Final Work Plan SDG&E Chula Vista NO Track Changes 091014 · 2017. 8. 30. · Microsoft Word -...

Post on 30-Aug-2020

0 views 0 download

transcript

Photo 1 – Construction activities during installation of subsurface high voltage line.

Photo 2 – Construction activities during installation of subsurface high voltage line.

OU 1 004411

Photo 3 – Construction activities during installation of subsurface high voltage line.

Photo 4 – Construction activities during installation of subsurface high voltage line.

OU 1 004412

Photo 5 – Aerial photograph showing location of the subsurface high voltage line excavation.

Photo 6 – View of Area of interest #1, looking north.

OU 1 004413

Photo 7 – View of grid A19 and railroad right of way looking south.

Photo 8 – View of suspect undocumented fill (Grid A10) with potential debris from kiln, looking northeast.

OU 1 004414

Photo 9 – Railroad right of way.

OU 1 004415