Post on 12-Jan-2016
transcript
Fermilab
Booster Cavity TemperatureMeasurements – 15Hz Operation
January 28, 2015
January 28, 2015J. Reid 1
Fermilab
Booster RF Cavity
January 28, 2015J. Reid 2
Fermilab
Cavity
January 28, 2015J. Reid 3
Fermilab
Blocking Capacitor
January 28, 2015J. Reid 4
Fermilab
RF Waveforms
January 28, 2015J. Reid 5
Fermilab
S/N 1002 Heating to LCW
January 28, 2015J. Reid 6
Cavity S/N 1002 Jan-15Power measurements for Cavity / Tuner heat removed by the LCWOperating conditions
RF Gap Voltage 47.3kVModulator Vout 22.5kVCenter Casting delta T 0.99 CCenter Casting Flow 1.04 gpmCenter Casting heat removed by LCW - Avg 0.273 kWCenter Casting heat removed by LCW - during RF Pulse 0.59kW
Back Tuner Cone Cooling US delta T 0.33 CBack Tuner Cone Cooling US Flow 1.44 gpmBack Tuner Cone Cooling US heat removed by LCW - Avg 0.125kWBack Tuner Cone Cooling US heat removed by LCW - RF Pulse 0.274kWBack Tuner Cone Cooling DS delta T 0.27 CBack Tuner Cone Cooling DS Flow 1.62 gpmBack Tuner Cone Cooling DS heat removed by LCW - Avg 0.116kWBack Tuner Cone Cooling DS heat removed by LCW - RF Pulse 0.253 kW
Back Tuner Cone + Ferrite for 1/2 tuner US delta T 3.85 CBack Tuner Cone + Ferrite for 1/2 tuner US Flow 1.44 gpmBack Tuner Cone + Ferrite for 1/2 tuner US heat removed by LCW - AVG 1.46kWBack Tuner Cone + Ferrite for 1/2 tuner US heat removed by LCW - RF Pulse 3.2kW
Tuner heat removed by LCW for 3 tuners - Avg 8.78kWTuner heat removed by LCW for 3 tuners - During RF Pulse 19.19kW
Fermilab
January 28, 2015J. Reid 7
Cavity Temperature Rise
Fermilab
Al Cone with Cooling
January 28, 2015J. Reid 8
Fermilab
Tuner Cone End View
January 28, 2015J. Reid 9
Fermilab
Tuner Cone with Skin Installed
January 28,2015J. Reid 10
Fermilab
Tuner End View
January 28, 2015J. Reid 11
Fermilab
Tuner Outer Cooling
January 28, 2015J. Reid 12
Fermilab
East Gallery Operating Temps
January 28, 2015J. Reid 13
Booster East Gallery operating 15 Hz