Post on 22-Apr-2019
transcript
B
B
B
LP
SC
RS
RS
LP
RS
Mkr
SC
LP
dis
RS
B
B
SC
SC
SC
SC
LP
LP
LP
B
B
LP
LP
Paving
LP
B
LP
LP
B
B
B
Bin
LP
LP
G
SC
Concrete
SC
LP
LP
Paving
LP
RS
LP
SC
GV
GV
GV
GV
B
B
B
B
SC
RS
BB
RS
LP
B
B
B
Mkr
RS
Grass
B
B
B
LP
SC
RS
RS
LP
Grass
SC
B
B
LP
B
B
B
LP
RS
GV
LP
B
B
B
LP
RS
B
B
Tactile
RS
B
LP
SC
RS
LP
B
B
B
B
B
B
B
GV
LP
RS
B
B
B
B
B
B
B
B
RS
LP
LP
RS
TP
B
B
B
B
B
B
Mkr
LP
RS
RS
LP
LP
Bin
RS
B
B
LP
LP
Grass
LP
RS
B
LP
TP
RS
RS
LP
LP
RS
Tactile
Asphalt
Tactile
BB
BB
B
Tactile
Grass
Tactile
Paving
B
B
Paving
Paving
Asphalt
B
B
Tactile
Paving
Paving
B
B
B
Asphalt
Asphalt
RS
Paving
Asphalt
P
a
v
in
g
Grass
BU
S
ST
OP
SA
FLE
BW
S
RS
Grass
Grass
Grass
Asphalt
Asphalt
C
oncrete
RS
Grass
T
a
c
tile
B
lo
ck p
a
vin
g
B
lo
c
k
p
a
v
in
g
Asphalt
Asphalt
Grass
Tactile
BB
BB
Tactile
Asphalt
T
a
c
tile
D
rainage channel
D
rainage channel
B
B
B
B
Asp
B
B
Stump
RS
LP
Paving
Asphalt
Grass
Tactile
Paving
Asphalt
LP
Grass
B
l
o
c
k
w
a
l
l
h
t
1
.
3
m
Tactile
Block paving
Post
Post
G
rass
Post
Tactile
Tactile
Concrete
R
a
i
l
i
n
g
s
h
t
1
.
1
m
W
o
o
d
p
o
s
t / w
o
o
d
ra
il h
t 1
.4
m
C
o
n
c
r
e
t
e
b
lo
c
k
LP
Railings ht 1.1m
W
o
o
d
p
o
st / w
o
o
d
ra
il h
t 1
.4
m
Paving
G
ra
s
s
Concrete
Paving
Post box
Grass
S
ig
n
S
i
g
n
SC
Paving
SC
Paving
Grass
Concrete
Grass
TV
Grass
SC
SC
Concrete
Grass
Grass
Post
Post
Asphalt
B
lo
c
k
re
ta
in
in
g
w
a
ll h
t 0
.7
m
Paving
Block paving
Concrete
TV
Post
Post
Mkr
SC
TV
RS
Paving
Concrete
Asphalt
Grass
B
r
ic
k
w
a
ll h
t 1
.8
m
Paving
Concrete
Concrete
Paving
Concrete
Concrete
Paving
Concrete
Asphalt
Paving
Concrete
Asphalt
Paving
Asphalt
Grass
Concrete
Grass
Grass
RS
Grass
Asphalt
C
o
n
c
re
te
Grass
B
r
ic
k
w
a
ll h
t 2
.1
m
B
lo
ck re
ta
in
in
g
w
a
ll h
t 0
.4
m
TP
Paving
Grass
W
o
o
d
p
o
s
t / c
lo
s
e
b
o
a
rd
e
d
h
t 2
.0
m
Grass Post
Post
TV
Post
Concrete
Concrete
Paving
Grass
TV
Post
Post
Concrete
Concrete
Grass
Concrete
Paving
Post
Post
Grass
TV
Post
Post
Concrete
SC
TP
Grass
Paving
TV
Grass
Grass
Paving
TV
TV
Post
Tactile
Blo
ck p
avin
g
Block paving
Tactile
Asphalt
Sign
B
r
i
c
k
w
a
l
l
h
t
1
.
8
m
Grass
Paving
TV
Grass
SC
TV
Concrete
Grass
Concrete
Grass
Grass
LP
Concrete
Grass
Paving
Paving
Concrete
Paving
LP
S
t
o
n
e
r
e
t
a
i
n
i
n
g
w
a
l
l
h
t
1
.
0
m
Grass
Grass
Grass
R
ailings ht 1.8m
R
a
i
l
i
n
g
s
h
t
1
.
8
m
R
a
i
l
i
n
g
s
h
t
1
.
8
m
R
a
i
l
i
n
g
s
h
t
1
.
8
m
R
a
i
l
i
n
g
s
h
t
1
.
8
m
Concrete
Asphalt
Asphalt
Post
Post
Post
Post
Asphalt
Post
Post
Paving
Grass
Grass
Concrete
G
SC
Post
Concrete
Post
Grass
Concrete
Paving
TV
Concrete
Grass
Blo
ck w
all h
t 1
.0
m
Concrete
Post
Post
Block w
all ht 0.4m
Post
Grass
Grass
Paving
Asphalt
Sign
Grass
Paving
Rough ground
Grass
Mkr
GV
LP
Block paving
Block paving
Tactile
Grass
Mkr
Asphalt
Asphalt
Paving
Post
Mobile phone mast
B
o
x
B
o
x
B
o
x
Tactile
Mobile phone mast
Grass
Asphalt
Paving
Asphalt
T
a
c
t
i
l
e
Grass
Grass
Grass
GV
GV
GV
GV
Tactile
Tactile
B
GV
B
RS
B
B
Grass
Asphalt
Grass
Paving
Concrete
Paving
C
oncrete
Tactile
Bin
Paving
Grass
RS
Grass
Paving
Asphalt
Tactile
Asphalt
RS
Grass
Bin
Paving
Grass
Asphalt
Tactile
Block paving
B
lo
ck p
avin
g
B
ox
Box
Paving
Asphalt
Paving
Asphalt
Bin
Paving
Tactile
Asphalt
B
B
Asphalt B
B
Tactile
C
o
n
cre
te
Post
Post
Asphalt
Concrete
TP
Post
Post
SC
TV
Paving
Tactile
Asphalt
Post
Post
Post
Tactile
Asphalt
R
ailings ht 1.5m
Paving
Grass
Grass
Tactile
Asphalt
Tactile
Asphalt
Tactile
Asphalt
Asphalt
D
rainage channel
D
ra
in
a
g
e
c
h
a
n
n
e
l
Stone retaining wall ht 1.2m
Asphalt
Concrete
Asphalt
Post
Post
R
a
ilin
g
s h
t 1
.5
m
Railings ht 1.5m
Railings ht 1.5m
Tactile
Bin
Sig
n
RS
LP
Brick retaining w
all ht 0.7m
Railings ht 1.8m
Railings ht 1.8m
RS
LP
B
Post
Grass
Asphalt
RS
LP
Paving
B
o
x
B
o
x
B
lo
c
k
w
a
ll h
t 1
.5
m
Block paving
B
o
x
Box
Tactile
SC
TV
TV
TV
Paving
Grass
Speed table
Paving
Concrete
GV
GV
IC
IC
GV
GV
GV
Paving
Concrete
Paving
Concrete
G
G
TV
BT
G
TV
SV
FH
BT
IC
TV
G
G
BT
TV
G
G
G
G
FH
IC
BT
FH
TV
G
TV
BT
BT
G
G
BT
G
G
G
FH
G
G
G
G
G
BT
BB
BB
Tactile
20
Paving
Tactile
Pa
v
Post
TP
Mkr
B
ox
Paving
Paving
SC
Asphalt
Speed table
Post
Post
G
Paving
Post
SC
Post
Post
Paving
Paving
Grass
Concrete
Post
Brick w
all ht 1.1m
Grass
B
o
x
Paving
Post
C
oncrete
block
Asphalt
Grass
Asphalt
Grass
Asphalt
B
o
x
MH
CL 34.53
MH
CL 32.75
W
o
o
d
p
o
s
t / w
o
o
d
r
a
il
h
t 1
.7
m
G
Digital
speed sign
Paving
Concrete
A
s
p
h
a
lt
MH
CL 30.33
MH
CL 27.98
MH
CL 28.85
MH
CL 30.28
G
MH
CL 28.56
MH
CL 28.62
MH
CL 28.34
MH
CL 28.42
G
IC
G
IC
G
IC
G
MH
CL 26.94
MH
CL 27.59
MH
CL 26.87
FH
G
BT
FH
TV
TV
G
IC
Box
G
G
BTTV
FH
G
BT
FH
SV
G
BT
G
SV
FH
SV
BT
Box
Box
Box
IC
G
MH
CL 27.46
MH
CL 27.64
MH
CL 27.25
MH
CL 27.19
MH
CL 26.93
G
TV
G
TV
BT
TV
MH
CL 26.80
Box
Box
G
MH
CL 26.81
BT
TV
G
TV
FH
IC
BT
G
G
MH
CL 25.57
G
BT
MH
CL 24.65
G
G
BT
MH
CL 24.50
G
IC
BT
KO
MH
CL 24.30
Asphalt
LP
G
G
G
G
G
G
Asphalt
G
G
G
RS
G
Tactile
G
G
G
IC
G
G
B
B
Paving
D
r
a
in
a
g
e
c
h
a
n
n
e
l
D
r
a
in
a
g
e
c
h
a
n
n
e
l
G
G
Asphalt
G
RS
G
G
G
G
G
Paving
Asphalt
Paving
LP
G
G
G
G
Asphalt
Block
paving Block
paving
Concrete
RS
RS
Asphalt
G
Asphalt
Paving
G
Asphalt
Asphalt
G
MH
CL 26.73
RS
Asphalt
Tactile
Paving
Asphalt
Tactile
BB
BB
Asphalt
Tactile
LP
G
Paving
G
G
Tactile
RS
Paving
Paving
RS
G
Bin
B
B
lo
c
k
p
a
v
in
g
B
lo
c
k
p
a
v
in
g
RS
R
ailings ht 1.5m
G
SC
Railings ht 1.0m
RS
Asphalt
Asphalt
Paving
MH
CL 26.91
Paving
W
A
T
E
R
H
IL
L
R
O
A
D
W
A
TE
R
H
ILL R
O
A
D
PLA
S-M
AW
R R
OA
D
H
A
Z
E
L
P
L
A
C
E
PENTREBANE ROAD
PW
LLM
ELIN
R
O
AD
P
W
L
L
M
E
L
IN
R
O
A
D
P
W
L
L
M
E
L
I
N
R
O
A
D
P
W
L
L
M
E
L
I
N
R
O
A
D
B
R
A
C
K
E
N
P
L
A
C
E
B
R
A
C
K
E
N
P
L
A
C
E
K
E
Y
T
O
N
R
O
A
D
B
lo
c
k
w
a
ll
Railings ht 1.0m
SV
G
PLA
S-M
AW
R R
O
AD
C
oncrete
P
LA
S
-M
A
W
R
R
O
A
D
G
G
G
G
G
LP
G
G
G
G
G
G
G
MH
CL 27.23
G
Concrete
Bus shelter
B
u
s
s
h
e
lte
r
Bus shelter
Bus shelter
Bus shelter
20
20
MH
CL 27.08
A
rm
co
h
t 0
.6
m
A
rm
c
o
h
t 0
.6
m
Asphalt
C
o
n
c
r
e
t
e
b
l
o
c
k
Asphalt
Asphalt
Paving
Concrete
Asphalt Grass
Grass
Concrete
Paving
Paving
W
ood post / w
ood rail
ht 1.7m
Step
W
o
o
d
p
o
st / clo
se
b
o
a
rd
e
d
h
t 1
.8
m
Paving
Grass
Steps
W
ood post / w
ood rail
ht 1.7m
Paving
W
ood post / w
ood rail
ht 1.7m
Paving
B
rick w
all hight varies
Paving
Block w
all
Brick w
all ht 1.3m
TV
Block w
all ht 0.4m
Stone w
all ht 0.9m
Brick w
all
Brick w
all hight varies
Paving
Blo
ck w
all h
t 1
.0
m
`
Brick w
all h
t 0
.9
m
Grass
Blo
ck w
all h
t 0
.4
m
Blo
ck w
all h
t 0
.4
m
Paving
Brick w
all
Block w
all ht varies
Paving
Block w
all
Paving
R
a
i
l
i
n
g
s
h
t
1
.
8
m
R
a
ilin
g
s
h
t 1
.8
m
Grass
Grass
Grass
MH
CL 27.78
B
r
i
c
k
w
a
l
l
h
t
1
.
8
m
B
r
ic
k
w
a
ll
h
t
1
.
8
m
B
r
ic
k
w
a
ll h
t 1
.8
m
Paving
B
ric
k
w
a
ll h
t 1
.8
m
Brick w
all ht 1.8m
Wood post /
wood rail ht 1.4m
LP
R
a
ilin
g
s
h
t 1
.8
m
R
a
ilin
g
s
h
t 1
.8
m
IC
Asphalt
Asphalt
Asphalt
Asphalt
Asphalt
Asphalt
Asphalt
Asphalt
Asphalt
Asphalt
Asphalt
Asphalt
Asphalt
Grass
Grass
Grass
Grass
Grass
Asphalt
Grass
Grass
Grass
Grass
Paving
Grass
Grass
Railings ht 1.4m
Asphalt
B
Asphalt
Asphalt
Asphalt
Paving
Paving
Asphalt
Paving
Asphalt
Paving
Grass
Asphalt
Asphalt
Paving
G
LP
G
Asphalt
Asphalt
Asphalt
P
E
N
T
R
E
B
A
N
E
R
O
A
D
B
lo
c
k
p
a
v
in
g
B
lo
c
k
p
a
v
in
g
Asphalt
B
rick w
a
ll h
t 1
.1
m
Tactile
Asphalt
Concrete
Concrete
Grass
Asphalt
Grass
Post
Concrete
Paving
Paving
Grass
Asphalt
Grass
Paving
Tactile
Paving
Paving
Grass
WA
TE
RH
ILL R
OA
D
W
AT
ER
HILL R
OA
D
GV
GV
Asphalt
Asphalt
BB
Asphalt
BB
Asphalt
Tactile
Tactile
Asphalt
Asphalt
Culvert
Asphalt
TP
TP
para left v150
SC
end of v
Asphalt
TV
TV
TV
Post
Post
SC
SC
TV
TP
Asphalt
Paving
GV
Asphalt
SC
SC
Post
TV
Asphalt
SC
SC
RS
Asphalt
Concrete
Block w
all ht 0.5m
TV
Asphalt
Sign
Post
Post
Paving
TV
Block wall ht 0.8m
SC
Post
Post
Asphalt
SC
Paving
TV
Asphalt
Concrete
Asphalt
Paving
Block wall ht 0.7m
Post
Post
Post
Post
SC
SC
Post
Post
Concrete
Paving
Post
Asphalt
TV
Post
Block w
all ht 0.3m
Post
Block wall ht 0.8m
Block w
all ht 0.4m
Brick wall ht 0.8m
TV
Post
Paving
LP
SC
Post
Post
Asphalt
Asphalt
Block wall ht 0.9m
LP
Concrete
Asphalt
Block retaining w
all ht 1.0m
Paving
S
i
g
n
TP
TV
G
BT
TV
G
G
MH
CL 30.15
TV
Asphalt
G
Concrete
Concrete
Block w
all ht 0.4m
Post
Concrete
SC
Post
Asphalt
Asphalt
G
Paving
Paving
G
Paving
Concrete
Paving
Asphalt
C
O
S
H
E
S
T
O
N
R
O
A
D
Post
Paving
LP
Concrete
Block w
all ht 0.5m
TV
Concrete
Post
Post
Post
Paving
Asphalt
Asphalt
Paving
Post
Post
Post
Post
Asphalt
Paving
TV
B
lo
c
k
w
a
ll h
t 0
.5
m
Post
Post
Post
Post TV
Pav.
Post
Post
Post
Post
Paving
Block w
all ht 0.8m
Post
Post
Post
Concrete
B
lock w
all ht 0.8m
Concrete
B
lock w
all ht 0.8m
Asphalt
Asphalt
Paving
Block wall
G
BT
TV
Box
Block wall ht 1.0m
Asphalt
TV
TV
Block wall ht 0.1m
LP
GV
Post
Paving
Asphalt
LP
TV
Concrete
Paving
B
lo
ck w
a
ll h
t 0
.7
m
TV
Concrete
Asphalt
G
Post
TV
Post
Asphalt
G
TV
TV
Concrete
Post
Paving
FH
G
Concrete
Asphalt
SC
Paving
A
s
p
h
a
lt
Post
Post
Concrete
Post
Asphalt
Paving
TV
Post
B
lo
c
k
w
a
ll h
t 0
.4
m
SC
SC
Concrete
Post
Post
Post box
TV
Post
Post
TV
Post
Post
Paving
TV
SC
SC
SC
TV
Post
Concrete
PavingA
s
p
h
a
lt
SC
SC
Paving
B
lo
c
k
w
a
ll h
t 0
.4
m
B
ric
k
w
a
ll h
t 1
.0
m
BT
TV
Box
TV
G
Asphalt
Paving
LP
SC
TP
LP
Bus stop
B
r
ic
k
w
a
ll h
t 0
.7
m
Iro
n
ra
ilin
g
s
1
.1
m
o
n
to
p
BT
B
r
ic
k
w
a
ll h
t 0
.7
m
Ir
o
n
r
a
ilin
g
s
1
.1
m
o
n
to
p
C
A
R
T
E
R
P
L
A
C
E
G
Post
Concrete
A
s
p
h
a
lt
G
TP
TV
G
Asphalt
FH
SC
G
S
ig
n
B
lo
c
k
w
a
ll h
t 0
.4
m
Paving
TV
B
lo
c
k
w
a
ll h
t 0
.9
m
BT
LP
Bus stop
K
E
Y
S
T
O
N
R
O
A
D
K
E
Y
S
T
O
N
R
O
A
D
Block wall ht 0.1m
K
E
Y
S
T
O
N
R
O
A
D
B
B
B
LP
SC
RS
RS
LP
RS
Mkr
SC
LP
dis
RS
B
B
SC
SC
SC
SC
LP
LP
LP
B
B
LP
LP
Paving
LP
B
LP
LP
B
B
B
Bin
LP
LP
G
SC
Concrete
SC
LP
LP
Paving
LP
RS
LP
SC
GV
GV
GV
GV
B
B
B
B
SC
RS
BB
RS
LP
B
B
B
Mkr
RS
Grass
B
B
B
LP
SC
RS
RS
LP
Grass
SC
B
B
LP
B
B
B
LP
RS
GV
LP
B
B
B
LP
RS
B
B
Tactile
RS
B
LP
SC
RS
LP
B
B
B
B
B
B
B
GV
LP
RS
B
B
B
B
B
B
B
B
RS
LP
LP
RS
TP
B
B
B
B
B
B
Mkr
LP
RS
RS
LP
LP
Bin
RS
B
B
LP
LP
Grass
LP
RS
B
LP
TP
RS
RS
LP
LP
RS
Tactile
Asphalt
Tactile
BB
BB
B
Tactile
Grass
Tactile
Paving
B
B
Paving
Paving
Asphalt
B
B
Tactile
Paving
Paving
B
B
B
Asphalt
Asphalt
RS
Paving
Asphalt
P
a
v
in
g
Grass
BU
S
ST
OP
SA
FLE
BW
S
RS
Grass
Grass
Grass
Asphalt
Asphalt
C
oncrete
RS
Grass
T
a
c
tile
B
lo
ck p
a
vin
g
B
lo
c
k
p
a
v
in
g
Asphalt
Asphalt
Grass
Tactile
BB
BB
Tactile
Asphalt
T
a
c
tile
D
rainage channel
D
rainage channel
B
B
B
B
Asp
B
B
Stump
RS
LP
Paving
Asphalt
Grass
Tactile
Paving
Asphalt
LP
Grass
B
l
o
c
k
w
a
l
l
h
t
1
.
3
m
Tactile
Block paving
Post
Post
G
rass
Post
Tactile
Tactile
Concrete
R
a
i
l
i
n
g
s
h
t
1
.
1
m
W
o
o
d
p
o
s
t / w
o
o
d
ra
il h
t 1
.4
m
C
o
n
c
r
e
t
e
b
lo
c
k
LP
Railings ht 1.1m
W
o
o
d
p
o
st / w
o
o
d
ra
il h
t 1
.4
m
Paving
G
ra
s
s
Concrete
Paving
Post box
Grass
S
ig
n
S
i
g
n
SC
Paving
SC
Paving
Grass
Concrete
Grass
TV
Grass
SC
SC
Concrete
Grass
Grass
Post
Post
Asphalt
B
lo
c
k
re
ta
in
in
g
w
a
ll h
t 0
.7
m
Paving
Block paving
Concrete
TV
Post
Post
Mkr
SC
TV
RS
Paving
Concrete
Asphalt
Grass
B
r
ic
k
w
a
ll h
t 1
.8
m
Paving
Concrete
Concrete
Paving
Concrete
Concrete
Paving
Concrete
Asphalt
Paving
Concrete
Asphalt
Paving
Asphalt
Grass
Concrete
Grass
Grass
RS
Grass
Asphalt
C
o
n
c
re
te
Grass
B
r
ic
k
w
a
ll h
t 2
.1
m
B
lo
ck re
ta
in
in
g
w
a
ll h
t 0
.4
m
TP
Paving
Grass
W
o
o
d
p
o
s
t / c
lo
s
e
b
o
a
rd
e
d
h
t 2
.0
m
Grass Post
Post
TV
Post
Concrete
Concrete
Paving
Grass
TV
Post
Post
Concrete
Concrete
Grass
Concrete
Paving
Post
Post
Grass
TV
Post
Post
Concrete
SC
TP
Grass
Paving
TV
Grass
Grass
Paving
TV
TV
Post
Tactile
Blo
ck p
avin
g
Block paving
Tactile
Asphalt
Sign
B
r
i
c
k
w
a
l
l
h
t
1
.
8
m
Grass
Paving
TV
Grass
SC
TV
Concrete
Grass
Concrete
Grass
Grass
LP
Concrete
Grass
Paving
Paving
Concrete
Paving
LP
S
t
o
n
e
r
e
t
a
i
n
i
n
g
w
a
l
l
h
t
1
.
0
m
Grass
Grass
Grass
R
ailings ht 1.8m
R
a
i
l
i
n
g
s
h
t
1
.
8
m
R
a
i
l
i
n
g
s
h
t
1
.
8
m
R
a
i
l
i
n
g
s
h
t
1
.
8
m
R
a
i
l
i
n
g
s
h
t
1
.
8
m
Concrete
Asphalt
Asphalt
Post
Post
Post
Post
Asphalt
Post
Post
Paving
Grass
Grass
Concrete
G
SC
Post
Concrete
Post
Grass
Concrete
Paving
TV
Concrete
Grass
Blo
ck w
all h
t 1
.0
m
Concrete
Post
Post
Block w
all ht 0.4m
Post
Grass
Grass
Paving
Asphalt
Sign
Grass
Paving
Rough ground
Grass
Mkr
GV
LP
Block paving
Block paving
Tactile
Grass
Mkr
Asphalt
Asphalt
Paving
Post
Mobile phone mast
B
o
x
B
o
x
B
o
x
Tactile
Mobile phone mast
Grass
Asphalt
Paving
Asphalt
T
a
c
t
i
l
e
Grass
Grass
Grass
GV
GV
GV
GV
Tactile
Tactile
B
GV
B
RS
B
B
Grass
Asphalt
Grass
Paving
Concrete
Paving
C
oncrete
Tactile
Bin
Paving
Grass
RS
Grass
Paving
Asphalt
Tactile
Asphalt
RS
Grass
Bin
Paving
Grass
Asphalt
Tactile
Block paving
B
lo
ck p
avin
g
B
ox
Box
Paving
Asphalt
Paving
Asphalt
Bin
Paving
Tactile
Asphalt
B
B
Asphalt B
B
Tactile
C
o
n
cre
te
Post
Post
Asphalt
Concrete
TP
Post
Post
SC
TV
Paving
Tactile
Asphalt
Post
Post
Post
Tactile
Asphalt
R
ailings ht 1.5m
Paving
Grass
Grass
Tactile
Asphalt
Tactile
Asphalt
Tactile
Asphalt
Asphalt
D
rainage channel
D
ra
in
a
g
e
c
h
a
n
n
e
l
Stone retaining wall ht 1.2m
Asphalt
Concrete
Asphalt
Post
Post
R
a
ilin
g
s h
t 1
.5
m
Railings ht 1.5m
Railings ht 1.5m
Tactile
Bin
Sig
n
RS
LP
Brick retaining w
all ht 0.7m
Railings ht 1.8m
Railings ht 1.8m
RS
LP
B
Post
Grass
Asphalt
RS
LP
Paving
B
o
x
B
o
x
B
lo
c
k
w
a
ll h
t 1
.5
m
Block paving
B
o
x
Box
Tactile
SC
TV
TV
TV
Paving
Grass
Speed table
Paving
Concrete
GV
GV
IC
IC
GV
GV
GV
Paving
Concrete
Paving
Concrete
G
G
TV
BT
G
TV
SV
FH
BT
IC
TV
G
G
BT
TV
G
G
G
G
FH
IC
BT
FH
TV
G
TV
BT
BT
G
G
BT
G
G
G
FH
G
G
G
G
G
BT
BB
BB
Tactile
20
Paving
Tactile
Pa
v
Post
TP
Mkr
B
ox
Paving
Paving
SC
Asphalt
Speed table
Post
Post
G
Paving
Post
SC
Post
Post
Paving
Paving
Grass
Concrete
Post
Brick w
all ht 1.1m
Grass
B
o
x
Paving
Post
C
oncrete
block
Asphalt
Grass
Asphalt
Grass
Asphalt
B
o
x
MH
CL 34.53
MH
CL 32.75
W
o
o
d
p
o
s
t / w
o
o
d
r
a
il
h
t 1
.7
m
G
Digital
speed sign
Paving
Concrete
A
s
p
h
a
lt
MH
CL 30.33
MH
CL 27.98
MH
CL 28.85
MH
CL 30.28
G
MH
CL 28.56
MH
CL 28.62
MH
CL 28.34
MH
CL 28.42
G
IC
G
IC
G
IC
G
MH
CL 26.94
MH
CL 27.59
MH
CL 26.87
FH
G
BT
FH
TV
TV
G
IC
Box
G
G
BTTV
FH
G
BT
FH
SV
G
BT
G
SV
FH
SV
BT
Box
Box
Box
IC
G
MH
CL 27.46
MH
CL 27.64
MH
CL 27.25
MH
CL 27.19
MH
CL 26.93
G
TV
G
TV
BT
TV
MH
CL 26.80
Box
Box
G
MH
CL 26.81
BT
TV
G
TV
FH
IC
BT
G
G
MH
CL 25.57
G
BT
MH
CL 24.65
G
G
BT
MH
CL 24.50
G
IC
BT
KO
MH
CL 24.30
Asphalt
LP
G
G
G
G
G
G
Asphalt
G
G
G
RS
G
Tactile
G
G
G
IC
G
G
B
B
Paving
D
r
a
in
a
g
e
c
h
a
n
n
e
l
D
r
a
in
a
g
e
c
h
a
n
n
e
l
G
G
Asphalt
G
RS
G
G
G
G
G
Paving
Asphalt
Paving
LP
G
G
G
G
Asphalt
Block
paving Block
paving
Concrete
RS
RS
Asphalt
G
Asphalt
Paving
G
Asphalt
Asphalt
G
MH
CL 26.73
RS
Asphalt
Tactile
Paving
Asphalt
Tactile
BB
BB
Asphalt
Tactile
LP
G
Paving
G
G
Tactile
RS
Paving
Paving
RS
G
Bin
B
B
lo
c
k
p
a
v
in
g
B
lo
c
k
p
a
v
in
g
RS
R
ailings ht 1.5m
G
SC
Railings ht 1.0m
RS
Asphalt
Asphalt
Paving
MH
CL 26.91
Paving
W
A
T
E
R
H
IL
L
R
O
A
D
W
A
TE
R
H
ILL R
O
A
D
PLA
S-M
AW
R R
OA
D
H
A
Z
E
L
P
L
A
C
E
PENTREBANE ROAD
PW
LLM
ELIN
R
O
AD
P
W
L
L
M
E
L
IN
R
O
A
D
P
W
L
L
M
E
L
I
N
R
O
A
D
P
W
L
L
M
E
L
I
N
R
O
A
D
B
R
A
C
K
E
N
P
L
A
C
E
B
R
A
C
K
E
N
P
L
A
C
E
K
E
Y
T
O
N
R
O
A
D
B
lo
c
k
w
a
ll
Railings ht 1.0m
SV
G
PLA
S-M
AW
R R
O
AD
C
oncrete
P
LA
S
-M
A
W
R
R
O
A
D
G
G
G
G
G
LP
G
G
G
G
G
G
G
MH
CL 27.23
G
Concrete
Bus shelter
B
u
s
s
h
e
lte
r
Bus shelter
Bus shelter
Bus shelter
20
20
MH
CL 27.08
A
rm
co
h
t 0
.6
m
A
rm
c
o
h
t 0
.6
m
Asphalt
C
o
n
c
r
e
t
e
b
l
o
c
k
Asphalt
Asphalt
Paving
Concrete
Asphalt Grass
Grass
Concrete
Paving
Paving
W
ood post / w
ood rail
ht 1.7m
Step
W
o
o
d
p
o
st / clo
se
b
o
a
rd
e
d
h
t 1
.8
m
Paving
Grass
Steps
W
ood post / w
ood rail
ht 1.7m
Paving
W
ood post / w
ood rail
ht 1.7m
Paving
B
rick w
all hight varies
Paving
Block w
all
Brick w
all ht 1.3m
TV
Block w
all ht 0.4m
Stone w
all ht 0.9m
Brick w
all
Brick w
all hight varies
Paving
Blo
ck w
all h
t 1
.0
m
`
Brick w
all h
t 0
.9
m
Grass
Blo
ck w
all h
t 0
.4
m
Blo
ck w
all h
t 0
.4
m
Paving
Brick w
all
Block w
all ht varies
Paving
Block w
all
Paving
R
a
i
l
i
n
g
s
h
t
1
.
8
m
R
a
ilin
g
s
h
t 1
.8
m
Grass
Grass
Grass
MH
CL 27.78
B
r
i
c
k
w
a
l
l
h
t
1
.
8
m
B
r
ic
k
w
a
ll
h
t
1
.
8
m
B
r
ic
k
w
a
ll h
t 1
.8
m
Paving
B
ric
k
w
a
ll h
t 1
.8
m
Brick w
all ht 1.8m
Wood post /
wood rail ht 1.4m
LP
R
a
ilin
g
s
h
t 1
.8
m
R
a
ilin
g
s
h
t 1
.8
m
IC
Asphalt
Asphalt
Asphalt
Asphalt
Asphalt
Asphalt
Asphalt
Asphalt
Asphalt
Asphalt
Asphalt
Asphalt
Asphalt
Grass
Grass
Grass
Grass
Grass
Asphalt
Grass
Grass
Grass
Grass
Paving
Grass
Grass
Railings ht 1.4m
Asphalt
B
Asphalt
Asphalt
Asphalt
Paving
Paving
Asphalt
Paving
Asphalt
Paving
Grass
Asphalt
Asphalt
Paving
G
LP
G
Asphalt
Asphalt
Asphalt
P
E
N
T
R
E
B
A
N
E
R
O
A
D
B
lo
c
k
p
a
v
in
g
B
lo
c
k
p
a
v
in
g
Asphalt
B
rick w
a
ll h
t 1
.1
m
Tactile
Asphalt
Concrete
Concrete
Grass
Asphalt
Grass
Post
Concrete
Paving
Paving
Grass
Asphalt
Grass
Paving
Tactile
Paving
Paving
Grass
WA
TE
RH
ILL R
OA
D
W
AT
ER
HILL R
OA
D
GV
GV
Asphalt
Asphalt
BB
Asphalt
BB
Asphalt
Tactile
Tactile
Asphalt
Asphalt
Culvert
Asphalt
TP
TP
para left v150
SC
end of v
Asphalt
TV
TV
TV
Post
Post
SC
SC
TV
TP
Asphalt
Paving
GV
Asphalt
SC
SC
Post
TV
Asphalt
SC
SC
RS
Asphalt
Concrete
Block w
all ht 0.5m
TV
Asphalt
Sign
Post
Post
Paving
TV
Block wall ht 0.8m
SC
Post
Post
Asphalt
SC
Paving
TV
Asphalt
Concrete
Asphalt
Paving
Block wall ht 0.7m
Post
Post
Post
Post
SC
SC
Post
Post
Concrete
Paving
Post
Asphalt
TV
Post
Block w
all ht 0.3m
Post
Block wall ht 0.8m
Block w
all ht 0.4m
Brick wall ht 0.8m
TV
Post
Paving
LP
SC
Post
Post
Asphalt
Asphalt
Block wall ht 0.9m
LP
Concrete
Asphalt
Block retaining w
all ht 1.0m
Paving
S
i
g
n
TP
TV
G
BT
TV
G
G
MH
CL 30.15
TV
Asphalt
G
Concrete
Concrete
Block w
all ht 0.4m
Post
Concrete
SC
Post
Asphalt
Asphalt
G
Paving
Paving
G
Paving
Concrete
Paving
Asphalt
C
O
S
H
E
S
T
O
N
R
O
A
D
Post
Paving
LP
Concrete
Block w
all ht 0.5m
TV
Concrete
Post
Post
Post
Paving
Asphalt
Asphalt
Paving
Post
Post
Post
Post
Asphalt
Paving
TV
B
lo
c
k
w
a
ll h
t 0
.5
m
Post
Post
Post
Post TV
Pav.
Post
Post
Post
Post
Paving
Block w
all ht 0.8m
Post
Post
Post
Concrete
B
lock w
all ht 0.8m
Concrete
B
lock w
all ht 0.8m
Asphalt
Asphalt
Paving
Block wall
G
BT
TV
Box
Block wall ht 1.0m
Asphalt
TV
TV
Block wall ht 0.1m
LP
GV
Post
Paving
Asphalt
LP
TV
Concrete
Paving
B
lo
ck w
a
ll h
t 0
.7
m
TV
Concrete
Asphalt
G
Post
TV
Post
Asphalt
G
TV
TV
Concrete
Post
Paving
FH
G
Concrete
Asphalt
SC
Paving
A
s
p
h
a
lt
Post
Post
Concrete
Post
Asphalt
Paving
TV
Post
B
lo
c
k
w
a
ll h
t 0
.4
m
SC
SC
Concrete
Post
Post
Post box
TV
Post
Post
TV
Post
Post
Paving
TV
SC
SC
SC
TV
Post
Concrete
PavingA
s
p
h
a
lt
SC
SC
Paving
B
lo
c
k
w
a
ll h
t 0
.4
m
B
ric
k
w
a
ll h
t 1
.0
m
BT
TV
Box
TV
G
Asphalt
Paving
LP
SC
TP
LP
Bus stop
B
r
ic
k
w
a
ll h
t 0
.7
m
Iro
n
ra
ilin
g
s
1
.1
m
o
n
to
p
BT
B
r
ic
k
w
a
ll h
t 0
.7
m
Ir
o
n
r
a
ilin
g
s
1
.1
m
o
n
to
p
C
A
R
T
E
R
P
L
A
C
E
G
Post
Concrete
A
s
p
h
a
lt
G
TP
TV
G
Asphalt
FH
SC
G
S
ig
n
B
lo
c
k
w
a
ll h
t 0
.4
m
Paving
TV
B
lo
c
k
w
a
ll h
t 0
.9
m
BT
LP
Bus stop
K
E
Y
S
T
O
N
R
O
A
D
K
E
Y
S
T
O
N
R
O
A
D
Block wall ht 0.1m
K
E
Y
S
T
O
N
R
O
A
D
DIAG. 1065
DIAG. 1065
EXISTINGZEBRA ANDHATCHAREALINING TOBEREFRESHED
EXISTINGZEBRA ANDHATCHAREALINING TOBE
REFRESHED
PROPOSED BUS STOP MARKINGS
EXISTINGLINING TO
BEREFRESHED
EXISTINGZEBRA
LINING TOBE
REFRESHED
EXISTINGZEBRA
LINING TOBE
REFRESHED
EXISTINGLINING TO
BEREFRESHED
EXISTINGLINING TO
BEREFRESHED
EXISTINGLINING TO
BEREFRESHED
LINING TO BEREFRESHED AT
JUNCTION
PROPOSEDLINING TOTIE INTOEXISTING
EXISTINGLINING TO
BEREFRESHED
PG
PG
PG
PG
EXISTING LINING TO BEREFRESHED
PROPOSEDLINING TOTIE INTOEXISTING
EXISTINGZEBRA ANDHATCHAREALINING TOBEREFRESHED
EXISTINGZEBRA ANDHATCHAREALINING TOBEREFRESHED
EXISTING LINING TO BEALTERED AT SCHOOL
ACCESS
PB
PB
PBPB PB
PBPB
BB
BB
EG
EG
PB
32.62
32.67 32.745
32.70 32.775
32.66 32.73532.76
32.77
32.72
32.62
32.94
33.33
33.50
33.0532.49
32.45
32.45
32.565
32.525
32.525
32.66
32.63
32.73
33.28
33.09
33.49
32.02
31.94
31.95
32.3632.55
32.46
32.7632.59
32.26
32.20
32.4332.53
32.5532.72
32.77
32.60
EG
27.465
27.5027.485
27.51
27.44
27.60
27.54
27.4927.55527.58
27.50527.43
27.53
27.46
27.35
27.435
27.535
27.635
27.55
27.665
27.685
27.46
27.3227.1727.16
27.1827.20
27.30
27.37
27.34
27.20
27.20 27.16
27.4527.50
27.4327.56
27.5727.54
27.4327.71
27.68
27.68
PB PB
27.6127.60
27.6427.59
27.56 27.84
27.78
27.67
27.67
27.45 27.49
27.38
27.37
27.43
27.45
27.58
PB
PB
BB
BB
EG
EG
27.0327.075 26.995
26.91526.81
26.9527.08
27.18
27.25
27.1727.15
26.87 26.70
26.34
26.41
26.55
26.9026.99527.06527.12527.08
26.9827.03526.965 26.91526.96
27.05
26.81
26.68
26.31
27.06
27.13
27.14
27.10
30.6930.745
30.71 30.775 30.70530.62 30.63530.53
30.6130.705
30.855
30.80
30.595 30.4930.675
30.59
30.775
28.6328.56
28.615 28.56528.49
28.4228.515
28.58
28.665
28.73528.67
28.61528.55
28.4428.525
28.57528.50
28.63
28.72 28.36
28.37
28.53
28.695
PG EG
EG
EG
EG
EG
PB
BB
BB
PB PB PB
27.1527.1927.09
27.21 27.10
27.05
26.9926.89
27.01
26.93
27.01
27.15
27.0826.98
26.92
26.8526.84
26.82
26.7929.89
26.9626.99
26.91
26.94
26.7526.91
26.79
26.86
26.85
26.74
26.89
26.865 26.975 26.915
26.90526.965
26.89
26.99526.88526.935
26.8126.92 26.87
26.9326.83
26.8426.85
26.8626.96
26.90 26.985 26.9526.92526.875
26.80
26.98 26.87
27.01
27.19
27.21
27.2227.21
27.08
27.1827.00
26.98
27.08
27.0026.98
26.97
26.95
26.94
26.75
26.77
26.88
26.84
26.79
26.81
26.8226.92
26.95
26.92
26.93
26.94
27.01
26.99
27.00
26.93
26.835
26.815
26.795
26.775
26.89 26.915
26.88 26.905
26.98
26.98
EF
EFEF
EF
BN2TK
TK
HB2
HB2
BN2TK
TK
HB2
HB2
EF
EF
EF
EF
EF
BN2
TK
EF
EF
EF
EF
TK
HB2
HB2
BN2
TK
TK
EF
EF
EF
EF
EF
EF
EF
EF
HB2
HB2
EF
EF
EF
EF
EF
EF
EF
EF
EF
HB2 HB2
EFEF
EF
EF
EF
EF
EF
TKTK
BN2
EF
EF
EF
EFEF
EFEF
TKTK HB2
HB2BN2
CKCK
CK
CK
CK
CK
HB2TK
BN2
EF
EF
EF
EF
TK
HB2
EF
EF
EF
EF
EF
EF
EF
HB2
HB2
HB2HB2
TKTK
BN2
BN2
TKTK
EF
EF
BN2TK
HB2
HB2
TK
TK
TK
BN2
HB2
HB2EF
EF
EF
EF
EF
EF
TKTK
TKTK
TKTK
TK
TK
BN2
BN1
BN1
BN1
HB2
HB2
HB2
EF
EF
EF
EF
EF
HB2
PS
PS(NRLA)
DIA 1003DIA 1009
DIA 1004
DIA 1004
DIA 1025.11.6mDIA 1001.3
DIA 1001.3DIA 1001.3
DIA 1001.3
DIA 1001.3
DIA 1001.3
DIA 1004
DIA 1003DIA 1009
DIA 1004
DIA 1025.11.6m
DIA 1017
DIA 1017
DIA 1001.3
DIA 1001.3
DIA 1001.3
DIA 1001.3
DIA 1001.3
DIA 1001.3
DIA 1018.1
DIA 1004
DIA 1004
DIA 1001.3
DIA 1001.3
DIA 1001.3
DIA 1001.3
DIA 1001.3
DIA
1003
DIA
1009
DIA 1003DIA 1009
DIA 1003DIA 1009
DIA 1001.3
DIA 1001.3
DIA 1001.3
DIA 1001.3
DIA 1001.3
DIA 1003DIA 1009
DIA 1012.1
DIA 1012.1
DIA 1012.1
DIA 1012.1
4.7
4.44.5
4.7
5.0
3.5
2.1
1.05
6.03.2
1.05
6.3
13.0
1.2
3.3
36.3
9.2
2.0
3.6
13.0
36.2
3.2
1.2
2.0
5.0
27.4
1.2
3.3
1.2
3.5
2.0
4.6
4.6
2.8
3.3
15.5
15.8
4.5
3.4
3.3
3.8
13.9
1.9
3.7
1.2
17.2
18.9
2.7
4.1
7.23.0
4.44.7
5.04.7
5.84.9
5.0
10.1
1.05
6.0
1.05
5.0
4.0
3.2
2.9
7.6
10.3
4.0
6.6
4.6
5.3
7.0
0.7
10.2
10.1
5.0
21.7
4.94.0
5.34.5
12.3
11.1
9.8
6.6
5.0
6.9 1.05 6.01.05
13.0
12.23.2
4.02.9
2.2
1.62.9
2.2
2.7
4.1
5.0
6.76.7
17.6 TO ENDOF RESURFACING
3.1
4.43.9
4.22.2
4.1
4.6
18.8 TO ENDOF RESURFACING
4.2
6.5
6.2
5.01.05
6.01.05
0.3
0.3
5.06.4
7.7m TOGULLY
6.56.2
18.0
18.0
5.0
1.05 6.01.05
0.3
0.3
5.0
6.4
4.7m TO GULLY
4.1
1.5
1.6
1.6
3.0
3.0
R8.0
R5.0
R20.0
10.0
8.77.0
6.4
1.05
5.9
2.0
1.6
2.4
1.6
1.2
1.2
5.1
0.8
4.9
3.1
8.6
3.3 1.9
4.0 1.9
4.2
3.0
2.5
3.7
2.4
3.9
2.4
3.73.0
5.3
2.8
2.7
2.7
1.8
6.3
5.0
3.2 3.5
6.5
2.51.4
1.6
18.2
1.6
3.94.1
1.05
CR
FP 2
2
4
OLD CONTROLLER TO BE REMOVED
AVON POLE TO BE REMOVED AND BT LINE RELOCATED IN NEWCONTROLLER
TC
TC
TC
1
1
1
3
4
1
2
PE
MVDA
EXISTING FEEDER PILLARTO BE RETAINED
1
1
1
1
2
2
4 4 4 4
4444444
1
11
11
1
1
EXISTINGLINING TOBE
REFRESHED
EXISTINGSPEEDCUSHIONTO BEPLANEDOUT ANDRESURFACED
4.3m
4.3m
14.8
14.5
PBPB
24.42
24.47
24.44
24.51
24.585
24.59
24.665
24.625
24.48
24.605
24.49524.405
14.10
1.04
6.00
1.05
3.00
3.0024.45
24.39
24.36
24.465
24.52524.47
24.545
24.42
DIA 1012.1
DIA 1012.1
24.495
24.515
1.71(From L.P.)
24.4950.30
0.10
27.345
27.35
27.32
27.31
27.39
27.39
27.42
DIA 1001.3
DIA 1001.3
DIA 1001.3
DIA 1004
DIA 1009DIA 1003
DIA 1004
DIA 1004
DIA 1009DIA 1003
DIA 1004
DIA 1009
DIA 1003
DIA 1004
PS(PS01 /PS04)
PS(PS01 /PS04)
(PS02 - ONEXISTING BUSSTOP FLAG)
EXISTING ILLUMINATED'PRIORITY NARROWING'SIGN AND POLEDISCONNECTED ANDREMOVED TO TIP OFF SITE
(EXISTING ROADSIGN TO BEREMOVED FROMLAMP COLUMN)
EXISTING SIGN TO BE REMOVED
PS04(BACK TO BACK ONEXISTINGLAMP COLUMN)EXISTING'NARROWING' SIGNTO REMAIN ONEXISTING POST
PS02(ON EXISTING BUSSTOP FLAG)EXISTING PARKINGRESTRICTION SIGN ONEXISTING LAMP COLUMN TO REMAIN
EXISTING PARKINGRESTRICTION SIGN TOREMAIN
EXISTING 20mph / 30mph SIGNS & POSTS REMOVED
TO TIP OFF SITE AND REPLACED WITH SIGNS AS PER
SIGN DETAIL PS01 / PS04 WITH NEW POSTS
PS(NRLA)
EXISTING 'PRIORITYNARROWING' SIGN
TO REMAIN ONEXISTING POST
EXISTING 'PRIORITYNARROWING' SIGN
TO REMAIN ONEXISTING POST
PS03 / PS04SIGNS AS PER SIGN DETAIL PS03 / PS04 WITH NEW
POSTS
PS-NRLAON NEW
POST
'NRLA' NEW POST
EXISTING ILLUMINATED'NARROWING'
SIGN AND POSTREMOVED TO TIP.
WIDE BASED POLE TOBE DISCONNECTEDPRIOR TO REMOVAL
EXISTING ILLUMINATED'NARROWING'
SIGN AND POSTREMOVED TO TIP.
WIDE BASED POLE TOBE DISCONNECTEDPRIOR TO REMOVAL
PS04 / PS03 ON NEWPOSTS
EXISTING SIGNS (X4) ANDPOSTS (X2) TO
BE TAKEN DOWN ANDREMOVED TO TIP
OFF SITE
EXISTING ILLUMINATED'HUMP' SIGN TO BE
'DISCONNECTED', TAKENDOWN AND REMOVED TO
TIP OFF SITE
EXISTINGILLUMINATED
'NARROWING' SIGNTO REMAIN ONEXISTING POST
DIA 1001.3
PGPG 27.4227.62
MVDB
DIA 1001
DIA 1001
EXISTING ILLUMINATED 'PRIORITY NARROWING'
SIGN AND POLE DISCONNECTED AND REMOVED
TO TIP OFF SITE
EXISTING GATEWAY SIGNSAND POSTS REMOVED TO TIP
OFF SITE
EXISTING ILLUMINATED'HUMP' SIGN TO BE
'DISCONNECTED', TAKENDOWN AND REMOVED TO
TIP OFF SITE
EXISTING SIGNS (X4) ANDPOSTS (X2) TO
BE TAKEN DOWN ANDREMOVED TO TIP
OFF SITE.PROPOSED SIGNS TO SIGN
DETAIL PS01 ON NEWPOSTS
BB
B
B
B
B
BB
BB
EXG
EXG
RS
RS
RS
LC-RS
RS
RS
RS
SRiC PLASMAWR
LOCATION PLAN
OM
GD
NTS
07/01/2019
CO17060 001
-
...
.....
General Arrangement 2 - (CO17060-03)(Plas-Mawr Road / Pwllmelin Road)
General Arrangement 3 - (CO17060-04(Waterhall Road)
PLASMAWR WELSHCOMPREHENSIVE SCHOOL PETER LEA
PRIMARYSCHOOL
except for planning application purposes
do not scale drawing
DRAWING CAN BE SCALEDFOR PLANNING APPLICATION PURPOSES ONLY.
Rev By Date Description of Amendment Chk.by DateTelephone 029 2287 2456
County Hall, Atlantic Wharf, Cardiff CF10 4UW
CYNGOR DINAS CAERDYDDTHE CITY OF CARDIFF COUNCIL
COPYRIGHT OF CARDIFFCOUNCIL.ALL RIGHTS RESERVED.C
© Crown copyright and database rights (2011) Ordnance Survey 100023376.© Hawlfraint y Goron a hawliau cronfa ddata (2011) Arolwg Ordnans 100023376.C
CAERDYDDCARDIFF
DESIGN CONTRACTS AND DELIVERY
DYLUNIO CONTRACTAU A DARPARU
Andrew GregoryDIRECTOR FOR PLANNING, TRANSPORT ANDENVIRONMENT
CYNLLUNIO, TRAFNIDIATH A'R AMGYLCHEDD
General Arrangement 1 (CO17060-02)Pentrebane Road
General Arrangement 1 (CO17060-02)Pentrebane Road
General Arrangement 2 - (CO17060-03)(Keyston Road 1)
General Arrangement 2 - (CO17060-03)(Keyston Road 2)
General Arrangement 2 - (CO17060-03)(Keyston Road 2)
General Arrangement 3 - (CO17060-04(Waterhall Road)
FOR CONSTRUCTION
B
B
L
P
B
B
B
L
P
R
S
G
V
L
P
B
B
B
L
PR
S
B
B
T
a
c
tile
R
SP
a
v
in
g
T
a
c
tile
A
s
p
h
a
lt
B
B
A
s
p
h
a
ltB
B
T
a
c
tile
Concrete
P
o
s
tP
o
s
t
A
s
p
h
a
lt
C
o
n
c
re
te
T
P
P
o
s
t
P
o
s
t
S
C
T
V
P
a
v
in
g
T
a
c
tile
A
s
p
h
a
lt
P
o
s
t
P
o
s
tP
o
s
t
T
a
c
tile
A
s
p
h
a
lt
Railings ht 1.5m
P
a
v
in
g
G
ra
s
s
G
ra
s
s
T
a
c
tile
A
s
p
h
a
lt
T
a
c
tile
A
sp
h
a
lt
T
a
c
tile
A
s
p
h
a
lt
A
sp
h
a
lt
Drainage chann
el
Drainage channel
Stone retaining wall ht 1.2m
Railings ht 1.5m
Railings ht 1.5m
B
T
G
S
V
F
H
L
P
G
P
a
v
in
g
G
G
T
a
c
tile
R
S
P
a
v
in
g
P
a
v
in
g
R
S
G
B
in
B
B
l
o
c
k
p
a
v
i
n
g
B
lo
c
k
p
a
v
in
g
R
S
Railings ht 1.5m
G
Bus shelter
20
A
s
p
h
a
lt
A
s
p
h
a
lt
A
s
p
h
a
lt
PENTREBANE ROAD
B
l
o
c
k
p
a
v
i
n
g
B
l
o
c
k
p
a
v
i
n
g
A
sp
h
a
lt
Brick wall ht 1.1m
T
a
c
tile
A
s
p
h
a
lt
B
B
A
s
p
h
a
lt
B
B
A
sp
h
a
lt
T
a
c
tile
T
a
c
tile
A
s
p
h
a
lt
A
s
p
h
a
lt
A
s
p
h
a
lt
B
B
L
P
B
B
B
L
P
R
S
G
V
L
P
B
B
B
L
PR
S
B
B
T
a
c
tile
R
SP
a
v
in
g
T
a
c
tile
A
s
p
h
a
lt
B
B
A
s
p
h
a
ltB
B
T
a
c
tile
Concrete
P
o
s
tP
o
s
t
A
s
p
h
a
lt
C
o
n
c
re
te
T
P
P
o
s
t
P
o
s
t
S
C
T
V
P
a
v
in
g
T
a
c
tile
A
s
p
h
a
lt
P
o
s
t
P
o
s
tP
o
s
t
T
a
c
tile
A
s
p
h
a
lt
Railings ht 1.5m
P
a
v
in
g
G
ra
s
s
G
ra
s
s
T
a
c
tile
A
s
p
h
a
lt
T
a
c
tile
A
sp
h
a
lt
T
a
c
tile
A
s
p
h
a
lt
A
sp
h
a
lt
Drainage chann
el
Drainage channel
Stone retaining wall ht 1.2m
Railings ht 1.5m
Railings ht 1.5m
B
T
G
S
V
F
H
L
P
G
P
a
v
in
g
G
G
T
a
c
tile
R
S
P
a
v
in
g
P
a
v
in
g
R
S
G
B
in
B
B
l
o
c
k
p
a
v
i
n
g
B
lo
c
k
p
a
v
in
g
R
S
Railings ht 1.5m
G
Bus shelter
20
A
s
p
h
a
lt
A
s
p
h
a
lt
A
s
p
h
a
lt
PENTREBANE ROAD
B
l
o
c
k
p
a
v
i
n
g
B
l
o
c
k
p
a
v
i
n
g
A
sp
h
a
lt
Brick wall ht 1.1m
T
a
c
tile
A
s
p
h
a
lt
B
B
A
s
p
h
a
lt
B
B
A
sp
h
a
lt
T
a
c
tile
T
a
c
tile
A
s
p
h
a
lt
A
s
p
h
a
lt
A
s
p
h
a
lt
EXISTINGZEBRA AND
HATCHAREA
LINING TOBE
REFRESHED
EXISTINGZEBRA AND
HATCHAREA
LINING TOBE
REFRESHEDPG
PG
PB
BB
BB
EG
EG
PB
PS(NRLA)
DIA 1003 DIA 1009
DIA 1004 DIA 1004
DIA 1025.11.6m
DIA 1001.3
DIA 1001.3
DIA 1001.3DIA 1001.3
DIA 1001.3
DIA 1001.3
EXISTINGLINING TO
BEREFRESHED
PS(PS01 /PS04)
PS(PS01 /PS04)
(PS02 - ONEXISTING BUSSTOP FLAG)
EXISTING ILLUMINATED'PRIORITY NARROWING'SIGN AND POLEDISCONNECTED ANDREMOVED TO TIP OFF SITE
(EXISTING ROADSIGN TO BE
REMOVED FROMLAMP COLUMN)
EXISTING SIGN TO BE REMOVED
PS04(BACK TO BACK ON
EXISTINGLAMP COLUMN)
EXISTING'NARROWING' SIGN
TO REMAIN ONEXISTING POST
EXISTING 20mph / 30mph SIGNS & POSTS REMOVEDTO TIP OFF SITE AND REPLACED WITH SIGNS AS PER
SIGN DETAIL PS01 / PS04 WITH NEW POSTSEXISTING ILLUMINATED 'PRIORITY NARROWING'SIGN AND POLE DISCONNECTED AND REMOVEDTO TIP OFF SITE
S
C
P
a
v
in
g
L
P
R
S
S
C
G
V
G
V
G
V
G
V
B
B
B
B
S
C
R
S
B
B
S
C
G
ra
s
s
R
S
A
s
p
h
a
lt
S
ig
n
G
ra
s
s
P
a
v
in
g
R
o
u
g
h
g
ro
u
n
d
G
ra
s
s
M
k
r
G
V
L
P
B
lo
c
k
p
a
v
in
g
B
lo
c
k
p
a
v
in
g
T
a
c
tile
T
a
c
tile
B
lo
c
k
p
a
v
in
g
B
lo
c
k
p
a
v
in
g
B
o
x
B
o
x
P
a
v
in
g
A
s
p
h
a
lt
P
a
v
in
g
A
s
p
h
a
lt
B
in
P
a
v
in
g
Stone retaining wall ht 1.2m
A
s
p
h
a
lt
C
o
n
c
re
te
A
s
p
h
a
lt
P
o
s
t
P
o
s
t
Railings ht 1.5m
R
a
ilin
g
s
h
t 1
.5
m
T
a
c
tile
B
in
S
ig
n
R
S
L
P
B
B
B
B T
a
c
tile
G
ra
s
s
B
o
x
P
a
v
in
g
G
B
T
F
H
S
V
G
S
V
B
T
B
o
x
B
o
x
B
o
x
IC
G
M
H
C
L
2
7
.4
6
M
H
C
L
2
7
.6
4
B
T
T
V
A
s
p
h
a
lt
T
a
c
tile
L
P
S
C
R
a
ilin
g
s
h
t 1
.0
m
R
S
P
L
A
S
-
M
A
W
R
R
O
A
D
P
E
N
T
R
E
B
A
N
E
R
O
A
D
B
u
s
s
h
e
lte
r
R
a
i
l
i
n
g
s
h
t
1
.
8
m
A
s
p
h
a
lt
A
s
p
h
a
lt
P
a
v
in
g
P
a
v
in
g
G
ra
s
s
A
s
p
h
a
lt
G
L
P
G
A
s
p
h
a
lt
W
A
T
E
R
H
IL
L
R
O
A
D
G
V
G
V
A
s
p
h
a
lt
S
C
P
a
v
in
g
L
P
R
S
S
C
G
V
G
V
G
V
G
V
B
B
B
B
S
C
R
S
B
B
S
C
G
ra
s
s
R
S
A
s
p
h
a
lt
S
ig
n
G
ra
s
s
P
a
v
in
g
R
o
u
g
h
g
ro
u
n
d
G
ra
s
s
M
k
r
G
V
L
P
B
lo
c
k
p
a
v
in
g
B
lo
c
k
p
a
v
in
g
T
a
c
tile
T
a
c
tile
B
lo
c
k
p
a
v
in
g
B
lo
c
k
p
a
v
in
g
B
o
x
B
o
x
P
a
v
in
g
A
s
p
h
a
lt
P
a
v
in
g
A
s
p
h
a
lt
B
in
P
a
v
in
g
Stone retaining wall ht 1.2m
A
s
p
h
a
lt
C
o
n
c
re
te
A
s
p
h
a
lt
P
o
s
t
P
o
s
t
Railings ht 1.5m
R
a
ilin
g
s
h
t 1
.5
m
T
a
c
tile
B
in
S
ig
n
R
S
L
P
B
B
B
B T
a
c
tile
G
ra
s
s
B
o
x
P
a
v
in
g
G
B
T
F
H
S
V
G
S
V
B
T
B
o
x
B
o
x
B
o
x
IC
G
M
H
C
L
2
7
.4
6
M
H
C
L
2
7
.6
4
B
T
T
V
A
s
p
h
a
lt
T
a
c
tile
L
P
S
C
R
a
ilin
g
s
h
t 1
.0
m
R
S
P
L
A
S
-
M
A
W
R
R
O
A
D
P
E
N
T
R
E
B
A
N
E
R
O
A
D
B
u
s
s
h
e
lte
r
R
a
i
l
i
n
g
s
h
t
1
.
8
m
A
s
p
h
a
lt
A
s
p
h
a
lt
P
a
v
in
g
P
a
v
in
g
G
ra
s
s
A
s
p
h
a
lt
G
L
P
G
A
s
p
h
a
lt
W
A
T
E
R
H
IL
L
R
O
A
D
G
V
G
V
A
s
p
h
a
lt
PROPOSED BUS STOP MARKINGS
EXISTINGZEBRA AND
HATCHAREA
LINING TOBE
REFRESHED
EXISTINGZEBRA AND
HATCHAREA
LINING TOBE
REFRESHED
EG
PB PB
BB
DIA 1004
DIA 1003
DIA 1009DIA 1004
DIA 1025.1
1.6m
DIA 1017
DIA 1017
DIA 1001.3
DIA 1001.3
DIA 1001.3
DIA 1001.3
DIA 1018.1
PE
MVDA
EXISTINGSPEED
CUSHIONTO BE
PLANEDOUT AND
RESURFACED
4.3m
4.3m
PBPB
PS04(BACK TO BACK ON
EXISTINGLAMP COLUMN)
EXISTING'NARROWING' SIGN
TO REMAIN ONEXISTING POST
PS02(ON EXISTING BUS
STOP FLAG)
EXISTING PARKINGRESTRICTION SIGN ON
EXISTING LAMP COLUMN TO REMAIN
EXISTING PARKINGRESTRICTION SIGN TO
REMAIN
PG
PG
MVDB
DIA 1001
DIA 1001
EXG
RS
except for planning application purposes
do not scale drawing
Telephone 029 2287 2456County Hall, Atlantic Wharf, Cardiff CF10 4UW
COPYRIGHT OF CARDIFFCOUNCIL.ALL RIGHTS RESERVED.C
DRAWING CAN BE SCALEDFOR PLANNING APPLICATION PURPOSES ONLY.
© Crown copyright and database rights (2011) Ordnance Survey 100023376.© Hawlfraint y Goron a hawliau cronfa ddata (2011) Arolwg Ordnans 100023376.C
Rev By Date Description of Amendment Chk.by Date
CYNGOR DINAS CAERDYDD THE CITY OF CARDIFF COUNCIL
Rev
CAERDYDDCARDIFF
DESIGN CONTRACTS AND DELIVERY
DYLUNIO CONTRACTAU A DARPARU
Andrew GregoryDIRECTOR FOR PLANNING, TRANSPORT AND
ENVIRONMENTCYNLLUNIO, TRAFNIDIATH A'R AMGYLCHEDD
SRIC PLASMAWR
GENERAL ARRANGEMENT 1
OM
GD
1:200 @ A1
07-01-2019
CO17060 02
-
...
.....
KEY
NOTE: ALL ROAD MARKINGS TO COMPLY WITH THE TSRGD 2016 & CHAPTER 5 OF THE TRAFFIC SIGNS MANUAL.
PROPOSED AREA OF CARRIAGEWAY TO BE PLANED 40mm AND RESURFACED WITH 40mm AC10 CLOSE SURFACE COURSE PMB75-130/75 TO BS 13108-1 MIN 65PSV
PROPOSED FLEXIBLE FOOTWAY CONSTRUCTION: TYPE 1 SUB-BASE 150mm THICK;AC20 DENSE BINDER COURSE 100/150REC 50mm THICK;AC6 SURFACE COURSE 1260/220 25mm THICK.
PROPOSED FLEXIBLE FOOTWAY CONSTRUCTION ON EXISTING CARRIAGEWAY: TYPE 1 SUB-BASE 25mm THICK;AC20 DENSE BINDER COURSE 100/150REC 50mm THICK;AC6 SURFACE COURSE 1260/220 25mm THICK.
PROPOSED RAMP CONSTRUCTION ( 1-14 GRADIENT).45mm AC10 DENSE SURFACE COURSE 100/150 PMB (POLYMERMODIFIED BINDER)75mm AC20 DENSE BINDER (UPPER) 100/150 TO BS EN 13108-4.75mm AC20 DENSE BINDER (LOWER) 100/150 TO BS EN 13108-4
SMA 14 SURF PMB 75/130-75, 40mm THICK, STEEL SLAG, MIN PSV 60, PMB - CLASS 7 PENETRATION, CLASS 3 SOFTENING POINT(TABLE 1 BS EN 14023) & CLASS 2 ELASTIC RECOVERY (TABLE 2 BS EN 14023)AC 20 DENSE BIN 100/150REC 60mm THICKAC 32 HDM BASE 40/60REC 150mm THICKTYPE 1 UNBOUND MIXTURE SUB-BASE 300mm THICK
PROPOSED GRASS/VERGE REINSTATEMENT TO MATCH EXISTING .
400mmX400mmX50mm PRECAST CONCRETE BLISTER PAVINGSLABS COLOR RED, LAID ON 150mm TYPE 1 SUB-BASE AND 30mmTHICK SAND BEDDING LAYER. JOINTS BRUSHED WITH KILN DRIEDSAND
NON ILLUMINATED GLASDON VICTORY BOLLARD OR SIMILARAPPROVED
PRECAST CONCRETE TRAPPED SG GULLY WITH D400 COVER ANDFRAME AS SD 508-050.
EXISTING GULLY.
PROPOSED NEW MODUSTAR BEACON HEAD AND BELISHA POLESTO BE INSTALLED 675mm FROM FACE OF KERB AND 500mmFROM TACTILES
PROPOSED SIGN (PLEASE REFER TO DRAWING CO17060-08 & SIGN SCHEDULE IN CCC STANDARD DETAILS)
EXISTING SIGN & POST TO BE REMOVED TO TIP OFF SITE
EXISTING ILLUMINATED SIGN TO BE DISCONNECTED. SIGN AND POST REMOVED TO TIP OF SITE
EXISTING SIGN FACE TO BE REMOVED TO TIP OFF SITE
PROPOSED 150mm DRAINAGE PIPE.
PRECAST CONCRETE CHANNEL TYPE CF (FLUTED).
REFER TO GENERAL ARRANGEMENT 02
PENTREBANE ROAD - SECTION 1
PENTREBANE ROAD - SECTION 2
REFER TO GEN
ERAL ARRANGEM
ENT 1
PENTREBAN
E ROAD - SECTIO
N 2
REFE
R TO
GEN
ERAL
ARR
ANGE
MEN
T 1
PEN
TREB
ANE
ROAD
- SE
CTIO
N 1
PB
BBEG
PG
PS-00
NOTE:FOR SIGNING DETAILS PLEASE REFER TODRAWINGS CO17060 - 07-011
NOTE:FOR SIGNING DETAILS PLEASE REFER TODRAWINGS CO17060 - 07-011
FOR CONSTRUCTION
SC
LP
RS
LP
SC
GV
GV
GV
GV
B
B
B
B
Mkr
RS
Grass
B
B
B
LP
SC
RS
RS
LP
Grass
SC
B
B
B
B
B
B
B
B
RS
LP
TP
B
B
B
B
B
B
Mkr
LP
RS
RS
Concrete
RS
Grass
T
a
ctile
B
lo
ck p
a
vin
g
B
lo
c
k
p
a
v
in
g
Asphalt
Asphalt
Grass
Tactile
BB
BB
Tactile
Asphalt
T
a
ctile
D
ra
in
a
g
e
ch
a
n
n
e
l
D
rain
age channel
B
B
B
B
Asp
B
B
Stump
RS
LP
Paving
Asphalt
Grass
Tactile
Paving
Asphalt
Sign
Grass
Paving
Rough ground
Grass
Mkr
GV
LP
Block paving
Block paving
Tactile
Grass
Mkr
Asphalt
Asphalt
Paving
Post
Mobile phone mast
B
o
x
B
o
x
B
o
x
Tactile
Mobile phone mast
Grass
Asphalt
Paving
Asphalt
T
a
c
t
i
l
e
Grass
Grass
GV
GV
GV
GV
Paving
Grass
Asphalt
Tactile
Block paving
B
lock pavin
g
B
ox
Box
Paving
Asphalt
Tactile
Bin
Sign
RS
LP
BB
BB
Tactile
20
Brick w
all ht 1.1m
Grass
B
o
x
Paving
Post
G
BT
FH
SV
BT
Box
Box
Box
IC
G
MH
CL 27.46
MH
CL 27.64
MH
CL 27.25
Box
Box
G
MH
CL 26.81
BT
TV
G
TV
FH
IC
BT
G
G
MH
CL 25.57
G
Asphalt
LP
G
G
G
Asphalt
Block
paving Block
paving
Concrete
RS
RS
Asphalt
G
Asphalt
Paving
G
Tactile
Raili
ngs h
t 1.0
m
RS
PLA
S-M
AW
R R
OA
D
PENTREBANE RO
AD
PW
LLM
ELIN
R
O
AD
P
W
L
L
M
E
L
IN
R
O
A
D
P
W
L
L
M
E
L
I
N
R
O
A
D
G
G
G
G
R
a
i
l
i
n
g
s
h
t
1
.
8
m
R
a
ilin
g
s
h
t 1
.8
m
Asphalt
Asphalt
Asphalt
Asphalt
Asphalt
Grass
Grass
Paving
Asphalt
Paving
Paving
Asphalt
Paving
Asphalt
Paving
Grass
Asphalt
Asphalt
Paving
G
W
AT
ER
HILL R
OA
D
GV
GV
SC
LP
RS
LP
SC
GV
GV
GV
GV
B
B
B
B
Mkr
RS
Grass
B
B
B
LP
SC
RS
RS
LP
Grass
SC
B
B
B
B
B
B
B
B
RS
LP
TP
B
B
B
B
B
B
Mkr
LP
RS
RS
Concrete
RS
Grass
T
a
ctile
B
lo
ck p
a
vin
g
B
lo
c
k
p
a
v
in
g
Asphalt
Asphalt
Grass
Tactile
BB
BB
Tactile
Asphalt
T
a
ctile
D
ra
in
a
g
e
ch
a
n
n
e
l
D
rain
age channel
B
B
B
B
Asp
B
B
Stump
RS
LP
Paving
Asphalt
Grass
Tactile
Paving
Asphalt
Sign
Grass
Paving
Rough ground
Grass
Mkr
GV
LP
Block paving
Block paving
Tactile
Grass
Mkr
Asphalt
Asphalt
Paving
Post
Mobile phone mast
B
o
x
B
o
x
B
o
x
Tactile
Mobile phone mast
Grass
Asphalt
Paving
Asphalt
T
a
c
t
i
l
e
Grass
Grass
GV
GV
GV
GV
Paving
Grass
Asphalt
Tactile
Block paving
B
lock pavin
g
B
ox
Box
Paving
Asphalt
Tactile
Bin
Sign
RS
LP
BB
BB
Tactile
20
Brick w
all ht 1.1m
Grass
B
o
x
Paving
Post
G
BT
FH
SV
BT
Box
Box
Box
IC
G
MH
CL 27.46
MH
CL 27.64
MH
CL 27.25
Box
Box
G
MH
CL 26.81
BT
TV
G
TV
FH
IC
BT
G
G
MH
CL 25.57
G
Asphalt
LP
G
G
G
Asphalt
Block
paving Block
paving
Concrete
RS
RS
Asphalt
G
Asphalt
Paving
G
Tactile
Raili
ngs h
t 1.0
m
RS
PLA
S-M
AW
R R
OA
D
PENTREBANE RO
AD
PW
LLM
ELIN
R
O
AD
P
W
L
L
M
E
L
IN
R
O
A
D
P
W
L
L
M
E
L
I
N
R
O
A
D
G
G
G
G
R
a
i
l
i
n
g
s
h
t
1
.
8
m
R
a
ilin
g
s
h
t 1
.8
m
Asphalt
Asphalt
Asphalt
Asphalt
Asphalt
Grass
Grass
Paving
Asphalt
Paving
Paving
Asphalt
Paving
Asphalt
Paving
Grass
Asphalt
Asphalt
Paving
G
W
AT
ER
HILL R
OA
D
GV
GV
PROPOSED BUS STOP MARKINGS
EXISTINGLINING TO
BEREFRESHED
EXISTINGZEBRA
LINING TOBE
REFRESHED
EXISTINGZEBRA
LINING TOBE
REFRESHED
EXISTINGLINING TO
BEREFRESHED
EXISTINGLINING TO
BEREFRESHED
EXISTINGLINING TO
BEREFRESHED
PG
PG
EG
PB PB
PB
PB
BB
BB
EG
EG
DIA 1003DIA 1009
DIA 1004
DIA 1017
DIA 1017
DIA 1001.3
DIA 1001.3
DIA 1001.3
DIA 1001.3
DIA 1001.3
DIA 1001.3
DIA 1018.1
DIA 1004
DIA 1004
DIA 1001.3
DIA 1001.3
DIA 1001.3
DIA 1001.3
DIA 1001.3
DIA
1003
DIA
1009
PBPB
PS(NRLA)
EXISTING 'PRIORITYNARROWING' SIGN
TO REMAIN ONEXISTING POST
EXISTING 'PRIORITYNARROWING' SIGN
TO REMAIN ONEXISTING POST
EXISTINGILLUMINATED
'NARROWING' SIGNTO REMAIN ONEXISTING POST
DIA 1001.3
PG
PG
DIA 1001
DIA 1001
EXISTING GATEWAY SIGNSAND POSTS REMOVED TO TIP
OFF SITEEXG
RS
SC
end of v
Asphalt
Concrete
Asphalt
Sign
TV
B
lock w
all
ht 0.8m
SC
Post
Post
Asphalt
SC
Paving
TV
Asphalt
Concrete
A
sphalt
Paving
Post
Post
Post
SC
SC
Post
Post
Concrete
B
lo
ck w
a
ll h
t 0
.8
m
Asphalt
Asphalt
B
lock w
all
ht 0.9m
LP
Concrete
Asphalt
B
lock retain
ing w
all
ht 1.0m
Paving
S
i
g
n
TP
TV
G
BT
TV
G
G
Concrete
Concrete
B
lock w
all
ht 0.4m
Paving
G
Paving
C
O
S
H
E
S
T
O
N
R
O
A
D
K
E
Y
S
T
O
N
R
O
A
D
SC
end of v
Asphalt
Concrete
Asphalt
Sign
TV
B
lock w
all
ht 0.8m
SC
Post
Post
Asphalt
SC
Paving
TV
Asphalt
Concrete
A
sphalt
Paving
Post
Post
Post
SC
SC
Post
Post
Concrete
B
lo
ck w
a
ll h
t 0
.8
m
Asphalt
Asphalt
B
lock w
all
ht 0.9m
LP
Concrete
Asphalt
B
lock retain
ing w
all
ht 1.0m
Paving
S
i
g
n
TP
TV
G
BT
TV
G
G
Concrete
Concrete
B
lock w
all
ht 0.4m
Paving
G
Paving
C
O
S
H
E
S
T
O
N
R
O
A
D
K
E
Y
S
T
O
N
R
O
A
D
LINING TO BEREFRESHED AT
JUNCTION
DIA 1012.1
DIA 1012.1
TP
Asphalt
Paving
TV
Asphalt
Paving
LP
B
lock w
all
ht 0.5m
TV
Concrete
Post
Post
Post
Paving
Asphalt
Asphalt
Paving
Post
Post
Post
Post
B
lo
ck w
a
ll h
t 0
.8
m
Concrete
B
lo
ck w
a
ll h
t 0
.8
m
G
BT
B
lock w
all
ht 1.0m
Asphalt
TV
TV
B
lo
ck w
a
ll h
t 0
.1
m
LP
GV
G
Post
TV
SC
K
E
Y
S
T
O
N
R
O
A
D
TP
Asphalt
Paving
TV
Asphalt
Paving
LP
B
lock w
all
ht 0.5m
TV
Concrete
Post
Post
Post
Paving
Asphalt
Asphalt
Paving
Post
Post
Post
Post
B
lo
ck w
a
ll h
t 0
.8
m
Concrete
B
lo
ck w
a
ll h
t 0
.8
m
G
BT
B
lock w
all
ht 1.0m
Asphalt
TV
TV
B
lo
ck w
a
ll h
t 0
.1
m
LP
GV
G
Post
TV
SC
K
E
Y
S
T
O
N
R
O
A
D
DIA 1012.1
DIA 1012.1
SC
Post
Post
Paving
TV
SC
SC
SC
Asphalt
Paving
LP
SC
B
r
ic
k
w
a
ll h
t 0
.7
m
Ir
o
n
r
a
ilin
g
s
1
.1
m
o
n
to
p
Concrete
A
s
p
h
a
lt
FH
B
lo
c
k
w
a
ll h
t 0
.9
m
K
E
Y
S
T
O
N
R
O
A
D
SC
Post
Post
Paving
TV
SC
SC
SC
Asphalt
Paving
LP
SC
B
r
ic
k
w
a
ll h
t 0
.7
m
Ir
o
n
r
a
ilin
g
s
1
.1
m
o
n
to
p
Concrete
A
s
p
h
a
lt
FH
B
lo
c
k
w
a
ll h
t 0
.9
m
K
E
Y
S
T
O
N
R
O
A
D
DIA 1012.1
DIA 1012.1
except for planning application purposes
do not scale drawing
Telephone 029 2287 2456County Hall, Atlantic Wharf, Cardiff CF10 4UW
COPYRIGHT OF CARDIFFCOUNCIL.ALL RIGHTS RESERVED.C
DRAWING CAN BE SCALEDFOR PLANNING APPLICATION PURPOSES ONLY.
© Crown copyright and database rights (2011) Ordnance Survey 100023376.© Hawlfraint y Goron a hawliau cronfa ddata (2011) Arolwg Ordnans 100023376.C
Rev By Date Description of Amendment Chk.by Date
CYNGOR DINAS CAERDYDD THE CITY OF CARDIFF COUNCIL
Rev
CAERDYDDCARDIFF
DESIGN CONTRACTS AND DELIVERY
DYLUNIO CONTRACTAU A DARPARU
Andrew GregoryDIRECTOR FOR PLANNING, TRANSPORT AND
ENVIRONMENTCYNLLUNIO, TRAFNIDIATH A'R AMGYLCHEDD
SRiC PLASMAWR
GENERAL ARRANGEMENT 2
OM
GD
1:200 @ A1
07-01-2019
CO17060 03
-
...
.....
LOCATION (Plas-Mawr Road)
LOCATION (Keyston Road 1) LOCATION (Keyston Road 2) LOCATION (Keyston Road 3)
KEY
PB
BB
EG
PG
400mmX400mmX50mm PRECAST CONCRETE BLISTER PAVINGSLABS COLOR RED, LAID ON 150mm TYPE 1 SUB-BASE AND 30mmTHICK SAND BEDDING LAYER. JOINTS BRUSHED WITH KILN DRIEDSAND
NON ILLUMINATED GLASDON VICTORY BOLLARD OR SIMILARAPPROVED
PRECAST CONCRETE TRAPPED SG GULLY WITH D400 COVER ANDFRAME AS SD 508-050.
EXISTING GULLY.
PROPOSED NEW MODUSTAR BEACON HEAD AND BELISHA POLESTO BE INSTALLED 675mm FROM FACE OF KERB AND 500mmFROM TACTILES
PROPOSED SIGN (PLEASE REFER TO DRAWING CO7060-08 & SIGN SCHEDULE IN CCC STANDARD DETAILS )
EXISTING SIGNS AND POSTS REMOVED TO TIP OFF SITE
PROPOSED 150mm DRAINAGE PIPE.
PS-00
NOTE:FOR SIGNING DETAILS PLEASE REFER TODRAWINGS CO17060 - 07-011
NOTE:FOR SIGNING DETAILS PLEASE REFER TODRAWINGS CO17060 - 07-011
NOTE:FOR SIGNING DETAILS PLEASE REFER TODRAWINGS CO17060 - 07-011
NOTE:FOR SIGNING DETAILS PLEASE REFER TODRAWINGS CO17060 - 07-011
PROPOSED AREA OF CARRIAGEWAY TO BE PLANED 40mm AND RESURFACED WITH 40mm AC10 CLOSE SURFACE COURSE PMB75-130/75 TO BS 13108-1 MIN 65PSV
PROPOSED FLEXIBLE FOOTWAY CONSTRUCTION: TYPE 1 SUB-BASE 150mm THICK;AC20 DENSE BINDER COURSE 100/150REC 50mm THICK;AC6 SURFACE COURSE 1260/220 25mm THICK.
PROPOSED RAMP CONSTRUCTION ( 1-14 GRADIENT).45mm AC10 DENSE SURFACE COURSE 100/150 PMB (POLYMERMODIFIED BINDER)75mm AC20 DENSE BINDER (UPPER) 100/150 TO BS EN 13108-4.75mm AC20 DENSE BINDER (LOWER) 100/150 TO BS EN 13108-4
SMA 14 SURF PMB 75/130-75, 40mm THICK, STEEL SLAG, MIN PSV 60, PMB - CLASS 7 PENETRATION, CLASS 3 SOFTENING POINT(TABLE 1 BS EN 14023) & CLASS 2 ELASTIC RECOVERY (TABLE 2 BS EN 14023)AC 20 DENSE BIN 100/150REC 60mm THICKAC 32 HDM BASE 40/60REC 150mm THICKTYPE 1 UNBOUND MIXTURE SUB-BASE 300mm THICK
PROPOSED GRASS/VERGE REINSTATEMENT TO MATCH EXISTING
FOR CONSTRUCTION
SC
LP
dis
LP
B
B
LP
LP
B
LP
G
SC
Concrete
RS
Concrete
Asphalt
Paving
Asphalt
Grass
Concrete
Paving
Grass
TV
Post
Post
Concrete
Concrete
Grass
Concrete
Paving
Post
Post
Grass
TV
Post
Post
Concrete
SC
TP
Grass
Paving
TV
Grass
Grass
Paving
TV
TV
Post
Tactile
Block paving
Block paving
Tactile
Asphalt
Sign
B
r
i
c
k
w
a
l
l
h
t
1
.
8
m
Grass
Paving
TV
Grass
SC
TV
Concrete
Grass
Concrete
Grass
Grass
LP
Concrete
Grass
Paving
Grass
R
a
i
l
i
n
g
s
h
t
1
.
8
m
Asphalt
Asphalt
Post
Post
Post
Post
Post
Post
Paving
Grass
Grass
Concrete
G
SC
Post
Concrete
Post
Grass
Block w
all ht 1.0m
Railings ht 1.8m
LP
B
Post
IC
BT
FH
TV
G
TV
BT
BT
G
G
BT
G
Paving
Tactile
Pav
Post
TP
Mkr
Box
Paving
Paving
SC
Asphalt
Speed table
Post
Post
G
Paving
Post
MH
CL 27.98
G
IC
G
IC
G
IC
G
MH
CL 26.94
MH
CL 27.59
MH
CL 26.87
FH
G
BT
FH
TV
TV
G
IC
Box
Asphalt
Paving
MH
CL 26.91
Paving
B
R
A
C
K
E
N
P
L
A
C
E
G
G
MH
CL 27.08
Brick w
all ht 1.3m
TV
Block w
all ht 0.4m
Stone w
all ht 0.9m
Brick w
all
Brick w
all hight varies
Paving
Block w
all ht 1.0m
`
Brick w
all ht 0.9m
Grass
Block w
all ht 0.4m
Block w
all ht 0.4m
Paving
Brick w
all
Block w
all ht varies
Paving
Grass
Grass
Grass
R
a
ilin
g
s
h
t 1
.8
m
R
a
ilin
g
s
h
t 1
.8
m
IC
Asphalt
Grass
Post
Concrete
Paving
Paving
Grass
Asphalt
Grass
Paving
Tactile
Paving
Paving
Grass
WA
TE
RH
ILL R
OA
D
SC
LP
dis
LP
B
B
LP
LP
B
LP
G
SC
Concrete
RS
Concrete
Asphalt
Paving
Asphalt
Grass
Concrete
Paving
Grass
TV
Post
Post
Concrete
Concrete
Grass
Concrete
Paving
Post
Post
Grass
TV
Post
Post
Concrete
SC
TP
Grass
Paving
TV
Grass
Grass
Paving
TV
TV
Post
Tactile
Block paving
Block paving
Tactile
Asphalt
Sign
B
r
i
c
k
w
a
l
l
h
t
1
.
8
m
Grass
Paving
TV
Grass
SC
TV
Concrete
Grass
Concrete
Grass
Grass
LP
Concrete
Grass
Paving
Grass
R
a
i
l
i
n
g
s
h
t
1
.
8
m
Asphalt
Asphalt
Post
Post
Post
Post
Post
Post
Paving
Grass
Grass
Concrete
G
SC
Post
Concrete
Post
Grass
Block w
all ht 1.0m
Railings ht 1.8m
LP
B
Post
IC
BT
FH
TV
G
TV
BT
BT
G
G
BT
G
Paving
Tactile
Pav
Post
TP
Mkr
Box
Paving
Paving
SC
Asphalt
Speed table
Post
Post
G
Paving
Post
MH
CL 27.98
G
IC
G
IC
G
IC
G
MH
CL 26.94
MH
CL 27.59
MH
CL 26.87
FH
G
BT
FH
TV
TV
G
IC
Box
Asphalt
Paving
MH
CL 26.91
Paving
B
R
A
C
K
E
N
P
L
A
C
E
G
G
MH
CL 27.08
Brick w
all ht 1.3m
TV
Block w
all ht 0.4m
Stone w
all ht 0.9m
Brick w
all
Brick w
all hight varies
Paving
Block w
all ht 1.0m
`
Brick w
all ht 0.9m
Grass
Block w
all ht 0.4m
Block w
all ht 0.4m
Paving
Brick w
all
Block w
all ht varies
Paving
Grass
Grass
Grass
R
a
ilin
g
s
h
t 1
.8
m
R
a
ilin
g
s
h
t 1
.8
m
IC
Asphalt
Grass
Post
Concrete
Paving
Paving
Grass
Asphalt
Grass
Paving
Tactile
Paving
Paving
Grass
WA
TE
RH
ILL R
OA
D
PROPOSEDLINING TOTIE INTOEXISTING
EXISTINGLINING TO
BEREFRESHED
EXISTING LINING TO BEREFRESHED
PROPOSEDLINING TOTIE INTOEXISTING
EXISTING LINING TO BEALTERED AT SCHOOL
ACCESS
PB
PBPB PB
PBPB
PG EG
EG
EG
EG
EG
PB
BB
BB
PB PB PB
DIA 1003DIA 1009
DIA 1003DIA 1009
DIA 1001.3
DIA 1001.3
DIA 1001.3
DIA 1001.3
DIA 1001.3
DIA 1003DIA 1009
1.05
PS-NRLAON NEW
POST
'NRLA' NEW POST
EXISTING ILLUMINATED'NARROWING'
SIGN AND POSTREMOVED TO TIP.
WIDE BASED POLE TOBE DISCONNECTEDPRIOR TO REMOVAL
EXISTING ILLUMINATED'NARROWING'
SIGN AND POSTREMOVED TO TIP.
WIDE BASED POLE TOBE DISCONNECTEDPRIOR TO REMOVAL
B
LP
SC
RS
LP
B
B
B
B
GV
LP
RS
Tactile
Tactile
B
GV
B
RS
B
B
Grass
Asphalt
Grass
Paving
Concrete
Paving
C
oncrete
Tactile
Bin
Paving
Grass
RS
Grass
Paving
Asphalt
Tactile
TV
TV
BT
TV
MH
CL 26.80
Asphalt
G
MH
CL 26.73
RS
Asphalt
Tactile
Paving
Asphalt
Tactile
BB
BB
H
A
Z
E
L
P
L
A
C
E
Railings ht 1.0m
C
oncrete
P
LA
S
-M
A
W
R
R
O
A
D
G
G
B
us shelter
20
Asphalt
Asphalt
Asphalt
Grass
Railings ht 1.4m
Asphalt
B
Asphalt
B
LP
SC
RS
LP
B
B
B
B
GV
LP
RS
Tactile
Tactile
B
GV
B
RS
B
B
Grass
Asphalt
Grass
Paving
Concrete
Paving
C
oncrete
Tactile
Bin
Paving
Grass
RS
Grass
Paving
Asphalt
Tactile
TV
TV
BT
TV
MH
CL 26.80
Asphalt
G
MH
CL 26.73
RS
Asphalt
Tactile
Paving
Asphalt
Tactile
BB
BB
H
A
Z
E
L
P
L
A
C
E
Railings ht 1.0m
C
oncrete
P
LA
S
-M
A
W
R
R
O
A
D
G
G
B
us shelter
20
Asphalt
Asphalt
Asphalt
Grass
Railings ht 1.4m
Asphalt
B
Asphalt
DIA 1001.3
DIA 1001.3
DIA 1001.3
DIA 1004
DIA 1009DIA 1003
DIA 1004
DIA 1004
DIA 1009DIA 1003
DIA 1004
DIA 1009
DIA 1003
DIA 1004
PS04 / PS03 ON NEWPOSTS
EXISTING SIGNS (X4) ANDPOSTS (X2) TO
BE TAKEN DOWN ANDREMOVED TO TIP
OFF SITE
EXISTING ILLUMINATED'HUMP' SIGN TO BE
'DISCONNECTED', TAKENDOWN AND REMOVED TO
TIP OFF SITE
PROPOSED SIGNS TO SIGNDETAIL PS01 ON NEW
POSTS
General Arrangement 3 (Waterhall Road)1:200
except for planning application purposes
do not scale drawing
DRAWING CAN BE SCALEDFOR PLANNING APPLICATION PURPOSES ONLY.
Rev By Date Description of Amendment Chk.by DateTelephone 029 2287 2456
County Hall, Atlantic Wharf, Cardiff CF10 4UW
CYNGOR DINAS CAERDYDDTHE CITY OF CARDIFF COUNCIL
COPYRIGHT OF CARDIFFCOUNCIL.ALL RIGHTS RESERVED.C
© Crown copyright and database rights (2011) Ordnance Survey 100023376.© Hawlfraint y Goron a hawliau cronfa ddata (2011) Arolwg Ordnans 100023376.C
CAERDYDDCARDIFF
DESIGN CONTRACTS AND DELIVERY
DYLUNIO CONTRACTAU A DARPARU
Andrew GregoryDIRECTOR FOR PLANNING, TRANSPORT AND
ENVIRONMENTCYNLLUNIO, TRAFNIDIATH A'R AMGYLCHEDD
SRIC PLASMAWR
GENERAL ARRANGEMENT 3
OM
GD
1-200@A1
07-01-2019
CO17060 04
...
.....
KEY
NOTE: ALL ROAD MARKINGS TO COMPLY WITH THE TSRGD 2016 & CHAPTER 5 OF THE TRAFFIC SIGNS MANUAL.
PROPOSED AREA OF CARRIAGEWAY TO BE PLANED 40mm AND RESURFACED WITH 40mm AC10 CLOSE SURFACE COURSE PMB75-130/75 TO BS 13108-1 MIN 65PSV
PROPOSED FLEXIBLE FOOTWAY CONSTRUCTION: TYPE 1 SUB-BASE 150mm THICK;AC20 DENSE BINDER COURSE 100/150REC 50mm THICK;AC6 SURFACE COURSE 1260/220 25mm THICK.
PROPOSED RAMP CONSTRUCTION (1-14 GRADIENT).45mm AC10 DENSE SURFACE COURSE 100/150 PMB (POLYMERMODIFIED BINDER)75mm AC20 DENSE BINDER (UPPER) 100/150 TO BS EN 13108-4.75mm AC20 DENSE BINDER (LOWER) 100/150 TO BS EN 13108-4
PROPOSED VEHICLE CROSSOVER CONSTRUCTION. 25mm AC6 DENSE SURFACE COURSE 100/150 BS EN 13108-4.50mm AC20 DENSE BINDER 100/150 TO BS EN 13108-4.225mm TYPE 1 SUB-BASE.
SMA 14 SURF PMB 75/130-75, 40mm THICK, STEEL SLAG, MIN PSV 60, PMB - CLASS 7 PENETRATION, CLASS 3 SOFTENING POINT(TABLE 1 BS EN 14023) & CLASS 2 ELASTIC RECOVERY (TABLE 2 BS EN 14023)AC 20 DENSE BIN 100/150REC 60mm THICKAC 32 HDM BASE 40/60REC 150mm THICKTYPE 1 UNBOUND MIXTURE SUB-BASE 300mm THICK
PROPOSED GRASS/VERGE REINSTATEMENT TO MATCH EXISTING .
400mmX400mmX50mm PRECAST CONCRETE BLISTER PAVINGSLABS COLOR BUFF, LAID ON 150mm TYPE 1 SUB-BASE AND 30mmTHICK SAND BEDDING LAYER. JOINTS BRUSHED WITH KILN DRIEDSAND
400mmX400mmX50mm PRECAST CONCRETE BLISTER PAVINGSLABS COLOR RED, LAID ON 150mm TYPE 1 SUB-BASE AND 30mmTHICK SAND BEDDING LAYER. JOINTS BRUSHED WITH KILN DRIEDSAND
NON ILLUMINATED GLASDON VICTORY BOLLARD OR SIMILARAPPROVED
PRECAST CONCRETE TRAPPED SG GULLY WITH D400 COVER ANDFRAME AS SD 508-050.
EXISTING GULLY.
PROPOSED NEW MODUSTAR BEACON HEAD AND BELISHA POLESTO BE INSTALLED 675mm FROM FACE OF KERB AND 500mmFROM TACTILES
PROPOSED SIGN (PLEASE REFER TO DRAWING CO7060-08)
PROPOSED 150mm DRAINAGE PIPE.
PB
BBEG
PG
PS
General Arrangement 3 (Plasmawr Road)1:500
FOR CONSTRUCTION