Gdansk’s cycling success story - European...

Post on 22-Jun-2020

1 views 0 download

transcript

Gdansk’s cycling success story

Krzysztof Perycz-SzczepańskiBrussels, 23.11.2016

2

The Urban Development NetworkInspire, innovate and exchange

15%bicycle share in modal split

GRPI-P, BYPAD, STeRfrom consultation to public participation

public participation

Charter of Gdańsk, Charter of Brussels,

Mobility and Transport,PUMA

political will

Infrastructure funds,promotion,

internal resources

investments and promotion

Cycling policy of Gdansk

3

The Urban Development NetworkInspire, innovate and exchange

Gdansk’scitizens

NGO

Participative civic budget

Political will

STeR

Promotion

investments

media

BYPAD

Cycling May Bike to

work

Gdansk’s cycling synergy

Qualified staff

4

The Urban Development NetworkInspire, innovate and exchange

Public participation

5

The Urban Development NetworkInspire, innovate and exchange

- 19 workshop sessions with residents

- 640 proposals submitted

Public participation - STeR

6

The Urban Development NetworkInspire, innovate and exchange

20th Critical Mass in Gdansk

6th Metro Critical Mass

Public participation

15 000 participants

7

The Urban Development NetworkInspire, innovate and exchange

• 4200 participants

• 826 806 km cycled

• 132 companies

• 16 high schools

• 27 gymnasiums

Europan Cycling Challenge 2016

8

The Urban Development NetworkInspire, innovate and exchange

Civic budget – the winning project

9

The Urban Development NetworkInspire, innovate and exchange

Political will

10

The Urban Development NetworkInspire, innovate and exchange

Raise up to 15% of the share of cycling in the modal split by 2020

Charter of Brussels and Gdansk’s Charter of Active Mobility

11

The Urban Development NetworkInspire, innovate and exchange

Political will

BYPAD

12

The Urban Development NetworkInspire, innovate and exchange

Velo-city Conference

Brussels 2009 - (3) OR, UMG, MdR, PSWE,Copenhagen 2010- (3) Prezydent, RMG, OR, PSWE, Seville 2011 - (4) OR, UMG, ZDiZ, BRG, PSWE, Vancouver 2012 - (2) Z-ca Prezydenta, OR, PUMA,Wien 2013 - (12) Z-ca Prezydenta, RMG, OR, UMG, ZDiZ, PUMA

OR – Oficer Rowerowy, UMG – Urząd Miejski w Gdańsku, RMG – Radni Miasta Gdańska, BRG – Biuro Rozwoju Gdańska, ZDiZ – Zarząd Dróg i Zieleni w Gdańsku, PSWE – Pomorskie Stowarzyszenie Wspólna Europa, PUMA – Polska Unia Mobilności Aktywnej, MdR – Miasta dla Rowerów

13

The Urban Development NetworkInspire, innovate and exchange

7 editions

1600participants

Active Mobility Congress

14

The Urban Development NetworkInspire, innovate and exchange

Participation in EU projects

ADFC, Gdańsk, Kalmar, PUMA, Rostock

Gdańsk, Krajn, Lipsk, Lizbona, Londyn, Pireus, Politechnika Ateńska

Centrum Dopravniho Vyzkumu (Brno), Drezno, Gdańsk, Lipsk, Pardubice, Politechnika Drezdeńska, PUMA, Tczew, Uherské Hradiště

Antwerpia, BOKU, EIP, Europejska Federacja Cyklistów, Gdańsk, Intelligent Health, Londyn, Rupprecht Consult, San Sebastian, Słoweńska Agencja Zdrowia, Walk 21, Wiedeń

5 further applications

COMENIUS – Central Europe,BSR-electric – Interreg Baltic Sea Region,AREA 21 – Interreg Baltic Sea Region,cities.multimodal – Interreg Baltic Sea Region,SuMo– Central Europe,

Bolonia, Funchal, Gdańsk, Interactions (Dublin), ISIS (Rzym), Politechnika Berlińska, Tallinn, Utrecht, Velomondial (Amsterdam)

Almada, Bratysława, Frankfurt, Gdańsk, Graz, Kłajpeda, Larnaka, Londyn, Maribor, Rotterdam, Serres, Sofia, Sztokholm, Timiszoara, Treviso

15

The Urban Development NetworkInspire, innovate and exchange

Investments and promotion

16

The Urban Development NetworkInspire, innovate and exchange

Cycling routes 2008

17

The Urban Development NetworkInspire, innovate and exchange

Cycling routes 2016

624 kmof cycling routes

118 km

17 km

29 km

12 km

47 km

7 km

440 km

+

+

+

18

The Urban Development NetworkInspire, innovate and exchange

19 mln euro35 km of cycling paths26 hubs and parking facilities

Infrastructure – cycling paths and parking facilities

Development of Cycling Traffic in Tricity AgglomerationOP 2007-2013

19

The Urban Development NetworkInspire, innovate and exchange

• separate bike lanes in the street

• bike boxes before the intersections

• dedicated cycling traffic lights

• Copenhagen left turns

The first cycling friendly street in Poland

20

The Urban Development NetworkInspire, innovate and exchange

Parking facilities

Parking rowerowy przy PKM Brętowo: 28 mp.Parking rowerowy przy ZOO: 36 mp.

Stojaki rowerowe na Głównym Mieście: 164 mp.

21

The Urban Development NetworkInspire, innovate and exchange

Parking facilities

4300bike racks

22

The Urban Development NetworkInspire, innovate and exchange

Get the U-Lock

700 U-Locks

Promotion of safety parking

23

The Urban Development NetworkInspire, innovate and exchange

Bicycle parking facilities

Cycling May 2016: 1000 pupils cycle to Primary School no 12

24

The Urban Development NetworkInspire, innovate and exchange

„Invisible” infrastructure – cycling counter flow

25

The Urban Development NetworkInspire, innovate and exchange

204 streets (47 km)Aksamitna, Aldony, Arkońska, Asnyka, Augustyńskiego, Bacha, Bałtycka, Bielańska, Bohaterów Getta Warszawskiego, Borówkowa, Bosmańska, Bracka, Burzyńskiego, Ceynowy, Chabrowa, Chwaszczyńska, Czeremchowa, Czopowa, Ćwiklińskiej, Dekerta, Długosza, Dolna, Domeyki, Dygasińskiego, Dylinki, Dzielna, Elewów, Floriańska, Fredry, Galla, Garncarska, Głęboka, Gościnna, Góreckiego, Grażyny, Grodzieńska, Gustkowicza, Hallera, Heweliusza, Hołdu Pruskiego, Jesionowa, Kadetów, Kaprów, Karłowicza, Karmelicka, Kisielewskiego, Klonowicza, Kochanowskiego, Kołłątaja, Komandorska, Konarskiego, Konwalii, Korczaka, Korzeniowskiego, Kossaka, Kotarbińskiego, Kotwiczników, Kraszewskiego, Krzemienieckiej, Kurpińskiego, Latarniana, Lawendowa, Łanowa, Łąkowa, Macierzankowa, Majewskich, Malczewskiego, Małachowskiego, Manifestu Połanieckiego, Matki Polki, Mazurska, Meissnera, Michny, Miedza, Mniszki, Moniuszki, Mostek, Mozarta, Mylna, Na Piaskach, Na Szańcach, Nadwodna, Necla, Niedźwiednik, Niemcewicza, Nowogródzka, Nowowiejskiego, Obywatelska, Ogarna, Okrąg, Oliwska, Olszewskiego, Osterwy, Otwarta, Pana Tadeusza, Pańska, Pileckiego, Pilotów, Piramowicza, Plac Wałowy, Plater, Plebania, Płowce, Podbielańska, Podhalańska, Podkramarska, Politechniczna, Porzeczkowa, Poziomkowa, Prusa, Przetoczna, Przędzalnicza, Przytulna, Pułaskiego, Puszkina, Refektarska, Reymonta, Rybaki Dolne, Rybaki Górne, Rzeźnicka, Schopenhauera, Schumana, Sielska, Sienkiewicza, Sienna, Sieroca, Słodowników, Słupska, Sobótki, Spichrzowa, Stare Domki, Starowiejska, Starowiślna, Startowa, Staszica, Stągiewna, Sternicza, Stolarska, Straganiarska, Subisława, Sukiennicza, Sympatyczna, Szczecińska, Szewska, Szklana Huta, Szklary, Śląska, Świerkowa, Świętego Ducha, Świętojańska, Świtezianki, Tartaczna, Tokarska, Topolowa, Trubadurów, Tylewskiego, Tysiąclecia, Wagnera, Wajdeloty, Walecznych, Wallenroda, Wassowskiego, Wesoła, Węglarska, Wieniawskiego, Wileńska, Wilków Morskich, Władysławowska, Własna Strzecha, Wojskiego, Wróbla, Wróblewskiego, Wspólna, Wygon, Wyspiańskiego, Zakopiańska, Za Murami, Zelwerowicza, Zgody I, Zgody II, Złotników, Żabi Kruk, Żeleńskiego, Żwirki i Wigury, Żywiecka

„Invisible” infrastructure – cycling counter flow

2016

26

The Urban Development NetworkInspire, innovate and exchange

Overtake safely

107 x

27

The Urban Development NetworkInspire, innovate and exchange

Free of charge bike maps

2012 – 165 tys. egz.

2007

–14

tys.

egz

.

2013

–99

tys.

egz

.

2014 –10 tys. egz.

2015 – 25 tys. egz.

2014

–16

tys.

egz

.

2015

–6

tys.

egz

.

341 000m a p s 2016 – 6 tys. egz.

28

The Urban Development NetworkInspire, innovate and exchange

Efect

29

The Urban Development NetworkInspire, innovate and exchange29

Share of cycling in modal structure

30

The Urban Development NetworkInspire, innovate and exchange

danetotal 2015

daily record

ul. Jantarowa 883 179 10 429

Al. Zwycięstwa 826 336 6 434

ul. 3 Maja 578 302 4 137

Al. Grunwaldzka 505 505 3 480

Total

Cycling traffic measurements

2 793 k.

31

The Urban Development NetworkInspire, innovate and exchange

Cyclists’ safety

100

120

133

148

162

97101 99

9498

60

80

100

120

140

160

180

2011 2012 2013 2014 2015

dynamika ruchurowerowego

wypadki z udziałemrowerzystów

3 fatal accidentsduring 6 years

1 collision in the bicycle counter flow

32

The Urban Development NetworkInspire, innovate and exchange

Cycling May

61

22 316

2014

Cycling activity*

Cycling frequency**

* odsetek uczniów, którzy przynajmniej raz przyjechali do szkoły na rowerze** odsetek możliwych przyjazdów

25

2016

1703

76%23%

50%14%

35

The Urban Development NetworkInspire, innovate and exchange

European Cycling Challenge

36

The Urban Development NetworkInspire, innovate and exchange[km]

37

The Urban Development NetworkInspire, innovate and exchange

Thank you

Krzysztof Perycz-Szczepański – City of Gdańskcontact: krzysztof.perycz-szczepanski@gdansk.gda.pl tel.: +48 58 526-80-83