Georgia 400 Toll Booth Plaza Project

Post on 16-Apr-2017

1,386 views 0 download

transcript

Going All Electronic, Managing Change, and Ending the GA 400 Tolls

State Road and Tollway Authority

Christopher Tomlinson, Executive Director

Mary Sallach, PMO Director

2

SRTA Overview

Governor (Chair)

GDOT Commissioner OPB Director

Lt. Gov.’s Appointee Speaker’s Appointee

The State Road & Tollway Authority (SRTA) is a state-level independent authority created by the Georgia General Assembly to:

• Operate Georgia toll facilities

• Serve as a State transportation financing arm Manage ~ $1.4B in transportation bonds Issue & service toll revenue financed debt Administer GTIB Program

SRTA is governed by a five-member Board:

Overview

• Overview• Timeline• Project Team• Change Approach• Communications• Outcomes & Future Projects• Lessons learned • Q&A

3

GA 400 Demolition Timeline

Phase 1: Early Signage

Removal/ModificationOctober 2013

4

GA 400 Detolling Team

5

GA 400 Detolling Change Approach

6

Tolls ended November 22, 2013

Three lanes accessible to motorists for duration of project (intermittent construction-related closures)

GDOT resumed construction after the holidays – January 2014 (Toll booth and canopy demolition, fill-in stairwell, convert to grass etc.)

Demolition activities to conclude in the Fall of 2014

GA 400 Detolling Summary

7

GA 400 Detolling Summary

SRTA Staff: Job well done!Shutdown tolling on cue (not an easy task)

Final cash close out (i.e. count, verify and reconcile) approximately $100K in vaults, coins and cash in time for Brinks pickup

Secured all equipment, the tunnel and the premises from an operational perspective (this work is ongoing thru December 16th).

8

GA 400 Summary – Thanks for your help!

GRTA helped us get the word out through its newsletter and webpage.

6,444 Tweets

796 Facebook Posts

162 Print/Online Articles

188 Broadcast Hits

23,550,570 Impressions

Media Scan

9

Ending the Tolls…

Keeping the promise. You keep the change.

10

Post-Demolition Toll Plaza View

11

Funding 14 transportation improvement projects with tolls

I-85/GA 400 Connector Ramps

HERO Units Expanded Emergency

Response

MARTA Buckhead Pedestrian Bridge

GA 400 Projects In Progress

12

GA Transportation Infrastructure Bank

13

Awarded approximately $20 million in grants and loans to date (total project value of $113 million dollars thus far)

2013- Received 60 applications for GTIB funding representing more than $82 million in funding requests; approx. $200 in total project value.

Currently $25 million in grant and loan GTIB funds available.

Diverging Diamond

Safety Improvements

Pay n GO! – Coming Soon!

Providing options for cash-based and/or cash-preferred customers at local retailers

Partnership with InComm, a leading marketer and distributor of stored-value gift cards and prepaid products

Starter Pack – Peach Pass transponder and Reload Card One-time $2.50 convenience fee Reload card also sold separately (has $1.50

convenience fee per transaction)

Est. Launch Date - May 2014

14

All Electronic Operations Today on I-85

More than 268,000 Peach Passes assigned since registration opened in June 2011

86% of customers paying toll; 14% non-tolled

Averaging ~20,000 daily trips in the Express Lanes per month

Highest daily trip count: 25,556 on October 11, 2013

Currently averaging 500 new Peach Passes each week without any active media campaign

More than 194,000 unique customers using roadway

15

16

SRTA Present & Future Tolling Facilities

I-85 Express Lanes & Ext.

(Est. open 2017)

I-75 Northwest

Corridor(Est. open 2018)

I-75 Express Lanes

(Est. open 2016)

Future Toll Project Planning

I-75 South Express Lanes 12 miles of reversible barrier-separated

electronic toll lanes along I-75 and I-675 in Henry and Clayton Counties.

Opens in 2016

Northwest Corridor Project 29.7 miles of reversible barrier-separated

electronic toll lanes along I-75 and I-575 in Cobb and Cherokee Counties.

Opens in 2018

17

Interoperability

Georgia (Peach Pass) to be interoperable with Florida (Sun Pass) by 2015

Interoperability Steering Committee in process for national interoperability

Florida and North Carolina currently under agreement

18

Questions & Answers

19