Foundations of Finance 2009 Lecture 5 Alcino Azevedo Investment Appraisal.

Post on 11-Jan-2016

213 views 0 download

Tags:

transcript

Foundations of Finance 2009

Lecture 5

Alcino Azevedo

Investment Appraisal

2

Learning Objectives

1. Discuss the difficulty of finding profitable projects in competitive markets and the importance of search.

2. Determine whether a new project should be accepted or rejected using the payback period, net present value, the profitability index, and the internal rate of return.

3. Explain how the capital-budgeting decision process changes when a limit is placed on the dollar size of the capital budget.

4. Discuss the problems encountered in project ranking.

5. Explain the importance of ethical considerations in capital-budgeting decisions.

6. Discuss the trends in the use of different capital-budgeting criteria.

7. Explain how foreign markets provide opportunities for finding new projects.

3

Capital-Budgeting

The process of decision making with respect to investments in fixed assets – that is, should a proposed project be accepted or rejected.All of techniques attempt to compare the costs and benefits of a project.The rule of capital budgeting is to accept all projects for which the cost is less than, or equal to, the benefit: Accept if: Cost £ Benefit; Reject if: Cost > Benefit

4

Source of Ideas for projects

Within the Firm: Typically, a firm has a research & development (R&D) department that searches for ways of improving existing products or finding new projects.

Other sources: Competition, Suppliers, Customers

5

Capital-Budgeting Decision Criteria

1. Payback Period2. Accounting Rate of Return3. Net Present Value4. Profitability Index5. Internal Rate of Return 6. Capital Rationing

6

Payback Period

Number of years needed to recover the initial cash outlay of a capital-budgeting project

Decision Rule: Project feasible or desirable if the payback period is less than or equal to the firm’s maximum desired payback period.

7

Payback Period Example

Example: Project with an initial cash outlay of $20,000 with following free cash flows for 5 years.

YEAR CASH FLOW BALANCE

1 $ 8,000 ($ 12,000)

2 4,000 ( 8,000)

3 3,000 ( 5,000)

4 5,000 0

5 10,000 12,000

Payback is 4 years

8

Trade-offs: Payback Period

Benefits: Uses cash flows rather than accounting

profits Easy to compute and understand Useful for firms that have capital constraints

Drawbacks: Ignores the time value of money and Does not consider cash flows beyond the

payback period.

9

Discounted Payback Period

DPP is exactly the same as the regular payback period, except that we use the present values of the cash flows in the calculation

Example: Should we buy the following machine using DPP, given the cash flows as below and the required return of 12%

0 1 2 3 4 5

2000 2500 3000 3500 4000-10,000

• Basic PP is = 3 + [2500/3500] = 3.71 years• How about DPP?

Discounted Payback Period

The discounted cash flow with 12% discount rate:

0 1 2 3 4 5

1785.711992.982135.342224.312269.71-10,000

DPP =4+ (1888.66/2269.71) =4.83 years

ALWAYS: DPP > Basic PP

11

What’s wrong with DPP?

The discounted payback period solves the time value problem, but it still ignores the cash flows beyond the payback period

Therefore, you may reject projects that have large cash flows in the outlying years that make it very profitable

In other words, any measure of payback can lead to a focus on short-run profits at the expense of larger long-term profits

Accounting rate of return (ARR):

ARR = Average annual profit*100%

Average investment

• ARR is a measurement of return on investment in %. It compares average annual profit increase with the initial investment capital.

• An investment is acceptable if the ARR exceeds an arbitrarily determined required rate of return for the business.

• ARR ignores time value of money

Average Investment = (Investment cost + Disposal value) / 2

ARR-exampleCash flow schedule of the purchase of a machine is as follows:

• Average profit before depreciation

= (£20,000 + £40,000 + £60,000 + £60,000 + £20,000) / 5 = £40,000

• Straight Line depreciation per annum

= (Cost £100,000 – Disposal value £20,000) / 5 = £16,000

• Average profit after depreciation = £40,000 – £16,000 = £24,000

• Average Investment = (Investment cost + Disposal value) / 2

Average Investment = (£100,000 + £20,000) / 2 = £60,000

• ARR = (£24,000 / £60,000) X 100% = 40%

14

Net Present Value or NPV

NPV is equal to the present value of all future free cash flows less the investment’s initial outlay. It measures the net value of a project in today’s dollars.

NPV = FCF - Initial outlay(1+k)n

Decision Rule: If NPV > 0, acceptIf NPV < 0, reject

15

NPV Example

Example: Project with an initial cash outlay of $60,000 with following free cash flows for 5 years.

Yr FCF Yr FCFInitial outlay -60,000 3 13,000

1 25,000 4 12,000 2 24,000 5 11,000

The firm has a 15% required rate of return.

16

NPV = FCF - Initial outlay (1+k)n

PV of FCF = $60,764 Subtracting the initial cash outlay of

$60,000 leaves an NPV of $764. Since NPV>0, project is feasible.

NPV Example (cont.)

17

NPV Trade-offs

Benefits Considers cash flows, not profits Considers all cash flows Recognizes time value of money By accepting only positive NPV projects, increases

value of the firm Drawbacks

Requires detailed long-term forecast of cash flows

NPV is considered to be the most theoretically correct criterion for evaluating capital-budgeting projects.

18

Profitability Index (PI)

PI is the ratio of the present value of the future free cash flows to the initial outlay. It yields the same accept/reject decision as NPV. PI = PV FCF/ Initial outlay

Decision Rule: PI > 1 = accept PI < 1 = reject

19

PI Example

A firm with a 10% required rate of return is considering investing in a new machine with an expected life of six years. The initial cash outlay is $50,000.

20

FCF PVF @ 10% PV

Initial Outlay

-$50,000 1.000 -$50,000

Year 1 15,000 0.909 13,636

Year 2 8,000 0.826 6,612

Year 3 10,000 0.751 7,513

Year 4 12,000 0.683 8,196

Year 5 14,000 0.621 8,693

Year 6 16,000 0.564 9,032

PI Example

21

PI = ($13,636 + $6,612+$7,513 + $8,196 + $8,693+ $9,032) / $50,000

=$53,682/$50,000= 1.0736

Project PI > 1, accept.

PI Example

22

NPV and PI

When the present value of a project’s free cash inflows are greater than the initial cash outlay, the project NPV will be positive. PI will also be greater than 1.

NPV and PI will always yield the same decision.

23

Internal Rate of Return or IRR

IRR is the discount rate that equates the present value of a project’s future net cash flows with the project’s initial cash outlay

Decision Rule: If IRR > Required rate of return,

accept If IRR < Required rate of return, reject

24

25

IRR and NPV

If NPV is positive, IRR will be greater than the required rate of return

If NPV is negative, IRR will be less than required rate of return

If NPV = 0, IRR is the required rate of return.

26

IRR Example

Initial Outlay: $3,817

Cash flows: Yr.1=$1,000, Yr. 2=$2,000, Yr. 3=$3,000

Discount rate NPV15% $4,35620% $3,95822% $3,817

IRR is 22% because the NPV equals the initial cash outlay.

27

Multiple IRRs

A normal cash flow pattern for a project is negative initial outlay followed by positive cash flows (-, +, +, + …);

However, if the cash flow pattern is not normal (such as -, +, -) there can be more than one IRRs;

Figure 9-2 is based on cash flows of: -1,600; +10,000; -10,000 in years 0,1,2

28

29

Modified IRR

Primary drawback of the IRR relative to the net present value is the reinvestment rate assumption made by the internal rate of return

Modified IRR allows the decision maker to directly specify the appropriate reinvestment rate

MIRR> required rate of return, accept

MIRR< required rate of return, reject

30

MIRR Example

Project having a 3yr. Life and a required rate of return of 10% with the following cash flows:

FCF’s FCF’sInitial Outlay

-$6,000 Year 2 $3,000

Year 1 $2,000 Year 3 $4,000

31

Step 1: Determine the PV of the project’s cash outflows. $6,000 is already at present.

Step 2: Determine the terminal value of the project’s free cash flows. To do this use the project’s required rate of return to calculate the FV of the project’s three cash flows of the project’s cash outflows. They turn out to be $2,420 +$3,300 + $4,000 = $9,720 for the terminal value

MIRR Example

32

Step 3: Determine the discount rate that equates to the PV of the terminal value and the PV of the project’s cash outflows. MIRR= 17.446%. It is > required rate of return: Accept

MIRR Example

33

Capital Rationing

Capital rationing occurs when a limit is placed on the dollar size of the capital budget.

How to select: Select a set of projects with the highest NPVs – subject to the capital constraint. Using NPV may preclude accepting the highest ranked project in terms of PI or IRR.

34

Ranking Problems

Size Disparity

Time Disparity

Unequal Life

35

Size Disparity

This occurs when we examine mutually exclusive projects of unequal size.

Example: Consider the following cash flows for one-year Project A and B, with required rates of return of 10%. Initial Outlay: A = $200 B = $1,500 Inflow: A = $300 B = $1,900

36

37

Project A Project B

NPV 72.73 227.28PI 1.36 1.15IRR 50% 27%

Ranking Conflict: Using NPV, Project B is better; Using PI and IRR, Project A is better.

Size Disparity

38

Which technique to use to select the better project?

Use NPV whenever there is size disparity. If there is no capital rationing, project with the largest NPV will be selected. When capital rationing exists, select set of projects with the largest NPV.

Size Disparity

39

Time Disparity Problem

Time Disparity problems arise because of differing reinvestment assumptions made by the NPV and IRR decision criteria.

Cash flows reinvested at: According to NPV: Required rate of

return According to IRR: IRR

40

Example: Consider two projects, A and B, with initial outlay of $1,000, cost of capital of 10%, and following cash flows in years 1, 2, and 3:

A: $100 $200 $2,000 B: $650 $650 $650

Time Disparity Problem

41

42

Project A Project BNPV 758.83 616.45PI 1.759 1.616IRR 35% 43%

Ranking Conflict: Using NPV, A is better Using IRR, B is better

Which technique to use to select the superior project? Use NPV

Time Disparity Problem

43

Unequal Lives Problem

This occurs when we are comparing two mutually exclusive projects with different life spans.

To compare projects, we compute the Equivalent Annual Annuity (EAA)

44

Example: If you have two projects, A and B, with equal investment of $1,000, required rate of return of 10%, and following cash flows in years 1-3 (for project A) and 1-6 (for project B)

Project A = $500 each in years 1-3 Project B = $300 each in years 1-6

Unequal Lives Problem

45

Computing EAA

1. Calculate project’s NPV:

A = $243.43 and B = $306.58

2. Calculate EAA = NPV/annual annuity factor

A = $97.89 B = $70.39

3. Project A is better

46

Ethics in Capital-Budgeting

Ethics do play a role in capital-budgeting.

Any actions that violate ethical standards can have a negative impact on the image of the firm and consequently, future cash flows.

47

Popularity of Capital-Budgeting Techniques: US

Percent of Firms Using EachMethod used Primary Secondary

TotalMethod Method

IRR 88% 11%99%

NPV 63% 22%85%

Payback 24% 59%83%

PI 15% 18%33%

48

Popularity of Capital-Budgeting Techniques: UK

What percentage of UK firms are using; IRR : 81% NPV: 80% PP : 70% ARR: 56%

Question: Why is IRR so fashionable despite its shortcomings?

49

OTHER ISSUES IN INVESTMENT APPRAISAL Learning Objectives

1. Identify guidelines by which we measure cash flows.2. Explain how a project’s benefits and costs – that is, its

free cash flows – are calculated.3. Explain the importance of options or flexibility in capital

budgeting.4. Explain what the appropriate measure of risk is for

capital-budgeting purposes. 5. Determine the acceptability of a new project using the

risk-adjusted discount method of adjusting for risk.6. Explain the use of simulation for imitating the

performance of a project under evaluation.

50

Incremental Cash Flows

Decision makers must consider what new cash flows the company as a whole will receive if the company takes on a given project.

Only incremental after-tax cash flows matter.

51

Ten Guidelines for Capital Budgeting

1. Use free cash flows, not accounting profits.

2. Think incrementally.

3. Beware of cash flows diverted from existing products.

4. Look for incidental or synergistic effects.

5. Work in working-capital requirements.

6. Consider incremental expenses.

7. Sunk costs are not incremental cash flows

8. Account for opportunity costs.

9. Decide if overhead costs are truly incremental cash flows.

10. Ignore interest payments and financing flows.

52

Use free cash flows

Free cash flow accurately reflects the timing of benefits and costs – when money is received, when it can be reinvested, and when it must be paid out.

Accounting profits do not reflect actual money in hand.

53

Incremental cash flows

Further, after-tax free cash flows must be measured incrementally.

Determining incremental free cash flow involves determining the cash flows with and without the project. Incremental is the “additional cash flows” (inflows or outflows) that occur due to the project.

54

Beware of diverted cash flows

Not all incremental free cash flow is relevant.

Thus new product sales achieved at the cost of losing sales from existing product line are not considered a benefit.

However, if the new product captures sales from competitors or prevents loss of sales to new competing products, it would be a relevant incremental free cash flow.

55

Incidental or Synergistic Effects

Although some projects may take sales away from a firm’s current projects, in other cases new products may add sales to the existing line. This is called a synergistic effect and is a relevant cash flow.

56

Working capital requirement

New projects require infusion of working capital (such as inventory to stock the shelves), which would be an outflow.

Generally, when the project terminates, working capital is recovered and there is an inflow of working capital.

57

Sunk Costs

Sunk costs are cash flows that have already occurred (such as marketing research) and cannot be undone. Sunk costs are considered irrelevant to decision making.

Managers need to ask two basic questions:

1. Will this cash flow occur if the project is accepted?

2. Will this cash flow occur if the project is rejected?

If the answer is “Yes” to #1 and “No” to #2, it will be an incremental cash flow.

58

Opportunity Costs

Opportunity cost refers to cash flows that are lost because of accepting the current project.

For example, using the building space for the project will mean loss of potential rental revenue.

59

Overhead Costs

Incremental overhead costs or costs that were incurred as a result of the project and relevant to capital budgeting must be included.

Note, not all overhead costs may be relevant (for example, the utilities bill may have been the same with or without the project).

60

Interest Payments and Financing Costs

Interest payments and other financing cash flows that might result from raising funds to finance a project are not relevant cash flows.

Reason: Required rate of return implicitly accounts for the cost of raising funds to finance a new project.

61

Free Cash Flow Calculations

Three components of free cash flows:1. Initial outlay2. Annual free cash flows over the project’s

life3. Terminal cash flow

62

Initial Cash Outlay

The immediate cash outflow necessary to purchase the asset and put it in operating order.

May include: Purchase cost, Set-up cost, Installation, Shipping/Freight, increased working-capital requirements, tax implications (if the project replaces an existing project/asset)

63

Sale and Taxes

If Sale = Book Value ==> No tax effect

If sale >BV (but less than cost) ==> recaptured depreciation, taxed as ordinary income

If sale > BV (greater than cost) ==> anything above cost, taxed as capital gain, rest taxed as recaptured depreciation

If sale < BV ==> capital loss ==> tax savings

64

Annual Free Cash Flows

Annual free cash flow is the incremental after-tax cash flow resulting from the project being considered.

Free Cash flow considers the following: Cash flow from operations Cash flows from working capital requirements Cash flows from capital spending

65

Calculating Operating Cash Flows

Step 1: Measure the project’s change in operating cash

flows:

Operating cash flows = Changes in EBIT- Changes in taxes + Change in depreciation

Note, depreciation is a non-cash expense but influences the cash flows through impact on taxes (see next two slides).

66

Calculating Operating Cash Flows: Depreciation & Cash Flow

Earnings before Tax and Dep. 40,000 Depreciation 25,000

Earnings before tax (EBT) 15,000

If the corporation is taxed at 30%, taxes = 0.3*15000 = $4,500

If the depreciation was $0, EBT = $40,000 and taxes = 0.3*40000 = $12,000

67

==> Depreciation is a “non-cash expense” BUT affects Cash Flow through its impact on “taxes”;

Depreciation ==> in Expense ==> in taxes ==> CF

Calculating Operating Cash Flows: Depreciation & Cash Flow

68

Calculating Operating Cash Flows: Change in Net Working Capital

Step 2: Calculate the cash flows from the change

in net working capital

This refers to additional investment in current assets minus any additional short-term liabilities that were generated.

69

Calculating Operating Cash Flows

Step 3: Determine the cash flows from the change

in capital spending

This refers to any capital spending requirements during the life of the project.

70

Calculating Operating Cash Flows: Putting it all together

Step 4: Project free cash flows = change in EBIT - changes in taxes + change in depreciation - change in net working

capital - change in capital spending

71

Terminal Cash Flow

Terminal cash flows are flows associated with the project at termination.

It may include: Salvage value of the project. Any taxable gains or losses associated

with the sale of any asset.

72

Example

73

74

Options in Capital Budgeting

Options add value to capital budgeting projects.

Some common options are:

1. Option to delay a project2. Option to expand a project3. Option to abandon a project

75

Option to Delay

Almost every project has a mutually exclusive alternative – waiting and pursuing at a later time.

It is conceivable that a project with a negative NPV now may have a positive NPV if undertaken later on. This could be due to various reasons such as favorable changes in fashion, technology, economy, or borrowing costs.

76

Option to Expand

Even if a project is currently unprofitable, it may be useful to determine whether the profitability of the project will change if the company is able to expand in the future.

Example: Firms investing in negative NPV projects to gain access to new markets.

77

Option to Abandon

It may be necessary to abandon the project before its estimated life due to inaccurate project analysis models or cash flow forecasts or due to changes in market conditions.

When comparing two projects with similar NPVs, the project that is easier to abandon may be more desirable (example, temporary versus permanent workers, lease versus buy).

78

Risk and Capital Budgeting Decisions

Two main issues:

1. What is risk and how should it be measured?

2. How should risk be incorporated into a capital budgeting analysis?

79

Three perspectives on risk

Project standing alone risk

Contribution-to-firm risk

Systematic risk

80

Project Standing Alone Risk

A project’s risk, ignoring the possibility that much of the risk will be diversified away as the project is combined with other projects and assets.

81

Contribution-to-Firm Risk

This is the amount of risk that the project contributes to the firm as a whole.

This measures the project’s risk considering the diversification away of risk, but ignores the effects of diversification on the firm’s shareholders.

82

Systematic Risk

Risk of the project from the viewpoint of a well-diversified shareholder.

This measure takes into account that some of the risk will be diversified away as the project is combined with the firm’s other projects and in addition, some of the remaining risk will be diversified away by the shareholders as they combine this stock with other stocks in their portfolios.

83

Relevant risk

Theoretically, the only risk of concern to shareholders is systematic risk.

Since the project’s contribution-to-firm risk affects the probability of bankruptcy for the firm, it is a relevant risk measure.

Thus we need to consider both the project’s contribution-to-firm risk and the project’s systematic risk.

84

Incorporating Risk into Capital Budgeting

We know that investors demand higher returns for riskier projects.

As the risk of a project increases, the required rate of return is adjusted upward to compensate for the added risk.

This risk adjusted discount rate is then used for discounting free cash flows (in NPV model) or as the benchmark required rate of return (in IRR model).

85

Measurement of Systematic Risk

Estimating the risk of a project can be difficult. Historical stock return data relates to an entire firm, rather than a specific project or division. Risk must be estimated. Options to estimate risk include:

1. Accounting Beta2. Pure Play Method3. Simulation4. Scenario Analysis5. Sensitivity Analysis

A CRITIQUE OF INVESTMENT APPRAISAL METHODS

NPV is better than both PP and ARR because: NPV considers the time value of money or timing of cash flows by using discount

factors. Discounted cash flow implies taking opportunity cost of capital into

account. NPV treats each cash flow of a specific year differently using different

discounting factors. All cash flows are interdependent in affecting NPV and are

taken into consideration. NPV is in line with the objective of the business: NPV>0 increases shareholder

wealth All relevant and measurable financial information related to decision is exploited

in calculating NPV.

The main problem of IRR: it does not emphasise wealth maximisation

IRR does not consider the scale of the investment.

IRR’s focus is only the rate comparison.

NPV is more reliable than IRR.

87

INVESTMENT APPRAISAL: CONCLUDING REMARKS

Each appraisal method has shortcomings: The problem with NPV:

it is assumed that expected future cash inflows will be realised.

Many companies use more than one method and compare the outcome of each method.

Companies have the tendency to use methods which consider time value of cash flows, i.e., IRR and NPV

Human behaviour is also an important factor in affecting investment decisions.