Flange Compressor Enclosure hr rev1

Post on 14-Aug-2015

101 views 0 download

Tags:

transcript

Dimensional Flange ManagementGuaranteed to Fit

Chlorine Compressor with a split line leak

Chlorine gas leaking between flanges at split line

Highly Complex Curvature

CAD Model DevelopmentReversed Engineered CAD Data

CAD Model DevelopmentReversed Engineered CAD Data

“Guaranteed to Fit”Prototype Enclosure Produced through Additive Manufacturing

“Guaranteed to Fit”CMM Inspection

“Guaranteed to Fit”Surface Analysis

“Guaranteed to Fit”Enclosure Prototype Scaled

“Guaranteed to Fit”Enclosure Prototype Scaled

“Guaranteed to Fit”Enclosure Prototype Fit‐Up Test

“Guaranteed to Fit”Enclosure Prototype Fit‐Up Test

“Guaranteed to Fit”Enclosure Prototype Fit‐Up Test

We guarantee our components will fit the first time every time.

1. We use metrology grade equipment to acquire the complete surface2. We utilize multiple layers of quality control procedures to ensure accuracy3. We manufacturer a physical test model using our own 3D printing equipment4. Enclosure is machined One-to-One to data collected in the field

www.Dimensional3d.com

“Guaranteed to Fit”