City of Boulder2013 “Breaking Ground” Overview

David DriskellExecutive Director, Community Planning + Sustainability

A Tale of Two Cities…

sensitiveinfill

transformativeredevelopment

A Tale of Two Cities…

sensitive infill

18,600 SF third story addition above existing buildingGround floor retail / restaurant space

Final construction phase

1600 Pearl

3-story addition in existing parking lot42,000 SF commercial, with ground floor retail / restaurant

Approved by planning board / subject to call-up

1738 Pearl

1301 Walnut

60,170 SF commercialGround floor retail, with offices above and below (daylighted)

By-right development / in review

1707 Walnut Apartments

Three-story infill redevelopment of former 7-1126 rental apartments / below-grade parking

Approved / in tech doc

901 Pearl

21,000 SF commercial, with ground floor restaurantFour condominiums above

Approved / in tech doc

909 Walnut

18,400 SF commercialGround floor restaurant, with offices above

In site review

11th and Pearl

11th and Pearl

160,000 SF commercialGround floor retail, public plaza, rooftop garden/restaurantNew downtown cinema, office space, below grade parking

Expected construction start early 2014

Downtown RTD Station Improvements

Expanded bus service / BRT terminus+ 15th Street enhancements+ West Pearl streetscape

Civic Area Vision Plan

Adopted September 2013

Civic Area Vision Plan

Adopted September 2013

Park at the CoreEast

End

West

End

“Civic Use Pad” (next to St Julien)

1750 14th Street

64,400 SF mixed use reuse / redevelopment8,500 SF commercial / 1,600 SF “micro-office”

43 residential units / 3,800 SF “micro-lofts”In concept review

transformative redevelopment

3100 Pearl

319 rental apartments (avg size: 800 SF)396,900 SF total / 5,000 SF ground floor commercial

Below grade parking (with parking maximums)

3100 Pearl

RTD Bus Box

Pearl Boulevard

Pearl Parkway, Junction Place + Goose Creek Bridge

New “multi-way boulevard” prototypeNew north-south multi-modal connection / Goose Creek crossing

Shared street design on Junction PlaceNew multi-use path connections, 30th to Foothills

Pearl Parkway, Junction Place + Goose Creek Bridge

Depot Square

Below grade RTD bus facilityRestored/repurposed historic depot with public plazaShared street design connecting to new pocket park

Depot Square

150-room Hyatt Hotel71 permanently affordable apartments

120,000 SF shared parking structure (wrapped by housing)

Depot Square

Steelyards Lofts

17 attached units First new residential in Boulder Junction north of Goose Creek

Site review approved

Pearl Place (30th and Pearl)

120-room hotel / 200,000 SF office / 6,000 SF retailNew multi-use path connection / daylighted creek / public space

Completed concept review

800 & 970 28th Street

800 28th St. -- 100 four-bedroom units / Fitness center and office

970 28th St. -- 150 one- and two-bedroom units / small retail

28th and Canyon / Eads-Golden Buff Site

Two hotels + 38,400 SF office building360 hotel rooms total / below grade parking

Ground floor retail / restaurant

26th and Canyon / Village Shopping Ctr.

Residence Inn 171 rooms / 116,000 SF

Located in parking area in front of current Marriot HotelIn site review

“Baseline Zero” (Baseline @ 36)

180,000 SF office building / 70,000 SF, 100-key hotelUnderground parking / restored riparian corridor

Enhanced path connections / leading-edge green buildingIn concept review

Boulder Foothills Hospital Expansion

200,000+ new SF

Becoming main hospital facility for Boulder

Under construction / completion in 2014

Gunbarrel Town Center

Urban mixed use center251 new housing units / 22,000 SF new retail + office

Expected completion in 2015

Alexan Flatirons

12 residential buildings @ end of Spine Road231 attached rental units, 1500 SF on-site retail + clubhouse

Under construction

Avery Brewing Company

94,000 SF brewery operation5,000 SF on-site restaurant

In tech doc

Violet Crossing (Violet @ Broadway)

98 attached for-rent units / 89,350 SFFlood and multi-use path improvements

Key property in North BoulderUnder construction

820 Lee Hill

31 single family homes (former County yards site)“Woonerf” street design / shared open space / 10th St. connection

Site review approved

1000 Rosewood

18 new small-lot homes and duplexStreet facing with alley access / new street connections

Under construction

Washington Village

33 co-housing units + 3000 SF officeRestored / reused historic school and pocket park

Phased construction; completion in 2016

Trailhead (4th Street)

23 single family homes / mix of sizesSite of former “Junior Academy”

Phased development / site development underway

Kalmia Estates

29 single family homes16 duplex units14 four-plex units

Under construction

Wonderland Creek Townhomes

40 attached townhome units4 detached “Habitat for Humanity” affordable units

Site review approved

City of Boulder2013 “Breaking Ground” Overview

David DriskellExecutive Director, Community Planning + Sustainability

We partner with our community to create a truly great and sustainable city, worthy of its setting