Gas European Network Code Implementation
May 2013
Lisa Martin
2
• Ofgem open letter on Congestion Management Procedures (CMP) implementation. – Included question on impact of change in the Gas Day.
• Individual TSO process on CMP implementation:– NGG consults on Bacton/Moffatt - Ofgem approval– IUK consulting (published 30 April) on its I/C – Ofgem/CREG
approval– BBL consults on its I/C- Ofgem/ACM approval– Ireland still under discussion
What has happened so far?
3
Summary of responses on change to Gas Day
• Very consistent tone of responses (non-confidential will be made available on Ofgem website).
• Avoid underestimating the scale of the task.• Preference for early consultation on how it will be implemented
and coordinated approach.• Preference for early decision on a fixed implementation date.• Recognition that change will be felt from offshore to customer
meter, with not all parties under Ofgem jurisdiction.
4
CAM Requirements
• Implementation 1 November 2015• Capacity to be auctioned as bundled, standard products• Applies to interconnector points (Bacton & Moffat) – may also apply to
entry and exit points to and from third countries (subject to relevant NRA decision)
• Applies to capacity that is available to be sold & contracted capacity once it becomes available, e.g. – BBL – capacity that is currently unsold & any that becomes available
through Oversubscription or Surrender (CMP), further capacity from 2016
– IUK – Oversubscription or Surrender, all capacity from 2018– & to relevant capacity at Bacton & in Belgium & Netherlands– So stepwise approach to implementation
• Implementation needs to meet obligations of CAM• There are options for implementation
5
Key Issues to be considered
GB issues Shared issues
Capacity identification e.g. how to calculate capacity at Bacton?
How to bundle capacity?
Should changes apply to all entry/exit points in GB or just interconnection points?
What booking platform to use (PRISMA ) & how this should be governed?
How do we go about changing the gas day?
Interaction between capacity/ allocation & nominations (within-day)?
Ensuring standardised capacity products are sold
TSO cooperation
Package approach at cross-border points - look at CAM, nominations in balancing, charging etc
6
Process
Ofgem NGGCREG Fluxys
IUK
Working groups (GB/ Bel/ NL) ?
Ofgem NGGACM GTS
BBL
Shared issues Shared issues
GB issues
Need to consider with Irish NRAs- Moffat