FINAL PUBLIC MEETINGOCTOBER 25, 2016

www.denvergov.org/federalcorridor

¿Necesita un traductor? Por favor, levanten la mano.

9 MILES, ENTIRE CITY LIMITS

2015 TO LATE 2016 STUDY COMPLETION

STUDY OVERVIEW

www.denvergov.org/federalcorridor

WALKING, TRANSIT, BIKING AND DRIVINGEVALUATION OF BUSINESS AND ENVIRONMENTAL CONCERNS

STUDY GOAL: PRIORITIZE OPPORTUNITIES AND DEVELOP IMPLEMENTATION PLAN

FOCUS

www.denvergov.org/federalcorridor

CRITICAL NORTH-SOUTH LINK ALONG WEST SIDE OF DOWNTOWN

SOME OF THE MOST DIVERSE NEIGHBORHOODS IN THE CITY

30,000 TO 40,000 VEHICLES PER DAY

INTERSECTIONS WITH HIGHEST ACCIDENT RATES IN THE CITY

2ND BUSIEST RTD TRANSIT CORRIDOR

ABOUT

www.denvergov.org/federalcorridor

1. ANALYZE EXISTING CONDITIONS

2. GATHER INPUT AND FEEDBACK

3. PRIORITIZE PROJECTS AND OPPORTUNITIES

4. DEVELOP IMPLEMENTATION STRATEGIES

5. GATHER ADDITIONAL INPUT AND FEEDBACK

PROCESS

www.denvergov.org/federalcorridor

FEDERAL BOULEVARD

STUDY

PROJECT MANAGEMENT TEAM

STAKEHOLDER

TASK FORCEGENERAL PUBLIC

APPROACH

www.denvergov.org/federalcorridor

STUDY TIMELINE

EXISTING CONDITIONS

CORRIDOR PLAN(OPPORTUNITIES AND

IMPLEMENTATION)

www.denvergov.org/federalcorridor

PUBLIC INVOLVEMENT

www.denvergov.org/federalcorridor

PUBLIC INVOLVEMENT

www.denvergov.org/federalcorridor

PUBLIC INVOLVEMENT

www.denvergov.org/federalcorridor

PUBLIC INVOLVEMENT

www.denvergov.org/federalcorridor

CRITICAL SUCCESS FACTORS

www.denvergov.org/federalcorridor

CRITICAL SUCCESS FACTORS

www.denvergov.org/federalcorridor

VISION STATEMENT

“Federal Boulevard will be a well-connected multimodal and high capacity boulevard that supports and celebrates diverse local business, residents, cultures, natural resources and community.

Traveling the Corridor will be safe, easy, and comfortable for all modes of transportation.”

www.denvergov.org/federalcorridor

FRAMEWORK ELEMENTS

www.denvergov.org/federalcorridor

TYPICAL CROSS-SECTION

www.denvergov.org/federalcorridor

PRIMARY INTERSECTION

www.denvergov.org/federalcorridor

SECONDARY INTERSECTION

www.denvergov.org/federalcorridor

MIDBLOCK CROSSING

www.denvergov.org/federalcorridor

TRANSIT STOP AND STATION ELEMENTS

www.denvergov.org/federalcorridor

PROJECTS AND PROCESS

www.denvergov.org/federalcorridor

PROJECTS

75 MAJOR RECOMMENDATIONS26 QUICK WIN PROJECTS33 NEAR-TERM PROJECTS16 LONG-TERM PROJECTS

www.denvergov.org/federalcorridor

PROJECTS

QUICK WINS: 1-2 YEARS NEAR-TERM: 2-10 YEARSLONG-TERM: 10-20 YEARS

www.denvergov.org/federalcorridor

PROCESS

www.denvergov.org/federalcorridor

PROCESS

75 MAJOR RECOMMENDATIONSwww.denvergov.org/federalcorridor

PROJECTS

8 - CORRIDOR WIDE14 - ZONE A SOUTH9 - ZONE B15 - ZONE C15 - ZONE D7 - ZONE E7 - ZONE A NORTH

www.denvergov.org/federalcorridor

QUICK WIN HIGHLIGHTS (1-2 YEARS)

INSTALL BENCHES AT TRANSIT STOPS

INSTALL BENCHES AT TRANSIT STOPS

TEST AND PILOTDEDICATED BUS LANES

TEST AND PILOTDEDICATED BUS LANES

TEST AND PILOTINCREASED

PUBLIC SPACE

TEST AND PILOTINCREASED

PUBLIC SPACE

UPGRADE CROSSINGS TO MEET ADA STANDARDS

UPGRADE CROSSINGS TO MEET ADA STANDARDS

www.denvergov.org/federalcorridor

NEAR-TERM HIGHLIGHTS (2-10 YEARS)

NEWTRANSIT SHELTERS

NEWTRANSIT SHELTERS

DESIGN CROSSING IMPROVEMENTS

DESIGN CROSSING IMPROVEMENTS

COMPLETESIDEWALK NETWORK

COMPLETESIDEWALK NETWORK

REDUCE SPEEEDING AND RACING

REDUCE SPEEEDING AND RACING

www.denvergov.org/federalcorridor

LONG-TERM HIGHLIGHTS (10-20 YEARS)

LANDSACPEDBUFFERS

LANDSACPEDBUFFERS

NEWMEDIANS

NEWMEDIANS

GRADE SEPERATEDTRAIL CROSSINGS

GRADE SEPERATEDTRAIL CROSSINGS

DISTRICT GATEWAYSDISTRICT GATEWAYS

www.denvergov.org/federalcorridor

CORRIDOR VISION

www.denvergov.org/federalcorridor

SMART CITY TECHNOLOGY

www.denvergov.org/federalcorridor

CURB CUTS AND SHARED PARKING

www.denvergov.org/federalcorridor

PILOT PROGRAMS

www.denvergov.org/federalcorridor

REDUCE STREET RACING: DESIGN AND ENFORCEMENT

www.denvergov.org/federalcorridor

DESTINATION + CREATIVE DISTRICTS

www.denvergov.org/federalcorridor

BRANDING + PROGRAMMING

www.denvergov.org/federalcorridor

REDUCE BILLBOARD DENSITY

www.denvergov.org/federalcorridor

NEIGHBORHOODBUILDING BLOCKS

www.denvergov.org/federalcorridor

ZONE A SOUTH - EVANS TRANSFER HUB

IMPROVED WAITING ENVIRONMENTCONNECTING TO MULTI-MODAL

ROUTES

IMPROVED WAITING ENVIRONMENTCONNECTING TO MULTI-MODAL

ROUTES

www.denvergov.org/federalcorridor

ZONE B - SANDERSON GULCH

SAFER CROSSINGPARKS AND TRAILS IDENTITY AND

WAYFINDING

SAFER CROSSINGPARKS AND TRAILS IDENTITY AND

WAYFINDING

www.denvergov.org/federalcorridor

ZONE C - LITTLE SAIGON

ENHANCE DISTRICT IDENTITYSIGNATURE URBAN DESIGN FEATURES

ENHANCE DISTRICT IDENTITYSIGNATURE URBAN DESIGN FEATURES

www.denvergov.org/federalcorridor

ZONE D - STADIUM DISTRICT

TREE PLANTING PROGRAMDEVELOP PARTNERSHIPS TO CREATE LOCAL

BRANDING

TREE PLANTING PROGRAMDEVELOP PARTNERSHIPS TO CREATE LOCAL

BRANDING

www.denvergov.org/federalcorridor

ZONE E - FEDERAL AND SPEER

PEDESTRIAN SAFETY AND ACCESSACTIVATE ADJACENT OPEN SPACES

MULTI-MODAL AMENITIES

PEDESTRIAN SAFETY AND ACCESSACTIVATE ADJACENT OPEN SPACES

MULTI-MODAL AMENITIES

www.denvergov.org/federalcorridor

ZONE A - NORTH GATEWAY

IMPROVED GATEWAY INTO CITYSUPPORT CAMPUS ENVIRONMENTS

EMBRACE LOCAL SITES

IMPROVED GATEWAY INTO CITYSUPPORT CAMPUS ENVIRONMENTS

EMBRACE LOCAL SITES

www.denvergov.org/federalcorridor

IMPLEMENTATION PLAN

www.denvergov.org/federalcorridor

PROJECT PHASING

www.denvergov.org/federalcorridor

QUICK WINS (1-2 YEARS) NEAR-TERM PROJECTS (2-10 YEARS)LONG-TERM PROJCTS (10-20 YEARS)

FUNDING OPPORTUNITIES

www.denvergov.org/federalcorridor

FEDERAL PROGRAMSSTATE PROGRAMSCITY PROGRAMSLOCAL/REGIONAL PROGRAMS

NEXT STEPS

www.denvergov.org/federalcorridor

NEXT STEPS

www.denvergov.org/federalcorridor

PROVIDE FEEDBACK AND COMMENTS

SURVEY AVAILABLE HERE OR ONLINE @www.denvergov.org/federalcorridor