Experiment of 11.7GHz PE at AWA DL

3/3/2014

Execution before the next meeting in around a week

1. 19MeV beam simulation---John/Dan

2. Structure assembling---Jing

3. Cleaning the rf load --- Sergey

4. Installation layout--- Scott (cross, pumping, ict location…)

5. Pump and leak check of diagnostic beamline--- Eric

Slide in Meeting on 2/27/2014

When:

Task* Description Res. Due Note

1 KL1/2 readiness Liu 4/30

2 LLRF readiness Jing 4/30

3 Structure readiness Jing 3/10 Re-cleaning and assembling, load

4 Installation readiness Scott 4/15 HW for installation

5 Safety readiness Manoel 3/30 Approval for 19MeV DL

6 Vacuum readiness Eric 4/30

7 Beamline readiness Liu 4/30 PS, magnets, actuators, remote control

8 Diagnostics readiness John 4/30 Cameras, cables, scope

9 Laser readiness John 4/30 16/32 bunch train

10 High charge (??) Eric 4/15 New cathode (upon the need)

11 simulation John 3/15 19MeV to DUT

Proposed starting date of experiment: 5/1

The goal of this meeting is to decide the installation configuration so that we can start ordering the necessary parts.

11.7GHz Proposed Config. 02-28-2014

11.7GHz Proposed Config. 02-28-2014

11.7GHz Proposed Config. 02-28-2014

11.7GHz Proposed Config. 02-28-2014

11.7GHz Proposed Config. 02-28-2014

Execution before the next meeting

• Final configuration drawing based on the 3 points mentioned in the meeting and Order all needed vacuum parts.

• Waveguide plumbing: loads (test L1&L2 with K1/K2 asap).

• Laser beam flap and re-alignment• Finish beam simulation