mosaic park ARLINGTON COUNTY

O C U L U S

Existing Sanitary Sewer Impacts

Final Master PlanPlan

Phase 1 Master Plan - Phase 1

Phase 1 Phases 1 & 2Conceptual Site Plan

O C U L U SWood & Water

O C U L U SWood Platform Seating

O C U L U SInteractive Water Feature

O C U L U SInteractive Water – Fan Jets

O C U L U SInteractive Water – Water Plate

Solar Solar

Wind

O C U L U SGreen Energy

O C U L U SGreen Energy - Wind

O C U L U SGreen Energy - Wind

O C U L U SGreen Energy - Solar

O C U L U SGreen Energy - Solar

O C U L U SPlayground EARTHWORKS

O C U L U SPlayground EARTHWORKS

O C U L U SPlayground EARTHWORKS

O C U L U SPlayground – Fall Zones

O C U L U SPlay Equipment Mounds - Slides

KompanCorocord

Kompan

O C U L U SPlay Equipment 5-12 years old CLIMBING

Kompan Corocord

O C U L U SPlay Equipment - Wood

‘play pump’

Kompan

O C U L U SPlay Equipment SPINNING

Sonic Architecture

Richter

O C U L U SPlay Equipment SOUND

Richter

Richter

Richter

Goric

Richter

Richter

O C U L U SPlay Equipment 2-5 years old

Goric Kompan

No Fault

Pebble-Flex

O C U L U SPlay Surfacing POURED IN PLACE

3/8” Wearing Surface Pebbles

1-1/8” SBR Recycled Rubber

Recycled Rubber Foam

(depth varies with fall height)

*Base will be concrete or asphalt,

Or compacted aggregatep gg g

Compacted Aggregate Base:

• Storm water collects in perforated pipe below grade and connects to storm drainage system

Concrete or Asphalt Base:

• Storm water sheets off surface into drain system.

system.

O C U L U SPlay Surfacing PEBBLE-FLEX POURED IN PLACE

PERFORATED METAL

O C U L U SFencing CHAIN LINKWire Mesh

O C U L U SSite Lighting LED + DARK SKY

O C U L U SSite Lighting LED + DARK SKY

O C U L U SConceptual Site Plan

mosaic park ARLINGTON COUNTY