Exercises
Exercise No. 1:ACE Chart variation after Generation
Loss
4
Exercise No. 1: ACE Chart variationafter Generation Loss
Purpose The purpose of this exercise is to illustrate what happens to ACE in a simple system following the loss of generation. During this exercise you (PALCO Balancing Authority) will lose the Crawford 2 unit, a loss of ~335 MW of generation. This is a little under 7% of total online generation in the PALCO Balancing Area at the time.
5
Results: Record the following Values after the Unit Trip: Maximum Frequency Deviation: ___________Initial Frequency Recovery due to Governor Droop: ________Did BA meet DCS? YES/NO
6
7
8
9
Advanced Exercises
Advanced Exercise No. 1
11
Advanced Exercise No. 1 ObjectivesTo be able to operate under emergency conditions.
12
Background• Weather is normal, no storms forecast.• It is 2 PM• Your system Net Scheduled Interchange is 0 MW• All units are on-line except the 70 MW Baker Unit and
80 MW Uxbrdg Unit• The Amus unit is removed from service for
emergency repairs for 48 hours.• All NERC and FRCC Reliability Standards and
Procedures are applicable.
13
Advanced Exercise No. 1A
EXTERNAL
CHSAN UXBRDG COPMANOR COPLEY STNTON OAKDLE
AMUS
POOL
BEAVERASH
LOCHER
MOSES
JENKINHOMERVEXLEY
WYNHAM
ELLS
FARLIE
GRANGE
DAWSON
TANTON
RICTER
KINCAID
DOYLE
200
3*200500600
1200
702*400600
1200
BAKER
CRWFRD
AIRPRT NESTLE
230 KV
138 KV
69 KV
33 KV
80
400
15
Advanced Exercise No. 1B• Transmission Supervisor reports conductor
damage on Oakdale-Crawford 230 kV lines 1 and 2 – No. 1 will take 15 minutes to repair and No. 2 will take 8 hours to repair.
• WHAT DO YOU DO?
16
17
18
EXTERNAL
CHSAN UXBRDG COPMANOR COPLEY STNTON OAKDLE
AMUS
POOL
BEAVERASH
LOCHER
MOSES
JENKINHOMERVEXLEY
WYNHAM
ELLS
FARLIE
GRANGE
DAWSON
TANTON
RICTER
KINCAID
DOYLE
200
3*200500600
1200
702*400600
1200
BAKER
CRWFRD
AIRPRT NESTLE
230 KV
138 KV
69 KV
33 KV
104
110
125
400
80
19
Cues/Patterns
• Lines are heavily overloaded• Extreme low voltages at Ricter and Cheshan
20
Debrief
• What were the important cues?• What patterns were recognized?• What are the recommended actions?• What were your greatest concerns?• What other alternatives were
considered?
21
Advanced Exercise No. 2
22
Advanced Exercise No. 2 ObjectivesTo be able to plan for a system emergency.
23
BackgroundAll NERC and FRCC Reliability Standards and Procedures are applicable.
The sales are non-firm contracts.
24
Advanced Exercise No. 1A
You are assigned the responsibility of drafting a System Restoration Plan for your system. You have only one unit capable of blackstart – The Baker Unit. Determine the path you will use to bring start up power to the Crawford Units 1 & 2.
25
Describe Briefly the System Restoration Procedure
___________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
EXTERNAL
CHSAN UXBRDG COPMANOR COPLEY STNTON OAKDLE
AMUS
POOL
BEAVERASH
LOCHER
MOSES
JENKINHOMERVEXLEY
WYNHAM
ELLS
FARLIE
GRANGE
DAWSON
TANTON
RICTER
KINCAID
DOYLE
200
3*200500600
1200
702*400600
1200
BAKER
CRWFRD
AIRPRT NESTLE
230 KV
138 KV
69 KV
33 KV
80
400
27
This exercise will bring Murphy’s Law into play. Here are the assumptions:
A severe storm moved through the Crawford area and both Baker to Crawford 230 kV lines No. 1 and 2 are out of service for repairs. This storm precipitated a blackout. Baker is the only black start unit. Start-up Power is required for the Crawford Units 1 & 2.
Write a switching order to bring startup power from Baker to the Crawford 1 and 2 Units.
28
29
30
31
32
Advanced Exercise No. 3
33
Advanced Exercise No. 3 ObjectivesTo be able to make decisions and take appropriate action under emergency conditions.
34
Background
• It is 6 AM and External is purchasing 450 MW• All External units are on line and all power flows and
voltages are normal.• All tie-lines are rated at 350 MW.• The PALCO transmission system is normal and all
units are on line except the 70 MW Baker Unit • The weather report calls for Severe storms in the
PALCO and External areas• All NERC and FRCC Reliability Standards and
Procedures are applicable.
35
Advanced Exercise No. 3A
EXTERNAL
CHSAN UXBRDG COPMANOR COPLEY STNTON OAKDLE
AMUS
POOL
BEAVERASH
LOCHER
MOSES
JENKINHOMERVEXLEY
WYNHAM
ELLS
FARLIE
GRANGE
DAWSON
TANTON
RICTER
KINCAID
DOYLE
200
3*200500600
1200
702*400600
1200
BAKER
CRWFRD
AIRPRT NESTLE
230 KV
138 KV
69 KV
33 KV
80
400
37
38
39
Advanced Exercise No. 3B
EXTERNAL
CHSAN UXBRDG COPMANOR COPLEY STNTON OAKDLE
AMUS
POOL
BEAVERASH
LOCHER
MOSES
JENKINHOMERVEXLEY
WYNHAM
ELLS
FARLIE
GRANGE
DAWSON
TANTON
RICTER
KINCAID
DOYLE
200
3*200500600
1200
702*400600
1200
BAKER
CRWFRD
AIRPRT NESTLE
230 KV
138 KV
69 KV
33 KV
80
400
41
42
Advanced Exercise No. 3C
EXTERNAL
CHSAN UXBRDG COPMANOR COPLEY STNTON OAKDLE
AMUS
POOL
BEAVERASH
LOCHER
MOSES
JENKINHOMERVEXLEY
WYNHAM
ELLS
FARLIE
GRANGE
DAWSON
TANTON
RICTER
KINCAID
DOYLE
200
3*200500600
1200
702*400600
1200
BAKER
CRWFRD
AIRPRT NESTLE
230 KV
138 KV
69 KV
33 KV
80
400
44
45
Advanced Exercise No. 3D
EXTERNAL
CHSAN UXBRDG COPMANOR COPLEY STNTON OAKDLE
AMUS
POOL
BEAVERASH
LOCHER
MOSES
JENKINHOMERVEXLEY
WYNHAM
ELLS
FARLIE
GRANGE
DAWSON
TANTON
RICTER
KINCAID
DOYLE
200
3*200500600
1200
702*400600
1200
BAKER
CRWFRD
AIRPRT NESTLE
230 KV
138 KV
69 KV
33 KV
80
400
47
48
Advanced Exercise No. 3E
49
Debrief
• What were the important cues?• What patterns were recognized?• What are the recommended actions?• What were your greatest concerns?• What other alternatives were
considered?
50
Advanced Exercise No. 4
51
Advanced Exercise No. 4 ObjectivesYou will be able to make decisions and take appropriate action under emergency conditionsAll NERC and FRCC Reliability Standards and Procedures are applicable.
52
Background• It is 6 AM and PALCO is selling 450 MW to External• All External units are on line and all power flows and
voltages are normal.• The PALCO transmission system is normal and all
units are on line except the 70 MW Baker Unit and 80 MW Uxbrdg Unit.
• All tie-lines are rated at 350 MW.• The weather report calls for Severe storms in the
PALCO and External areas.• All NERC and FRCC Reliability Standards and
Procedures are applicable.
53
Advanced Exercise No. 4A
EXTERNAL
CHSAN UXBRDG COPMANOR COPLEY STNTON OAKDLE
AMUS
POOL
BEAVERASH
LOCHER
MOSES
JENKINHOMERVEXLEY
WYNHAM
ELLS
FARLIE
GRANGE
DAWSON
TANTON
RICTER
KINCAID
DOYLE
200
3*200500600
1200
702*400600
1200
BAKER
CRWFRD
AIRPRT NESTLE
230 KV
138 KV
69 KV
33 KV
80
400
55
56
57
58
59
Advanced Exercise No. 4B
EXTERNAL
CHSAN UXBRDG COPMANOR COPLEY STNTON OAKDLE
AMUS
POOL
BEAVERASH
LOCHER
MOSES
JENKINHOMERVEXLEY
WYNHAM
ELLS
FARLIE
GRANGE
DAWSON
TANTON
RICTER
KINCAID
DOYLE
200
3*200500600
1200
702*400600
1200
BAKER
CRWFRD
AIRPRT NESTLE
230 KV
138 KV
69 KV
33 KV
80
400
61
62
63
64
65
Advanced Exercise No. 4C
EXTERNAL
CHSAN UXBRDG COPMANOR COPLEY STNTON OAKDLE
AMUS
POOL
BEAVERASH
LOCHER
MOSES
JENKINHOMERVEXLEY
WYNHAM
ELLS
FARLIE
GRANGE
DAWSON
TANTON
RICTER
KINCAID
DOYLE
200
3*200500600
1200
702*400600
1200
BAKER
CRWFRD
AIRPRT NESTLE
230 KV
138 KV
69 KV
33 KV
80
400
67
68
69
70
Advanced Exercise No. 4D
EXTERNAL
CHSAN UXBRDG COPMANOR COPLEY STNTON OAKDLE
AMUS
POOL
BEAVERASH
LOCHER
MOSES
JENKINHOMERVEXLEY
WYNHAM
ELLS
FARLIE
GRANGE
DAWSON
TANTON
RICTER
KINCAID
DOYLE
200
3*200500600
1200
702*400600
1200
BAKER
CRWFRD
AIRPRT NESTLE
230 KV
138 KV
69 KV
33 KV
80
400
72
73
74
75
76
77
Advanced Exercise No. 4E
78
79
80
Advanced Exercise No. 4F
EXTERNAL
CHSAN UXBRDG COPMANOR COPLEY STNTON OAKDLE
AMUS
POOL
BEAVERASH
LOCHER
MOSES
JENKINHOMERVEXLEY
WYNHAM
ELLS
FARLIE
GRANGE
DAWSON
TANTON
RICTER
KINCAID
DOYLE
200
3*200500600
1200
702*400600
1200
BAKER
CRWFRD
AIRPRT NESTLE
230 KV
138 KV
69 KV
33 KV
80
400OPEN
82
83
84
Debrief
• What were the important cues?• What patterns were recognized?• What are the recommended actions?• What were your greatest concerns?• What other alternatives were
considered?
85
Advanced Exercise No. 5
86
Advanced Exercise No. 5A
87
88
89
Debrief
• What were the important cues?• What patterns were recognized?• What are the recommended actions?• What were your greatest concerns?• What other alternatives were
considered?
90
Review of Advanced Exercises
• Team Decision Making
91
Bob Burkard, P.E.