EVALUATION OF PURCHASING PROCESS AT MRF LTD.
EXECUTIVE SUMMARY
In today’s world of intense competition and rapid dynamism, all the companies
worldwide are tuning their focuses on the customer. Suddenly, the customer had
succeeded in capturing all the attention of the companies towards him, so much so, that
the once famous maxim, “customer is the god” has become so true and relevant today.
There has been a “paradigm shift” in the thinking of these companies and none
other then the customer has brought this about.
Earlier there was a sellers market, since goods and services were in short supply
and the sellers use to call the shots. But, ever since the advent of the era of globalization,
there has been total transformation in the way the customers being perceived. Today,
marketers are directing their efforts in retaining the customers and customers’ base. Their
focus has shifted towards integrating the three elements people, service and marketing.
The customer’s importance has assumed imponderable proportions in today’s
world, because of the inherent value that the customers command can “make or break” a
company. It is the responsibility of every company to see that all its customers are
equally satisfied with them, for one single dissatisfied customer will tell atleast nine
others about the dissatisfaction and will spark off a chain reaction and spell doom for that
company. In such scenario, retention of the existing customers assumes diabolical
proportion. Research has thrown light on some important aspects of customer’s retention
it has been proved empirically that acquiring new customers can cost five times more
than the cost involved in satisfying the customers.
T. JOHN INSTITUTE OF MANAGEMENT AND SCIENCE, BANGALORE Page 1
EVALUATION OF PURCHASING PROCESS AT MRF LTD.
INTRODUCTION
Far-reaching changes have been taking place in the Indian economy during the
recent Past, consequent to the opening up of our economy through globalization and
liberalization policies. The flood gates have been thrown open to allow international
competition for manufactured goods as well as services, marketing it a question of
survival of the fittest in any industry.
In the Present highly competitive economy which can be called a buyer’s market,
it is the customer who wields full power. He can make or wreck a company. No wonder
that the collective battle cry from sales and marketing people, retailers, who leasers and
advertising wizards alike is now ‘Serve the customer’, or ‘Delight the customer’. The
customer who was considered the ‘King’ is now treated almost like ‘God’, emulating the
highly successful marketing people of Japan. When consumer expectations become
higher and higher, superior market driven strategies or customer driven strategies and
their execution in the market are important.
Companies have to be fully customer oriented to succeed in the present
competitive scenario and, should think customer ‘live for customer’, ‘Smell Customer’,
and ‘build customer relations’.
T. JOHN INSTITUTE OF MANAGEMENT AND SCIENCE, BANGALORE Page 2
EVALUATION OF PURCHASING PROCESS AT MRF LTD.
ROLE AND SCOPE OF PURCHASING
Every manufacturing process requires materials, supplies and services. Before
men or machines can start turning out products, the materials must be on hand, and there
must be assurance of a continuing supply to meet production needs and schedules. The
quality of materials must be adequate for the intended purpose and suitable for the process
and the equipment used. If the material fails on any of these points, the results can be costly;
expensive delays, inefficient production, inferior products, broken delivery promises and
unhappy customers.
If a company wants to stay competitive and earn satisfactory profits, it must
procure materials at the lowest cost consistent with quality and service requirements. At the
same time, it must keep the administrative cost of buying and the cost of material inventories
at an economic level.
In some manufacturing industries, despite rising wages, the ratio of purchased
materials cost to total product cost is generally rising. This fact is due to in part to increasing
mechanization. It is also due, in great measure to the growing trend towards specialization in
manufacturing.
PURCHASING’S PART IN THE TOTAL SYSTEM
Purchasing is not an end in itself. Materials and supplies are bought because they
are needed. Because the activities of purchasing have the primary purpose of implementing
the work of other departments by procuring these goods, it is sometimes regarded as merely a
service function. Purchasing can be carried on under this concept with partial effectiveness.
The implication, however, is that purchasing considerations and subordinated to the aims,
desires and policies—or even to the preferences and whims—of the departments served.
T. JOHN INSTITUTE OF MANAGEMENT AND SCIENCE, BANGALORE Page 3
EVALUATION OF PURCHASING PROCESS AT MRF LTD.
RESPONSIBILITY FOR PURCHASING
Purchasing responsibility, as with other major management and operating functions, is
generally delegated to a specific person or a special department in the company organization.
In few concerns of any substantial size today do individual departments do their own buying,
of either production materials or operating supplies. In some cases, the specialized
purchasing department comes under the jurisdiction of the production manager. Most
companies set up purchasing, or materials, management as a completely separate department,
with the chief purchasing officer reporting directly to the executive who has the overall
responsibility for profitable operation, that is, the president, executive vice president, general
manager, or plant or divisional manager.
DEFINITION
Management control point where all significant purchases are monitored for the right
authorization of the right item, at the right price, quality, and quantity, from the right supplier
at the right terms, and at the right time.
Its major objectives are to
(1) Maintain the quality and value the firm's products,
(2) Minimize cash tied-up in inventory,
(3) Maintain the flow of inputs to maintain the flow of outputs, and
(4) Strengthen the firm's competitive position.
Purchasing may also involve
(a) Development and review of the product specifications,
(b) Receipt and processing of requisitions,
(e) Award of supply contracts,
(f) Inspection of good received, and
(g) Their appropriate storage and release.
T. JOHN INSTITUTE OF MANAGEMENT AND SCIENCE, BANGALORE Page 4
EVALUATION OF PURCHASING PROCESS AT MRF LTD.
MEANINGPurchasing managers/directors, and procurement managers/directors guide the
organization’s acquisition procedures and standards. Most organizations use a three-way
check as the foundation of their purchasing programs. This involves three departments in
the organization completing separate parts of the acquisition process. The three
departments do not all report to the same senior manager to prevent unethical practices
and lend credibility to the process. These departments can be purchasing, receiving; and
accounts payable or engineering, purchasing and accounts payable; or a plant manager,
purchasing and accounts payable. Combinations can vary significantly, but a purchasing
department and accounts payable are usually two of the three departments involved.
When the receiving department is not involved, it's typically called a two-way check or
two-way purchase order. In this situation, the purchasing department issues the purchase
order receipt not required. When an invoice arrives against the order, the accounts
payable department will then go directly to the requestor of the purchase order to verify
that the goods or services were received. This is typically what is done for goods and
services that will bypass the receiving department. A few examples are software
delivered electronically, NRE work (non reoccurring engineering services), consulting
hours, etc...
Historically, the purchasing department issued Purchase Orders for supplies, services,
equipment, and raw materials. Then, in an effort to decrease the administrative costs
associated with the repetitive ordering of basic consumable items, "Blanket" or "Master"
Agreements were put into place. These types of agreements typically have a longer
duration and increased scope to maximize the Quantities of Scale concept. When
additional supplies are required, a simple release would be issued to the supplier to
provide the goods or services.
T. JOHN INSTITUTE OF MANAGEMENT AND SCIENCE, BANGALORE Page 5
EVALUATION OF PURCHASING PROCESS AT MRF LTD.
RESEARCH METHODOLOGY
1. The research was conducted through personal interaction.
2. The primary data was collected through personal interview and the secondary
data was collected through the website of the company and journals.
SAMPLING DESIGN:
100% coverage was difficult within limited period of time. Hence, personal discussion
and telephonic discussion method was adopted for the purpose of the study.
DATA COLLECTION
Most of the data was collected through discussion, working on the floor with the staff
and gaining inputs from them.
TYPES OF DATA
Primary Data: Questionnaire and personal interviews to higher level managers.
Secondary Data: Company Website, In-house Magazine, Company Journals and Reports.
DESIGN OF THE STUDY
RESEARCH PROBLEM
The topic for the study was “Evaluation of Purchasing Process” at Madras Rubber
Factory Limited, Medak - Hyderabad
PURPOSE OF RESEARCH
The Project helps the Company to evaluate the purchasing process in depth and
understand the purchasing responsibility as with other major management operating
functions. The study also provides a platform to study and evaluate the suppliers of MRF
Ltd. In accordance with the purchasing cycle.
T. JOHN INSTITUTE OF MANAGEMENT AND SCIENCE, BANGALORE Page 6
EVALUATION OF PURCHASING PROCESS AT MRF LTD.
SCOPE OF THE STUDY
1. Useful for academic purpose and further reference.
2. Provides information about the functioning of the tyre industry in India.
3. The project helps to put into practice the theoretical aspects of the study into
reality.
4. It will also serve as a foundation upon which further can be planned.
OBJECTIVES
1. To study in detail the functioning and working of the Purchase Department at
MRF Ltd.
2. To review the existing purchasing cycle at MRF.
3. To study the supplier management at MRF in detail.
4. To evaluate the suppliers management with respect to suppliers evaluation.
5. To provide valuable inputs to the organization with reference to the analysis
made.
LIMITATIONS
1. Due to the time constraint, the Managers could not give more information at
times.
2. Level of accuracy of the results of research is restricted to accuracy level
which the Staff has given their inputs.
3. Market forces can bring changes which are unavoidable.
4. Limited number of employees who were selected for the survey of this study.
5. Some core data could not be collected due to confidentiality policies of the
company.
T. JOHN INSTITUTE OF MANAGEMENT AND SCIENCE, BANGALORE Page 7
EVALUATION OF PURCHASING PROCESS AT MRF LTD.
COMPANY PROFILE
Madras Rubber Factory Limited
Type Public
Founded 1949(chennai)
Founder(s) K M Mammen Pillai
Headquarters Chennai, India
Area served India
IndustryCar tyres, Motorcycle
Tyres, Bus/Truck tyres
FinancialsTotal Income - Rs. 56982 Million ( year ending Sep 2009)
Net Profit - Rs. 2563.2 Million ( year ending Sep 2009)
Website www.mrftyres.com
Key PersonsChairperson – K M Mammen
MD - Arun Mammen
T. JOHN INSTITUTE OF MANAGEMENT AND SCIENCE, BANGALORE Page 8
EVALUATION OF PURCHASING PROCESS AT MRF LTD.
ABOUT MRF LTD.
MRF (Madras Rubber Factory) is India’s No.1 tyre manufacturing company. It was
started in the year 1946 by K M Mammen Mappillai as a small toy ballon unit. Much
later in November 1960 it ventured in manufacturing of tyres. The company entered a
technical collaboration woth Tire & Rubber company, USA.
In 1964 it established an overseas office at Beirut, Lebanon to tap the export market.
This was amongst India’s very first efforts on tyre exports.
In 1989 the company collaborated with Hasbro International USA, the world’s largest toy
maker and launched Funskool India. In the same year it entered into a pact with
Vapocure of Australia to manufacture polyurethane paint formulations and with Pirelli
for MUSCLEFLEX conveyor and elevator belting.
Currently MRF exports tyres to over 65 countries including America, Europe, Middle
East, Japan, and Pacific region. It presently has overseas offices in Dubai, Vietnam and
Australia.
PRODUCTS
Tyres- It manufactures various tyres for passenger cars, two-wheelers, trucks, buses,
tractors, light commercial vehicles and off the road tyres.
Conveyor belts- It manufactures conveyor belts with wide range of grades. It has a range
of applications in industries like mining, ports, thermal power plants, cement plants,
fertiliser, steel, etc. It exports the products to 15 countries.
MRF Tyres & Services is one stop shop providing range tyres. Currently it operates 90
franchisees across the country
T. JOHN INSTITUTE OF MANAGEMENT AND SCIENCE, BANGALORE Page 9
EVALUATION OF PURCHASING PROCESS AT MRF LTD.
KEY EXECUTIVES
S.No Name Designation
1.K M Mammen Chairman
2. K M Mammen Managing Director
3. Arun Mammen Managing Director
4. Ravi Mannath Company Secretary
5. K C Mammen Director
6. Ashok Jacob Director
7. Salim Joseph Thomas Director
8. K M Philip Whole Time Director
SWOT ANALYSIS
Strengths
1. Established brand names (key in the replacement market)
T. JOHN INSTITUTE OF MANAGEMENT AND SCIENCE, BANGALORE Page 10
EVALUATION OF PURCHASING PROCESS AT MRF LTD.
2. Extensive distribution networks - For example, Apollo Tyres has more than 118
district offices, 12 distribution centre and 4,250 dealers.
3. Good R&D initiatives by top players.
Weaknesses
1. Cost Pressures - The profitability of the industry has high correlation with the
prices of key raw materials such as rubber and crude oil, as they account for more
than 70% of the total costs.
2. Pricing Pressures – The huge raw material costs have resulted in pressure on the
realizations and hence, the players have been vouching to increase the prices.
3. Highly capital intensive - It requires about Rs 4 billion to set up a radial tyre
plant with a capacity of 1.5 million tyres and around Rs 1.5-2 billion, for a cross-
ply tyre plant of a 1.5 million tyre-manufacturing capacity.
Opportunities
1. Growing Economy leads to Growing Automobile Industry leads to Increasing
OEM demand that in turn leads to Subsequent rise in replacement demand
2. Creation of road infrastructure has given, and would increasingly give, a
tremendous fillip to road transportation, in the coming years. The Tyre industry
would play an important role in this changing road transportation dynamics.
Threats
1. Continuous increase in prices of natural rubber, which accounts for nearly one
third of total raw material costs.
2. Cheaper imports of Tyres, especially from China, selling at very low prices, have
been posing a challenge.
T. JOHN INSTITUTE OF MANAGEMENT AND SCIENCE, BANGALORE Page 11
EVALUATION OF PURCHASING PROCESS AT MRF LTD.
INDUSTRY PROFILE
Established in 1946 as a small toy balloon manufacturing unit in a shed at Tiruvottiyur,
Madras (now Chennai), MRF ventured into the manufacture of tread rubber in the year
1952. The quality of the product was so high that by close 1956 MRF had become the
market leader with 50%share of the tread-rubber market in India. In 1961, MRF entered
into tyre manufacturing in collaboration with the Mansfield Tire & Rubber Company of
USA. Since then MRF has come along way towards achieving greater heights in the
automotive tyre industry, with 6manufacturing units in India. It has a huge distribution
network of 2,500 outlets within India and exports to over 65 countries worldwide.
MRF is the leading manufacturer of tyres for almost all segments. Being driven
by technology and product innovation, every tyre that comes out is of the highest
standards and tested to weather the toughest conditions on any road. With more than 85
tyre variants, MRF holds the highest market share of 22% in terms of sales volume in the
tyre industry.
The level of economic activity, performance of domestic automotive industry, and
the fairing of the transport sector directly influence the performance of the tyre industry
in India. The tyre industry is linked to performance of the original equipment
manufacturer in the automotive industry & also the replacement segment. With the
replacement segment dominating the overall tyre demand in India, the industry remains
inherently vulnerable to economic cycles. While adoption of radials as become the norm
in the car segment, in the bus and truck tyre segment, its acceptance is still limited. Bus
and truck radialisation could emerge in the long term as the quality of roads improves
and the restrictions on overloading are better enforced.
T. JOHN INSTITUTE OF MANAGEMENT AND SCIENCE, BANGALORE Page 12
EVALUATION OF PURCHASING PROCESS AT MRF LTD.
OVERVIEW OF THE INDIAN TYRE INDUSTRY
The Rs.20,000 crore Indian Tyre Industry, is highly raw material intensive and
predominantly a Cross Ply (or Bias) tyre manufacturing industry. It is highly
concentrated wherein 10 large manufacturers account for over 95% of the total tonnage
production of 11.35 lakh M.T. It produces all categories of tyres, except Snow Tyres and
Aero Tyre for which there is no demand domestically.
The origin of the Indian Tyre Industry dates back to 1926 when Dunlop Rubber Limited
set up the first tyre company in West Bengal. MRF followed suit in 1946. Since then, the
Indian tyre industry has grown rapidly.
Transportation industry and tyre industry go hand in hand as the two are interdependent.
Transportation industry has experienced 10% growth rate year after year with an absolute
level of 870 billion ton freight. With an extensive road network of 3.2 million km, road
accounts for over 85% of all freight movement in India.
Tyre majors have hiked prices. Moreover, due to shortfall in domestic supply and
increasing gap between domestic and international prices of rubber, the tyre
manufacturers have increased the import of natural rubber. According to estimates by
Automotive Tyre Manufacturers Association (ATMA), tyre producers are likely to
import 50% of their total natural rubber consumption due to tight domestic supply. With
profitability of tyre companies having a strong correlation to raw material prices and as
these companies operate on thin margins, this would remain an area of concern.
T. JOHN INSTITUTE OF MANAGEMENT AND SCIENCE, BANGALORE Page 13
EVALUATION OF PURCHASING PROCESS AT MRF LTD.
Tyres by Type
Indian tyre industry produces the complete range of tyres required by the Indian
automotive industry, except for aero tyres and some specialized tyres. Domestic
manufacturers produce tyres for trucks, buses, passenger cars, jeeps, light trucks, tractors
(front, rear and trailer), animal drawn vehicles, scooters, motorcycles, mopeds, bicycles
and off-the-road vehicles and special defence vehicles.
1. Truck and Bus Tyres
The truck and bus tyre segment accounted for 19% of tyres produced in India in FY2003.
Every truck/bus manufactured generates a demand for seven tyres (six regular and one
spare) as against three in the case of two-wheelers and five for passenger cars. In
addition, the price of a truck tyre is significantly higher than that of a passenger car tyre
(roughly 10 times) or a motorcycle tyre. Thus the demand multiple emanating from the
commercial vehicle segment is highest in value terms.
2. Passenger Car Tyres
The passenger car tyre segment accounted for 17% of all tyres produced in India in
FY2003. With passenger car production witnessing a growth of 12% in FY2003 over the
previous year, OEM demand accounted for about 33% of the total sales that year. The
replacement market accounted for around 63% of the total sales of passenger car tyres in
FY2003. Exports accounted for 4% of the total passenger car tyre demand in FY2003.
With the stock of cars increasing, replacement demand is likely to continue.
3. Motorcycle Tyres
Motorcycles accounted for 76% of two-wheelers sold in the domestic market in FY2003.
Motorcycle tyres constitute the largest segment of the domestic tyre industry (29% of
total tyre demand in FY2003). The replacement market accounted for around 49.8% of
the total motorcycle tyres sold in FY 2003, while OEM demand accounted for around
50%.
T. JOHN INSTITUTE OF MANAGEMENT AND SCIENCE, BANGALORE Page 14
EVALUATION OF PURCHASING PROCESS AT MRF LTD.
MAJOR PLAYERS AND MARKET SHARES
Major players include MRF Ltd. Which is the market leader (22% market Share)
followed closely by Apollo tyres limited (21% market share). The other players are J K
Tyres and Industries Ltd. (18%), Ceat Ltd. (13%), Birla Tyres (10%), Good year (7%)
and Bridgestone (5%).
T. JOHN INSTITUTE OF MANAGEMENT AND SCIENCE, BANGALORE Page 15
EVALUATION OF PURCHASING PROCESS AT MRF LTD.
PRODUCT PROFILERADIAL TYRES
Wanderer ZGT ZCC
ZVT ZVTS ZGP
BIAS PLY TYRE PATTERNS
LEGEND SM – 12 SW - 99
ESTATE BIGROVER TWINTREAD
T. JOHN INSTITUTE OF MANAGEMENT AND SCIENCE, BANGALORE Page 16
EVALUATION OF PURCHASING PROCESS AT MRF LTD.
MOTOR BIKES-FRONT
RIB/RIB PLUS ZAPPER FS ZAPPER FM
MOTOR BIKES-REAR
ZAPPER VYDE MOTO-D ZAPPER-Q
SCOOTER-FRONT
NYLOGRIP SCOOTER NYLOGRIP PLUS FE ZAPPER FG
SCOOTER-REAR
NYLOGRIP 001 NYLOGRIP SCOOTER ZAPPER-D (SCOOTER)
T. JOHN INSTITUTE OF MANAGEMENT AND SCIENCE, BANGALORE Page 17
EVALUATION OF PURCHASING PROCESS AT MRF LTD.
OTHERS
MUSCLEROK MUSCLEROK MUSCLEROK
EARTHMOVERS SMOOTH GRADERS
TRUCKS/BUSES
SUPERLUG-50 M-77 MUSCLEROK-X
STEEL MUSCLE S1R4 STEEL MUSCLE S1L6
T. JOHN INSTITUTE OF MANAGEMENT AND SCIENCE, BANGALORE Page 18
EVALUATION OF PURCHASING PROCESS AT MRF LTD.
AWARDS & ACHIEVEMENTS
NSMRF voted the "Most Trusted" Tyre company in India by TNS 2006 global CSR study.
J D POWER ASIA PACIFICMRF won the award for customer satifaction not once but 6 timesin the last 7 years.
CAPEXILMRF won the award for exports.
T. JOHN INSTITUTE OF MANAGEMENT AND SCIENCE, BANGALORE Page 19
EVALUATION OF PURCHASING PROCESS AT MRF LTD.
THE MRF DESIGN PROCESS
The Design process at MRF starts from the customer - inputs from individual customers
are compiled by marketing and given to Corporate Technical MRF's R&D and Product
Development Division or vehicle specific requirements are received from the OE
customer.
MRF's team of 300 engineers and scientists gives MRF its enormous strength in product
design. Requirements received, a team now works on converting the customer input into
a Design Concept.
MRF uses cutting - edge technologies in predictive testing and design validation before it
leaves the drawing board. These advances have significantly brought down the time to
market for new designs.
Advanced raw materials are tested and approved in our NABL accredited laboratories.
MRF works closely with global suppliers in using the latest developments in materials
across the globe. Our laboratories which have the very latest in testing equipment closely
monitor the quality of the material going into our tyres at the time of approval and
regularly after that.
Tyres are now handed over to the Vehicle Dynamics Group, who now validates the
design on the vehicle. These tests are done at the test track in a series of manoeuvres at
various speeds, pushing the tyres to the limits of its capabilities.
MRF also tests tyres on fleets across the country to ensure that the tyres have endured
successfully all the types of roads on which our customers travel daily. Race Tracks and
Indian Roads are our laboratories.
Only after this do we give any tyres to the customer - all global players manufacturing a
global class of vehicles. MRF has been designing tyres this class of vehicles for more
than a decade now. MRF tyres have met the demanding requirements of these vehicles,
backed by an R&D team which is completely in-house and self reliant.
T. JOHN INSTITUTE OF MANAGEMENT AND SCIENCE, BANGALORE Page 20
EVALUATION OF PURCHASING PROCESS AT MRF LTD.
GENERAL PRACTICES AT MRF
ORGANIZATION CULTURE
MRF exhibits a very free and friendly environment where both friendship and
performance is valued and appreciated. The employees have a strong feeling of
belongingness as well there exists a ruthless focus on goal achievement. The employees
are focused and have a clear vision of the Company’s future.
ORGANIZATIONAL STRUCTURE
At MRF, the jobs are formally divided, grouped and coordinated as per the skills and
capabilities of the individuals. The organization exhibits a decentralized pattern wherein
decisions are at the lower level personnel who are directly dealing with the job or
activity. The organizational structure is a mixture of mechanistic model and organic
model.
The structure is characterized by extensive departmentalization, low level of
formalization, possesses a comprehensive information network and relies on participative
decision-making.
COMMUNICATION NETWORK
Each statement of MRF exhibits SAP which helps Departmental heads to communicate
with each other. It is the most quick and convenience way to share important information.
It also helps to file day to day report to the divisional head.
SPAN OF CONTROL
Span of control is the number of employees a Manager can effectively and efficiently
manage. MRF exhibits a narrow or small span of control. Hence, employees of MRF are
effectively managed by the Manager and they also get enough time to provide the
necessary leadership and support.
BENCH MARKING
At MRF, benchmarking is an important task, which is carried out in every department,
where the company searches for the best practices amongst its competitors and non-
competitors that lead to their superior performance and continuous improvements are
done.
T. JOHN INSTITUTE OF MANAGEMENT AND SCIENCE, BANGALORE Page 21
EVALUATION OF PURCHASING PROCESS AT MRF LTD.
DEPARTMENTAL STUDY
HUMAN RESOURCE DEPARTMENT
INTRODUCTION
Human Resource Department is concerned with the people working in the organization.
This department handles activities like recruitment, identifies and evaluated training
needs of individuals, payroll.
Matters relating to labor welfare and labor disputes are also handled.
OBJECTIVE
To bring in organization culture, this encourages and rewards exceptional
performance.
Fosters team work and supports balance attitude to work and personal life.
FLOW OF AUTHORITY
T. JOHN INSTITUTE OF MANAGEMENT AND SCIENCE, BANGALORE Page 22
Sr. Manager Personnel and Administration
Security Guards (17)
Head Security
Security OfficerPersonnel and Admin Executive (2)
EVALUATION OF PURCHASING PROCESS AT MRF LTD.
FUNCTIONS
RECRUITMENT
Recruitment of Executives and Managers is done at the corporate office in Chennai.
Recruitment of staff and casual employees is done at the unit level.
In MRF, any new employee is appointed for a probation period of six months. After this
period based on the Performance Appraisal administered, he/she may be confirmed in the
company.
MRF believes that once an appropriate candidate is selected, half the job is done.
Sources of Recruitment
Advertisement
Data Bank
References
TRAINING
Training is provided through educational or training activities.
The educational, training and experience requirements for positions which
perform activities affecting quality are identified.
Appropriate training is provided either in-house or externally.
Employee training records are established and maintained.
The effectiveness of training is evaluated and employee training records are
reviewed to determine future training requirements.
T. JOHN INSTITUTE OF MANAGEMENT AND SCIENCE, BANGALORE Page 23
EVALUATION OF PURCHASING PROCESS AT MRF LTD.
Compensation and other Pay Roll practices
Payrolls-
This is the function which enables payment to the employees. An employee payroll will
contain elements as follows:
Payment Deduction Benefits
Basic Provident Fund(PF) Reimbursement Medical
Expenses (RME)
House Rent Allowance Employees State
Insurance(ESI)
Conveyance Allowance
Dearness Allowance Income Tax Deduction Lunch Allowance
Attendance Bonus Any Loans taken
Entertainment Allowance LIC Premium
PEP(Performance
evaluation Payment)
Labor Welfare Fund (LWF)
PIP(Profit Incentive
Payment)
Payrolls are initially managed by the HR department (Preparation of salary data pay
slips) and then handed over to the Finance department for payments. Final payment is
given to the employees through Bank.
Madras Rubber Factory Ltd. employs both Permanent and casual workers. MRF has
stopped recruiting permanent workers. They mostly hire causal workers as per the
requirements. This has helped them in cost cutting.
T. JOHN INSTITUTE OF MANAGEMENT AND SCIENCE, BANGALORE Page 24
EVALUATION OF PURCHASING PROCESS AT MRF LTD.
FINANCE DEPARTMENT
INTRODUTION
This department takes care of all the financial and commercial aspects of the company.
Allocation of funds and proper utilization of funds is the main objective of this
department. All major records and documentation is done by this Department at MRF
Ltd.
OBJECTIVE
Manage cash and funds in an effective and efficient manner
Helps to know the financial status of the company.
Payment of Salary to the employees and other expenses of the company.
FUNCTIONS
Funds availability and Management
PAYMENTS (Accounts Payable) SALES (Accounts Receivables)
RAW MATERIAL (Inventory) MANUFACTURING (Finished Goods)
Preparation and Monitoring Business Plan and Forecasts
In MRF, the financial year begins in March and ends in April. Every year the
company evaluates the business plan for the year and prepares new business plan
for the next year.
Finalization and Audit of Accounts
At the end of the year the Finance Department prepares the Balance Sheet and the
Profit and Loss Account. It is then submitted to the corporate Head Office at
Chennai.
T. JOHN INSTITUTE OF MANAGEMENT AND SCIENCE, BANGALORE Page 25
EVALUATION OF PURCHASING PROCESS AT MRF LTD.
Statutory Payments
The various statutory payments like PF, ESI, Service tax, Label Registration fee,
renewal licenses etc are paid by the department.
Payment of Salary
The salary voucher is passed by the Accounts Department and is sent to the Bank.
For casual labors the payment is done in hand.
Monthly MIS Reports and audits are prepared and sent to the Head Office.
FLOW OF AUTHORITY
T. JOHN INSTITUTE OF MANAGEMENT AND SCIENCE, BANGALORE Page 26
Manager (Accounts)
Junior Officer (Cashier) Junior Officer (Commercial)
EVALUATION OF PURCHASING PROCESS AT MRF LTD.
MAINTENANCE DEPARTMENT
INTRODUCTION
Maintenance department includes the Electrical and Mechanical tem of MRF. The
maintenance department has to see to the proper functioning of machinery at the various
plants of the brewery.
OBJECTIVES
To achieve low down time
To reduce the cost of maintenance
To save electricity, gas and furnace oil.
To reduce the loss of utilities.
To maintain a continuous production process.
FLOW OF AUTHORITY
T. JOHN INSTITUTE OF MANAGEMENT AND SCIENCE, BANGALORE Page 27
Plant Engineer
Maintenance Engineer (Mechanical)
Maintenance Engineer (Electrical)
Electricians (3)Welders (2) Fitters (2)
EVALUATION OF PURCHASING PROCESS AT MRF LTD.
FUNCTIONS
1) Preventive Maintenance- Is done on a weekly, monthly and annual basis.
This is done so as to prevent any sort of breakdown.
2) Predictive Maintenance- Is done when any fault is predicted to occur.
3) Breakdown Maintenance- Is done when there is a breakdown of any
machinery.
TYPES OF MAINTENANCE
1. Preventive Maintenance: “Prevention is better than cure” same thing is applied
here at MRF. Basically this maintenance is to prevent machines from getting
damaged in future. Servicing of machines is done irrespective whether machine is
working or not. Then complaints from workers are entertained. A check list is
prepared of different machines so as to which machine is to service at what
periods i.e. on weekly basis, monthly basis, or yearly basis.
2. Predictive Maintenance: It is a prediction about the requirement of servicing for
any machinery at particular stage or period. This maintenance is based on past
records and experience. This is done to reduce uncertain breakdown of
machinery.
3. Breakdown Maintenance: This maintenance is performed when machinery breaks
down. Here either machinery is repaired or replaced with other. Preventive
maintenance is directly related to breakdown maintenance. More preventive
maintenance means less Breakdown of machinery.
T. JOHN INSTITUTE OF MANAGEMENT AND SCIENCE, BANGALORE Page 28
EVALUATION OF PURCHASING PROCESS AT MRF LTD.
QUALITY ASSURANCE DEPARTMENT
INTRODUCTION
The Quality Assurance (QA) department inspects the quality of raw materials,
intermediate products, packaging materials and finished products. The laboratory has
standard testing techniques and instruments to perform various tests.
OBJECTIVES
To control and assure the quality of raw materials till the final product is
produced.
To carry out 100% inspection of components and finished products.
FLOW OF AUTHORITY
FUNCTIONS
Incoming raw materials inspection
Final Inspection Dispatch
Documentation
Customer Feedback and Research.
T. JOHN INSTITUTE OF MANAGEMENT AND SCIENCE, BANGALORE Page 29
Manager (Quality Assurance)
Shift BrewerMicrobiologists(2)
EVALUATION OF PURCHASING PROCESS AT MRF LTD.
SUPPLY CHAIN DEPARTMENTPURCHASE DEPARTMENT
OBJECTIVE
The main objective of the Purchase Department is the procurement of raw materials in
the least possible lead time and minimum cost.
FLOW OF AUTHORITY
FUNCTIONS
Once it receives the bill of material (B.O.M), it checks with the stores and the non
available materials are ordered.
Follow up with the vendors for the status of delivery of raw material.
Negotiate deals and prices of the purchases with the local vendor.
Communicate the rejection information to the vendor with proper DMR
(Defected Material Report)
Communicate the change in specification to the vendor.
Conduct vendor on site audit.
T. JOHN INSTITUTE OF MANAGEMENT AND SCIENCE, BANGALORE Page 30
Stores and Purchase Manager
Stores and PurchaseExecutive
Stores Assistant
EVALUATION OF PURCHASING PROCESS AT MRF LTD.
STORES DEPARTMENT
OBJECTIVE
Supply material on the production floor on time.
Reduce the inventory cost
Proper flow of materials so that the production process is not hampered.
FUNCTIONS
Receives the material in the inspection area.
Checks the consignment whether it is in good or bad condition and also the
quantity ordered is verified.
Records the number or units handled and moved.
Sorts and stores items according to specification and does the physical
management of goods.
Daily/Weekly inventory updates. Physical inventory check at the end of the
financial year is undertaken by this department.
Issues material on the production floor according to the requirement
Comparative statements of rates are done whenever quotations are received from
two or more vendors.
DISPATCH
OBJECTIVE
Ensures delivery of finished goods.
Dispatch and transportation of finished goods.
FUNCTIONS
Communication the mode of transportation to the distributor.
Arranging transportation and dispatching of finished goods as per packaging slip
and invoice.
Payment confirmation
T. JOHN INSTITUTE OF MANAGEMENT AND SCIENCE, BANGALORE Page 31
EVALUATION OF PURCHASING PROCESS AT MRF LTD.
PURCHASING PROCESS AT MRF LTD.
Operating a purchasing department at MRF to meet these responsibilities involves a
variety of detailed assignments, of both an administrative and a routine nature.
Typical activities of even the simplest purchasing program include:
1. Basic Information
Maintaining purchase records
Maintain price records
Maintaining stock and consumption records
Maintaining vendor records
Maintaining specification files
Maintain catalog files
2. Research
Conducting market studies
Conducting material studies
Conducting cost analysis
Investigating supply sources
Developing supply sources
Developing alternate materials and sources
3. Procurement
Checking requisitions
Securing quotations
Analyzing quotations
Choosing between contract or open-market purchase
Scheduling purchases and deliveries
Negotiating contracts
Issuing purchase orders
Checking legal conditions of contract
Following up for delivery
4. Materials Management
T. JOHN INSTITUTE OF MANAGEMENT AND SCIENCE, BANGALORE Page 32
EVALUATION OF PURCHASING PROCESS AT MRF LTD.
Maintaining minimum stocks
Improving inventory balance
Improving inventory turnover
Transferring materials
Consolidating requirements
Avoiding excess stocks and obsolescence
Standardizing packaging
Making periodic reports of commitments
DOCUMENTS MAINTAINED IN PURCHASE DEPT.
1 a. Advance Files:-
The file which maintains a record of the advance asked for accounts.
The supplier asks some advance for their product before delivery, with purchase order.
The percentage depends on the supplier’s interest.
1. b. Advance Executed:-
The file which maintains a record of the payment sent to the vendor.
The payments done for the supplier as advance for the product with the purchase
order before proforma of invoice.
1. c. Advance Recovered:-
The file which maintains a record of the items received & the
accounts settled.
2. Civil Major Expansion Jobs:-
The file which maintains a record of the civil expansion jobs within
the company environment.
Example- Supply of Chimney
Blow down pipe Trench 55 RMT
Office mezzanine floor shipping expansion.
T. JOHN INSTITUTE OF MANAGEMENT AND SCIENCE, BANGALORE Page 33
EVALUATION OF PURCHASING PROCESS AT MRF LTD.
3. Civil order major jobs:-
The file which maintains a record of the civil orders of the jobs. The
purchase order will be sent to the vendor for the particular civil job.
4. Executed high value purchase order:-
The file that records the executed purchase order of high valued
items.
Example- Boiler Chimney
HV-84 mill bearing- housing assly
DG KT 3067 Cummins engine.
5. a. Executed orders with file note:- (Intimation)
The file that records the executed purchase order with a file note or a
intimation. The intimation is given to the company that some details are either
missing or they are wrong and hence giving an intimation to change them.
5. b. Executed orders with file note:- (Violation)
The files that records the executed purchase order with a file note i.e.
violation note. The purchase order is cancelled due to some reasons by the company.
6. a. Purchase order of raw materials:-
The file that records the purchase order copies of raw materials
which are used for the production of tyres.
Example- Tyre bead wire
High speed diesel
Mineral turpentine.
b. Purchase order of spare parts:-
The file that records the copies of purchase order of spare parts
required for the production purpose.
Example- Floor cleaning liquid
Water pump to inlet manifold hose-P4.
Electronic ballast- opal- ES40S
T. JOHN INSTITUTE OF MANAGEMENT AND SCIENCE, BANGALORE Page 34
EVALUATION OF PURCHASING PROCESS AT MRF LTD.
c. Purchase order of repairs:-
The file that records the copies of purchase order of the repairing done for
the existing machines and equipments of the company.
Example- Repairing of Banbury body lub.
Repairing of B. bearing.
d. Purchase orders:-
The file that records the copies of the purchase order of every material that is
been purchased.
e. Purchase order- Service:-
The file that records the copies of the purchase order of the service taken by
other companies.
Example- Annual maintenance contract for thickness indication system on calendaring
machine.
7. Vendor detail forms:-
These files contains the details about the vendors of the business. It has a
chronological set of vendors from A to Z.
T. JOHN INSTITUTE OF MANAGEMENT AND SCIENCE, BANGALORE Page 35
EVALUATION OF PURCHASING PROCESS AT MRF LTD.
THE PURCHASE CYCLE
T. JOHN INSTITUTE OF MANAGEMENT AND SCIENCE, BANGALORE Page 36
Identification of need
Selecting suppliers, issuing
requests for quotations,
receiving and analyzing
quotations, and selecting
the right supplier.
Receiving and
analyzing purchase
requisitions.
Determinin
g the right
price.
Issuing
Purchase
Orders.
Following
up to assure
delivery
dates are
met.
Receiving and
accepting goods.
Approving
supplier's
invoice for
payment.
EVALUATION OF PURCHASING PROCESS AT MRF LTD.
1. BASIC FORMS AND PROCEDURES
A using department indicates its need for material on a requisition. MRF uses a stores
requisition to obtain materials that are in regular use in the plant and that are carried as
normal stock. This goes directly to the stores department and the requirements are
supplied from there. A purchase requisition is used for materials that have to be ordered
from suppliers. The person who needs the material fills in either type of form with the
material name or code identification, the amount needed, and the desired delivery date.
Before sending the requisition to either stores or purchasing, the person making the
requisition must have it signed by a supervisor authorized to approve the expenditure.
Sometimes purchasing is based directly on a bill of materials, which lists every item in a
company’s end product. When a manufacturing schedule is set by production planning,
purchasing is notified and can set up its purchasing schedule or program to correspond
with production plans. It receives a copy of bill of materials, on which are indicated those
items that are not on hand or ordered. This tabulation serves the same purpose as a whole
series of requisitions.
2. ORDERING
The various processes of negotiation and decision that take place between the time at
which a purchase is authorized and the time at which the order is issued. About the only
routine procedure in the process as part of a purchasing system is the invitation to
suppliers to bid and the evaluation of bids received. In MRF, when such invitations are
issued prior to ordering, the form used is generally called a request for quotation, and no
obligation to buy from the supplier quoting the lowest price is implied.
The purchase order is the instrument by which goods are procured to fill a requirement. It
expresses in specific language the agreement between the buyer and the vendor. Once
accepted, it has the legal force of a binding contract.
The essential information in MRF purchase order includes name and address of
purchasing company, identifying order number, date, name and address of vendor,
general instructions(marking of shipments, number of invoices required, and so forth),
delivery date required, shipping instructions, description of materials ordered and the
T. JOHN INSTITUTE OF MANAGEMENT AND SCIENCE, BANGALORE Page 37
EVALUATION OF PURCHASING PROCESS AT MRF LTD.
quantity, price and discounts, and signature. Terms and conditions are printed on the back
of the form. The purchase order must bear some authorized signature-usually that of a
purchase manager or buyer.
Many companies try to get written acceptance of the order from the vendor. This is
sometimes in the form of an extra copy of the order, known as the acknowledgement
copy.
Simple purchase order systems usually require at least three copies of order.
a. the original, sent to the vendor
b. the acknowledgement copy just mentioned
c. and a purchasing department file copy.
But in MRF they maintain only two copies of purchase order, the original copy goes to
the vendor, and a duplicate copy of that will be filed for the department purpose.
3. CLEARING THE ORDER
Usually, however, the purchasing department is involved in all of these duties, on the
general principle that procurement responsibility ends only when a satisfactory delivery
has been made and materials are actually on hand for use, and when the buyer’s
obligation to the vendor has likewise been satisfied, completing the contract.
4. ROUTINE FOLLOW-UP
Follow-up is selective. The mechanism for follow-up is a file of open orders arranged in
numerical sequence so that those that are longest outstanding are in the front of the file,
giving quick visual indication of the oldest ones. This, of course, is not an accurate
indicator of the delivery dates requested or promised. Some further coding or signaling
device is necessary.
T. JOHN INSTITUTE OF MANAGEMENT AND SCIENCE, BANGALORE Page 38
EVALUATION OF PURCHASING PROCESS AT MRF LTD.
5. CHANGE ORDERS
It sometimes becomes necessary to make changes in the original order- changes in
quantity, scheduling, or specifications; changes authorizing some alternative product; or
any other of the scores of possible correction that may arise with changing design and
changing conditions of business. Many companies accomplish changes by
correspondence. MRF makes use of a form known as the change order or change notice.
6. RECEIVING
The receiving department is usually an adjunct of the stores department, which may or
may not be a part of the purchasing department. Its functions are to receive incoming
goods, signing the delivery notice presented by the carrier or the supplier in connection
with the shipment; to identify and record all incoming materials; to report their receipt to
the purchasing department and to the stores, using, or inspection departments as required;
and to make prompt disposition of the goods to the appropriate department.
T. JOHN INSTITUTE OF MANAGEMENT AND SCIENCE, BANGALORE Page 39
EVALUATION OF PURCHASING PROCESS AT MRF LTD.
SUPPLIER MANAGEMENT
MAKE OR BUY DECISION
DEFINITION
Determination of whether it is more advantageous to make a particular item in-house, or
to buy it from a supplier. The choice involves both qualitative (such as quality control)
and quantitative (such as the relative cost) factors.
MEANING
The make-or-buy decision is the act of making a strategic choice between producing an
item internally (in-house) or buying it externally (from an outside supplier). The buy side
of the decision also is referred to as outsourcing. Make-or-buy decisions usually arise
when a firm that has developed a product or part—or significantly modified a product or
part—is having trouble with current suppliers, or has diminishing capacity or changing
demand.
Make-or-buy analysis is conducted at the strategic and operational level. Obviously, the
strategic level is the more long-range of the two. Variables considered at the strategic
level include analysis of the future, as well as the current environment. Issues like
government regulation, competing firms, and market trends all have a strategic impact on
the make-or-buy decision. Of course, firms should make items that reinforce or are in-
line with their core competencies. These are areas in which the firm is strongest and
which give the firm a competitive advantage.
The increased existence of firms that utilize the concept of lean manufacturing has
prompted an increase in outsourcing. Manufacturers are tending to purchase
subassemblies rather than piece parts, and are outsourcing activities ranging from
logistics to administrative services.
Considerations that favor making a part in-house:
Cost considerations (less expensive to make the part)
Desire to integrate plant operations
Productive use of excess plant capacity to help absorb fixed overhead (using
existing idle capacity)
Need to exert direct control over production and/or quality
Better quality control
T. JOHN INSTITUTE OF MANAGEMENT AND SCIENCE, BANGALORE Page 40
EVALUATION OF PURCHASING PROCESS AT MRF LTD.
Design secrecy is required to protect proprietary technology
Unreliable suppliers
No competent suppliers
Desire to maintain a stable workforce (in periods of declining sales)
Quantity too small to interest a supplier
Control of lead time, transportation, and warehousing costs
Greater assurance of continual supply
Provision of a second source
Political, social or environmental reasons (union pressure)
Factors that may influence firms to buy a part externally include:
Lack of expertise
Suppliers' research and specialized know-how exceeds that of the buyer
cost considerations (less expensive to buy the item)
Small-volume requirements
Limited production facilities or insufficient capacity
Desire to maintain a multiple-source policy
Indirect managerial control considerations
Procurement and inventory considerations
Brand preference
The two most important factors to consider in a make-or-buy decision are cost and the
availability of production capacity. Cost considerations should include all relevant costs
and be long-term in nature. Obviously, the buying firm will compare production and
purchase costs. Elements of the "make" analysis include:
Incremental inventory-carrying costs
Direct labor costs
Incremental factory overhead costs
Delivered purchased material costs
Incremental managerial costs
T. JOHN INSTITUTE OF MANAGEMENT AND SCIENCE, BANGALORE Page 41
EVALUATION OF PURCHASING PROCESS AT MRF LTD.
Any follow-on costs stemming from quality and related problems
Incremental purchasing costs
Incremental capital costs
Cost considerations for the "buy" analysis include:
Purchase price of the part
Transportation costs
Receiving and inspection costs
Incremental purchasing costs
Any follow-on costs related to quality or service
CONSIDERATION IN SUPPLIERS SELECTION
PROFESSIONALISM
What constitutes 'Professionalism' depends on the business environment and may need to
be judged by other people in the same field ('fellow professionals'/domain experts).
FLEXIBILITY & COMMITMENT
How well will they handle schedule upsets, changes to requirements etc? This may be
best judged
in informal discussion and by checks with reference clients.
OPEN/FRIENDLY
•How honest are they about problems faced & overcome?
•Are they suitably discrete about their other clients?
•Do you feel comfortable with them?
•Do they appear to communicate openly and freely internally?
INTEGRITY
•Do they stand by their offerings?
•Are they consistent in what they say:: -
- during trade-off negotiations? (e.g. if budgets are limited)
- about their capabilities?
•Are they happy to be technically/financially audited if necessary?
UNDERSTANDING YOUR BUSINESS GOALS
T. JOHN INSTITUTE OF MANAGEMENT AND SCIENCE, BANGALORE Page 42
EVALUATION OF PURCHASING PROCESS AT MRF LTD.
•Does the supplier really understand why you want to do this project, from a Business
perspective?
PROACTIVE
•Do they offer sensible & appropriate advice on potential solutions?
UNDERSTANDS BUSINESS ENVIRONMENT
•Are they willing to work with other 3rd Party development environments and yours?
•Where relevant, the supplier should understand multilingual requirements for content
delivery and its impact on maintenance complexity.
SUPPLIER EVALUATION
Supplier evaluation is a term used in business and refers to the process of evaluating and
approving potential suppliers by factual and measurable assessment. The purpose of
supplier evaluation is to ensure a portfolio of best in class suppliers is available for use.
Supplier evaluation is also a process applied to current suppliers in order to measure and
monitor their performance for the purposes of reducing costs, mitigating risk and driving
continuous improvement
PROCESS
Supplier evaluation is a continual process within purchasing department and forms part
of the pre-qualification step within the purchasing process, although in many
organizations it includes the participation and input of other departments and
stakeholders.. It often takes the form of either a questionnaire or interview, sometimes
even a site visit, and includes appraisals of various aspects of the supplier's business
including capacity, financials, quality assurance, organizational structure and processes
and performance. Based on the information obtained via the evaluation, a supplier is
scored and either approved or not approved as one from whom to procure materials or
services. In many organizations, there is an approved supplier list (ASL) to which a
qualified supplier is then added. If rejected the supplier is generally not made available to
the assessing company's procurement team. Once approved, a supplier may be
reevaluated on a periodic, often annual, basis. The ongoing process is defined as supplier
performance management.
BENEFITS AND DRAWBACKS
T. JOHN INSTITUTE OF MANAGEMENT AND SCIENCE, BANGALORE Page 43
EVALUATION OF PURCHASING PROCESS AT MRF LTD.
There are various benefits associated with an effective supplier evaluation process such
as mitigation against poor supplier performance or performance failures. The benefits
typically include sourcing from suppliers that provide high standards of product and
service levels whilst offering sufficient capacity and business stability. Supplier
evaluation can help customers and suppliers identify and remove hidden cost drivers in
the supply chain. The process of evaluating performance can motivate suppliers to
improve their performance.
Associated challenges with supplier evaluation include resource and cost commitments in
establishing and maintaining a robust and effective system, challenges with specifying
and gathering meaningful and relevant information, data integrity, scorecards that do not
get at the root causes of supplier problems, and subjective or inconsistent scoring which
may result in inaccurate assessment..Another challenge is making sure that evaluation of
current suppliers goes beyond measurement to actual performance improvement by
providing feedback to suppliers on their performance and working on continuous
improvement opportunities. Thus, management commitment to and support of a supplier
evaluation process is essential.
T. JOHN INSTITUTE OF MANAGEMENT AND SCIENCE, BANGALORE Page 44
EVALUATION OF PURCHASING PROCESS AT MRF LTD.
Analysis and Graphs:
1. Since when you are supplying materials for MRF?
Table 1
Frequency Percent Valid Percent Cumulative Percent
0 to 6 months 7 14.0 14.0 14.0
6 months to 1 year
13 26.0 26.0 40.0
1 year to 2 year 12 24.0 24.0 64.0
More than 2 year 18 36.0 36.0 100.0
Total 50 100.0 100.0
Figure 1
INTERPRETATIONThe data provided in Table 1 and Figure 1 indicates that 36% of the suppliers are
supplying materials for MRF more than 2 years, 26% of suppliers are supplying materials
from 6 months to 1 year, 24% of the suppliers are supplying materials from 1year to 2
year and only a minimum of 14% of the suppliers are supplying materials from 0 to 6
months. A greater percentage of the suppliers of MRF are supplying materials for MRF
from more than 2 years.
2. By what means was the order placed to you?
T. JOHN INSTITUTE OF MANAGEMENT AND SCIENCE, BANGALORE Page 45
EVALUATION OF PURCHASING PROCESS AT MRF LTD.
Table 2
Frequency Percent Valid Percent Cumulative Percent
Personally by the purchase manager
21 42.0 42.0 42.0
By an Agent 15 30.0 30.0 72.0
Internet 14 28.0 28.0 100.0
Total 50 100.0 100.0
Figure 2
INTERPRETATION
The data provided in Table 2 and Figure 2 indicates that 42% of the suppliers get orders
personally by the purchase manager, 30% of the suppliers get the orders by an agent, and
28% of the suppliers get the orders through the internet. A greater percentage of the
suppliers get the orders personally by the purchase manager of MRF.
3. Was proper follow up was done after the order was placed?
T. JOHN INSTITUTE OF MANAGEMENT AND SCIENCE, BANGALORE Page 46
EVALUATION OF PURCHASING PROCESS AT MRF LTD.
Table 3Frequency Percent Valid Percent Cumulative Percent
Yes 26 52.0 52.0 52.0
No 24 48.0 48.0 100.0
Total 50 100.0 100.0
Figure 3
INTERPRETATIONThe data provided in Table 3 and Figure 3 indicates that 52% of the suppliers agrees that
proper follow up will be done after the order is placed and 48% of the suppliers disagrees
for the same statement. The greater percentage of suppliers agrees to the statement that
proper follow up will be done after the order is placed.
4. Was your order collected on the agreed date and time?
Table 4
T. JOHN INSTITUTE OF MANAGEMENT AND SCIENCE, BANGALORE Page 47
EVALUATION OF PURCHASING PROCESS AT MRF LTD.
Frequency Percent Valid Percent Cumulative Percent
Yes 22 44.0 44.0 44.0
No 28 56.0 56.0 100.0
Total 50 100.0 100.0
Figure 4
INTERPRETATIONThe data presented in figure 4 and table 4 indicates that 56 % of the suppliers say that the
order was not collected on the agreed date and time and 44% of suppliers say that the
order was collected on the agreed date and time. A greater percentage of the suppliers
disagrees to the statement that the orders are not collected on the agreed date and time.
T. JOHN INSTITUTE OF MANAGEMENT AND SCIENCE, BANGALORE Page 48
EVALUATION OF PURCHASING PROCESS AT MRF LTD.
5. If No, what was the period of delay?
Table 5Frequency Percent Valid Percent Cumulative Percent
2-4hrs 2 7.1 7.1 7.1
4-8hrs 9 32.1 32.1 39.3
8-12hrs 8 28.6 28.6 67.9
More than 12hrs 9 32.1 32.1 100.0
Total 28 100.0 100.0
Figure 5
INTERPRETATIONThe data presented in figure 5 and table 5 indicates that 32.1% of the suppliers say that
there will be a delay of 4-8 hours in collecting the ordered materials, 32.1% of the
suppliers say that there will be a delay of more than 12 hours, 28.6% say that there will
be delay of 8-12 hours and 7.1% say that there will be delay of 2-4 hours. A greater
percentage of the suppliers say that there will be a delay of 4-8 hours and more than 12
hours in collecting the ordered materials on the agreed date and time.
T. JOHN INSTITUTE OF MANAGEMENT AND SCIENCE, BANGALORE Page 49
EVALUATION OF PURCHASING PROCESS AT MRF LTD.
6. Was the order delivered by you on the agreed date and time?
Table 6Frequency Percent Valid Percent Cumulative Percent
Yes 33 66.0 66.0 66.0
No 17 34.0 34.0 100.0
Total 50 100.0 100.0
Figure 6
INTERPRETATIONThe data presented in figure 6 and table 6 indicates that 66 % of the suppliers agree that
the order will be delivered by them on the agreed date and time and 34% of disagree that
the order will be delivered by them on the agreed date and time. A greater percentage of
suppliers say that there will not be any delay in delivering the order on the agreed date
and time.
T. JOHN INSTITUTE OF MANAGEMENT AND SCIENCE, BANGALORE Page 50
EVALUATION OF PURCHASING PROCESS AT MRF LTD.
7. If No, what was the period of delay?
Table 7Frequency Percent Valid Percent Cumulative Percent
2-4hrs 7 43.8 43.8 43.8
4-8hrs 3 18.8 18.8 62.5
8-12hrs 5 31.3 31.3 93.8
More than 12 hrs 1 6.3 6.3 100.0
Total 16 100.0 100.0
Figure 7
INTERPRETATIONThe data presented in figure 7 and table 7 indicates that 43.8% of the suppliers say that
there will be a delay of 2-4 hours in delivering the materials on agreed date and time,
31.3% of suppliers say that there will be a delay of 8-12 hours, 18.8% of the suppliers
say that there will be a delay of 4-8 hours and 6.3% of the suppliers say that there will be
a delay of more than 12 hours. A greater percentage of suppliers say that there will be a
delay of 2-4 hours in delivering the order on agreed date and time.
T. JOHN INSTITUTE OF MANAGEMENT AND SCIENCE, BANGALORE Page 51
EVALUATION OF PURCHASING PROCESS AT MRF LTD.
8. What do you prefer the most at MRF Ltd.?
Table 8Frequency Percent Valid Percent Cumulative Percent
Product quality 15 30.0 30.0 30.0
Price 17 34.0 34.0 64.0
Convenience 8 16.0 16.0 80.0
After Sales Service 10 20.0 20.0 100.0
Total 50 100.0 100.0
Figure 8
INTERPRETATIONThe data presented in figure 8 and table 8 indicates that 34% of the suppliers say that
MRF give more preference to the price of the materials, 30% suppliers say that they
prefer product quality at MRF, 20% suppliers say that they prefer after sales services at
MRF and 16% suppliers say that they prefer convenience at MRF. A greater percentage
of suppliers say that MRF gives more preference to the price of the materials.
T. JOHN INSTITUTE OF MANAGEMENT AND SCIENCE, BANGALORE Page 52
EVALUATION OF PURCHASING PROCESS AT MRF LTD.
9. How would you describe the creditworthiness of MRF Ltd.?
Table 9
Frequency Percent Valid Percent Cumulative Percent
Very Good 12 24.0 24.0 24.0
Good 12 24.0 24.0 48.0
Average 10 20.0 20.0 68.0
Poor 12 24.0 24.0 92.0
Very Poor 4 8.0 8.0 100.0
Total 50 100.0 100.0
Figure 9
INTERPRETATIONThe data presented in figure 9 and table 9 indicates that 24% of the suppliers describe
that the creditworthiness of MRF is very good, 24% of the suppliers describe that its
good, 24% of suppliers describe that its poor, 20% of the suppliers describe that its
average and 8% of suppliers describe that the creditworthiness of MRF is very poor.
T. JOHN INSTITUTE OF MANAGEMENT AND SCIENCE, BANGALORE Page 53
EVALUATION OF PURCHASING PROCESS AT MRF LTD.
10. What is the period of credit allowed by you to MRF Ltd.?
Table 10Frequency Percent Valid Percent Cumulative Percent
0-15 days 21 42.0 42.0 42.0
15-30 days 7 14.0 14.0 56.0
30-45days 18 36.0 36.0 92.0
45-60days 4 8.0 8.0 100.0
Total 50 100.0 100.0
Figure 10
INTERPRETATIONThe data presented in figure 10 and table 10 indicates that 42 % of the suppliers are
allowing a credit period of 0-15 days to MRF, 36% of suppliers get 30-45 days, 14%
suppliers get 15-30 days and 8% of suppliers get 45-60 days. A greater percentage of
suppliers are allowing a credit period of 0 to 15 days to MRF.
T. JOHN INSTITUTE OF MANAGEMENT AND SCIENCE, BANGALORE Page 54
EVALUATION OF PURCHASING PROCESS AT MRF LTD.
11. Immediate payment is done after the delivery of materials?
Table 11Frequency Percent Valid Percent Cumulative Percent
Strongly agree 11 22.0 22.0 22.0
Agree 12 24.0 24.0 46.0
Neither agree nor disagree
10 20.0 20.0 66.0
Disagree 12 24.0 24.0 90.0
Strongly disagree 5 10.0 10.0 100.0
Total 50 100.0 100.0
Figure 11
INTERPRETATIONThe data presented in figure 11 and table 11 indicates that 24 % of the suppliers agree to
the statement that immediate payment is done after the delivery of the materials, 24% of
suppliers disagree for the statement, 11% of the suppliers strongly agree to this statement,
20% of the suppliers are in neither agree nor disagree state and 10% of the suppliers
strongly disagree to this statement.
T. JOHN INSTITUTE OF MANAGEMENT AND SCIENCE, BANGALORE Page 55
EVALUATION OF PURCHASING PROCESS AT MRF LTD.
FINDINGS
1. 36% of the suppliers supply materials for MRF from more than 2 years, Therefore
the management needs to retain these suppliers who are in business with the
company.
2. 42% of the suppliers get the orders personally by the purchase manager.
Therefore the management needs to concentrate more on placing the orders
personally by the purchase manager.
3. 52% of the suppliers agree that proper follow up is done after the order is been
placed. Therefore the management needs to concentrate more on the follow ups to
be done.
4. 56% of the suppliers are unhappy with the statement that order was collected on
agreed date and time. 32.1% of the suppliers who say no to this statement have
stated that there was a delay of 4-8hrs or more than 12hrs.
5. 66% of the suppliers are delivering the goods on agreed date and time. And in the
remaining suppliers 42.8% have made a delay of 2-4hrs in delivering the material
on agreed date and time.
6. 34% of the suppliers say that they prefer price of the material more at MRF. The
management is giving much of importance to the price of the raw materials while
purchasing.
7. 24% of the suppliers agrees that the creditworthiness of MRF is either very good
or good and at the same time equal amount of the suppliers disagree to this
statement and say the creditworthiness of MRF is poor.
8. 42% of the suppliers are giving a credit period of 0-15 days to MRF, where as
36% of the suppliers are giving 30-45 days of credit period to MRF.
9. 24% of the suppliers are happy with the statement that immediate payment is
done after the delivery of materials and at the same time equal amount of the
suppliers are unhappy with this statement.
T. JOHN INSTITUTE OF MANAGEMENT AND SCIENCE, BANGALORE Page 56
EVALUATION OF PURCHASING PROCESS AT MRF LTD.
SUGGESTIONS
1. ON TIME DELIVERY
The company needs to concentrate more on collection of raw materials on the
agreed date and time so as to minimize the time that is wasted by the loaded
trucks which wait outside the company premises.
2. FOLLOW UP
Meanwhile the purchase department should give appropriate follow up to its
suppliers, in order to avoid late delivery.
3. QUALITY PREFERENCE
The study reveals, that the company gives more preference to the price aspect of
the materials supplied at MRF. Further, the company should give more
preference to the quality of the product in order to increase the efficiency of the
finished product.
4. HEALTHY RELATIONSHIP
The company should maintain a healthy relationship with the suppliers by
interacting more with them, getting the feedback from them which will help to
increase the credit period allowed to MRF by the vendors.
5. FEEDBACK
Last but not the least, every process is incomplete without the feedback. The
company should maintain a feedback board or feedback forms for suppliers to
know their level of satisfaction about the purchase process.
T. JOHN INSTITUTE OF MANAGEMENT AND SCIENCE, BANGALORE Page 57
EVALUATION OF PURCHASING PROCESS AT MRF LTD.
CONCLUSION
1. The suppliers of MRF have an optimistic attitude towards their business with the
company but a few critical areas like delays in the collection of materials and
payment done for the materials.
2. Suppliers are well-bonded with MRF and are sustainable and the company also
maintains healthy relations with the suppliers and retains them.
3. MRF ensures that they maintain personal relations with the suppliers and place
the order personally instead of any third party agents.
4. Strong commitment of employees, positive attitude, loyalty, satisfaction level of
the employees towards their job would take up MRF to No.1 position.
5. Workforce is MRF’s greatest strength which will lead the company to the apex
level of the Tyre Pyramid.
T. JOHN INSTITUTE OF MANAGEMENT AND SCIENCE, BANGALORE Page 58
EVALUATION OF PURCHASING PROCESS AT MRF LTD.
BIBLIOGRAPHY
Company Manuals & Journals
Purchasing Principles & Applications by Stuart F. Heinritz, Paul V. Farrell
WEBSITES
www.mrf.com
www.mrftyres.com
T. JOHN INSTITUTE OF MANAGEMENT AND SCIENCE, BANGALORE Page 59
EVALUATION OF PURCHASING PROCESS AT MRF LTD.
MRF LTD.Evaluation of Purchasing Process
Questionnaire
I Mr. HARI KUMAR K, student of T JOHN INSTITUTE OF MANAGEMENT AND SCIENCE, BANGALORE conducting this research survey as a part of the Project undertaken at MRF Ltd. And will be kept confidential and used for educational purpose only.NAME OF THE SUPPLIER/VENDOR:________________________________________________MATERIAL SUPPLIED:_________________________________________________
1. Since when you are supplying materials for MRF?a. 0 to 6 months b. 6 months to 1 year
c. 1 year to 2 year d. More than 2 years.
2. By what means was the order placed?a. Personally by the purchase managerb. By an agentc. Internet
3. Was proper follow up was done after the order was placed? a. Yes b. No
4. Was your order collected on the agreed date and time? a. Yes b. No
5. If No, what was the period of delay? a. 2-4 hrs b. 4-8 hrs c. 8-12 hrs d. more than 12 hrs
6. Was the order delivered by you on the agreed date and time? a. Yes b. No
7. If No, what was the period of delay? a. 2-4 hrs b. 4-8 hrs c. 8-12 hrs d. More than 12 hrs
T. JOHN INSTITUTE OF MANAGEMENT AND SCIENCE, BANGALORE Page 60
EVALUATION OF PURCHASING PROCESS AT MRF LTD.
8. What do they prefer most at MRF Ltd.? a. Product quality b. Price c. Convenience d. After Sales Service
9. How would you describe the creditworthiness of MRF Ltd. a. Very Good b. Good c. Average d. Poor e. Very Poor
10. What is the period of credit allowed by you to MRF Ltd. a. 0- 15 days b. 15 days- 30 days c. 30 days-45 days d. 45 days- 60 days
11. Immediate payment is done after the delivery of materials. a. Strongly agree b. Agree c. Neither agrees nor disagrees d. Disagree e. Strongly Disagree
T. JOHN INSTITUTE OF MANAGEMENT AND SCIENCE, BANGALORE Page 61