Erik Sinz - DFS AAI ATFM CCC – Highlights of the System ICAO-IATA Cross-Border ATFM Workshop Hans...

Post on 31-Dec-2015

220 views 1 download

Tags:

transcript

Erik

Sin

z -

DF

S

AAI ATFM CCC – Highlights of the System

ICAO-IATA Cross-Border ATFM Workshop

Hans van der Meulen / Cleber de Mico Muramoto / Eno Siewerdt

New Delhi, 3-4 September, 2015

Erik

Sin

z -

DF

S

2

Erik

Sin

z -

DF

S

AAI ATFM CCC – Highlights of the System

…to provide an overview of the C-ATFM system capabilities and installations at CCC – Command and Control Center.

Erik

Sin

z -

DF

S

3

Erik

Sin

z -

DF

S

Agenda

• Background• Introduction

(DFS – Hans Van der Meulen)

• SkyFlow ATFM System• demo

Flight routes over Germany (1956 - today)

JANUARY 20154

Erik

Sin

z -

DF

S

5

Erik

Sin

z -

DF

S

What is good ATFM

ATFM is a mind-set like Quality Assurance

- You live Quality, it is not a technology

Communicate openly

All participants are equal

Apply “No Blame Culture”

- Share and learn from mistakes made

Erik

Sin

z -

DF

S

6

Erik

Sin

z -

DF

S

What is ATFM Principles

What is needed for ATFM?

ATM resources

Traffic Demand

Tactical and up to date traffic situation

Meteorological situation

Airspace and Airport status

ATFM tools

Institutional arrangement and regulation

Pre-requisites

Erik

Sin

z -

DF

S

7

Erik

Sin

z -

DF

S

What is ATFM Principles

What is needed for ATFM?

ATM resources

Airspace (national or regional) and Airports are resources that are shared by all ATM stakeholders and require:- Transparancy

- Collaborative decisions

- Common processes

- Equity

Erik

Sin

z -

DF

S

8

Erik

Sin

z -

DF

S

What is ATFM Principles

What is needed for ATFM?

Traffic Demand

Data sharing and understanding is a major pre-requiste of ATFM. At least it needs:- Airline data (ATC-FPL; schedule)

- ATC capacitiy (Sectors; Airports)

- Partners constraints

- Intentions

- Information sharing

Erik

Sin

z -

DF

S

9

Erik

Sin

z -

DF

S

What is ATFM Principles

What is needed for ATFM?

Tactical and up to date traffic situation

Ensuring accurate and timely data by common data exchange to increase accuracy of short to medium term predicition- ATFM flight information

- ATFM capacity information

- ATFM demand information

Erik

Sin

z -

DF

S

10

Erik

Sin

z -

DF

S

What is ATFM Principles

What is needed for ATFM?

Meteorological situation

Weather is one of the most constraining influences for ATM. Increasing the situational awareness by highly precise: - Forecast WX

- Dynamic WX

Erik

Sin

z -

DF

S

11

Erik

Sin

z -

DF

S

What is ATFM Principles

What is needed for ATFM?

Airspace and Airport status

Availabiltiy of Airspace and Airport resources affects the efficient and safely flow of Air Traffic- Airport Capacity

- Sector Capacitiy

- Restriceted or reserved Airspace

Erik

Sin

z -

DF

S

12

Erik

Sin

z -

DF

S

What is ATFM Principles

What is needed for ATFM?

ATFM tools

Common situational awarenes and transparency through data and information sharing by displaying: - Weather situation

- Traffic forecast

- Communication possibilities

- Airport and airspace information

Erik

Sin

z -

DF

S

13

Erik

Sin

z -

DF

S

What is ATFM Principles

“World”

ICAO

CANSO/ANSP

IATA

States

DOC 9971

What is needed for ATFM? Institutional arrangement and regulation

“Regional”

DOC 9971

Supplements

Positions

Action Plans

ICAO Region

IATA

States

CANSO/ANSP

States

ANSP

Airspace Users

Airports

“National”

AIP

CONOPS

ATFM Handbook

LoA

Stakeholders working

arrangements

All Stakeholder

“Local”

Processes

Procedures

Working instructions

Erik

Sin

z -

DF

S

14

Erik

Sin

z -

DF

S

Key enablers for its success

Integrated Flight Plan System (IFPS)

- Provides for:

• Unified Data Set on Flight Plans

• No errors

• Update homogeneous and instant for all stakehoders

Collaborative Decision Making (CDM)

- ATS, Airlines and Airports

Integration of Airports in the system

- Integration of Airport-CDM (A-CDM)

• Enables the introduction of dynamic slots vs. fixed slots

Best Practices

Erik

Sin

z -

DF

S

15

Erik

Sin

z -

DF

S

C-ATFM India

SkyFlow - The Indian C-ATFM

Erik

Sin

z -

DF

S

16

Erik

Sin

z -

DF

S

SkyFlow – Highlights of the System

Current status:

SAT –Phase 1

ok

SRST starts mid-September

Erik

Sin

z -

DF

S

17

Erik

Sin

z -

DF

S

C-ATFM India - ATFM System demo:

://skyflow.ddns.net/skyflow/

Several typical ATFM System features are shown on following slides:

Video-wall installed at CCC-AAINew Delhi

Erik

Sin

z -

DF

S

18

Erik

Sin

z -

DF

S

C-ATFM India Tools

RPL Database

Erik

Sin

z -

DF

S

19

Erik

Sin

z -

DF

S

C-ATFM India Tools

Airspace element search tool

Erik

Sin

z -

DF

S

20

Erik

Sin

z -

DF

S

C-ATFM India Tools

Status Monitor (up to 36 airports simultaneously)

Erik

Sin

z -

DF

S

21

Erik

Sin

z -

DF

S

C-ATFM India Tools

Route Detail (alternate routes may be developed and assigned to aircraft according to specific capability, e.g. RNAV – Flow managers will be aware of)

Erik

Sin

z -

DF

S

22

Erik

Sin

z -

DF

S

C-ATFM India Tools

CDM Proposal (Ground Delay Program)

Erik

Sin

z -

DF

S

23

Erik

Sin

z -

DF

S

C-ATFM India Tools

Aircraft Performance Database

Erik

Sin

z -

DF

S

24

Erik

Sin

z -

DF

S

C-ATFM India Tools

Regulated Elements Database

Erik

Sin

z -

DF

S

25

Erik

Sin

z -

DF

S

C-ATFM India Tools

Weather information

Erik

Sin

z -

DF

S

26

Erik

Sin

z -

DF

S

C-ATFM India Tools

General view Capacity and Demand

Erik

Sin

z -

DF

S

27

Erik

Sin

z -

DF

S

C-ATFM India Tools

Capacity and Demand Analysis (e.g. FIR Sector)

Erik

Sin

z -

DF

S

28

Erik

Sin

z -

DF

S

C-ATFM India Tools

Capacity and Demand Analysis by timeframe (e.g. Aerodrome)

Erik

Sin

z -

DF

S

30

The Target Off Block Time (TOBT), as the estimation of aircraft ready, is the Airline commitment to the A-CDM process

Dispatch

Technical Problems

Fueling

PAX / Gate / Terminal

Loading

Cockpit

Ground handling

TOBT

Impact:

C-ATFM India Important future aspects

Erik

Sin

z -

DF

S

31

Target Start Up Approval Time TSAT is the Airport CDM commitment to the process Introduction of TSAT based on TOBT, VTT, CTOT and real operational capacity as

driver for the „Pre Departure Sequence “Pre departure sequencing

Traffic Demand

Weather situation

Infrastrucural constraints

De-Icing

Taxitime

TSAT

TOBT

Impact:OPERATIONAL

CAPACITY

C-ATFM India Important future aspects

Erik

Sin

z -

DF

S

32

Additional Information:

eno@atech.com.br

hans.van.der.meulen@dfs.de

C-ATFM India Conclusion

Thank you for your attention and cooperationधन्यवा�द