Exploration, drilling, well completion and testing of deep-seated aquifers

Leif Bjelm, prof.Engineering Geology, Lund University, Sweden.

ARGeo C-1. Addis Abeba, 2006.

Lund in Europe adjacent to the Tornquist zone,TZ

Exploration Scheme

Design & construction of production systemsGroundwater, geothermal energy etc.

Propose sites for production wellsProduction drilling & Well design

Bidding and contracting

Exploration Drilling & testingSampling & bore hole geophysics

Calibration, revision and prospect evaluation

Siting of Expl. drillholes. Logistics & permitsPrepare Drilling programme.

Bidding & contracting

Data interpretation & Revision of CGMComplementary geology &geophysics etc.

Execution of reconn. Expl. prgrm.Geophysics, reconn. drilling. etc.

Revision of 1st CGMFormulate reconn. exploration programme

Desk top work and field control

Formulation of 1st Conceptual Geological Model/ CGM /

Governing needs and goalsgiven by Authorities, companies etc.

LEIF BJELM. DEG.LU.SE. 20061115.

HIGH

LOW

TZ

TZ

Data acquisition with Towed Array Equipment

Well position

The following drilling methods were used

Conventional rotary drilling with mudRotary air drilling / UBDPercussion drilling/Hammer drilling /UBDMud Hammer drilling

AIR DRILLING SET UP USED FOR DGE #1

By Peter Jonsson Engineering Geology, Lund University

Or Rotary Air bit

Air lift of DGE 01Air lift of DGE 01

*

*

It is inevitable and to many maybe somewhat disturbing that useful production information is

available at first at the very end of a long and many times exhausting exploration chain. But this is a fact

and one must accept this since there are no short cuts in this business.