District, Hai Ha District, Mong
Cai City, and Co To District
6 Implementation
Agency
DONRE: LUP, Wetland Reserve, Ramsar
DARD: Management
7 Investment
Agency
Quang Ninh Provincial People’s Committee
8 Implementation 2014 - 2022
9 Indicative Cost Quang Ninh Provincial Budget: US$ 11 million
10 Remark Though the establishments of two marine protected areas (MPA) , namely
Tran Island MPA and Co To Island MPA are listed in Decision
742/QĐ-TTg approving the Vietnam marine protected areas system to
Environment Improvement Project in Quang Ninh Province
5-4
2020, it is recommended here to connect these two MPAs into one, so that
this coastal ecological corridor can be managed more efficiently with
larger refuge for marine flora and fauna. In the corridor, important area
especially for spawning of marine fauna, and also the area for corals and
sea grasses should be conserved with introduction and enforcement of
closed sessions for each important species.
11 Possible Financial
Source
Central Government/International Loans
12 EIA Required
5.2.2 Project for Management of Bai Tu Long National Park with Registration of ASEAN
Heritage Site
No. Items Description
1 Project Name Project for Management of Bai Tu Long National Park with
Registration of ASEAN Heritage Site
2 Necessity Bai Tu Long Bay area is currently managed as national park and this
bay is not less important and precious than the world heritage Ha Long
Bay. Considering its importance of not only the ecosystems on the
islands such as Ba Mun island and Cai Lim island, but also the marine
ecosystem, it is proposed to change its status into Marine Protected
Area cum National Park to enhance its capacity to manage its marine
area more efficiently. Furthermore the Marine Protected Area cum
National Park should be registered as the ASEAN Heritage Park for
high level conservation and eco-tourism.
3 Objectives Management capacity of Bai Tu Long National Park is strengthened and
is registered as ASEAN Heritage Park.
4 Scope of Work The proposed project consist of 04 components with main activities as
follows:
1. Improve infrastructure facilities and services of conservation and
protection.
- Construct office house, forest rangers’ stations, forest-fire watch
towers
- Construct patrol roads also in service of eco-tourist activities
- Provide equipment and facilities for forest-fire control;
- Preparation of management plan the national park cum marine
protected area and ASEAN Heritage Park.
2. Forest protection and development
- Plant 20 ha of forest and 90 ha of mangrove as new forest;
Environment Improvement Project in Quang Ninh Province
5-5
- Protect and sustainably manage 5,356 ha of natural and planted forest.
- Restore 90 ha of forest by natural regeneration with additional
planting;
3. Scientific research and environment education
- Construct botanical garden, nursery and experimental forest;
- Study and Research on biodiversity and ecosystem;
- Construct laboratory and scientific research station;
- Construct station of bio-diversity supervision and interpretation;
- Construction of ex-situ conservation facility and rescue center;
- Propaganda and training on environment conservation/ protection;
- Provide equipment/facilities for scientific researches
4. Support eco-tourism development activities
- Prepare eco-tourism development plan
- Support to develop 6 models of sustainably-utilized bio-diversity
resources;
- Develop 3 community-based eco-tourism villages, including
eco-tourism visiting sites
- Construct 01 tourist reception house
- Upgrade the beach (in Minh Chau commune)
The project area
5 Location Bai Tu Long National Park in Van Don District
6 Implementation
Agency
DONRE: LUP
Management Board of Bai Tu Long National Park: Management
Sub Dept of Fisheries: Marine conservation plan
7 Investment Agency Quang Ninh Provincial People’s Committee
8 Implementation 2014 - 2020
9 Indicative Cost Quang Ninh Provincial Budget: US$ 3.6 million
Environment Improvement Project in Quang Ninh Province
5-6
10 Remark In order to register as the ASEAN Heritage Park, survey and procedure
should be proceeded to get an agreement by the ASEON (ASEAN
Senior Officials on the Environment) Working Group. The target area
covers the terrestrial and marine areas of Bai Tu Long National Park,
with potential expansion of the area.
In the National Park, it is planned to establish ex-situ conservation
facility and rescue center for better conservation of biodiversity. The
Bai Tu Long national park has the museum already, however the
exhibition facilities should be more developed for effective eco-tour and
environmental education.
11 Possible Financial
Source
Central Government
12 EIA Required
5.2.3 Project for Management of Yen Tu National Forest
No. Items Description
1 Project Name Project for Establishment and Upgrading of Yen Tu National Forest to
National Park
2 Necessity In order to conserve the watershed of Dong Trieu District and Uong Bi
City, connect the mountain and sea as the western systems of the
watersheds, the rehabilitation of headwater forest in the province is
essential. This area is rich in coal resources as well, and rehabilitation
work is required especially in the buffer area of Yen Tu National Park.
3 Objectives Yen Tu National Forest is upgraded to be Yen Tu National Park and
sustainably managed
4 Scope of Work This proposed project consists of components and main activities as
follows:
1. Forest protection and forest-fire control
- Construct of cemented roads of 9.5 km of 3.5 m width and 1.5 km of
2.5 m width
- Construct compact road of 6.2 km
- Construct 9.5 km of steel and stone founded fences.
- Construct 18.5 km of steel net fences (B40 type)
- Construct 270 benchmark pillars to demarcate the boundary of the
national park
- Construct 20 signal boards of forest protection and forest fire control
- Construct 3 new stations and upgrade 7 stations of forest protection
- Upgrade and construct forest roads and fire-break lines, retaining
Environment Improvement Project in Quang Ninh Province
5-7
dams, and water tanks in service of forest fire control
2. Forest development and landscape improvement
- Protect 2,227 ha of forest in the project area.
- Plant 91.3 ha of new forest (afforestation and replantation)
- Restore 46.3 ha of forest by natural re-generation
- Restore and enrich 450 ha of forest by natural re-generation and
additional planting (indigenous species).
- Plant 2,800 landscape trees, 500 flower pots and 4,000 shade trees
3. Upgrade to National Park
- Construct Office Building of the Management Board of National Park
- Construct 01 orchid garden
- Prepare management plan including the buffer zone management
- Support community-based development in 5 villages of the buffer
zone areas
4. Scientific research and environmental education
- Construct 01 botanical garden
- Construct 01 zoology museum
- Scientific Research Center
- Establish 01 herbal garden
- Biodiversity conservation
5. Eco-tourism development
- Preparation of eco-tourism plan in accordance with the carrying
capacity of the area
- Development of eco-tourism facility and human resources
- Construct a visitor center
Yen Tu National Park
5 Location Uong Bi City and Dong Trieu District
Environment Improvement Project in Quang Ninh Province
5-8
6 Implementation
Agency
DONRE: LUP
DCST: Co-management
DARD: Co-management
7 Investment Agency Quang Ninh Provincial People’s Committee
8 Implementation 2013 - 2019
9 Indicative Cost Quang Ninh Provincial Budget: US$ 6.0million
10 Remark The target area to be managed is proposed expansion area of Yen Tu
National Park. Since the record says that the forest cover change in
Dong Trieu District and Uong Bi City area are worse compared with the
other part of the province, the expansion of the national forest to a
national park is important, together with the buffer zone management.
The forest and ecosystem condition in this area is connected with the
ecosystem of Bach Dang River, Cat Ba and Ha Long Bay area of great
importance.
And, currently Yen Tu National Forest is one of the most popular
tourism destinations within the province, with the features of historical,
religious and natural importance. It is one of 34 special national
monuments in Vietnam. It has further potential as the attraction for the
people on mountain ecosystem and landscape with cultural, historical
and religious value. For the sustainable use of this tourism resource,
concept of eco and cultural tourism should be well developed
considering its carrying capacity.
11 Possible Financial
Source
Central Government
12 EIA Required
5.2.4 Project for Management of Headwater Protection Forest
No. Items Description
1 Project Name: Project for Management of Headwater Protection Forest (Yen Lap and
Trang Vinh)
2 Necessity The rivers are rather short in the province due to its topography, thus the
water resource should be well conserved to utilize it efficiently. For Ha
Long and Mong Cai city, headwater protection forests are designated
for the water reservoir dams.
The headwater protection forests are important for the supply of the
clean water for the population in these cities, thus the conservation
should be put highest priority for the management of these areas. The
rehabilitation of the degraded areas and the conservation from
Environment Improvement Project in Quang Ninh Province
5-9
development should be prioritized.
3 Objectives Three headwater protection forest areas are conserved for supplying
water.
4 Scope of Work 1. Conduct baseline surveys
- Forest inventory and biodiversity survey
- Survey on Economic condition of local area
2. Establish 2 Forest Management Boards of Yen Lap, Cao Van and
Trang Vinh.
- Construct Office Building of the Management Boards
- Set-up boundaries of the headwater protection area (forest roads and
benchmark pillars)
- Construct nurseries and produce seedling for forest plantation and
improvement
3. Forest protection and improvement
- Plant new forest in bare land or heavily-degraded forest areas
- Restore forest by supporting activities of natural re-generation
- Improve forest by natuural re-generation with additional planting
- Construct forest protection and forest-fire protection signal boards
- Construct forest protection stations
- Construct fire-break lines and forest-fire watch towers
- Construct/upgrade forest protection stations
4. Community-based forest management
- Prepare buffer-zone management plan and community based natural
resource plan
- Support local community villages in agro-forestry production
- Research and experiment solution for Soil erosion control.
The three headwater areas
Environment Improvement Project in Quang Ninh Province
5-10
5 Location Hoanh Bo (Yen Lap), Mong Cai (Trang Vinh), Cam Pha (Cao Van)
6 Implementation
Agency
DONRE: LUP
DARD: Management
7 Investment Agency Quang Ninh Provincial People’s Committee
8 Implementation 2014 - 2020
9 Indicative Cost Quang Ninh Provincial Budget: US$ 3.3million
10 Remark With regard to Cao Van Protection Forest Area, it is recommended to
consider the integration of Cao Van Protection Forest with Dong Son –
Ky Thuong Nature Reserve for better integrated management of the
watershed and ecosystem.
11 Possible Financial
Source
Central Government
12 EIA Required
Environment Improvement Project in Quang Ninh Province
5-11
5.2.5 Examination for Minimizing of Sedimentation in the Coastal Zone in Cua Luc Bay and
Halong Bay
No. Content General information about the project
01 Name of
Project
Minimize sedimentation and sediment pollution in Halong Bay bottom
02 Necessity Halong Bay is formed and developed by the unique conditions of nature,
especially the geological - tectonic structures. The existence for thousands
years with not large sediment thickness, average water layer thickness of
15-20m, but little gets turbid due to alluvium even at rough
sea. Environment of Bay sediment and fresh water environment has
facilitated the development of the characterized abundant marine ecosystems
such as corals and mollusks with high value; to be the critical factors making the
most valuable asset of the World Natural Heritage Halong Bay.
However, in recent years the speed of sedimentation in the Bay bottom
increases significantly, some coastal areas arround the islands, have seen the
phenomenon of "being the swamps" of sediment with red mud layers exposed at
foot of the cliffs. Some of access channels to the port areas have been shallowed
up pretty quickly, and have to be frequently dredged.
The research results show that the sources of materials for the bay bottom
sediments have been increased primarily due to the streams, rivers estuaries
derived from coal mining areas in Quang Ninh, especially from the stream
branches at the East of Cua Luc Bay, the Lo Phong stream, the Mong Duong
river.
In addition to impacts from coal mining, tourism, aquaculture activities in the
Bay and the general operations on the shoreline are contributing to the
significant increase in the amount of sediment as well as hazardous substances
to the bottom environment of Halong Bay.
Sedimentation and pollution of the bay bottom has led to many consequences, as
shown clearly in degradation of ecosystems, threatening risks to landscapes,
biodiversity and environment of Halong Bay. The following example is on the
decline of coral reef ecosystems:
Table 1: Change in the number of species of some typical coral reef in areas of
Ha Long - Cat Ba (Report on Subject KC.09.26/06-10, Dr. Nguyen Huy Yet,
2010)
No. Reef
Number of species
surveyed in 1998
Number of species
surveyed in
2002-2003
Declined
(%)
1 Cong La 73 39 46.6
2 Hang Trai 78 22 71.8
Environment Improvement Project in Quang Ninh Province
5-12
3 Cong Hip 46 40 13.0
4 Cong Do 51 27 47.0
5 Tung Ngon 75 29 61.3
6 Coc Cheo 58 48 17.2
Average 63.5 34.2 42.8
According to Dr. Nguyen Huy Yet, the boundary of coral reefs distribution in the
bay tends to shift rapidly from the shore towards the sea, reflecting the decline of
coral ecosystems due to impacts from the continent.
There must be positive solutions to reduce the harmful effects of sedimentation
and sediment pollution, contributing to create a clean and healthy environment
for Halong Bay, protect the biodiversity and the precious value of Halong Bay.
03 Objectives Evaluate the status, speed, sedimentation trends and bay sediment pollution,
identify causes and propose mitigation measures to ensure the stability and
sustainable development for the Bay Long are essential and urgent.
04 Items for
implement
ation
The main activities and expected contents of the project are summarized as
follows:
1. Investigation, survey, assessment of amount of sediment, sedimentary
environment, the marine motive fossil factors associated with sediment
dispersal in Halong Bay;
2. Assess the status, speed, trends of sedimentation pollution and
environmental pollution of the bay bottom;
3. Assess the sources of sediment and sediment pollution of the Bay;
4. Develop solutions to minimize sedimentation and sediment pollution to the
bay bottom;
5. Test the technology solutions of environmental cleanning for the bay bottom
sediments.
05 Locations
for
implement
ation
- Overall assessment for the entire Halong Bay space;
- Detailed assessment for the shorelines and around some islands with
tourist activities (to a depth of 6m);
06 Implementi
ng Agency
Department of Natural Resources and Environment, in collaboration with
VINACOMIN & HBMD
07 Investors Quang Ninh PPC
08 Execution
time
2018 - 2021
09 Estimated
budget
Quang Ninh Provincial Budget: 1.5 mil.USD
- Sub-project 1: 15 billion;
- Sub-project 2: 100 billion
10 Note Can be separated into 2 separate sub-projects:
Environment Improvement Project in Quang Ninh Province
5-13
- Sub-project 1 (Item 1-4): Survey and assessment of status of sediment
condition and establish the scientific foundations for technological solutions
to clean the bay bottom sediments;
- Sub-project 2 (Item 5): Testing of environment clean the bay bottom
sediments in selected areas
11 Funds can
be
mobilized
State Budget / International loans
12 EIA Necessary (for the cleaning test)
5.2.6 Enhancement of forest planting to improve forest coverage and quality, and
encouragement of development and regeneration of natural forest
No. Content General information about the Project
01 Name of Project Enhancement of forest planting to improve forest coverage and quality, and
encouragement of development and regeneration of natural forest
02 Objectives Aiming at working as a sink of CO2 and disaster prevention, to improve forest
quality and coverage areas in Quang Ninh Province
03 Items for
implementation
1. The Baseline Survey (forest inventory, socio-economic survey and
biodiversity)
2. Management planning
3. Planning management of buffer zone natural resources base on community
4. Boundary demarcation
5. Prevention of forest fire
6. Forest reforestation
7. Control soil erosion works
04 Execution time 2016 – 2020
05 Estimated budget 4.8 mil.USD
5.2.7 Developing of Green Belt in Halong and Cam Pha Cities
No. Content General information about the Project
01 Name of Project Developing of Green Belt in Halong and Cam Pha Cities.
02 Necessity Coal mining activities in Halong City and Cam Pha City have strong impacts
on environment of residential areas, Halong Bay and of the downstream
areas. Currently in these areas, there are many activities aiming to improve this
problem. Cam Pha City has identified environmental protection roadmap for the
period 2015-2020. Accordingly, Cam Pha will cease dumping waste in the South
Environment Improvement Project in Quang Ninh Province
5-14
side of the City, the whole areas are to be restored, assigned to organizations for
planting protective trees for creating green trees belt, forming dust shield for
the citiy. For Halong city, in order to reduce sources of sedimentation materials to
Halong Bay, improve the residential environment, especially to create
environmentally friendly landscapes in accordance with the Halong Bay Natural
World Heritage, it is necessary to make planning for the green tree belt systems
as a buffer zone to isolate the coal mining areas from the residential areas at the
downstream....
03 Objectives Create the green trees belt surrounding the dumping sites outside the Halong
and Cam Pha areas aiming the achieve double benefits:
- Minimize the negative impacts of rock slide, landslide and mud flood
hazards occurred from the dumping sites at the outside to residents and
production facilities at the surrounding areas when heavy storms, especially
in the climate change context.
- Ensure the green - clean – beautiful environment for the urban residential
areas.
- Ensure the coal mining production done according to the plan of the Coal
Sector.
04 Items for
implementation
Main contents of the Project include:
1. Investigation and assessment of the landscapes and environment status;
identification of residential areas affected by coal mining and transportation;
Assessment, evaluation of the damages, affected benefits caused by coal
mining operations to the residential areas in the aspects of economy, society
and environment ;
2. Prepare detailed planning of the green space for Ha Long and Cam Pha
cities: Planning to create natural forest patches from the existing sceneries;
Planning the green space complex; New planning of greenery areas, small
forests, clusters of trees, independent trees etc.; Planning to connect green
spaces creating biodiversity corridors .
3. Moving people and Site clearance
4. Investment in design and implementation of construction of green space in
the two cities; designing the forms of the trees of being natural or trimmed,
bent in certain shapes to be fit with landscape and environmental functions of
the area .
05 Locations for
implementation
The areas isolating between the coal mine dumping sites with the surrounding
residential areas of Halong City and Cam Pha City.
Environment Improvement Project in Quang Ninh Province
5-15
06 Implementing
Agency
DOC, DONRE in collaboration with VINACOMIN
07 Investors Quang Ninh PPC
08 Execution time 2014 – 2018
09 Estimated budget 12 mil.USD
10 Note The three Sub-projects:
- Sub-project 1: Prepare detailed planning of Green Space for Halong City and
Cam Pha City (Content 1 & 2)
- Sub-project 2: Site clearance (Moving people and compensation – Content
3)
- Sub-project 3: Investment to design and implementation of construction
(Content 4)
11 Funds can be
mobilized
State Budget /International loans
12 EIA Necessary (for sub-project 1)
5.2.8 Planning and Testing the Models of Land Use toward Environmental Friendly around
Closed Coal Mines
No. Content General information about the project
01 Name of Project Planning and testing the models of land use environmentally friendly after
closing the coal mines in Quang Ninh Province.
2 Necessity Coal mining activities cause significant impacts on environment, causing
many types of serious natural disasters. Soil quality in the coal mining areas
is increasingly depleted, the amount of nutrient is getting poorer, the soil
becomes dry and friable. The coal mining operations change dramatically the
Environment Improvement Project in Quang Ninh Province
5-16
topography surface, create deep pits, high coal waste dumps sites; causing
loss of vegetation carpets on the surface. The volume of soil and rock layers
taken off from open pit coal mines exploitation is very large, by disposal will
form the terrain hazards of landslides, flood flashs washed away together
with sand and mud, causing filling of surface flows, sedimentation of the
Bays. Together with these impacts is the deterioration of quality of
ecosystems on land and in water, shrinking areas of forests, especially
mangroves downstream.
To be a province with the largest coal reserves, with the mining output of
nearly 16 million tons/year, the profits from the coal industry has contributed
significantly to the GDP of Quang Ninh province. However the coal
mining industry creates a huge volume of soil and rock waste.
According to the Coal sector Dev.Plan to 2020, considering vision to 2030,
the amount of soil and rock waste to 2025 is estimated from 7 – 8 billion m3.
In average between 2005 to 2010, in 5 big mines of: Cao Son, Deo Nai, Coc
Sau, Ha Tu, Nui Beo only, the soil and rock waste volume is up to 21-30
million m 3/year. The rapid increase of soil and rock waste also means the
increasing of dumping area. Currently, the landfill area in Cam Pha City is
nearly 900 ha, Hon Gai city is 750ha; some dumping sites have the height
of 100-200m such as the dumping sites of Nui Beo, Deo Nai and Coc
Sau. The dumping sites create high hills such as: Coc Sau 280m, South Deo
Nai: 200m, East Cao Son: 200m, Nui Beo: 250m, ...
In rainy seasons, the dumping sites are eroded strongly, creating deep slots
from 2-5m wide, soil and sludge is washed away by rain water and moved
downstream and causing sedimentation in flows, streams, rivers and
cultivation land. According to research, the average amount of soil eroded
from the dumping sites is about 2,960 tons/ha/year. Eroded soil and rock
volume is the basic source of materials causing sedimentation, pollution in
Halong Bay.
Soil and rock waste are also the indirect causes leading to cumulative
impacts on the development of the mine dust, causing reduction in regional
air quality for urban coal resident areas, affecting the health and life of the
community.
- To overcome the negative impacts of minerals mining activities, the
Vietnamese Government has many advocates and solutions for
environmental restoration, is shown most clearly in the Decision No.
18/2013/QD dated 29/3/2013 of the Prime Minister issuing the Decision
on rehabilitation and restoration of environment and signing fund for
Environment Improvement Project in Quang Ninh Province
5-17
environmental rehabilitation and restoration for the mining operations;
the Circular No.34/ 2009/TT-BTNMT, dated December 31, 2009 of the
Ministry of Natural Resources and Environmental regulating on
establishment, approval, inspection and certification of environmental
renovation and restoration projects and signing of fund for environmental
rehabilitation and restoration for minerals mining operations.
In the strategic environmental impact assessment of the Vietnam Coal Sector
planning as well as the environmental impact assessment report of the
particular mines also gave solutions to rehabilitate and restore of
environment after the mines closure, however, implementation has been
difficult.
To minimize the adverse impacts of coal mining as well as of soil and rock
waste to the environment, need to have appropriate solutions. In addition to
designing of the dumping sites as height restrictions, appropriate layering as
well as creating drainage water channels around, tree planting and greening
the dumping sites, controling erosion, landslides etc. Need to have the
comprehensive solutions towards land use environmentally friendly.
03 Objectives Build up the land use planning in the direction of environmentally friendly of
the coal mining operations; Propose and test the model of land use
environmentally friendly in the key areas.
04 Items for
implementation
The main contents of the project include:
1. Investigate, evaluate the overall status (natural conditions, natural
resources, environment, ...) of the coal mines and the impact on the
environment around the mines;
2. Survey, assess the needs, conditions and ability to plant the species of
valuable plants in the coal mining areas after mine closure;
3. Make land use planning environmentally friendly in the coal mining areas
of Quang Ninh;
4. Survey, make detailed assessment of some key areas for testing of models
of environmentally friendly land use;
5. Test the model of environmentally friendly land use (spatial design of
land use, investment to materials, equipment, plant seedlings, ..., plant
and care, assessment, ...);
05 Locations for
implementation
- General Plannings for the two main coal mining areas: Hon Gai and Cam
Pha;
- Testing for 2 selected dumping sites representing Hon Gai and Cam Pha.
06 Implementing
Agency
DONRE, in collaboration with VINACOMIN.
Environment Improvement Project in Quang Ninh Province
5-18
07 Investors Quang Ninh PPC
08 Execution time 2015 - 2020
09 Estimated budget 2.6 mil.USD
10 Notes The project can be separated into two sub-projects, or 2 phases:
- Sub-project 1: Investigation, assessment and making planning of
environmentally friendly land use in coal mining areas of Quang Ninh;
- Sub-project 2: Test of environmentally friendly land use in the 2
representative areas.
11 Funds can be
mobilized
State Budget / International loans
12 EIA Necessary (for testing of environmental friendly land-use of the 2
representative areas)
Environment Improvement Project in Quang Ninh Province
6-1
CHAPTER 6 BIODIVERSITY CONSERVATION
6.1 Approach on Selection of Priority Projects
Quang Ninh province has various biological resources due to variety of natural
environment from mountainous environment to sea environment the province has.
These biological resources should be maintained for not only environmental protection
but also as important resources to shift economical structure of Quang Ninh province
from “brown growth” to “green growth”. Biodiversity conservation will have a key
role to proceed the green growth strategy. In this Environment Plan, the approach for
biodiversity conservation is proposed based on Japanese experience and idea, named
“SATOYAMA” initiative. The proposed priority projects are as follows;
Planning of Biodiversity Conservation Plan of Quang Ninh Province
Restoration and Rehabilitation of Coral Reefs, sea grass and seaweed
vegetation
Promotion of Eco-tourism and Establishment of Ramsar Site
The detail of each proposed priority project is described in the following section.
6.2 Planning of Biodiversity Conservation Plan of Quang Ninh Province
No. Items Description
1 Project Name: Planning of Biodiversity Conservation Plan of Quang Ninh
Province including Halong Bay Area
2 Objectives In order to progress the specific activities for biodiversity
conservation, the biodiversity conservation plan of Quang Ninh
Province including Halong Bay area to 2020, vision to 2030 and
the biodiversity conservation plan should be planned based on
Environmental Planning of Quang Ninh Province to 2020, vision
to 2030 and Environmental Planning in Halong Bay to 2020,
vision to 2030.
The conservation plan should show detailed plans to progress the
specific activities of other proposed projects effectively and
comprehensively in Quang Ninh Province. including Halong Bay
area.
3 Scope of Works 1.Collecting Materials
2. Basic Field Survey
(1) Biota
(2) Vegetation and landscape
Environment Improvement Project in Quang Ninh Province
6-2
(3) Distribution of Coral reef, Sea-weed and Sea Grass
(3) Threaten Species
(4) Exotic Species Including Invasive Alien Species
3.Analysing the Biodiversity Data
4. Updating the Biodiversity Maps
5. Determining Biodiversity Hot Spots in QN Province
6. Making the Detailed Plans
- first Priority
(1) Project for Promotion and Encourage of Public Education and
Awareness
(2) Zoning of Halong Bay natural world heritage area and Bai Tu
Long national park
(3) Restoration and Rehabilitation of Coral Reefs, sea grass and
seaweed vegetation
(4) Capacity buildings for management skills of endangered
species traffic control
(5) Promotion of Eco-tourism and Establishment of Ramsar Site
(6) Promotion of Sustainable Agriculture and Aquaculture
- 2nd Priority
(7) Institutional Development and Capacity Building for
Relevant Organizations
(8) Survey and Control of Invasive Alien Species
- Second Priority
(9) Expanding and Enhancement of Existing Protected Area and
Establishment of New Protected Area
(10) Development for cultivation and plantation technology
of endangered and indigenous plant species
(11) Establishment of ex-situ conservation center of plants
and animals
(12) Conservation and Beneficial Use of Genetic Resources
(13) Implementation of Comprehensive Biodiversity Survey
and Monitoring
(14) Implementation of Community-based Management of
Biodiversity
(15) Promotion of Environmental Education
9. Schedule
10. Budget
11. Others
Environment Improvement Project in Quang Ninh Province
6-3
4 Implementation
Agency
DONRE
5 Implementation 20143-2015, 2019
9 Indicative Cost Quang Ninh Government: US$ 250,000
6.3 Restoration and Rehabilitation of Coral Reefs, sea grass and seaweed vegetation
No. Items Description
1 Project Name: Restoration and Rehabilitation of Coral Reefs, sea grass and
seaweed vegetation
2 Objectives In order to recovery of marine ecosystem damaged by illegal
fishing and water and sediment pollution, the restoration and
rehabilitation of coral reefs, sea grass and seaweed vegetation
should be developed and conducted.
3 Scope of Works 1. Field Survey
(1) Biota of Coral Reef
(2) Biota of Sea Grass and Sea Weed
(3) Water Quality and Bottom Sediment Quality Survey
2. Analysis of Field Survey Result
(1) Degradation of Coral Reef
(2) Degradation of Sea Grass and Sea Weed
(3) Making a Map of Degradation Degree of Coral Reef
(4) Making a Map of Degradation Degree of Sea Grass and Sea
Weed
(5) Making a Map of Environmental Pollution Status
3. Site Determination for Restoration and Rehabilitation
4.Planning the Restoration and Rehabilitation
5. Examination of breeding and plantation of coral, sea grass and
sea weed
6. Pilot activities of plantation of coral, sea grass and sea weed
7.Implementation of restoration and rehabilitation
4 Implementation
Agency
DARD
Cooperation: DONRE, DST, HBMD
5 Implementation 2014-2015
6 Indicative Cost US$ 0.25 mil.USD
Environment Improvement Project in Quang Ninh Province
6-4
6.4 Promotion of Eco-tourism and Establishment of Ramsar Site
No. Items Description
1 Project Name: Promotion of Eco-tourism and Establishment of Ramsar Site
2 Objectives In order to conserve the SATOYAMA wetlands and promote the
sustainable use and ecotourism, the three coastal wetlands (Quang
Yen , Tien Yen and Mong Cai) in Quang Ninh Province should be
protected areas and the Ramsar Sites.
3 Scope of Works 1.Field Survey
(1) Wetlands of International Wetland
(2) Assessment based on Wetland Criteria
2. Analysis of Field Survey
3. Determination for boundary of Protected Area
Industrial Area Plan
Road Plan
Core Area(Mangrove
Dense Area)
Core Area(Mangrove
Dense Area)
Buffer Zone(Shrimp Pond)
Buffer Zone(Shrimp Pond)
Core Area(Mangrove
Dense Area)
Dong Rui Island
Buffer Zone(Shrimp Pond)
Airport
Plan
Core Area(Mangrove
Dense Area)
Buffer Zone(Shrimp Pond,
Mud Flat)
Environment Improvement Project in Quang Ninh Province
6-5
4.Making Documents for Procedure to register the protected
area and Ramsar Sites
5.Planning and Training of Sustainable Use for Local People
(1) Survey for Current Status of Using Chemical Materials for
Agriculture
(2) Survey for Current Status of Using Chemical Materials for
Aquaculture
(3) Toxic Evaluation of Chemical Materials
(4) Development of Sustainable Agriculture and Aquaculture as
“Quang Ninh Method”.
(5) Making Manual of Sustainable Agriculture and Aquaculture
(6) Marketing and Branding the Products by Sustainable Method
as Eco-friendly and Healthy Products.
(7) Making Program for Training Local Farmer and Fisherman
(8) Training the Local Farmer and Fisherman
6.Planninng of Community-based Conservation System
(1) Case study of Community-based Management in the Dong
Rui Island.
(2) Development of Community-based Management Method in
Quang Ninh Province.
(3) Making Manual of Community-based Management
(4) Making Program for Training Local People
(5) Training the Local People
(6) Apply to Quang Yen Wetland, Tien Yen Wetland, Mong Cai
Wetland
7.Development Eco-tour Programs
8.Training the Eco-tour Narrators
9.Promotion of SATOYAMA Initiative in Ramsar sites
10.Design and Construction of Facilities for Eco-tour
11. Schedule
12. Budget
13. Others
4 Implementation
Agency
DONRE
Cooperation: DONRE, DST
8 Implementation 2015-2016
9 Indicative Cost Quang Ninh Government: US$ 0.98mil.
Environment Improvement Project in Quang Ninh Province
7-1
CHAPTER 7 CLIMATE CHANGE ISSUES
7.1 Approach on Selection of Priority Projects
Quang Ninh province may be affected by climate change impacts, such as sea level
rising and increase risk on natural hazard. Adaptation measures on climate change
impacts are important to be examined to reduce such impacts. Regarding mitigation
measures on climate change issues, those have close relationship with proceeding the
green growth strategy. Currently, there is an idea to establish ASEAN green growth
strategy center in Quang Ninh province. If it is actualized, the impact on
environmental protection and proceeding the green growth strategy in Quang Ninh
province will be quite large. To promote this matter, the Environment Plan proposes to
introduce some mitigation measures on environmental field. The proposed priority
projects are as follows;
Communication for Raising of Knowledge on Climate Change Management
Mechanism at All Levels as well as Communities in Quang Ninh Province
Study on Development of the ASEAN Green Growth Centre
Capacity Enhancement for Organizations in Responding to Climate Change
Development of Local Regulations for Climate Change Issues
Construction, Upgrading, and Renovation of Hydrometeorology Station in
Co To District
Development of Environment and Hazard Database, and Automatic System
for Natural Disaster Monitoring and Warning in Quang Ninh Province
Promotion of Efficient Operation of Tourist Boats in Halong Bay
Promotion of Energy Efficiency to Major Manufacturers
The detail of each proposed priority project is described in the following section.
7.2 Communication for Raising of Knowledge on Climate Change Management
Mechanism at All Levels as well as Communities in Quang Ninh Province
No. Items Description
1 Project Name: Communication for raising of knowledge on climate change
management mechanism at all levels as well as communities in
Quang Ninh Province (priority for coastal communities)
2 Necessity Quang Ninh is the coastal province with the coastline of 250 km.
Vulnerability of Quang Ninh to climate change particularly
concentrates in the districts of coastal cities. Climate change is a
new problem and a cross-cutting issue. So, the level of
understanding of climate change is limited.
Quang Ninh Province has already started the awareness raising
programs targeting local communities as well as public officers. It
is recommended the business sectors would be also involved in
the programs.
3 Objectives Prioritize the coastal areas, to improve awareness and knowledge
Environment Improvement Project in Quang Ninh Province
7-2
on climate change and sea level rising among all stakeholders in
Quang Ninh Province.
4 Scope of Work 1. Survey and assess the current state of awareness, knowledge,
attitude, and behavior of people on climate change, and
identify how to cope with natural disasters and needs of the
communities on climate change-related information.
2. Compile and print documents and products for training and
communication on climate change.
3. Implement programs and campaigns to raise awareness on
climate change and sea level rising in
communities (prioritizing coastal population), including
training of communicators and organizing conferences.
4. Awareness raising programs targeting on business sector such
as transportation services, vehicle shops, tourism sector, etc.,
and awareness raising programs cooperating with those
sectors.
5. Conduct capacity building (human resource development) for
staffs at all levels through education, training, and
dissemination of policies, and policy proposals and to
promote communication on climate change.
5 Location Quang Ninh Province
6 Implementation
Agency
Focal organization: DONRE
Cooperating organization: Target DPCs
7 Investment Agency DONRE
8 Implementation 2014-2015
9 Indicative Cost 0.1 million USD
10 Indicators 1. By 2015, materials for improving awareness and knowledge
about climate change are prepared
2. By 2015, workshops on improving awareness and knowledge
about climate change are organized in DONRE, DART,
DOIT, and DOT
3. By 2015, workshops on improving awareness and knowledge
about climate change are organized in prioritized coastal
districts
11 Possible Financial
Source
-
7.3 Study on Development of the ASEAN Green Growth Centre
No. Items Description
1 Project Name: Study on development of ASEAN Green Growth Centre
2 Necessity Quang Ninh Province aims at becoming a core region for green
growth in Vietnam. To develop an ASEAN Green Growth Center
is one of the activities to support this idea. The ASEAN Green
Growth Center plans to be a research center as well as a green
business incubator.
3 Objectives Aiming at promoting to establish ASEAN Green Growth Center
in Quang Ninh province.
4 Scope of Work 1. Review requirement of ASEAN Green Growth Center
2. Plan organizational structure development
2.1 Plan organizational structure
2.2 List up candidates of researchers and staffs
3. Plan facilities and equipment development
Environment Improvement Project in Quang Ninh Province
7-3
3.1 Make facility development plan
3.2 Plan equipment procurement
4. Make budget plan
5. Develop partnership cities and/or research centers in Japan
5.1 Selection candidates, e.g. Kitakyushu-City, Osaka-City,
Institute for Global Environmental Strategies (IGES), etc.
5.2 Contact and have discussions with candidates
5.3 Sign partnership agreement
5 Location To be decided
6 Implementation
Agency
Focal organization: PPC, DONRE Cooperating organization: DPI, DOF
7 Investment Agency PPC
8 Implementation 2014-2015
9 Indicative Cost 0.3 million USD
10 Indicators Until 2014, development plan of ASEAN Green Growth Center
will be prepared
11 Possible Financial
Source
International donor, Japanese local governments, Japanese
research centers
7.4 Capacity Enhancement for Organizations in Responding to Climate Change
No. Items Description
1 Project Name: Capacity enhancement for organizations in responding to climate
change
2 Necessity In Quang Ninh Province, it is crucial to establish a clear
organizational structure to develop strategies and implement
measures tackling climate change issues.
Based on Decision No. 713/QD-UBND PPC, the organizational
structure has already been developed. Though the steering
committee is developed it does not work efficiently. To improve
the functions, first it is recommended to set up the annual working
plan and meeting schedule.
The Permanent Office for Steering Committee in Response to
Climate Change and Sea Level Rise is an advisory organization to
the steering committee. Its members are DONRE and DPI, but
their tasks are not articulated in the regulation. So, they need to be
clarified.
With regard to adaptation, the Natural Disaster Prevention and
Rescue Committee of Quang Ninh Province is established prior to
the establishment of a Permanent Office for Steering Committee
in Response to Climate Change and Sea Level Rise. Its focal
organization is DARD. It is crucial that these two offices
collaborate and share information closely.
3 Objectives Aiming at effective implementation of measures to climate
change issues, to prepare an annual working plan, to clarify tasks,
and to develop coordination scheme in the current organizational
structure.
4 Scope of Work 1. Improve effectiveness of steering committee
1.1 Review tasks and, if needed, revise them
1.2 Review members and, if needed, revise them
1.3 Make work plan and meeting schedule, and implement
them
2. Improve effectiveness of Permanent Office for Steering
Environment Improvement Project in Quang Ninh Province
7-4
Committee in Response to Climate Change and Sea Level
Rise
2.1 Review tasks of DONRE and DPI, and, if needed, revise
them
2.2 Make work plan and meeting schedule, and implement
them
3. Improve effectiveness of Natural Disaster Prevention and
Rescue Committee of Quang Ninh Province
3.1 Review tasks of DARD, and, if needed, revise them
3.2 Make work plan and meeting schedule, and implement
them
4. Improve cooperation among three organizations above
4.1 Prepare cooperation management scheme and plan
4.2 Implement plan
5 Location Quang Ninh Province
6 Implementation
Agency
Focal organization: PPC, DONRE
Cooperating organization: DPI, DOF, DARD, DOET, DIC, DOH,
DCST, DOLISA, NRCC, Centre for Hydrometeorology of Quang
Ninh, authorities of districts, towns, and cities, etc.
7 Investment Agency PPC
8 Implementation 2014-2015
9 Indicative Cost 0.1 million USD
10 Indicators 1. By 2014, annual working plan of the steering committee is
prepared.
2. By 2014, the steering committee is convened periodically.
11 Possible Financial
Source
-
7.5 Development of Local Regulations for Climate Change Issues
No. Items Description
1 Project Name: Development of local regulations for climate change issues
2 Necessity The coping measures to climate change issues cover a broad
range of sectors such as agriculture, forestry, industry, energy, and
infrastructure. Besides, it is relatively a new concept for local
governments in Vietnam. Local regulations for climate change
issues have not been developed well.
3 Objectives To develop local regulations as the basis in the promotion of
adaptation and mitigation measures in Quang Ninh Province.
4 Scope of Work 1. Review local regulations relevant to adaptation and mitigation
measures, and identify deficiencies, especially about
- Protection of sea dykes and prevention of sea water
inundation
- GHG inventory and MRV system
- Energy efficiency in tourism industry
- Energy efficiency in manufacturing
- Transportation management in the Bai Chay area
2. Prepare draft regulations and submit to PPC
3. Issue necessary local regulations
5 Location Quang Ninh Province
6 Implementation
Agency
Focal organization: PPC
Cooperating organization: DONRE, DOIT, DOT, DARD, DCST
7 Investment Agency PPC
Environment Improvement Project in Quang Ninh Province
7-5
8 Implementation 2014-2016
9 Indicative Cost 0.1 million USD
10 Indicators By 2015, the following local regulations, at least, are issued:
1. Energy efficiency in tourism industry
2. Energy efficiency in manufacturing
3. Transportation management in the Bai Chay area
11 Possible Financial
Source
-
7.6 Construction, Upgrading, and Renovation of Hydrometeorology Station in Co To
District
No. Items Description
1 Project Name: Construction, upgrading, and renovation of hydrometeorology
station in Co To District
2 Necessity A meteorological station plays a key role in weather forecast and
early warning system. Thus, this project aims to renovate the
hydrometeorology station in Co To District including construction
of a new office.
3 Objectives Aiming at improving the weather forecast and early warning
system, to renovate the hydrometeorology station in Co To
District and improve staff’s capacity.
4 Scope of Work 1. Review conditions of hydrometeorology station in Co To
District
2. Assess capacity of staffs of Provincial Meteorological Center,
and prepare manuals for operation
3. Plan organizational structure renewal
3.1 Plan organizational structure
3.2 List up candidates of engineers and staffs
4. Plan facilities and equipment renovation
4.1 Make facility development plan
4.2 Plan equipment procurement
5. Make budget plan
6. Implement renovation including procurement of equipment
7. Conduct training of staffs of Provincial Meteorological
Center
8. Conduct monitoring
8.1 Monitor station operation
8.2 Monitor capacity of staffs
5 Location Co To District
6 Implementation
Agency
Focal organization: Provincial Meteorological Center
Cooperating organization: Co To DPC, DONRE
7 Investment Agency Provincial Meteorological Center, PPC
8 Implementation 2014-2016
9 Indicative Cost 0.5 million USD
10 Indicators By 2015, the hydrometeorology station in Co To District is
renovated.
11 Possible Financial
Source
International donor or governmental fund
Environment Improvement Project in Quang Ninh Province
7-6
7.7 Development of Environment and Hazard Database, and Automatic System for
Natural Disaster Monitoring and Warning in Quang Ninh Province
No. Items Description
1 Project Name: Development of an environment and hazard database, and system
for natural disaster monitoring and warning in Quang Ninh
Province
2 Necessity This is a project developed by combining and adjusting the two
proposed projects in the Action Plan to Respond to Climate
Change in Quang Ninh Province (the seventh and 20th prioritized
projects in Table IV.10. stated in the action plan).
To minimize impacts from extreme weather, development of
hazard database and warning in Quang Ninh Province is critical.
They need to be developed together with the renovation of
hydrometeorology station in Co To District.
3 Objectives Aiming to mitigate disaster as much as possible, to develop a
system for natural disaster monitoring and warning.
4 Scope of Work 1. Review current conditions of early warning, disaster
management and database, and prepare their development
plans and budget
2. Develop hazard database
2.1 Survey hazard areas
2.2 Prepare hazard area maps
2.3 Disseminate to communities
2.4 Reinforcement of hazard areas to prevent natural hazard
3. Develop system for natural disaster monitoring
3.1 Develop periodical monitoring plan of hazard areas at
community level
3.2 Develop monitoring data transfer system from
community level to DONRE
4. Develop early warning system
4.1 Develop information transfer system from
hydrometeorology station to Provincial Meteorological
Center and DONRE
4.2 Develop early warning system to communities, e.g.
utilizing community radio system, and contents
publicized in case that disaster happens
4.3 Prepare operation manual of early warning system and
train staffs
5. Develop emergency evacuation plans in communities
5.1 Develop evacuation routes
5.2 Designate evacuation places such as schools, public
facilities, etc.
5.3 Develop emergency evacuation maps
5.4 Disseminate them to communities, and conduct training
and awareness raising events in communities
5 Location Quang Ninh Province
6 Implementation
Agency
Focal organization: DONRE
Cooperating organization: DARD, Provincial Meteorological
Center
7 Investment Agency DONRE
Environment Improvement Project in Quang Ninh Province
7-7
8 Implementation 2014-2018
9 Indicative Cost 1.3 million USD
10 Indicators By 2015, system for natural disaster monitoring and warning
starts to operate.
11 Possible Financial
Source
International donor
7.8 Promotion of Efficient Operation of Tourist Boats in Halong Bay
No. Items Description
1 Project Name: Promotion of an efficient operation of tourist boats in Halong Bay
2 Necessity Tourist boats in Halong Bay play a crucial role in the tourism
business. There is still some room for improvement in the
operation efficiency of these boats by reducing CO2 emissions.
Most of the boats are equipped with second hand engines
manufactured by Yanmar. However, currently, there are no
detailed data on the engine types and energy consumption of the
tourist boats. Thus, it is critical to survey these basic data for
further consideration to improve their operation efficiency. Based
on the survey results, several measures can be developed, e.g., set
a regulation of engine specification, support to renew old engines,
set a rule on boat operation in Halong Bay, etc.
On the other hand, DARD, DOT, and JICA have started the study
about the application of biodiesel to the tourist boats since June
2013. In the study, a total of two boats coming from a boat
company and from the Halong Bay Management Board will be
operated with biodiesel in Halong Bay.
The tourism boats in the Halong Bay play a crucial role in the
tourism business. There is room to improve their operation
efficiency aiming at reduction their CO2 emissions.
There are 86 registered private tourist boat companies in Quang
Ninh Province. The number of boats owned by a boat company
varies from 1 to 23 depending on the size of company. Currently,
there is the Ha Long Tourist Boat Sub-Association in the Quang
Ninh Tourism Association with a total of 15 members. There are
two types of tourist boats, day excursion boats and overnight stay
boats. According to DCST, the total number of registered tourist
boats was 509 consisting of 329 day excursion boats and 180
overnight stay boats in May, 2012.
To improve energy efficiency and to reduce CO2 emissions from
boat operation, activities below are proposed in this project.
3 Objectives To improve the operation efficiency of tourist boats and introduce
biodiesel aiming at reducing GHG emissions.
4 Scope of Work 1. Survey boat equipment and operation
1.1 Survey engine types, generator types, lighting system,
and energy consumption
1.2 Survey common engine operation
2. Develop financial support scheme to improve energy
efficiency in boat operation
3. Renew old boat engine
3.1 Identify old engines which must be renewed
3.2 Provide financial supports
3.3 Renew old boat engines
Environment Improvement Project in Quang Ninh Province
7-8
4. Renew old diesel generators
4.1 Identify old generators which must be renewed
4.2 Provide financial supports
4.3 Renew old generators
5. Install energy efficient lumps such as CFL and LED lump
5.1 Provide financial supports
5.2 Renew lighting system
6. Improve engine operation
6.1 Develop engine operation rules
6.2 Prepare dissemination materials such as guideline
6.3 Organize workshop to promote engine operation rules
7. Promote bio-diesel in boat operation
7.1 Test engine applicability to bio-diesel
7.2 Implementation of bio-diesel operation
8. Monitor improvement of energy efficiency in boat operation
8.1 Monitor energy consumption
8.2 Monitor implementation of engine operation rules
8.3 Monitor provision of financial support
5 Location Halong bay
6 Implementation
Agency
Focal organization: DOT, Boat companies, Ha Long Tourist Boat
Sub-Association
Cooperating organization: DCST, DONRE, DARD
7 Investment Agency Boat companies: Investment to improve energy efficiency
JICA: Fund to promote biodiesel
PPC: Subsidy to boat companies
8 Implementation 2014-2017
9 Indicative Cost 0.3 million USD
10 Indicators 1. By 2016, 30% of tourist boats operating in Halong Bay renew
their engines
2. By 2016, tourist boats fueled by biodiesel started their
operation
11 Possible Financial
Source
Japanese Government through Joint Crediting Scheme (JCM)
7.9 Promotion of Energy Efficiency to Major Manufacturers
No. Items Description
1 Project Name: Promotion of energy efficiency to major manufacturers
2 Necessity In 2010, the Resolution No. 51/2010/QH10, entitled Law on
Economical and Efficient Use of Energy, was promulgated.
Following the law, Decree No. 21/2011/ND-CP, or also known as
Detailing the Law on Economical and Efficient Use of Energy
and Measures for its Implementation, was issued in 2011.
According to the decree, industrial production establishments,
which annually consume energy of a total of one thousand tons of
oil equivalent or higher, are designated as major energy
consumers.
Therefore, they have the obligation to assign an energy manager,
and prepare the annual and five-year energy management plans
and reports, as well as conduct energy audit once per three-year.
Following the decree, DOIT has identified major manufacturers in
Quang Ninh Province.
3 Objectives To improve the energy efficiency of major manufacturers aiming
Environment Improvement Project in Quang Ninh Province
7-9
at reducing GHG emissions.
4 Scope of Work 1. Survey major manufacturers and operation
1.1 Survey their facilities
1.2 Survey energy consumption
1.3 Identify major energy consumers defined in Decree No.
21/2001/ND-CP
2. Develop financial support scheme to improve energy
efficiency
3. Improve air-conditioning system
3.1 Identify facilities whose systems must be improved
3.2 Provide financial supports
3.3 Improve facilities
4. Promote compliance with Decree No. 21/2001/ND-CP
4.1 Prepare technical support materials
4.2 Organize workshops and trainings
5. Monitor improvement of energy efficiency
5.1 Monitor energy consumption
5.2 Monitor compliance with Decree No. 21/2001/ND-CP
5.3 Monitor provision of financial supports
5 Location Quang Ninh Province
6 Implementation
Agency
Focal organization: DOIT, Target major energy consumers
Cooperating organization: DOC, DONRE
7 Investment Agency Target major energy consumers: Investment to improve energy
efficiency and energy management
PPC: Subsidy to energy consumers
8 Implementation 2014-2018
9 Indicative Cost 0.3 million USD
10 Indicators By 2017, all target manufacturers have assigned energy managers
and prepared energy management plans and reports
11 Possible Financial
Source
Energy service company (ESCO), Japanese Government through
Joint Crediting Scheme (JCM)
Environment Improvement Project in Quang Ninh Province
8-1
CHAPTER 8 ENVIRONMENTAL MONITORING
8.1 Approach on Selection of Priority Projects
The Socio-economic Development Plan of Quang Ninh Province proposes to
introduce developed countries’ standards in the certain area of Quang Ninh province.
For actualizing this measure smoothly, enhancement of environmental monitoring
capacity is essential. Additionally, Quang Ninh province is expected to develop
environmental information system such as establishment of a provincial GIS center,
and enhance international cooperation for monitoring inter-provincial environmental
pollution. The proposed priority projects are as follows;
Project for Construction of Automatic Environmental monitoring Stations in
Quang Ninh Province
Development of Construction Plan of Regional GIS Center
The detail of each proposed priority project is described in the following section.
8.2 Project for Construction of Automatic Environmental Monitoring Stations in
Quang Ninh Province
No. Items Description
1 Project Name: Construction of Automatic Environmental Monitoring Stations in
Quang Ninh Province
2 Necessity The Study Team has examined the contents of the project proposal
which were prepared by DONRE and it was concluded as quite
necessary. The project will help the environment management of
DONRE very much. The reasons are as follows:
Auto air quality monitoring (AQM) station can able to grasp air
quality such as Particulate Matter (TSP, PM10, PM2.5), ozone (O3),
CO, NOx, and SO2, together with some meteorological parameters
such as wind speed, wind direction, temperature, humidity, and rain
on semi-instant value, hourly average, daily average and annual
average.
By applying auto AQM station, DONRE can grasp the hourly, daily,
monthly, yearly or annual concentration of TSP, PM10, O3, CO, NOx,
and SO2, and then can compare it with air quality standards (AQS),
QCVN 05/2009/BTNMT. For applying stricter AQS than the
national standards to 2020, auto AQM station is essential.
3 Objectives The project will be implemented by construction and installation
of automatic environmental monitoring stations to grasp the
quality of air and water environment in Quang Ninh province.
(1) Automatic monitoring stations for measuring ambient air
quality: 10 stations located in populated area or the area impacted
by industrial activities.
(2) Automatic monitoring stations for measuring surface water (2
stations) and coastal water (5 stations)
(3) Automatic monitoring stations for measuring flue gases from
stacks of important thermo power and cement production plants:
Environment Improvement Project in Quang Ninh Province
8-2
7 stations
4 Scope of Work 1. Prepare specification of equipment for AQM station,
automatic water quality monitoring station, and automatic
monitoring station for measuring flue gases from stacks.
2. Procure equipment for AQM station, automatic water quality
monitoring station, and automatic monitoring station for
measuring flue gases from stacks.
3. Install equipment for AQM station, automatic water quality
monitoring station, and automatic monitoring station for
measuring flue gases from stacks.
4. Prepare an operation and maintenance, and replacement
program
5. Prepare a monitored data management program
6. Prepare a training program of human resource development
5 Location Quang Ninh Province
6 Implementation
Agency
DONRE
7 Investment Agency PPC
8 Implementation 2014-2030
9 Indicative Cost 28.6 million USD
10 Indicators 1. Development of automatic monitoring network in provincial
level for ambient air and water quality monitoring
2. Development of automatic monitoring network in provincial
level for flue gas monitoring on large stationary pollution
sources
11 Possible Financial
Source
Governmental budget (already requested to PPC)
12 Remark For sustainable operation of automatic monitoring station, the
following factors should be taken in consideration.
(1) High Humidity
Most of the equipment set up in “Auto AQM station” applies a
kind of sensor technology such as UV spectrometry, IR
spectrometry, Chemical luminescence, UV Fluorescence. As a
precondition of these technologies, sample gas should be Dry
condition, therefore dryer for sampled air such as silica gel, CaCl2
are needed to replace very frequently. In some case, if capacity of
dryer is not enough, the sensor will be damaged. There are some
famous manufactures in US, Germany, France, UK, Australia and
Japan. Continuous high moisture contents/humidity condition like
Vietnam is not observed in these countries, therefore operational
cost for dryer is higher than usual cost in these countries.
(2) Frequent Electric Power Failure:
Unfortunately frequent electric power failure is observed in
Vietnam, also in QN. Most of the equipment set up in “Auto
AQM station” is very weak for electric power failure. Although
UPS (Uninterruptible Power Supply) will be installed, the power
consumption of “Auto AQM station” is quite large; from 3kVA to
5kVA, the UPS can stand several 10 minute only. The electric
power failure will make damage to the equipment set up on
“Auto AQM station” Also it is not observed in these manufacture
countries at all. Therefore the repair cost is much higher than
usual cost in these countries. Alternative to use generator instead
Environment Improvement Project in Quang Ninh Province
8-3
during power failure is to be considered very carefully, because
generator will emit CO, NOx, SO2 and PM (TSP, PM10, and
PM2.5) and will affect the data. One of the solutions is to put
generator more than 50 m distance.
(3) In Terms of Consumable Auxiliaries, Spare Parts/Replace
First of all, continuous air quality monitoring analyzers such as
Particulate Matter (TSP, PM10, PM2.5), ozone (O3), CO, NOx and
SO2 Monitor are completely different from household appliances
like a refrigerator. It is very much money consuming equipment
to keep operation. For example, most of equipment, Particulate
Matter (TSP, PM10, PM2.5), ozone (O3), CO, NOx and SO2
Monitor in a) “Auto AQM station” and CO, NOx and SO2 in c)
“Auto PEM Station”, diaphragm pump is set as a suction pump.
Diaphragm which is a kind of membrane made of special rubber
needs to be replaced every 2 years. The cost of a diaphragm is US
few hundred dollars to US 500 dollars, in total
500x5x10+500x3x7=35,500 USD is needed every 2 years at a
maximum. As for cylinders for standard gases of CO, NO and
SO2, each station needs 3 cylinders. Cylinder of standard gas is
imported from Singapore and will expire in 2 years usually.
Approximately, one cylinder of standard gas costs 500 USD to
1,000 USD, in total, 1000x3x10=30.000 USD is needed every 2
years at a maximum. These are just examples of consumable
auxiliaries and spare parts, Based on the list of user’s manual
from manufacturer, many items are to be replaced periodically.
8.3 Development of Construction Plan of Regional GIS Center
No. Items Description
1 Project Name: Development of Construction of Regional GIS Center
2 Necessity Natural disasters in Quang Ninh Province have been limiting the
development of its economy, and damaging the environment,
ecology and impacting the social life of the province. Along with
impacts of global climate change, the level of natural disaster in
the country has worsened in general, particularly in Quang Ninh.
Recognizing this problem, the XIIIth Congress of the Quang Ninh
Provincial Party (2010–2015) had clearly stated the key tasks and
measures for sustainable development. One of the measures stated
in the congress was “Increasing investment in research,
application of scientific and technical advances, new technology
to serve leadership, management and administration in
agriculture, forestry, fishery production, administrative reform,
public services, and environmental protection”.
Currently, the baseline data on natural resources, environment and
the sea, and islands in the province is quite large. These data were
collected from several national level and provincial level topics,
projects and programs (annual projects and tasks of the province,
project on the development of a national database on natural
resources and environment, Scheme No. 47: Baseline Survey and
Marine Natural Resources and Environment to 2010, Vision to
2020, etc.). These products are quite diverse, including a database
Environment Improvement Project in Quang Ninh Province
8-4
on natural social conditions as well as a system of maps, satellite
images of all kinds, and software for managing the database based
on GIS technology.
3 Objectives The objectives of developing a provincial GIS center are to store,
analyze, update and utilize required data for;
(i) securing safety for tourism activities, (ii) planning and
implementing required measures to address climate change
impacts, (iii)
management of sea - island economy as well as support to people
who live along the coast line and on islands, (iv)
conducting disaster prevention measures, and (v) planning and
implementing measures on management of natural resources and
environment protection.
4 Scope of Work 1. Plan facilities and equipment development
2. Plan equipment procurement
3. Develop projects and explanation notes on the necessity for
submission to competent authorities for approval.
4. Select managing models concentrated or dispersed in each
area of expertise and select specific policies for the
concentrated model (at the Environmental Information Center
or at the Response Center, if any, in functioning sections or at
the sub-department of Environmental Protection)
5. Enhance human capacity: Organize training courses on the
use of equipment, software, report making; sending of
faculties for training at professional institutions at home or
abroad.
6. Enhance the hardware and software capacity.
7. Assessment of effectiveness: Announce monitoring reports
during deployment period (e.g., damage assessment report
after a storm, flooding, water pollution due to oil spill, etc.)
8. Plan organizational structure development
9. List up candidates of researchers and staffs
5 Location To be decided
6 Implementation
Agency Focal organization: PPC, DONRE, DOIT, DPI
7 Investment Agency PPC
8 Implementation 2014-2015
9 Budgetary Cost 0.5 million USD
10 Indicators In 2014, construction program of GIS center will be prepared, and
financial source for construction of GIS center will be proposed.
11 Possible Financial
Source
Governmental budget
Environment Improvement Project in Quang Ninh Province
9-1
CHAPTER 9 SOLUTIONS FOR IMPLEMENTATION
OF ENVIRONMENTAL PLANNING
9.1. Solutions on investment capitals mobilization
- Propose to the Central Level for special sources of fund for environmental protection
activities;
- Active mobilization of funds from Sponsors; from the official development assistance (ODA);
from foreign direct investment (FDI);
- Promote the socialization of investment to the environmental protection projects: with funding
contributions from people, businesses and domestic investors (accounting for 30% of total
budget);
- Enterprises, Economic organizations of minerals production and trading to allocate sufficient
resources to carry out projects of environmental improvement due to impacts from activities
of mining, processing, transportation and consumption of minerals products in the province.
- Establish encouragement mechanisms, administrative remedies, and implement fairly and
reasonably for all state and private institutions when engaging in environmental protection.
9.2. Solutions on organization and capacity building for the environmental management
apparatus
- Establish an Unit for management Project Funds.
- Implement training, re-training and strengthening capacity of environmental management
specialized staff of the province.
- Improve effectiveness of law enforcement for environmental protection; specifically: on one
hand to improve the sense of law observance of citizens and businesses, on the other hand to
strengthen the supervision and management of the state agencies for law enforcement.
- Promote the use of economic instruments in environmental management: collection of
environmental protection tax and fees, natural resources tax for mining activities, the facilities
with large sources of waste water, waste gas...(under the Natural Resources Law, 2009,
Decree No. 74/2011/ND-CP dated 25/8/2011, Decree No. 67/2002/ND-CP.... ).
- Develop and expand international relations with international organizations such as the
Development Programme of the United Nations (UNDP), the Environment Programme (of
the United Nations UNEP), the World Bank (WB), the Asian development Bank (ADB), the
Global Environment Fund (GEF), the Government organizations, other NGOs to mobilize all
resources through specific investment projects and schemes.