EuroNu CERNFebruary 5, 2008
Marco Zito
Super-Beam work package
Marco ZitoDapnia-Saclay
On behalf of the SB w2 team
EuroNu 5/2/2008
Thanks to M. Dracos for providing materials!
EuroNu CERNFebruary 5, 2008
Marco Zito
Outline
• About this workpackage• Focusing on the most challenging/crucial problems :
– The target - talk by C. Densham
– The collector
– The target/collector integration
– Neutrino beam simulation
• Participating institutes: IN2P3, CEA/IRFU(previously Dapnia), CCLRC, Cracow U. of Technology
• Deliverables and milestones -> a CDR for the Superbeam!
EuroNu CERNFebruary 5, 2008
Marco Zito
What Euroν DS Superbeam is about-1
• Consider as baseline the SPL to Frejus concept
MEMPHYS
Far detector feasibility, excavation, engineering is covered by the Laguna DS
EuroNu CERNFebruary 5, 2008
Marco Zito
What Euroν DS Superbeam is about-2
• Proton driver and target : many issues in common between Super-Beam and NF
• Decide to join forces and tackle these problems in this WP
• The NF WP will focus on the muon front-end• The conclusion of this WP will then be incorporated in
the SB and NF CDR’s
EuroNu CERNFebruary 5, 2008
Marco Zito
SPL
• Important and very positive recent news (see next slides from R. Garoby and F. Gerigk)
• CDR for SPL available • Ongoing work by dedicated team• Refinements, R/D, further studies in other frameworks
(HIPPI, IA …)• Changes to this proton-driver design only from the
optimization of the target and collection or from the physics and detector studies
EuroNu CERNFebruary 5, 2008
Marco Zito
CERN-AB-2007-014-PAF
EuroNu CERNFebruary 5, 2008
Marco Zito
EuroNu CERNFebruary 5, 2008
Marco Zito
EuroNu CERNFebruary 5, 2008
Marco Zito
EuroNu CERNFebruary 5, 2008
Marco Zito
Collector
• Main challenges:• design of a high current pulsed power supply (300
kA/100 μs/50 Hz), • cooling system in order to maintain the integrity of
the horn despite of the heat amount generated by the energy deposition of the secondary particles provided by the impact of the primary proton beam onto the target,
• definition of the radiation tolerance,• integration of the target.
EuroNu CERNFebruary 5, 2008
Marco Zito
CollectorsCollectors
horns
Or solenoid
In operation
completed
built
MiniBooNE
CNGS K2K
(SB)
NUMI
In operation
M. Dracos
EuroNu CERNFebruary 5, 2008
Marco Zito
Focusing system: magnetic horn
Protons
Current of 300 kA
To decay channel
Hg Target B1/R
B = 0
M. Dracos
EuroNu CERNFebruary 5, 2008
Marco Zito
Horn prototype ready for tests M. Dracos
EuroNu CERNFebruary 5, 2008
Marco Zito
The power supply
Due to the high price go to a modular system and increase small by small the current
M. Dracos
EuroNu CERNFebruary 5, 2008
Marco Zito
Neutrino Beam simulation
• Needed to optimize the target, collector, decay tunnel• Use modern tools (GEANT 4) and recent data (HARP)• Input to the physics work package for the performance
evaluation• Need to develop in synergy with similar studies in
existing SB and in the IDS community
EuroNu CERNFebruary 5, 2008
Marco Zito
"Physics" studies to be restarted"Physics" studies to be restarted
energy depositionz (cm)
P (
kW
)
z (cm)corne
corne 2
M. Dracos
EuroNu CERNFebruary 5, 2008
Marco Zito
Sensitivity 3.5GeV
sin221310-110-210-3
m2
23
10-3
10-2
10-4
90%CL95%CL99%CL
Minimum:13= 1.2°(90%CL)
PreliminaryA.Cazes thesis
EuroNu CERNFebruary 5, 2008
Marco Zito
Deliverables
Deliverable Delivery date (months)
Requirements for proton driver
6
Target and Collection design report
30
Target and Collection integration
36
Beam characteristics 36
Final report 48
EuroNu CERNFebruary 5, 2008
Marco Zito
Milestones
Milestone Delivery date (months)
Proton driver report 12
Prel. Design of Target and Collection
24
1st Target and Collection integration drawings
24
1st Est. of Nu Beam Intensity
24
Final Target and Collection integration drawings
36
Design of target station 40
Report on Nu Beam Intensity
42
EuroNu CERNFebruary 5, 2008
Marco Zito
Conclusions
• SuperBeam work package of the Euroν DS is focusing on the key issues for this project
• The SPL to Fréjus project is the baseline• Excellent news from SPL side• Feasibility and conceptual solutions for the target and
collector (horn) will be studied• A strong European collaboration is ready to contribute to
this field