GENERIC NQF 1 with Road Construction electives at NQF 1 & 2 added
Title IDNumber
Specific outcomes Range statement NQF
Credits
Addtogeneicqu
al.
Apply health and safety to
work area 9964
1. Identify potential hazards in the work area. 2.
Limit damage to persons or property in the case
of an emergency. 3. Follow procedures that apply
to illness or injury in the work area.
1. Implications of exposure to hazardous substances andhazards include reference to a possible chain of events that
could result from not removing, reducing or reporting a hazard.
2. A health and safety program includes hazard identification,
risk assessment and a health and safety plan. 3. Statutory
requirements include current national regulations applicable to
construction, including acts and regulations, ordinances, by-
laws, directives, standards, guidelines, and codes, issued by a
legislative body such as parliament, provincial administrations,
local authorities and other bodies so empowered by any of the
former. 4. Regarding Acts and Regulations, all pertinent national
legislation is included. 2 3 YES
Apply hot mix asphalt 14554
1. Demonstrate knowledge of technology of
applying hot mix asphalt. 2. Prepare a road layer
to receive premix asphalt. 3. Apply a premix
asphalt layer. 4. Complete a promix asphalt layer. 2 5 YES
Apply labour intensive
construction systems and
techniques to work
activities 114921
1. Understand and explain the Labour Intensive
Construction philosophy. 2. Implement LabourIntensive Construction Systems. 3. Implement
resource management techniques for Labour
Intensive Construction projects. 4. Train, coach
and develop team members in LIC methods. 5.
Implement LIC administrative systems.
The typical scope of this unit standard is : 1. Pre-planning a
LIC activity includes the establishment of LIC procedures and systems,
supervisory information systems, and the development of an appropriate and
resourced time schedule (bar chart) programme. 2. Project-specific systems are
those incorporated in the project specifications, such as specific measurement
and recording proformas. 2 12
8/13/2019 Generic 1 & 2 & E
2/20
8/13/2019 Generic 1 & 2 & E
3/20
8/13/2019 Generic 1 & 2 & E
4/20
8/13/2019 Generic 1 & 2 & E
5/20
8/13/2019 Generic 1 & 2 & E
6/20
8/13/2019 Generic 1 & 2 & E
7/20
8/13/2019 Generic 1 & 2 & E
8/20
8/13/2019 Generic 1 & 2 & E
9/20
8/13/2019 Generic 1 & 2 & E
10/20
8/13/2019 Generic 1 & 2 & E
11/20
8/13/2019 Generic 1 & 2 & E
12/20
8/13/2019 Generic 1 & 2 & E
13/20
8/13/2019 Generic 1 & 2 & E
14/20
8/13/2019 Generic 1 & 2 & E
15/20
8/13/2019 Generic 1 & 2 & E
16/20
8/13/2019 Generic 1 & 2 & E
17/20
8/13/2019 Generic 1 & 2 & E
18/20
8/13/2019 Generic 1 & 2 & E
19/20
8/13/2019 Generic 1 & 2 & E
20/20