Example of requirements for issuance of
LoAs for PoAs
Miss Penporn PetchsriThailand Greenhouse Gas Management Organization
(Public Organization)
Thailand Greenhouse Gas Management Organization (Public Organization)
www.themegallery.com
Outline
Background
Issuance of LoA for CDM-PoAs in Thailand
Status of CDM Projects in Thailand
4
1
2
3
Issues and possible solutions
www.tgo.or.th
www.themegallery.com
Thailand Greenhouse Gas Management Organization (Public Organization)Thailand Greenhouse Gas Management Organization (Public Organization)
MNREMNREMNRE
Appointed
ONEPONEP
CabinetCabinetCabinet
TGO ONEP
� Ministry of Natural Resources & Environment (MNRE) as CDM DNA
THAILAND in July 2003
� TGO is the CDM DNA Office since July 7 2007
� Office of Natural Resources & Environmental Policy & Planning (ONEP)under MNRE as National focal point of UNFCCC , the co-secretariat with
TGO for National Committee on Climate Change
www.tgo.or.th
www.themegallery.com
Thailand Greenhouse Gas Management Organization (Public Organization)Thailand Greenhouse Gas Management Organization (Public Organization)
Objectives and Duties! Analyzing and screening the CDM projects for issuance of the Letter of
Approval (LoA) and monitoring the projects! Promoting CDM projects and CERs market ! Managing all information regarding the approved CDM projects and
CER�s value! To be the Information Clearing House of Greenhouse Gas! Enhancing the capacity building of the government and private sectors on
greenhouse gas management! Promoting the public outreach regarding greenhouse gas! Promoting and supporting all activities related to mitigation measure of
climate change
www.tgo.or.th
www.themegallery.com
Thailand Greenhouse Gas Management Organization (Public Organization)Thailand Greenhouse Gas Management Organization (Public Organization)
TGOTGO��s Organization Chart s Organization Chart The TGO (Thailand Greenhouse Gas Management Organization) Board:
"Responsible for a final decision on CDM project approval and issuing Letters of Approval (LoA) for CDM project proponents that fulfil Thailand's sustainable development criteria. "The chairman of the TGO Board is nominated by the Cabinet.
The TGO Board Representatives
(1) Government (5 representatives)
� Ministry of Natural Resources and Environment(Permanent Secretary)
� Office of Natural Resources and EnvironmentalPolicy and Planning
� Department of Alternative Energy Developmentand Efficiency
� Office of Transportation and Traffic Policy and Planning
� Thailand Greenhouse Gas Management Organization
(2) Private sector experts (5 Representatives)� energy expert � business administrative expert� forestry expert� industrial expert � technology expert
www.tgo.or.th
Review and Monitoring office
L/O/G/O
Issuance of Letter of Approval (LoA) for CDM-PoAs
in Thailand
)�
www.themegallery.com
Approval Procedure for CDM-PoAs in Thailand
Submit application documents to TGO
Initial Screening (20 working days)
Consideration by Sub-committee of TGO Board
Approval by TGO Board
C/ME
Issuance of Letter of Approval
Not Approved
Approved
Incomplete
Re‐submit
Complete
Recommendation
Max.180
days
C/ME submits application documents to TGO as follows
(1) Request form for C/ME approval and relating evidences of Juristic person and experts
(2) PoA-DD(3) CPA-DD of Initial CPAs(4) PoA report (consisting PoA
description and the environmental & sustainable development framework)
(5) IEE-SD Report of Initial CPA orEIA Report (If required by Environmental Law)
(6) CDs
Concernedagencies*
1.1. 1.1.
2.2.
Review and Monitoring office of TGO checks the completeness of the application documents within 20 working days
2.2.
3.13.1
3.23.2
TGO send documents to relevant agencies. At this stage, the relevant agencies are requested to assess the project eligibility.
3.13.1
Note : * Concerned agencies such as- Department of Industrial Works, Ministry of Industry- Department of Alternative Energy Development and Efficiency, Ministry of Energy- Department of Livestock Development, Ministry of Agriculture and Cooperatives.
Sub-committee of TGO Board considers the C/ME qualification and the proposed program based on SD criteria.
3.23.2
www.themegallery.com
Approval Procedure for CDM-PoA in Thailand
Submit application documents to TGO
Initial Screening(20 working days)
Consideration by Sub-committee of TGO Board
Approval by TGO Board
C/ME
Issuance of Letter of Approval
Not Approved
Approved
Incomplete
Re‐submit
Complete
Recommendation
Max.180
days
Concernedagencies*
1.1.
2.2.
LoA signed by the Permanent Secretary of the Ministry of Natural Resources and Environment sends to C/ME.
5.5.
3.13.1
3.23.2
4.4.TGO board makes the final decision to approve or reject the program.
4.4.
5.5.
www.tgo.or.th
www.themegallery.com
2. POA-DD 3. CPA-DD of Initial CPA4. PoA report according to TGO guideline
5. IEE-SD Report of the initial CPA according to TGO guideline/EIA (if required by environmental law)
1. Request form for C/ME approval and relating evidences of Juristic person and experts depending on type of Juristic person(Certification letter/evidence of juristic person, List of Shareholders, List ofexperts specifying name qualification and experience, Curriculum Vitae of Experts etc.)
List of Required Documents
www.tgo.or.th
1. Introduction2.Project Description
3.Environmental & sustainable development framework
(E&SD Framework)4. CPA Monitoring Plan6. Plan for Coordinating with TGO7. Qualification and function of C/ME
1. Introduction2.Project Description 3.Existing environment 4.Initial environmental impact evaluation and sustainable potential5.Mitigation measures to prevent
environmental impact
www.themegallery.com
Qualification of juristic person apply to C/ME
Sustainability and Environmental impact of PoA and Initial CPAs
Approval Criteria for Issuing LoA for CDM-PoAs
www.tgo.or.th
www.themegallery.com
Qualifications of the Coordinating/Managing Entity (C/ME)
www.tgo.or.th
1. Juristic Person Type
(1) Governmental Agency/University/Agency under Supervision of the Government or(2) Thai Juristic Person established under Thailand �s Law or (3) Foreign Juristic Person established under Thailand �s Law
(must obtain a license/certificate to operate business from the Department of Foreign Business Development, Ministry of Commerce, Thailand) or
(4)Foreign Juristic Person established under Foreign �s Law which its branch located in Thailand
(must have the branches office located in Thailand and obtain a license/certificateto operate business from the Department of Foreign Development , Ministry of Commerce, Thailand)
www.themegallery.com
Qualifications of the Coordinating/Managing Entity (C/ME)
www.tgo.or.th
2. There are at least 2 experts in C/ME and the experts must have at least 3 years related experiences .
3. Both entity and experts have related experience in 4 areas including
(1) Development of CDM projects
(2) Coordinating and managing the projects under the program/group of projects
(3) Providing trainings on CDM projects
(4) Having experience in operating the same type of the proposed project
(Ex: Experience in Biogas is required to be C/ME for Biogas Project )
www.themegallery.com
Sustainability and Environmental impact of CDM-PoAs
Initial CPAs
(Sustainable Development criteria : SD criteria)
4 Categories 24 Indicators
Evaluation by TGO (Scoring)
-1 Negative impact to the area
0 No impact to the area, or equivalent to the baseline scenario
+1,+2 Positive Effect on the area, or shows contribution to the
surrounding area of the project
Approval Criteria
All projects activities under Initial CPA meet SD-criteria
Total Score is positive and Score of each category is positive
All Project Activities under Initial CPAs
� Eligibility criteria
� Environmental Preventive &
Mitigation Measures based on
SD criteria
PoA Report PoA Report IEE-SD Report of Initial CPA/ EIA IEE-SD Report of Initial CPA/ EIA
The Completion, Suitability and
Sufficiency of the environmental
measures proposed by C/ME in the
E&SD-Framework
Environmental & Sustainable
Development Framework
(E&SD-Framework)
proposed by C/ME
- Approved E&SD-Framework will be used
as the guideline for implementation of the
next CPA.
- Approved E&SD-Framework will be used
as the guideline for implementation of the
next CPA.
Approval Criteria
www.themegallery.com
1. Natural Resources and Environment 1. Natural Resources and Environment 2. Social 2. Social
3. Technology Development and/or Technology Transfer3. Technology Development and/or Technology Transfer
4. Economic 4. Economic
1.1 Environmental Indicators
(1) Reduction of Greenhouse gases
under the Kyoto Protocol
(2) Air pollution
(3) Noise pollution
(4) Odor
(5) Wastewater management
(6) Waste management
(7) Soil contamination
(8) Underground water contamination
(9) Hazardous waste management
1.2 Natural Resources Indicators
(10) Water demand and Utilization
efficiency
(11) Soil/coastal/river bank erosion
(12) Green areas
(13) Other indicators that have significant
impact
(1) Employment
(2) Additional stakeholder income
(3) Renewable energy utilization
(4) Energy efficiency
(5) Local content
(1) Technology development
(2) End of project life plan or end of crediting period
plan that the project activity has adopted
(3) Capacity building for personnel
(1) Public participation
(2) Support of social , cultural, and sufficiency
economy development activities
(3) Workers and nearby community health
Sustainable Development Criteria for CDM projects in Thailand
Notification of The Board of Directors of Thailand Greenhouse Gas Management Organization on Sustainable Development Criteria for Clean
Development Mechanism Project B.E. 2553 (2010) No. 1/2553
www.themegallery.com
Scoring
-1 indicates Negative impact to the area
0 indicates No impact / equivalent to the baseline scenario+1 , +2 indicates Positive impact to the area, or shows contribution
to the surrounding area of the project
The proposed CDM project will be evaluated that it contributes to sustainable development in Thailand only if the score of each category and the total score is positive.
Sustainable Development Criteria
www.tgo.or.th
www.themegallery.com
Example : SD criteria & scoring
www.tgo.or.th
www.themegallery.com
Example : SD criteria & scoring
www.tgo.or.th
L/O/G/O
Status of CDM Project in Thailand
www.themegallery.com
Current Status of CDM projects in Thailand (as of 19 March, 2012)
PDD (Project Design Document)
Host country approval
Validation
GHG Emission Monitoring
Verification/ Certification
Issuance
Registration
The number of CDM Projects
168 Projects(10.12 MtCO2e/y)
67 Projects(3.50 MtCO2e/y)
10 Projects(1.045 MtCO2e)
www.tgo.or.th
CDM-PoA
3 PoAs
www.themegallery.com
CDM projects approved by the Thai DNA (as of 19 March, 2012)
www.tgo.or.th
www.themegallery.com
CDM-PoAs approved by Thai DNA (as of 29 February, 2012)
www.tgo.or.th
No. Title C/ME Project Type
Project Detail
Emission Reduction(tCO2e/y)
Project Status
PoA Initial CPAs
1. Thailand Small Scale Livestock
Waste Management
Program Energy
Research and Development
Institute of Chiang Mai University
Biogas Generate electricity
and/or heat from pig farm wastewater
360,000 55,774 Approval Date(27 May 2011)
Under validation process by DOE
2. Biomass Power Development Programme in
Thailand
Advance Carbon
Securities Ventures Co. Ltd. (ACSV)
Biomass Generate electricity
from Biomass
474,260 37,941 Approval Date(21 Sep 2011)
Under validation process by DOE
3. Small �Scale Renewable
Energy PoA in Thailand
Carbon Coordinating Management Entity Limited
Renewable
Energy
Generate electricity
from Renewable
Energy
- 8,272 Approval Date(25 Jan 2012)
Under validation process by DOE
www.themegallery.com
CDM projects registered at CDM EB (as of 29 February, 2012)
www.tgo.or.th
www.themegallery.comwww.tgo.or.th
Issues & potential Solution
1. For the cross border-PoA which the initial CPA is not located in Thailand, the information in PoA-DD and initial CPA DD located in other host country is not sufficient to evaluate the environmental impact and sustainability of PoA in Thailand.
- It may be required to submit the Environmental and Sustainable Development Framework of the PoA and/or have the initial CPA in the host country .
2. In the case of PoA covering with many technologies but submitting only one technology for the initial CPA (for example, PoA is the renewable energy program consisting with solar power, hydro power, biomass power , biogas power etc. , and C/ME submits the solar power as the first CPA. It is very difficult to evaluate the environmental impact and sustainability of the PoA and first CPA.
- To ensure sustainability of the PoA and give DNA more confidence to issue LoA, Thai DNA determines that C/ME must propose the E&SD Framework of every technologies for consideration.
- To facilitate the approval process, Thai DNA is now in the process to develop the examples of E&SD Framework for the biogas, biomass , solar power, hydro power projects.
www.themegallery.comwww.tgo.or.th
Issues & potential Solution
3. The revocation of the C/ME in case the C/ME makes up the information or discontinues the PoA.
- Thai DNA keeps the right to revoke the permission of C/ME or change the C/ME for that registered PoA, respectively.
www.themegallery.com
Thailand Greenhouse Gas Management Organization (Public Organization)
9th floor, The Government Complex Building B 120 Moo 3 Chaengwattana Road, Laksi, Bangkok 10210 THAILAND
Tel + 662 141 9841-48 Fax + 662 143 8404E-mail: info@tgo.or.th URL : www.tgo.or.th
25